CHANGE ORDER
PROJECT TITLE
CO NUMBER 3
BID ITEM
DATE October 19,
2001
18" RWL Conversion and 16" Connection Project
ORIGINAL CONTRACT DATE 4/16/2001
PROJECT NUMBER 10160
OWNER AUGUSTA COMMISSION
PO NUMBER
P37975
The following change order is hereby made ~o the proposal for the above project:
PAYEE
Blair Construction Co., Ine.
TOTAL AMOUNT OF TIllS mANGE ORDER
$
77,096.63
The contract time will be INCREASED by _ calendar days as a result of this change.
ORIGINAL CON1RACf COST
PREVIOUS CHANGE ORDER (INCREASE)
TIllS CHANGE ORDER (INCREASE) -
TOTAL CON1RACf WITH mANGE ORDER
FUNDING NUMBER/ACCOUNT NUMBER
509043410
REQUESTED BY:
9:~~ao
1IoEt!ktFNr~
SUBMITTED BY:
t.
FINANCE ENDORSEMENT:
RECOMMENDED BY:
APPROVED BY:
$
540,185.96
$
154,482.00
$
77,096.63
$
771,764.59
cc.r.n?H-
5425110
5425110
DATE:
/P/I,/tJ I
/o/tt/ol
f
DATE:
DATE:
/ ( -8'- -eN
DATE:
l'Udo/
II /17 /01
I I
DATE:
'f
.,
-,
,
2: E ~35 Telfair Street
.,. dWEll' P E Ch f B dE' ~ Augusta, Georgia 30901-2494
Ie . IS"., m, 0 oar, mentus
Joseph J. Tankersley. P.E., President E N GIN E E R S
Jorge E. Jimenez. P.E., Vice-President
Charles D. Drown, PE.. Treasurer ZIMMERMAN, EVANS AND LEOPOLD, INC.
(700)724-5627
Kenneth E, Green, P.E, Secretary
John R, Evans. P,E,
R, Nelson Williams, P.E.
John R, Armstrong, P.E., Retired
~\"\"\'. ZE:f, ~,N HI NI': Ji: H S.CO 1\I
October 19, 2001
Mr. Jim Rush, Project Engineer
PROGRAM MANAGEMENT OFFICE
360 Bay Street, Suite 100
Augusta, Georgia 30901
Subject: 18" RWL Conversion, Change Order No.3
Dear Mr. Rush:
Attached, please find Change Order No.3 for the referenced project. This change
order covers items requested by the owner and modifications requested by EPD.
The project is near completion. The operations division has requested the material
left over on the project be transferred to the City. The City has requested the existing
18" pipeline be pressure tested in addition to all the new pipelines. The Ga. EPD has
directed samples be taken at 1200 If intervals. Also included are the exploratory
efforts to confirm the tees had been removed from the pipeline. This will increase
the project cost by $77,096.63 for a total of $755,218.98. Construction of a new
pipeline of this size would have cost considerably more.
Very truly yours,
_/
"
.
i'
SECTION CO
CHANGE ORDER
Order No. 3
Date October 19, 2001
Agreement Date: February 21, 2001
PROJECT:
2001 WATER SYSTEM IMPROVEMENTS
18" RAW WATER LINE CONVERSION
OWNER:
CITY OF AUGUSTA, GEORGIA
CONTRACTOR:
BLAIR CONSTRUCTION INC.
P.O. BOX 770
EVANS, GEORGIA 30809
The following changes are hereby made to the CONTRACT DOCUMENTS:
JUSTIFICATION:
Materials requested by owner - $37,096.63 - (See Attached List)
Pressure test of existing pipe requested by owner - 10 days @ $1600.00/day
$16,000.00 - (See Attached Letter)
Exploratory excavation (8 days @ $2500/day (in ~ day increments)=$20,000
Additional Taps - 2.5 days @ $1600/day = $4000 - (See Attached Letter)
CHANGE TO CONTRACT PRICE:
Original CONTRACT PRICE
$
540,185.96
Current CONTRACT PRICE adjusted
by previous CHANGE ORDERS .
$
678,122.35
The CONTRACT PRICE due to this
CHANGE ORDER will be (increased)
(clccrcaaccl) by:
$
77,096.63
New CONTRACT PRICE including this CHANGE ORDER
$
755,218.98
CHANGE TO CONTRACT TIME:
The CONTRACT TIME will be (increased) (dccrcaocd) by 30
calendar days.
The date for comple~ion of all work will
Recommended by ZEL En ineers
2002
(Date) .
Requested by Blair Construction
Ordered by
Accepted by
ZEL, ENGINEERS
0006-00 COllo3. doc
CO-l
/
~!.
20011'Water.-System Improvement$,.
, I
1 a... Raw,Water Lin& Conversion
...-":.~'
STORED MATERIAL SCHEDULE
for Pay Request No.6
,.
MATERIALS ON SITE (Inventorted'1 0105/01) ..
.. 30" Ductile Iron Pipe. 54 LF'@ $43A2 $2.344.68
. 18" Ductile Iron Pipe, 320 LF @ $22.43 $7,177.60
. 4" Ductile Iron Pipe. 20 LF@ $5:14' $102.80
. 12- Ductile Iron Pipe. 216 LF@$13.50 $2.916.00
. 18" MJ 90 degree bend, 2' Ea@ $500.95 $1,001.90
. 18" MJ Solid Sleeve. 7Ea@,$471.95 $3,303.65
. 18" MJ Gate Valve, 1 Ea @ $5,543.00 $5,543.00
. 18- MJ 45 degree bend, 2.Ea@ $391.6 I $783.20
. 18- Blind Aange. 1 Ea@257.05 $257.15
.. 18" Transition Coupting; 4 Ea @387:00 $1.548.00
. 18" Mega Lug Restraint, 1 Ea $143.30 $143.30
. 16" MJ 11-1/4 degrre bend, 3 Ea@ $211.60 I $634.80
. 16" MJ 45 degree bend. 2 Ea@$199.00 I $398.00
.. 16" Mega Lug Restraint, 8 Ea @ $131.10 $1,048.80
. 16" MJ 22-1/2 degree bend, 1 Ea @ $199.00 $199.00
. 16" MJ Plug, 1 Ea @ $122.55 $122.55
. 16" Field Lock Gasket, 1 Ea @ $218.85 $218.85
. 14" x 12'" MJ Reducer, 1 Ea @ $182.00 $182.00
. 12" MJ Plug, 1 Ea @ $33.15 $33.15
. 12" MJ Tee. 1 Ea @ $161.90 $161.90
. 12" x 6" MJ Tee. 1 Ea @ $127.65 $127.65
. 12" Field Lock Gasket, 13 Ea @ $93.10 $1,210.30
. 12" x 1" Service Saddle with Corp/Curb Slop & Ell. 11 Ea @ $104.85 $1.153.35
. 8" Tapping Sleeve &Valve, 1 Ea @ $1,050.00 I $1,050.00
. 8" MJ 45 degree bend. 1 Ea @ $62.15 $62.15
. 8" MJ Gate Valve, 1 Ea @ $458.00 $458.00
. 8" xS" MJ Tee. 1 Ea @ $79.85 I $79.85
. 6" Tapp;na Sleeve, 2 Ea I8l 348.00 $696.00
,~1
--t
.'
.' 6" MJ 45 degree bend, 1 Ea@ $38:80 ,.' \ $38.80
. 6'" Field Lock Gasket, 4 Ea,@ $29.50 $118.00
"'t'; -.:- ~
. 6" Quantum Sleeve, 4Ea@ $88.68 $354. n
. 4" Tapping Sleeve & Valve, 1 Ea @$633.oo $633.00
. Concrete Valve Collar, 17 Ea @$12.80 $217.60
. Cast Iron Meter Box, 10 Ea,@$22.00 $220.00
. Cast Iron Ring & Cover. 1 Ea @ $130.00 $130.00
SUB TOTAL: $34,669.75
SALES TAX: $2,426.88
,
TOTAL: $37.096.63
I
I
CCT.19'2001 10:28 i068681855
3LAIa CONSTRUCTION
;6136 ?001,001
'.'
),> '
.. ':-~.",
. .
Fax Cover Sheet
Sheet l' of 2
COpy
(!)00<b -0 0
~ c;::r ~
c..~]) ~
BI ·
i,i3lr
CONSTRUCTION, INC.
ASPHALT PAVING. UNDeRGROUND UTlUTIES
P.O. Sox no. Evan5. GA 30809
Phone: (108) 868-1960 Fax: (106) 868-1866
TO:
Jorge Jeminez @ ZEL -
Jim Rush @ CH2MHILL
t I)a.vll, Pit- 0 v./ tV
copied
FROM
DATE:
Winlam @ Blslr Construction, Inc.
October 17,2001 - oct - /9.J zeD/
RE: r have been working on the requested prices that were asked for in the meeting yesterday. I was asked to provide a
price for the pressure test and the inslAllatfon of the sample ups for bacteria llamples. After close examinBrions of our cost estimateS [
came up with the following figures which I hope are acceptable.
J. For item number 5 of the new chlorination procedun: r can provide all nCXC6Sary equipment and labor for a
Pl"e$sure test of each scaion at S 1600.00 a day with Y.& day minimum. r estimate (his work wilt take II ~lc..
~uming favorable tesT resultS.
2. For the sample tap installation requeSted by the EPD I ha~c two options.
A. If a saddle is required r can provide aJl necessary equipment and labor for the installatioo of the $~Ie
taps for $1?50.00 achy with a 'A day minimum. (four per day est. outside road)
B. Jfwe can get approval to direct tap the IS" pipe (no saddle) we c3Jlinstall the ups using item
Number 41 if outside the roadway, or Number 42 and 43 if inside the roadway. Please note
that this does not include road patching. which we have a bid item for, but includes materials.
I hope me pressure tests go well, however I am expecting some leaks 10 surface. Shoold leaks need to be repaired J
will offer my services for the repain at the same rate mat we performed the cross connection location for. I hope we c:an get th.is line
in service soon and J will do llnything , can to help make it happen. Jfyou need anything else from me plC3SC let me know.