HomeMy WebLinkAboutCHANGE ORDER #15 MCKNIGHT CONSTRUCTION
Contract Change Order
CHANGE ORDER NUMBER: -'J:-6- IS
DATE: 12/16/2009
PROJECT NAME: ARC - Task 07 - Webster Detention
Center
PROJECT NO: 0400101 - Task 07
"\4<.r -r
''l.l '"'1\.. "I
CONTRACTOR:
McKnight Construction Company
645 Frontage Road NW
P.O. Box 204718, 30907
Au usta, GA 30907
Project Description: Expansion and renovations to the Detention Center, including new housing pods, new medical pod
and new video visitation facility.
REFERENCE:
COP#
Description of Change to the Scope of Work: Provide power to support the Video Visitation Stations in the existing
facility renovated area. Cost Proposal is revised to delete the (2) day extension requested in the first proposal.
Project Duration:
Number of Days added to the Substantial Completion Date
as a result of this Change to the Scope of Work:
Add
0.0000 Days
The original Contract amount
Net change by previous change orders
The previous Contract amount
$ $27,041,000.00
$ $6,202,972. 70
$ $33,243,972.70
. $ $19,093.10
$ $33,263,066.10
I^l~"
nl I. I"''''
.. "l.'. "'4 I. ceo, PO
~ (",YI"1,'-14'> "It:.
" 1.,. '" (.gO I '" f#' . q Cb
Total amount of this change order
Current Contract amount
t 1'\,"''13. Ltc
., '11o.4'''l,t;f#1.'l~
All terms and conditions of the Contract Agreement between the Owner and the Contractor apply to this Change Order.
Signatures:
Agreed to by
Recomme
he Architect: .
DATE:
/2. 17.. 09
Recommended for Acceptance by the Project Manager:
for Acceptance by the Project Manager:
~
.;
DATE:
DATE:
the Project Owner:
Recommended for Acceptance by the Owner:
~
DATE:
DATE:
, Cost Event
Page 1 of 1
BEERY
Cost Event
Project [0400101 - Task 07] - ARC - Task 07 - Webster
Detention Center
View Date 12/16/2009
Heery International Inc. (Augusta, GA)
501 Greene Street
Suite 307
Augusta, GA 30901
Phone: (706) 842-5543
Fax: (706) 821-2484
Cost Event No. 020
Date
Type
Description
12/16/2009 Budget Status
Design Deficiency/Omission Cost Status
Revised PR 44 Power to Video Visitation Stations
New
New
Responsible
Initiated By
Pat Patrick
McKnight Construction Company
645 Frontage Road NW
P.O. Box 204718, 30907
Augusta, GA 30907
Phone: (706) 863-7784
Fax: (706) 863-2031
Funded By
Initial Estimate
Expected Final
Long
Description
Video Visitation Stations In the existing facility renovation portion of the work will require power to be supplied
via low vOltage power supplies.
Scope of
Work
Provide power to support the Video Visitation Stations in the existing facility renovated area. Cost Proposal is
revised to delete the (2) day extension requested in the first proposal.
Items
No. Budget Contact Description Estimated Proposed Submitted Approved Committed Budget Cost
Code Status Status
1 6011110 Pat Patrick (McKnight Revised PR - $19,093.40 $19,093.40 $19,093.40 $19,093.40 New New
Construction 44 Power to
Company) Video
Visitation
Stations
Estimated Proposed Submitted Approved Committed
Items $19,093.40 $19,093.40 $19,093.40 $19,093.40
Markups
Total $19,093.40. $19,093.40 $19,093.40 $19,093.40
http://heery.constructware.com/CornmonlView/DocumentJ)isp1ay.asp?DocumentType=... 12/16/2009
· Contractor Change Request
Page 1 of 1
IW:K
Contractor Change Request
Project [0400101 - Task 07] - View Date 12/16/2009
ARC - Task 07 - Webster
Detention Center
Md:: NIGHT CONSTRUCTiON
COMPANY, INC
McKnight Construction Company
645 Frontage Road NW
P.O. Box 204718, 30907
Augusta, GA 30907
Phone: (706) 863-7784
Fax: (706) 863-2031
Contractor Change
Request No. 00066
To Jack Turner (Heery International Inc. (Augusta, GA))
Submitted By McKnight Construction Company Date
Description Revised PR 44 Power to Video Visitation Stations Status
State
Referenced CCO No.
11/25/2009
Pending
Approved
16
Estimated Effects of Request
ITime
Amount
10 days
$19,093.40
Work Description
Provide power to support the Video Visitation Stations in the existing
facility renovated area. Cost Proposal is revised to delete the (2) day
extension requested in the first proposal.
Recommendation
Please issue a change order for the work described.
Response By
Response
Jack Turner
Linked Documents
Document
Type
Doc
Document
Open
Description
Date
0400101 - Task 07-01352 ~ mil
Revised PR 44 power to Video
Visitation
11/25/2009
http://heery.constructware.comlCommon/View/Document Disp1ay.asp?DocumentType=... 12/16/2009
\
~
()
~
!
FOUNDERS:
Mason McKnig t, Sr. 1900-1973
Mason McKnight, Jr. 1930-1994
\.
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
William D. McKnight - President
Mason McKnight, III - Vice President
Huey E. Carter - Sec. - Treasurer
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: [706] 863-7784
Fax: [706] 863-2031
November 25,2009
Heery International/CIPM
501 Greene St., Suite 307
Augusta, GA. 30901
Attn: Bob Munger
RE: Webster Detention Center
Cost Proposal PR - 44
(RFI- 175) Power to Video
Visitation Stations
Mr. Munger,
The following is a cost proposal to provide power to the Video Visitation Stations in the existing facility
as shown in RF1175.
ISI
McKnight 6% O!P
$17850.00
1071.00
$18,867.00
226.40
$19,093.40
1. 2% Bond
Total
This work will require (2) additional days the installation ofthe LV devices as noted in schedule activity
item no 7161.
Please issue a change order for this proposal.
Sincerely,
MCKNIGHT CONSTRUCTION CO.
ppQ)~
Pat Patrick
Project Manager
PP:pgn
Attachments
cc: Jobsite
"
~,
IS-
- I
12903 Delivery Olive
San Antonio> Texas 78247
www.isidet.com
AN ARGYLE SECURITY COMPANY
Phone 210.495.5245
Fax 210.495.5613
PROJECT Webster Detention
SUBCONTRACTOR REQUEST FOR INFORMA nON
RFI
NO.
DATE
9/18/2009
JOB NO
ISI Job # 10-00190
TO:
Mcknight Construction
CONTRACT DOCUMENT INVOLVED
DRAWING NO.
SPEC. SECTtON
AREA OF WORK
ATTN:
Bernard Dunstan
DESCRIBE THE INFORMATION BEING REQUESTED:
IN REVIEW OF THE CONTRACT DOCUMENTS AND THE PROJECT SPECIFICATIONS, PLEASE NOTE THAT
ISIIMCS HAS DISCOVERED CONFLICTING INFORMATION REGARDING THE VIDEO VISITATION SYSTEM.
THE CONTRACT DOCUMENTS PROVIDE FOR INMATE VIDEO VISITATION STATIONS IN THE RENOVATION
AREA OF THE SUILDING, AS WELL AS THE NEW CONSTRUCTION AREA. PLEASE NOTE THOUGH, THE
INMATE STATIONS IN THE ADDITION AREA ARE ALL SHOWN TO HAVE POWER PROVIDED AT EACH
LOCATION BY THE ELECTRICAL CONTRACTOR. THIS POWER IS SHOWN TO BE 110VAC AND IS
CORRECT FOR THE NEEDS OF THE VIDEO VISITATION EQUIPMENT. IN THE RENOVATION AREA, THERE
IS NO POWER SHOWN FOR THE INDIVIDUAL STATIONS.
PROPOSED SOLUTION:
THE INNOVISIT SYSTEM HAS THE ABILITY TO POWER THE STATIONS WITH CLASS 2, LOW
VOLTAGE RUN WITH THE DEVICE WIRE, IN THE SAME CONDUIT. THIS WOULD BE AN EXTRA TO THE
CONTRACT AS THIS WAS NOT SHOWN AS A NEED ON THE CONTRACT DRAWINGS BUT IT MAY
ALLEVIATE THIS PROBLEM EASIER AND MORE COST EFFECTIVELY THAN OTHER POSSIBLE REMEDIES.
RESPONSE REQURED BY:
(DATE) 9/23/2009
SUBCONTRACTOR:
ISI Detention Group
SIGNATURE
:;ac/v 'fjHJeIW-
ARGYL.E SECURITY
INC.
www.argylesecurlty.com
ISI DETENTION CONTRACTING GROUP, INC.
12903 Delivery Drive
San Antonio, Texas 78247
210/495-5245
CHANGE ORDER PROPOSAL
Date: 10-14-09
ISI CO Number: 10
ISI Job #: 10-00190
Customer: McKnight Construction
635 NW Frontage Rd.
Augusta , GA 30907
Job:
Webster Co Det - Aug~sta Gl
1941 Phinizy
Augusta, GA 30906
===============================================================~==========================
We quote the following scope of work:
Customer Proposal #
Add Low Voltage Power Supplies to video visitation
units per RFI 175.
Material - $10,980
Labor - $4,542
OH and Profit at 15% - $2,328
Total Price - $17,850
Item 1
Price: $
17,85C
Please Note: We must have executed change order in our office before we can proceed.
Accepted by:
Printed Name:
Date
Company:
ISl Detention Cont
Request For Information Page 1 of 3
NCK
Request For Information
Project [0400101 - Task 07] - ARC - View Date 10/7/2009
Task 07 - Webster Detention
Center
McKNiGHT CONSTRUCTION
COMPANY, iNC
Primary
Responder
CC
From
Subject
Drawing No.
CSI Code
McKnight Construction Company
645 Frontage Road NW
P.O. Box 204718,30907
Augusta, GA 30907
Phone: (706) 863-7784
Fax: (706) 863-2031
Gregory Washington
KSGW Architects
2500 Northwinds Parkway
Suite 250
Alpharetta, GA 30004
USA
Phone: (770) 619-5913
Fax: (770) 619-5919
Bob Munger (Heery International Inc. (Augusta,
GA))
Norman Davis (Heery International, Inc. (Dukes
Edwards & Dukes - Subconsultant))
Zach Greene (ISI Detention Contracting)
Pat Patrick (McKnight Construction Company)
Chris Elliott (The Sack Company)
Corey Hinson (The Sack Company)
Mark Mitchell (The Sack Company)
Bernard Dunstan
McKnight Construction Company
Power to Video Visitation Stations @ Renovation Areas
Detail No.
26 05 00 - Common Other Ref. No.
Work Results for
Electrical
RFl No. 00175
Date
Status
Resolved Date
Reason for
Request
Action
Requested
Probable Cost
Effect
Probable Time
Effect
Priority
Response Due
9/22/2009
Closed
Other
Direction
Increase
Unknown
High
9/25/2009
Information Requested
DESCRIBE THE INFORMATION BEING REQUESTED: IN REVIEW OF THE CONTRACT DOCUMENTS AND
THE PROJECT SPECIFICATIONS, PLEASE NOTE THAT ISI/MCS HAS DISCOVERED CONFLICTING
INFORMATION REGARDING THE VIDEO VISITATION SYSTEM.
THE CONTRACT DOCUMENTS PROVIDE FOR INMATE VIDEO VISITATION STATIONS IN THE
RENOVATION AREA OF THE BUILDING, AS WELL AS THE NEW CONSTRUCTION AREA. PLEASE NOTE
THOUGH, THE INMATE STATIONS IN THE ADDITION AREA ARE ALL SHOWN TO HAVE POWER
PROVIDED AT EACH LOCATION BY THE ELECTRICAL CONTRACTOR. THIS POWER IS SHOWN TO BE
110VAC AND IS CORRECT FOR THE NEEDS OF THE VIDEO VISITATION EQUIPMENT. IN THE
RENOVATION AREA, THERE IS NO POWER SHOWN FOR THE INDIVIDUAL STATIONS.
PROPOSED SOLUTION: THE INNOVISIT SYSTEM HAS THE ABILITY TO POWER THE STATIONS WITH
CLASS 2, LOW VOLTAGE RUN WITH THE DEVICE WIRE, IN THE SAME CONDUIT. THIS WOULD BE AN
EXTRA TO THE CONTRACT AS THIS WAS NOT SHOWN AS A NEED ON THE CONTRACT DRAWINGS BUT
IT MAY ALLEVIATE THIS PROBLEM EASIER AND MORE COST EFFECTIVELY THAN OTHER POSSIBLE
REMEDIES.
http://heery.constructware.comlCommon/View/Document_ Display.asp?DocwnentType=7... 10/7/2009
Request For Information
Page 2 of3
Recommendation
Response Information
Responder Date Response
Gregory Washington 9/23/2009 Pat, please see JLA's attached response regarding RFI No.175 and
proceed as directed. If you have questions please contact KSGW
Architects in writing.
Ralph Salzmann 9/22/2009 The proposed solution is acceptable.
Disclaimer
Notes
Authorized Signature
Gregory Washington (KSGW Architects)
Printed Name
9/23/2009
Date
Linked Documents
Document Type
Doc
Date
9/22/2009
Document
0400101 - Task 07-01131
Description
RFI Innovlslt Power
Distribution
Recipient Company Method Date
Bernard McKnight Construction Company Message 9/23/2009
Dunstan
Bob Munger Heery International Inc. (Augusta, Message 9/23/2009
GA)
Bob Munger Heery International Inc. (Augusta, Email: rmunger@augustaga.gov 9/22/2009
GA)
Chris Elliott The Sack Company Email: ChrisE@hasack.com 9/30/2009
Corey Hinson The Sack Company Email: coreyh@hasack.com 9/22/2009
Gregory KSGW Architects Message 9/22/2009
Washington
Gregory KSGW Architects Email: gregory@ksgw.net 9/22/2009
Washington
Mark Mitchell The Sack Company Email: markm@hasack.com 9/30/2009
Norman Davis Heery International, Inc. (Dukes Message 9/23/2009
Edwards & Dukes - Subconsultant)
Norman Davis Heery International, Inc. (Dukes Emall: ndavis@augustaga.gov 9/22/2009
Edwards & Dukes - Subconsultant)
Pat Patrick McKnight Construction Company Message 9/30/2009
Pat Patrick McKnight Construction Company Email: 9/30/2009
oatrlck@mcknightconstructionco.com
Ralph Johnson Laschober & Associates Message 9/22/2009
http://heery.constructware.comlCommon/View/Document_ Display .asp?DocumentType=7... 10/7/2009