HomeMy WebLinkAboutCHANGE ORDER 2 CRANSTON ENGINEERING AUGUSTA CANAL FERC COORDINATION ENGINEERING CONTRACT CHANGE ORDER CO NUMBER 2 DATE 6/15/10 PROJECT TITLE Augusta Canal FERC Coordination ORIGINAL CONTRACT DATE 2/25/09 PROJECT NUMBER Cif- A OWNER AUGUSTA, GEORGIA PO NUMBER P162085 p Ur 1 V ! The following change is hereby made to the contract for the above project: PAYEE Cranston Engineering TOTAL AMOUNT OF THIS CHANGE ORDER $ 186,450.00 The contract time will be INCREASED by 0 calendar days as a result of this change. ORIGINAL CONTRACT AMOUNT $ 250,905.00 PREVIOUS CHANGE ORDER (INCREASE) $ 18,115.00 THIS CHANGE ORDER (INCREASE) $ 186,450.00 TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ 455,470.00 FUNDING NUMBER /ACCOUNT NUMBER 507043410 5425110 80320115 5425110 PROPOSED BY: 4 %t '"' „G DA I'E: 7 /,o 0 ESIG ENGINEER. REQUESTED BY: ` DATE: �1 / rte PROJECT ENGINEER SUBMITTED BY: c� ,hrti, . W 4.0.< -v DATE: ei S7/ a DEPARTMENT HEAD FINANCE ENDORSEMENT: i 3(, rt.- /)� DA'Z'E: 9 c 70 COMPTROLLER / 6 RECOMMENDED BY: /C / / DATE: /8// l / /t� /it.`�1 /LOADMINISTRATOR r APPROVED BY: _ DATE: t o (1 ,5 1 i J MAYOR I ,/ ' I f, r' ' woofs