CONSTRUCTION CONTRACT CHANGE ORDER
CO NUMBER 1
BID ITEM 09 -156
DATE 9/2/10
PROJECT TITLE Eisenhower Hospital Area Gravity Sewer System
ORIGINAL CONTRACT DATE 4/01/10 PROJECT NUMBER ICU -0069
OWNER AUGUSTA - RICHMOND COUNTYCOMMISSION PO NUMBER P178857
The following change is hereby made to the contract for the above project:
Description of Change (for a more detailed description see attached proposal):
The modification to this contract is to upsize the new sewer main to accommodate new construction on the
base and extend a jack and bore due to extreme depth of the new sewer main and unforeseen existing water
mains in the same path of the new sewer main. This modification was requested by Fort Gordon and is beyond
the original scope of work. Augusta will be reimbursed by Fort Gordon for the cost of this work.
PAYEE Blair Construction
TOTAL AMOUNT OF THIS CHANGE ORDER $ 76,805.00
The contract time will be INCREASED by 0 calendar days as a result of this change.
ORIGINAL CONTRACT AMOUNT $ 771,378.13
PREVIOUS CHANGE ORDER (INCREASE) $ 0
THIS CHANGE ORDER (INCREASE) $ 76,805.00
TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ 848,183.13
FUNDING NUMBER /ACCOUNT NUMBER 507043420 5425210
1
/ 2 88880069__ 5425210
PROPOSED BY:
if
DAIS: yi f�
I RAC 'PO�
REQUESTED BY: • ' DATE:
NGINEF'/ /7 V'
SUBMITTED BY: r . i erw.., ..0 • DAM:;: 1 / t C-A O
DEPARTMENT HEAD
D DATE:
FINANCE ENDORSEMENT:
�C�l. 2zt[�O� � Ci/ 3- 10-7 -r 0
COMPTROLLER .
/ / L ATh:
RECOMMENDED BY: /6/1 / /i)
/�
ADMINISTRATOR
BY: Le c..e.1► • DA 1E: t (,?l (
MAY