Loading...
HomeMy WebLinkAboutCHANGE ORDER 2 CROWDER CONSTRUCTION GOODRICH STREET RAW WATER PUMP STATION IMPROVEMENTS �/ 1' CONSTRUCTION CONTRACT CHANGE ORDER CO NUMBER 2 BID ITEM 07 -214 DATE 5/20/09 PROJECT TITLE Goodrich Street Raw Water Pump Station Improvements ORIGINAL CONTRACT DATE 3/4/2008 PROJECT NUMBER 10250 OWNER AUGUSTA- RICHMOND COUNTYCOMMISSION PO NUMBER P149584 The following change is hereby made to the contract for the above project: Description of Change (for a more detailed description see attached proposal): This change includes updates from change order 1, modifications to retaining wall 7, modifications to the tie in at Penstock 4, additional electrical scope in the engine rooms, a credit for pedestrian control, modifications to the fish bypass box, canal bank slope repair, canal cleaning, repairs to intakes 2 and 3, and the addition of stone at the front edge of the new intakes for 9 and 10. PAYEE Crowder Construction Company TOTAL AMOUNT OF THIS CHANGE ORDER $ 170,567.00 The contract time will be INCREASED by 0 calendar days as a result of this change. ORIGINAL CONTRACT AMOUNT $ 13,870,000.00 PREVIOUS CHANGE ORDER (INCREASE) $ 448,779.00 THIS CHANGE ORDER (INCREASE) $ 170,567.00 TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ 14,489,346.00 FUNDING NUMBER /ACCOUNT NUMBER 507043410 5425110 80320115 5425110 PROPOSED BY: A , A i i: 1 DATE: � � 0 o o CO TRAC')R `� /� I REQUESTED BY: �.i DATE: 23 M (0 ENGINEER SUBMITTED BY: � „ tc.t.,C"16eA . DATE: L f i o DEPARTMENT HEAD FINANCE ENDORSEMENT: .(gcNVy� �. E C� ,ccat rivi DATE: (r 2 %V COMPTROLLER RECOMMENDED BY: L DATE: ph 0/, 0 ADMINISTRATOR APPROVED BY: DATE: .0 f iv f /Z.✓I YOR r . A , a6 2p10�� s