Loading...
HomeMy WebLinkAboutCHANGE ORDER 14 MCKINGHT CONSTRUCTION CO INC TERMINAL AREA IMPROVEMENTS AUGUSTA REGIONAL AIRPORT AT BUSH FIELD CHANGE ORDER NO. - 14 June 7, 2007 MODIFICATIONS TO THE CONTRACT ARE AS FOLLOWS: See Attached Change Order #14 Summary Original Contract Sum ...................................$ 25,254,192.45 Change by Previous Change Order......... ...... ... ...$ 471,815.61 Contract Sum Prior to this Change Order... .. .-r. . . . ..$ 25,726.008.06 .f- This Change Order...... ..... .......................... ..$ 402,812.17 New Contract Sum.......................................$ 26.128,820.23 Cohtract Time will be as follows: 0 Calendar Days are added to the duration of Phase 3 and the Total Contract Duration Signed by: ~ rI #!/J t'Lhj; ~ - McKnight Construction Co., Inc. ~ TE The LP A Group, I DATE - b · g, · (! 7 DATE DATE p Must be signed by Construction Manager. Architect. Owner, Mayor and Contractor Cc: All Signers Item No. Item Description A Hotel/Bank Demolition Change Order #14 Summary June 7, 2007 Quantity Unit Unit Cost ($) LS $402,812.17 Total $402,812.17 Total ($) $402,812.17 $402,812.17 Time Extension (Days) o o S:\CM Files\CO 14 The Least Expensive Option Selection wouid be to perform the Required Work ($414,582.17), Eliminate the Access Road ($11,770) and Eliminate the Bank Abatement and Demo. ($9,630) Best Cost = $393,182.17 , , Hotel/Bank Sitework Demolition Rev. 1 (April 16, 2007) Item Description Quantity Units CostJUnit Labor Material Subcontract Cost Cost Cost Abatement Costs - Hotel/Bank 1 LS 66000 0 0 66000 Demolition Costs - Hotel/Bank 1 LS 226075 0 0 226075 McKnight Working Foreman 120 HRS 25.6 3072 Silt Fence - Required 4000 LF $4.54 $0.00 $0.00 $18,160.00 Construction Fence - Required 2000 LF $6.00 $0.00 $000 $12,000.00 Topsoil/Hotel- Required 1503 CY $18/$5 $0.00 $27,05400 $7,51500 Topsoil/Bank - Required 378 CY $18/$5 $0.00 $6,804.00 $1,890.00 HydraSeed - Required 6 AC $2,00000 $0.00 $0.00 $12,000.00 Subtotal $3,072.00 $33,85800 $343,640.00 McKnight Mark-Up (15%) $460.80 $5,078.70 McKnight Mark-Up (7%) $0.00 $0.00 $24,054.80 Bond (1.2%) $5.53 $467.24 $4,412.34 Total- Required $3,538.33 $38,936.70 $372,107.14 $414,582.17 Cost Savings Options Option #1 . Use On-Site Fill Fill Material/Hotel- USE ON-SITE 4555 CY $6.00 $0.00 $0.00 $27,330.00 Fill MateriallBank- USE ON-SITE 1148 CY $6.00 $0.00 $0.00 $6,88800 Subtotal $34,218.00 McKnight Mark-Up (7%) $2,39526 Option #1 Added Costs $36,613.26 Option #2 - Remove Stone Base Remove Stone Base 10000 CY $4.00 $0.00 $0.00 $40,00000 Subtotal $40,000.00 McKnight Mark-Up (7%) $2,800.00 Option #2 Added Costs $42,800.00 Option #3 - Eliminate Access Road Estimated Savings LS 11000 0 $0.00 $11,000.00 Subtotal $11,000.00 McKnight Mark-Up (7%) $770.00 Option #3 Cost Savings $11,770.00 Option #4 . Eliminate Bank AbatementJDemo Bank Demo Cost Estimate 1 LS $9,000.00 $0.00 $0.00 $9,000.00 Subtotal $9,00000 McKnight Mark-Up (7%) $630.00 Option #4 Cost Savings $9,630.00 The recommended option would be to perform the Required Work Recommended ($414,582.17) identified above and accept Option #3 (11,770) to eliminate the Cost = Access Road $402,812.17 U~ilJiLVUI ~D.UO r~A lUO OO~ ~U~J LU L f"il:.f\ .I b n j .t\ I,jl", tAJr\ ;:) 1 ~ 1.1\1.1"/ UU0 , , McKnight Construction Co., Inc. GENERAL CONTRACTORS William D. McKnight - President Mason McKnight, HI - Vice President Huey E. Carter - Sec. - Treasurer FOUNDERS: Mason McKnight, Sr. 1900-1973 Mason McKnight, Jr. 1930-1994 P. O. Box 204718 Augusta, Georgia 30917 Office Phone: P06J 863-7784 Fax: [706J 863-2031 April 13, 2007 {FIIX NIUllbeTI Parsons Brinckerhoff Construction Services me. 1510 Hangar Road, Suite A A~ GA 30906 Attn: Matt McCoy RE: AUGUSTA REGIDNALA1R.PORT Cost ProJIo- HtNel tm4 Btmk DemoIiIitm ( JleWsioli) Gentlemen: . - Per your request, the following is a revise cost proposal for the work: involved for the Hotel and Bank: demolition. This revised price includes the Hotel demolition, and aU 'associated ~ however; it excludes any Bank demolition, coostmction of1be access ~ and the haul-in fill to create the sloped finish grade shown by lP A. Basically, thecootractocwill removethe building. parkin& as shown, and leave the site level. Four inches of topsoil will be installed, and this site will be hydroseeded. Ross &. Logan Additional sitework ( see breakdown) Subtotal McKnight 7% OIP Subtotal 1/2% Bond Total $272,075.00 93,154.78 S365,229.18 25,566.08 $390.195.86 4.689.55 $395,485.41 ~ b Please call if you need any additional information.. Sincerely. MCKNlGHT CONSTltUCTION CO~, INC Pat fJaJJwJr-/S~_ Pat Patrick Project 1\P.anager PP:sdr cc: Jobsite pat041301 ~ wpd V~/~U/~UVI lU.UU L'nA lVU UUO 'VOL 1~1 \.....["-1 'l .!~ 'JILL ["1'''4''-> '-...'U'1"t I.J J ~ UU'-i VVV 04/12/2007 if 13 F lJ1X . 8043788747 ROSS AND LOGP,N !4I001/(l01 Ross ex LOGAN INDUSTR/~S v7a Facsimile (706) 868-J516 April 12, 2007 McKnight Construction Co., Inc- Post Office Box. 211900 Augusta, Georgia 30917 Attention: Pat Patrick RE: Hotel and Bank Demolition Augusta Regional Airport Augusta., Georgia *Re,'ised Proposal'" Ross & Logan Industries, Inc. is pleased to provide you ""ith this proposal for demolition, removal a.nd disposal as per drawing no.'s DM1, DM2 andDM 3, by The LPA Design Group, Inc., at the above~ referenced project for a total lump sum price of$292,075.oD. This price is inclusive of labor, supervision, equipment and materials necessary to complete our scope of work. Price breakdown: Hotel $206,075.00 \ Bank f:..\ ~. "l'.. .~ " / 9,000.00 > ~ '2..7 'C I C '7 '5 ,,~ Aecess Road "Nt)~, ) ~ 11,000.00 Asbestos Abatement 66,000.00 .........- Price includes thefollowi'hg; 0/ Removal and documentation of proper disposal of refbgerant from Ale units in buildings to be demolished 0/ Fill in depression from pool removal with fill dirt ./ Upon cOIupletion, rough grading of area disturbed during demolition operations Price excludes the following: x Permits .lC Temporary protection JC Erosion, noise and/or dust controL .l( Protection and/or relocation of items to re!na.in .l( Backfill andlor eompaction ,Ie Shoring and/or bracing Thank you for the opportu."1ity to propose .his se.."'Vice, I look fonvard to working with you. It you have any questions or concerns, please contact me at (904) 378-9700. _---.---T::;II~~ T odd Pritchard PrQ,iect Man~g~ lJemol1tWl1 . Recycling 11II Site Prep 6507 West Beaver Street; Jacksonville, FL 32254 P.O, Box 61206. Jacksonville) FL 32236 904-378-9700 904-378-9747 Fax , . \~ \ I \ ~ ~.. ,".. ,,_ _ . _ .... ". I -:-j:.e \ iJif!fffr~!iafWfl;;, r-faff'J 4~14 EYS-=a,3.E ___,~._~"TTD .... _ '. 1 45-304 2" Pack ---------'t< -e V~s.c..(~ - ~N...';"" ~~;:,J\ i: 1 ! 2 !14-006 ~I ~dt l' .I 19 2011 21 r 22 -. ~, L,) 24 I i ':': 1 ~--------r--- ~. , 32 i 30 34 ~D\f1.St' t-UtC ~ /- ~ f?J I,f/ Vz 0" ~'-I i 'f'Vle. .ttvt\c q.:t:lM U /"... f. ,.,j ~ 'St.1e L:-\4.-t' 5< g. , . , - , , ; ~ I< ' 1"_. M'I;t.. ~lV \, t.'Wi "e.i 'U''''',I.< VVIV _____~ 4/\~/ 07 i 'n~~f-~-i' r.:"'L \. K. .'.., , \f Cl ",,) '-<.{..l,...... )',0 \AM /' .~~~- ( M c~( "','v,* J --~--u Prepared BV I t,ppiD\led By ! ~-W~ 14) ::; ,~ -++--l=cJi+ r: " . --~ wi : il !'. ,- 11~!.,.~, .--11 I I II,. i II.-Lj' 1 it ,,! " '1'1 I " , Ii;+- 'TI-:~ ~ ;~__ U. II .' i I I; I "\ ~ i:1 I i i ,!;iO!Q! r.>L>O .---"'-, , !' -]--- ',: I, ',' . " ,''',I. , i I ~ I! - l i: . f---.-.-.--.c--~ I-'-~---r-- @lOOD~! ! SOOD! II .JF100! I, ,t- ~~---L; , II ,... I j ,. LJ~: 1 ' lV~ivt,- .\-VV:wl\WlA Cd ~ !! i[Jerpo! II ! 8Jj____ll ; I . r ~ II i!:. i ,L_-!-~~iL....J11 i;!:, ! . I I I II: j IJ i:. I .: ,I!. I I I I +-1 ! \(~I ilnb!S4---.m-, nI51!~ I I I: I "i Ii 'I i i: i I I , I j ii,' ! I ~ : I ' i: ' ! I ~I ' ! ~ ' i : . i1ft;~ (1210(.)10[ I !.l- -t-~ T-++- ' j i I 5 i ;: ! -~ f i'l ' I i~ : . ! [.: , ' : I ttrl i' : i:~~ Ii, I! ,it:~lob ~ ! Zf1jdS~' ~ II :~~e 1!51 ' ! i ! 26 :~ -t-I ; illDi5rz 1 %~, !~Di33rj II : + : '2J I! ' \..--....h' :?i\ I 'C!l'i,S II Ii" ,\15/, iC' il 1.. ~,' In \ i:=i.li '7~ 25 .:1, 'lb~',Li . ',' ':';", ~Oo : -If-~.: ,.1 '.;;)'1 ; n..::? I~I;__ I ! II :., I Ii I'! Ii. I Ii ; ~l-~+-:' i! 1.:+ Ii i I . Ii': 26 I ! ; . . : !" I II I," . [I i i ii, 27 I, , +h.~ ::-j-- j I,' i, , ,I ': '-t I I I ' I i I 1128 I .. .~< 1----1- ----t--" l I:' I' _______~ I :_+__~ ' :: ~~ i ' w~r29 " I i ~, :" I'~ i ': I ,-. _ : i ': ;_~__~!:.:) . ....-eo.-~6t4~Qe ~+_i\~' ~+-~,\.Lt l--,Ij~ I~ I ---'---~-1--_!'_: 6 I I . I ~ I tit t ,I, I I I "'l') os:.:>. -tOo c.\re~.:t-e.._ e.VVY\. AJ<;,' 111ldV~ I~~r... ~~. i_ i_L_....L_ ;, '-1__F'" P , I I I :-n--.:-! ~l c -01- , , ,... ~ (,'c~J~~___~~T i"'c,i _~-'l~t.... .$ v..g.___ ~ : ~~ " .: ' ,_j.;" A ~ -V.L,~t: )"""l:;' , :l~+ ',tT.. Urr I: "I " l : ; i'}'! '): -' \ ,-;- i - ,I' - --1 I I II I -; ----;-'---1' 0 c :~IR=t=1 -~-- " : i II! -~-=c; i -~'--~_':""-nl"-' ::-'!:: -----~----- tit.. ~+--1~I--~--~I'-t~. :-nil~: ]8 j:, --~-- -~-- -" - -~-- -: '-ijl--'-----t"--+----~ :-~----r----l 0>; ;r_, i~----~-t=, -- ~ -..~- t: ~~- ------ lr -t--:-~ ;, -~---,,----- - : ':: : IIII;~ , >--->---,--- ------11 --'--- 'I: -------.'1.-+-,,' I I : ..,'..' 4t J :_ ~_,____1 I I ~ ~ ~ Ii ! _~~~__~_===__=I"-['--T~-~-ll-I~----l:-t"_l=-- II I-IT! J~~J :~2 L- ! M , "1...._ I , : ii ------f ' I: Ii : s ! I L___i 4==~ T i i : 1 Ii, 2 I ' i ii' ~OIDiD!oi I !, i I~bo t(j~ i ': I, : Ii ,..---1 I ilt~15 ''3 :)t):o' i ;' I I ! I ! 6 · i!' Ii: ;' : ~ , '!:' i! i , : 8 , iT; i i~ 1190 : . , III , , I : }2 I j 13 , I I . , I ! ; ! :~ : I 14 It I 4 head 1..1= !t-=~ . _; II I !L----~ _..~ 6 11 2~~ S-i I A5o~l:\.. Rot~,'V @. , 'I I 7 ji i 811 \ \.. $ i "R-e9CA'V' ".' Ii I - II , 1011 G, Ju 11 Ii 1 I 1211/1.0 i\.\{~, MLt" I' \ 3 i i I I . ....- ' 14. i 10.04-,:( ;5 /snl t....t :/I-\O+-t\) 1"2.3.Yll.,F~ :~~h1 \6 I I . I i \ g t t'J tl~VfJ II \t\j c.lV'o:Se.,e:c\ 1 Ii i ii I Ii i ii , i !i ,i I' I II I Ii I Ii ~:I[III ~:I-HI 2'1 I , I 1 I I , , f , ' , , I , I 1 < ,.0 . i , , i ' i Ii, 16 , .' I i I I ! 17 ~' I r-:-'118 i ): II ; ; i ill 19 i ,i . I : 1120 1[21 . i . t I I' I I 22 23 " J~~~~7~ Public Service Committee Meeting 5/7/200712:30 PM Airport Hotel/Bank DemolitionGost-- C.HJ:>.,h..lG,.'2 Oy(OE..c.. W_<<_"'''A~'''~_~W,"""AV'~U~._,~~=--;_~~"^"",~~"""",,,"~~_",--''=~'''''~_~"""==""-_~~~~_W<<~N""""""""","!",'N~;-:r'-~N.-'-,!,,,,,,,,,.,,-~.~,,.~=_~~=,,!,",<,,,,~~,,,,.-.,,,,,:,,,.,.,,.,.,,,.,~~'"""""'-'c-"',~'"':""'''!""~'''f':'''''''-~'''_~~,~',''''''',,,, Department: Caption: Background: Analysis: Financialolmpact: Alternatives: Recommendation: Funds are Available in the Following Accounts: Augusta Regional Airport Request approval of the cost regarding the airport Hotel/Bank Demolition. The Augusta Aviation Commission requested a cost for demolition and redevelopment of the property where the hotel and bank buildings are located, This was not included in the original cost for the new terminal construction. Due to the condition of the existing facilities ofthe hotel and bank buildings on airport it was decided that the property would be better utilized as additional parking for airport customers which would increase revenue for the airport. $402,812.17 is the recommended cost for demolition and will be funded 50% from customer facility fees and 50% from Airport Capital Improvement Fund Deny the request. Accept the recommendation of the Augusta Aviation Commission to approve the cost ofthe airport HotellBank Demolition. 551081301/5411110 REYlRWED_ANDAJ')l:>_R.OVED_BY: