HomeMy WebLinkAboutCHANGE ORDER 14 MCKINGHT CONSTRUCTION CO INC
TERMINAL AREA IMPROVEMENTS
AUGUSTA REGIONAL AIRPORT AT BUSH FIELD
CHANGE ORDER NO. - 14
June 7, 2007
MODIFICATIONS TO THE CONTRACT ARE AS FOLLOWS:
See Attached Change Order #14 Summary
Original Contract Sum ...................................$
25,254,192.45
Change by Previous Change Order......... ...... ... ...$
471,815.61
Contract Sum Prior to this Change Order... .. .-r. . . . ..$
25,726.008.06
.f- This Change Order...... ..... .......................... ..$
402,812.17
New Contract Sum.......................................$
26.128,820.23
Cohtract Time will be as follows: 0 Calendar Days are added to the duration of Phase 3
and the Total Contract Duration
Signed by:
~ rI #!/J t'Lhj; ~ -
McKnight Construction Co., Inc. ~ TE The LP A Group, I
DATE
-
b · g, · (! 7
DATE
DATE
p
Must be signed by Construction Manager. Architect. Owner, Mayor and Contractor
Cc: All Signers
Item No.
Item Description
A
Hotel/Bank Demolition
Change Order #14 Summary
June 7, 2007
Quantity
Unit
Unit Cost ($)
LS
$402,812.17
Total
$402,812.17
Total ($)
$402,812.17
$402,812.17
Time Extension
(Days)
o
o
S:\CM Files\CO 14
The Least Expensive Option Selection wouid be to perform the Required Work
($414,582.17), Eliminate the Access Road ($11,770) and Eliminate the Bank
Abatement and Demo. ($9,630) Best Cost =
$393,182.17
, ,
Hotel/Bank Sitework Demolition Rev. 1 (April 16, 2007)
Item Description Quantity Units CostJUnit Labor Material Subcontract
Cost Cost Cost
Abatement Costs - Hotel/Bank 1 LS 66000 0 0 66000
Demolition Costs - Hotel/Bank 1 LS 226075 0 0 226075
McKnight Working Foreman 120 HRS 25.6 3072
Silt Fence - Required 4000 LF $4.54 $0.00 $0.00 $18,160.00
Construction Fence - Required 2000 LF $6.00 $0.00 $000 $12,000.00
Topsoil/Hotel- Required 1503 CY $18/$5 $0.00 $27,05400 $7,51500
Topsoil/Bank - Required 378 CY $18/$5 $0.00 $6,804.00 $1,890.00
HydraSeed - Required 6 AC $2,00000 $0.00 $0.00 $12,000.00
Subtotal $3,072.00 $33,85800 $343,640.00
McKnight Mark-Up (15%) $460.80 $5,078.70
McKnight Mark-Up (7%) $0.00 $0.00 $24,054.80
Bond (1.2%) $5.53 $467.24 $4,412.34
Total- Required $3,538.33 $38,936.70 $372,107.14 $414,582.17
Cost Savings Options
Option #1 . Use On-Site Fill
Fill Material/Hotel- USE ON-SITE 4555 CY $6.00 $0.00 $0.00 $27,330.00
Fill MateriallBank- USE ON-SITE 1148 CY $6.00 $0.00 $0.00 $6,88800
Subtotal $34,218.00
McKnight Mark-Up (7%) $2,39526
Option #1 Added Costs $36,613.26
Option #2 - Remove Stone Base
Remove Stone Base 10000 CY $4.00 $0.00 $0.00 $40,00000
Subtotal $40,000.00
McKnight Mark-Up (7%) $2,800.00
Option #2 Added Costs $42,800.00
Option #3 - Eliminate Access Road
Estimated Savings LS 11000 0 $0.00 $11,000.00
Subtotal $11,000.00
McKnight Mark-Up (7%) $770.00
Option #3 Cost Savings $11,770.00
Option #4 . Eliminate Bank AbatementJDemo
Bank Demo Cost Estimate 1 LS $9,000.00 $0.00 $0.00 $9,000.00
Subtotal $9,00000
McKnight Mark-Up (7%) $630.00
Option #4 Cost Savings $9,630.00
The recommended option would be to perform the Required Work Recommended
($414,582.17) identified above and accept Option #3 (11,770) to eliminate the Cost =
Access Road
$402,812.17
U~ilJiLVUI ~D.UO r~A lUO OO~ ~U~J
LU L f"il:.f\ .I b n j .t\ I,jl", tAJr\ ;:) 1
~ 1.1\1.1"/ UU0
, ,
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
William D. McKnight - President
Mason McKnight, HI - Vice President
Huey E. Carter - Sec. - Treasurer
FOUNDERS:
Mason McKnight, Sr. 1900-1973
Mason McKnight, Jr. 1930-1994
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: P06J 863-7784
Fax: [706J 863-2031
April 13, 2007
{FIIX NIUllbeTI
Parsons Brinckerhoff Construction Services me.
1510 Hangar Road, Suite A
A~ GA 30906
Attn: Matt McCoy
RE: AUGUSTA REGIDNALA1R.PORT
Cost ProJIo- HtNel tm4 Btmk
DemoIiIitm ( JleWsioli)
Gentlemen: . -
Per your request, the following is a revise cost proposal for the work: involved for the Hotel and Bank:
demolition. This revised price includes the Hotel demolition, and aU 'associated ~ however; it
excludes any Bank demolition, coostmction of1be access ~ and the haul-in fill to create the sloped
finish grade shown by lP A. Basically, thecootractocwill removethe building. parkin& as shown, and
leave the site level. Four inches of topsoil will be installed, and this site will be hydroseeded.
Ross &. Logan
Additional sitework ( see breakdown)
Subtotal
McKnight 7% OIP
Subtotal
1/2% Bond
Total
$272,075.00
93,154.78
S365,229.18
25,566.08
$390.195.86
4.689.55
$395,485.41
~
b
Please call if you need any additional information..
Sincerely.
MCKNlGHT CONSTltUCTION CO~, INC
Pat fJaJJwJr-/S~_
Pat Patrick
Project 1\P.anager
PP:sdr
cc: Jobsite
pat041301 ~ wpd
V~/~U/~UVI lU.UU L'nA lVU UUO 'VOL
1~1 \.....["-1 'l .!~ 'JILL ["1'''4''-> '-...'U'1"t I.J J
~ UU'-i VVV
04/12/2007 if
13 F lJ1X
.
8043788747
ROSS AND LOGP,N
!4I001/(l01
Ross ex LOGAN
INDUSTR/~S
v7a Facsimile (706) 868-J516
April 12, 2007
McKnight Construction Co., Inc-
Post Office Box. 211900
Augusta, Georgia 30917
Attention: Pat Patrick
RE: Hotel and Bank Demolition
Augusta Regional Airport
Augusta., Georgia
*Re,'ised Proposal'"
Ross & Logan Industries, Inc. is pleased to provide you ""ith this proposal for demolition, removal a.nd
disposal as per drawing no.'s DM1, DM2 andDM 3, by The LPA Design Group, Inc., at the above~
referenced project for a total lump sum price of$292,075.oD. This price is inclusive of labor, supervision,
equipment and materials necessary to complete our scope of work.
Price breakdown:
Hotel $206,075.00 \
Bank f:..\ ~. "l'.. .~ " / 9,000.00 > ~ '2..7 'C I C '7 '5 ,,~
Aecess Road "Nt)~, ) ~ 11,000.00
Asbestos Abatement 66,000.00
.........-
Price includes thefollowi'hg;
0/ Removal and documentation of proper disposal of refbgerant from Ale units in buildings to be
demolished
0/ Fill in depression from pool removal with fill dirt
./ Upon cOIupletion, rough grading of area disturbed during demolition operations
Price excludes the following:
x Permits
.lC Temporary protection
JC Erosion, noise and/or dust controL
.l( Protection and/or relocation of items to re!na.in
.l( Backfill andlor eompaction
,Ie Shoring and/or bracing
Thank you for the opportu."1ity to propose .his se.."'Vice, I look fonvard to working with you. It you have
any questions or concerns, please contact me at (904) 378-9700.
_---.---T::;II~~
T odd Pritchard
PrQ,iect Man~g~
lJemol1tWl1 .
Recycling
11II
Site Prep
6507 West Beaver Street; Jacksonville, FL 32254 P.O, Box 61206. Jacksonville) FL 32236
904-378-9700 904-378-9747 Fax
, . \~ \ I \ ~
~.. ,".. ,,_ _ . _ .... ". I -:-j:.e \
iJif!fffr~!iafWfl;;, r-faff'J 4~14 EYS-=a,3.E ___,~._~"TTD .... _
'. 1 45-304 2" Pack
---------'t< -e V~s.c..(~ -
~N...';""
~~;:,J\
i: 1 !
2 !14-006 ~I ~dt
l'
.I
19
2011
21 r
22
-. ~,
L,)
24
I
i
':': 1 ~--------r---
~. ,
32 i
30
34
~D\f1.St'
t-UtC ~
/- ~
f?J I,f/
Vz 0" ~'-I
i
'f'Vle.
.ttvt\c q.:t:lM
U
/"... f. ,.,j
~ 'St.1e
L:-\4.-t' 5<
g. , .
, - , ,
; ~ I< ' 1"_.
M'I;t.. ~lV \, t.'Wi
"e.i 'U''''',I.< VVIV
_____~ 4/\~/ 07
i 'n~~f-~-i'
r.:"'L \.
K. .'.., , \f Cl
",,) '-<.{..l,...... )',0 \AM
/' .~~~-
( M c~( "','v,* J
--~--u
Prepared BV I
t,ppiD\led By !
~-W~ 14) ::; ,~ -++--l=cJi+ r: " . --~
wi : il !'. ,- 11~!.,.~, .--11 I
I II,. i
II.-Lj' 1 it ,,!
" '1'1 I " ,
Ii;+- 'TI-:~ ~ ;~__
U. II .' i
I I; I "\ ~ i:1
I i i ,!;iO!Q! r.>L>O
.---"'-, , !' -]---
',: I, ',' . " ,''',I. ,
i I ~ I! - l i: .
f---.-.-.--.c--~ I-'-~---r--
@lOOD~! ! SOOD! II .JF100! I, ,t-
~~---L; , II ,... I j ,. LJ~: 1 '
lV~ivt,- .\-VV:wl\WlA Cd ~ !! i[Jerpo! II ! 8Jj____ll ; I . r
~ II i!:. i ,L_-!-~~iL....J11 i;!:, !
. I I I II: j IJ i:. I .: ,I!. I I
I I +-1 ! \(~I ilnb!S4---.m-, nI51!~ I
I I: I "i Ii 'I i i: i I I , I
j ii,' ! I ~ : I ' i: '
! I ~I ' ! ~ ' i : . i1ft;~ (1210(.)10[
I !.l- -t-~ T-++- '
j i I 5 i ;: !
-~ f i'l ' I i~ : . ! [.: , ' : I
ttrl i' : i:~~ Ii,
I! ,it:~lob ~ ! Zf1jdS~' ~ II :~~e 1!51 ' ! i !
26 :~ -t-I ; illDi5rz 1 %~, !~Di33rj II : + : '2J
I! ' \..--....h' :?i\ I 'C!l'i,S II Ii" ,\15/, iC' il 1.. ~,' In \ i:=i.li '7~ 25
.:1, 'lb~',Li . ',' ':';", ~Oo : -If-~.: ,.1 '.;;)'1 ; n..::? I~I;__
I ! II :., I Ii I'! Ii. I
Ii ; ~l-~+-:' i! 1.:+ Ii i I . Ii': 26
I ! ; . . : !" I II I," . [I i i ii, 27
I, , +h.~ ::-j-- j I,' i,
, ,I ': '-t I I I ' I i I 1128
I .. .~< 1----1- ----t--" l I:' I'
_______~ I :_+__~ ' :: ~~ i ' w~r29
" I i ~, :" I'~ i ': I ,-. _ : i ': ;_~__~!:.:)
. ....-eo.-~6t4~Qe ~+_i\~' ~+-~,\.Lt l--,Ij~ I~ I ---'---~-1--_!'_:
6 I I . I ~ I tit t ,I, I I I "'l')
os:.:>. -tOo c.\re~.:t-e.._ e.VVY\. AJ<;,' 111ldV~ I~~r... ~~. i_ i_L_....L_ ;, '-1__F'"
P , I I I :-n--.:-! ~l c -01- , , ,...
~ (,'c~J~~___~~T i"'c,i _~-'l~t.... .$ v..g.___ ~ : ~~ " .: ' ,_j.;"
A ~ -V.L,~t: )"""l:;' , :l~+ ',tT.. Urr I: "I " l : ; i'}'!
'): -' \ ,-;- i - ,I' - --1 I I II I -; ----;-'---1' 0 c
:~IR=t=1 -~-- " : i II! -~-=c; i -~'--~_':""-nl"-'
::-'!:: -----~----- tit.. ~+--1~I--~--~I'-t~. :-nil~:
]8 j:, --~-- -~-- -" - -~-- -: '-ijl--'-----t"--+----~ :-~----r----l 0>;
;r_, i~----~-t=, -- ~ -..~- t: ~~- ------ lr -t--:-~ ;, -~---,,----- - : ':: : IIII;~
, >--->---,--- ------11 --'--- 'I: -------.'1.-+-,,' I I : ..,'..'
4t J :_ ~_,____1 I I ~ ~ ~
Ii ! _~~~__~_===__=I"-['--T~-~-ll-I~----l:-t"_l=-- II I-IT! J~~J
:~2
L- ! M
, "1...._
I
,
:
ii
------f '
I:
Ii
:
s
! I
L___i
4==~
T
i
i : 1
Ii,
2
I ' i ii'
~OIDiD!oi I !, i
I~bo t(j~ i ': I,
: Ii ,..---1 I ilt~15
''3 :)t):o' i ;' I I ! I ! 6
· i!' Ii: ;'
: ~ , '!:' i! i
, : 8
, iT; i i~ 1190
: . , III
, ,
I
: }2
I
j 13
,
I
I . ,
I !
; !
:~
:
I
14
It I
4 head 1..1=
!t-=~ .
_; II I
!L----~ _..~
6 11 2~~ S-i I A5o~l:\.. Rot~,'V @.
, 'I I
7 ji i
811 \ \.. $ i "R-e9CA'V'
".' Ii I
- II ,
1011 G, Ju
11 Ii 1 I
1211/1.0 i\.\{~, MLt"
I'
\ 3 i i
I I . ....- '
14. i 10.04-,:(
;5 /snl t....t :/I-\O+-t\) 1"2.3.Yll.,F~ :~~h1
\6 I I
.
I i
\ g t t'J tl~VfJ II \t\j c.lV'o:Se.,e:c\
1 Ii
i ii
I Ii
i ii
,
i !i
,i
I'
I II
I Ii
I Ii
~:I[III
~:I-HI
2'1 I
, I 1
I I
, ,
f , '
, , I
, I
1 <
,.0
. i
, ,
i '
i Ii, 16
, .' I
i I I ! 17
~'
I r-:-'118
i ): II
; ; i ill 19
i ,i .
I : 1120
1[21
. i
.
t I
I' I
I
22
23
"
J~~~~7~
Public Service Committee Meeting
5/7/200712:30 PM
Airport Hotel/Bank DemolitionGost-- C.HJ:>.,h..lG,.'2 Oy(OE..c..
W_<<_"'''A~'''~_~W,"""AV'~U~._,~~=--;_~~"^"",~~"""",,,"~~_",--''=~'''''~_~"""==""-_~~~~_W<<~N""""""""","!",'N~;-:r'-~N.-'-,!,,,,,,,,,.,,-~.~,,.~=_~~=,,!,",<,,,,~~,,,,.-.,,,,,:,,,.,.,,.,.,,,.,~~'"""""'-'c-"',~'"':""'''!""~'''f':'''''''-~'''_~~,~',''''''',,,,
Department:
Caption:
Background:
Analysis:
Financialolmpact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
Augusta Regional Airport
Request approval of the cost regarding the airport
Hotel/Bank Demolition.
The Augusta Aviation Commission requested a cost for
demolition and redevelopment of the property where the
hotel and bank buildings are located, This was not included
in the original cost for the new terminal construction.
Due to the condition of the existing facilities ofthe hotel and
bank buildings on airport it was decided that the property
would be better utilized as additional parking for airport
customers which would increase revenue for the airport.
$402,812.17 is the recommended cost for demolition and will
be funded 50% from customer facility fees and 50% from
Airport Capital Improvement Fund
Deny the request.
Accept the recommendation of the Augusta Aviation
Commission to approve the cost ofthe airport HotellBank
Demolition.
551081301/5411110
REYlRWED_ANDAJ')l:>_R.OVED_BY: