HomeMy WebLinkAboutCHANGE ORDER #1 RTW TETRA TECH FORT GORDON REPLACE REHABILITATE PUMP STATION
To: DrewGoins 10/19/09sh
f5) re iF'> ~ n\,:71~ I'R.
lfl)!f;~I.bU ,-I ~...=::.
OCT 1 '6 2009
Accounting Department
ENGINEERING CONTRACT CHANGE 0
co NUMBER
DATE
PROJECT TITLE
ORIGINAL CONTRACT DATE
OWNER AUGUSTA, GEORGIA
Fort Gordon Rt;place/Rehabilitate Pufi\P Stations
11/18/08
PROJECT NUMBER
PO NUMBER
.QQQ1
P158643
The following change is hereby made to the contract for the above project:
The Privatization of Water/Wastewater Utilities contract between Fort Gordon and Augusta Richmond
County was awarded September 2007. Requirements of the contract include executing Initial Capital
Upgrades (ICU) and Renewal and Replacement (R & R) projects for the water and wastewater systems
throughout Fort Gordon. Augusta Utilities has requested Tetra Tech RlW, Inc. perform a radio path
survey to determine radio type, frequency and proper installations necessary to network twenty sanitary
sewer lift stations and five permanent wastewater flow meter sites which are located throughout the
installation. Augusta Utilities Department has also identified the need to replace one existing sanitary
sewer lift station. The Boardman Lake lift station is currently receiving wastewater from six residences and
pwnps it to a common drain field. Augusta Commission Approved this Change Order on September
03,2009,
$61,812.00
PAYEE
TOTAL AMOUNT OF THIS CHANGE ORDER
$
61,812.00
The contract time will be INCREASED by Q calendar days as a result of this change.
ORIGINAL CONTRACT AMOUNT $
PREVIOUS CHANGE ORDER (INCREASE) $
THIS CHANGE ORDER (INCREASE) $
TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $
FUNDING NUMBER/ACCOUNT NUMBER
507043410
88880074
PROPOSED BY:
..
-~ 'r:>. W~DATE:
DESIGN ENGINEER
RECOMMENDED
DATE:
DATE:
REQUESTED BY:
, DATE:
SUBMI1TED BY:
DATE:
FINANCE ENDORSEMENT:
DATE:
APPROVED BY:
RlWTetra Tech
395,863.00
.....
o
61,812.00
437,675.00
5425110
5425110
lO/lt/6t.
~
II / /J/tJ1
. ,
ID-I('-0'1
IO-/tj-O'1
!O /&\ /0\
.'
ii'