HomeMy WebLinkAboutCHANGE ORDER 4 CROWDER GOODRICH STREET RAW WATER PUMP STATION $52,722.00- P;tJGU
' _ ", / CONSTRUCTION CONTRACT CHANGE ORDER
17 a
GEORG \p NUMBER CO NUMBER 4
DALE 03/15/2010
PROJECT TITLE Goodrich Street Raw Water Pump Station
ORIGINAL CONTRACT DATE 03/04/08 PROJECT NUMBER 10250 �/�
OWNER AUGUSTA - RICHMOND COUNTYCO1vII ZISSION PO NUMBER v
P149584
The following change is hereby made to the contract for the above project:
Description of change: This change is for the Reach 7 project. Reach 7 is an area of the Augusta Canal where the
embankment is the narrowest. This project will place an earthen berm with a toe drain along the bottom edge of the
embankment to prevent standing water from damaging the embankment and further strengthen the embankment.
TOTAL AMOUNT OF THIS CHANGE ORDER $ $52,722.00
The contract time will be INCREASED by 0 calendar days as a result of this change.
ORIGINAL CONTRACT AMOUNT $ $13,870,000.00
PREVIOUS CHANGE ORDER (INCREASE) $ $679,991.00
THIS CHANGE ORDER (INCREASE) $ $52,722.00
TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ $14,602,713.00
FUNDING NUMBER /ACCOUNT NUMBER 507043410 5425110
80320115 5425110
PROPOSED BY: DA 1 E:
-7 J i /io
r CO !" CTOR
REQUES LED BY: DATE:
+��,0 0o ���� 572.51(
am �,aC0�� 5 ENGINEER
P SUBMITTED BY: DA
. a x 11
DEPARTMENT HEAD
FINANCE ENDORSEMENT: DATE:
n
rl `/ <11mc.Q l.0.,1-0-4-C4/70 CO-23 -/0
COMPTROLLER
RECOMMENDED BY: DALE:
Sholka
ADMINISTRA OR
APPROVED BY: DATE ::
j I it (I /
MAYOR