HomeMy WebLinkAboutCHANGE ORDER 001CONTINENTAL CONSTRUCTION FIRE STATION 3 " ...:;. 11 'lA.lA Document G70r" - 2001 Change Order" ,PROJECT (Name and address): Fire Station #3 1099 Reynolds Street, Augusta, GA 30901 TO CONTRACTOR (N~ and iuUJress): "Continental Constructioq 4190 CrosstoWne Ct. Evans; GA 30809 CHANGE OROER NUMBER: 001 DATE: May 22, 2007 OWNER: 181 ARCHITECT: 181 CONTRACTOR: 181 FIELD: 0 OTHER: 0 ARCHITECT'S PROJECT NUMBER: 2538 CONTRACT DATE: June 21, 2006 CONTRACT FOR: General Construction TH~C~N~qIS CHANGED AS FOLLOWS: '(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) 'Millwork adjustment deduct $9,871.58 Testing allowance lIdjustffient deduct $1,500.00 Extension of time 3 days for furnish and install plenum lights Total deduct of $11,371.58 and tOtal add of 3 days 'The original Contriict Sum was The net change by previouslY authorized Change Orders The ,Contract Sum prior ~o,this Change Order was The Contract Sum wi~ be decreased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Tim: yml be increased by Three ( 3 ) days. The date of Substantial Completion as of die date of this Change Order therefore is December 05, 2006 223,718.00 0.00 223,718.00 11,371.58 212,346.42 $ $ $ $ $ 'co NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorize4 ~yConstruction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in wpichcase a Change Qrder is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED ,BY THE ARCHITECT, CONTRACTOR AND OWNER. Virgo Gambill Architects Augusta, GA, a political subdivision of the State of Georgia OWNER (Firm name) Continental Construction ARCHITECT (Firm 7Uirhe) 253r'Center West Parkway, Ste:200, Augusta, GA 30909 ADDRESS CONTRACTOR (Firm name) 4190 Crosstowne Ct., Evans, GA 30809 c:::. 1Nt1c --=------ BY (Signature) Richard Horton (Typed name) c:: / z-z,J 0'1 DATE ' , Deke Copenhaver (Typed ny-me) <{; (1" ( 4 1 DATE R. teven Virgo, AlA, ASID (Typedngme) , '6'0 \ .01 DATE ~ 6 "(3 -07 AlA Document G701111- 2001. Copyright @1979, 1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AlA" Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA" Document, or any 1 portion of It, may result In savere civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 09;40;10 on OS/22/2007 under Order No.1 000293195_1 which expires on 3/21/2008. and is not for resale. User Notes: (455919261) , , "", ... FIRE STATION #3 A. Original Millwork Allowance: 1 Install dedicated circuit 2 Relocate existing water cooler 3 Replace existing acoustical tile 4 Remove duct, replace w/sheet metal ductwork .5 Alter substandard ductwork at air handler 6 Paint the corridor wall 7 Deletion of engine bay insulation 8 Furnish & install 3 plenum lights 9 New single phase panel 1 0 Paint instead of tile recreation walls 11 Install VCT and resilient base in corridor 12 Furnish & install K type fire extinguisher Allowance Balance B. Original Testing Allowance 1 Testing Receipts Allowance Balance C. Change Order Status 1 Original contract sum a. C.O. #1 Allowance adujustment deduct Adjusted Contract Sum D. Liquidated Damages 1 Date of notice to proceed 2 Original completion date (120 days) 3 Owner authorized extension 4 Revised completion date 5 Date of substantial completion 6 Days past revised completion date 7 Liquidated damages 0 days x $200/day $20,000.00 -$791.36 -$344.00 -$460.00 -$4,956.00 -$1,177.00 -$345.00 $400.00 -$1,331.68 3 days -$1,232.53 $750.00 -$475.00 -$165.85 , $9,871.58 $1,500.00 $0.00 $1,500.00 $223,718.00 -$11,371.58 $212,346.42 August4,2006 Dec. 2,2006 3 days Dec. 5,2006 Dec. 5,2006 o days $0.00