HomeMy WebLinkAboutCHANGE ORDER 2 CROWDER CONSTRUCTION GOODRICH STREET RAW WATER PUMP STATION IMPROVEMENTS �/
1'
CONSTRUCTION CONTRACT CHANGE ORDER
CO NUMBER 2
BID ITEM 07 -214
DATE 5/20/09
PROJECT TITLE Goodrich Street Raw Water Pump Station Improvements
ORIGINAL CONTRACT DATE 3/4/2008 PROJECT NUMBER 10250
OWNER AUGUSTA- RICHMOND COUNTYCOMMISSION PO NUMBER P149584
The following change is hereby made to the contract for the above project:
Description of Change (for a more detailed description see attached proposal):
This change includes updates from change order 1, modifications to retaining wall 7, modifications to the tie in
at Penstock 4, additional electrical scope in the engine rooms, a credit for pedestrian control, modifications to
the fish bypass box, canal bank slope repair, canal cleaning, repairs to intakes 2 and 3, and the addition of stone
at the front edge of the new intakes for 9 and 10.
PAYEE Crowder Construction Company
TOTAL AMOUNT OF THIS CHANGE ORDER $ 170,567.00
The contract time will be INCREASED by 0 calendar days as a result of this change.
ORIGINAL CONTRACT AMOUNT $ 13,870,000.00
PREVIOUS CHANGE ORDER (INCREASE) $ 448,779.00
THIS CHANGE ORDER (INCREASE) $ 170,567.00
TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ 14,489,346.00
FUNDING NUMBER /ACCOUNT NUMBER 507043410 5425110
80320115 5425110
PROPOSED BY: A , A i i: 1 DATE: � � 0 o o
CO TRAC')R `� /�
I
REQUESTED BY: �.i DATE: 23 M (0
ENGINEER
SUBMITTED BY: � „ tc.t.,C"16eA . DATE: L f i o
DEPARTMENT HEAD
FINANCE ENDORSEMENT: .(gcNVy� �. E C�
,ccat rivi DATE: (r 2 %V
COMPTROLLER
RECOMMENDED BY: L DATE: ph 0/, 0
ADMINISTRATOR
APPROVED BY: DATE:
.0 f iv f /Z.✓I
YOR
r . A , a6 2p10��
s