Loading...
HomeMy WebLinkAboutCHANGE ORDER 1 ZEL ENGINEERS Augusta Richmond GA DOCUMENT NAME: \8" tzaw WG-ter \YJo\n CDnvers\Cl'1 Qro \19" ~~ \S:)ye DOCUMENT TYPE: c.Dor~ order YEAR: OJ BOX NUMBER: \ ) FILE NUMBER: \ ~ )8s NUMBER OF PAGES: cO --' .....-- ~'.. < II- .~ ",:. V r .. CHANGE ORDER co NU1vffiER 1 BID ITEM n/a DATE 12/4/2000 PROJECT TITLE 18" Raw Water Main Conversion & 16" Jack and Bore ORIGINAL CONTRACT DATE 9/11/2000 PROJECT NUMBER 10160 OWNER AUGUSTA COMlvrrSSION PO NUMBER ill The following change order is hereby made to the proposal for the above project: PAYEE ZEL Engineers TOTAL AMOUNT OF THIS CHANGE ORDER The contract time will be INCREASED by 1 calendar days as a result of this change. $ 10,030 ORIGINAL CONTRACT COST PREVIOUS CHANGE ORDER (INCREASE) THIS CHANGE ORDER (INCREASE) TOTAL CONTRACT \VITH CHANGE ORDER $ 27,600,00 $ 0.00 $ 10,030.00 $ 37,630.00 FUNDING NUMBER/ACCOUNT NUMBER 509043410 5212115 REQUESTED BY: 80110160 9~g vi! ~1l:iikl:; SUBl\lITTED BY; FINANCE ENDORSEIvIENT: RECOMMENDED BY: APPROVED BY: 5212115 DATE: /zjs/oC) , " DATE: I z/:/ It!)tl . DATE: ~~~v DATE: /.2/ v2%/ dJ , , DATE: ~"'lq /DO I "- .... , If -. " .... ., 4", .. ~ 18" Raw Water Main Conversion Change Order #1 .Descl'i~ti()1'l 1 Survey and redesign 18" water connection to Washington Road and stub out for future transmission main. 2 Preparation of eight (8) easement plats 3 Design a new water main from Fuller Drive to Eisenhower Drive along Apricot Lane to transfer the water more efficiently. 10160001204 C01 Backup 1 Cost $3,000.00 $4,530.00 $2,500.00 $10,030.00 12/05/2000