CHANGE ORDER
co NU1vffiER 1
BID ITEM n/a
DATE 12/4/2000
PROJECT TITLE
18" Raw Water Main Conversion & 16" Jack and Bore
ORIGINAL CONTRACT DATE 9/11/2000
PROJECT NUMBER 10160
OWNER AUGUSTA COMlvrrSSION
PO NUMBER
ill
The following change order is hereby made to the proposal for the above project:
PAYEE
ZEL Engineers
TOTAL AMOUNT OF THIS CHANGE ORDER
The contract time will be INCREASED by 1 calendar days as a result of this change.
$
10,030
ORIGINAL CONTRACT COST
PREVIOUS CHANGE ORDER (INCREASE)
THIS CHANGE ORDER (INCREASE)
TOTAL CONTRACT \VITH CHANGE ORDER
$
27,600,00
$
0.00
$
10,030.00
$
37,630.00
FUNDING NUMBER/ACCOUNT NUMBER
509043410
5212115
REQUESTED BY:
80110160
9~g
vi! ~1l:iikl:;
SUBl\lITTED BY;
FINANCE ENDORSEIvIENT:
RECOMMENDED BY:
APPROVED BY:
5212115
DATE:
/zjs/oC)
, "
DATE:
I z/:/ It!)tl
.
DATE: ~~~v
DATE: /.2/ v2%/ dJ
, ,
DATE: ~"'lq /DO
I
"-
.... , If -. "
.... ., 4",
..
~
18" Raw Water Main Conversion
Change Order #1
.Descl'i~ti()1'l
1 Survey and redesign 18" water connection to Washington
Road and stub out for future transmission main.
2 Preparation of eight (8) easement plats
3 Design a new water main from Fuller Drive to Eisenhower
Drive along Apricot Lane to transfer the water more efficiently.
10160001204 C01 Backup
1
Cost
$3,000.00
$4,530.00
$2,500.00
$10,030.00
12/05/2000