CHANGE ORDER
CO NUMBER 1
BID ITEM 01-154
DATE 5/21/2001
PROJECT TITLE
18" Raw Water Main Conversion Project
ORIGJNAL CONTRACT DATE 02/28/2001
PROJECT NUMBER 1.Q.1.Q.Q
OWNER AUGUSTA CO:NIMISSION
PO NUMBER
P37975
The following change order is hereby made to the proposal for the above project:
P A'r.'EE
Blair Construction, Inc.
TOTA~lli~OUNTOFTillSCHANGEORDER
$
42,119.00
The contract time will be INCREASED by Q calendar days as a result of tills change.
ORIGINAL CONTRACT COST
$
540,185.96
PREVlOUS CHANGE ORDER (INCREASE)
$
0.00
TillS CHANGE ORDER (INCREASE)
$
42,119.00
TOTALCONTRACT~THCHANGEORDER
$
582,304.96
FUJ~DING NU:NffiER/ ACCOUNT NUMBER
509043410
5425110
REQUESTED BY:
5425110
SUBMITTED BY:
DATE: / /
tJ-r/ZI/tJ/
E GINEER I ,
~ M) i I/;._/it:i r{rr;""d~TE IS/~ I/O I
_ PEP1\JUMENT'l\D 5/ b),1 0 I
~vOiLl' ""r-.-
n_ " DATE.
1tX/tlA1o../f (J.JtiJf2t(ff'YtL) . 5 - ::U-OI
COMPTROLLER ,J;t3
DATE:
{~~/
!plld,
/ '
FINANCE ENDORSEMENT:
R:~COM1vfENDED BY:
APPROVED BY:
DATE:
\
P5/21/~001 02:24 FAX
14J00l
CH~~MHILL
FAX
Atlanta
Tal 77D-604-9182 x.530
Fax 770-604-918:3
To:
April Myers
From: James Rush
Fax No.:
706.312.4123
Date: May 21, 2001
Total Pages; 4
ComfJ1any:
AUD
Voice No.:
706.312.4122
Messiage:
Here is the back up for the Change Order on the 18" Raw Water Main.
PIA;!IJ:A r.;!I1I1f naoes are mlsslna or lllealble or If you receive this fax In error.
,
OS/21/2001 02:24 FAX
AECE~V~~; 5/1'/0' 8;08; ->CH2M HILL; #460; PAGE 2
~002
." MAY.l1'2001 09:28 7068681855
BLAIR CONSTRUCTION
#4197 P.002/004
,-
QUIDTATION
~ CONS~UCTION. INC.
p. O. BOX 770
Evans, Georgia 30809
PalI!: May 11.2001
To: Augusta Alenmond Utilities Department
~so Bay Street, Suite 1 ao
Augu~, GA 30801
Attrt: Mr. Jeff Henderson
Re: 1 B" Raw Water Line Conversion
We aro pleased to submit the fDllow/ng quotes for the cleaning Df approxImately 11,000 LF of 18H
ceme01l "ned cast iron pipe for the aj)ove noted project.
ALTERNATE NO.1
. Cleaning of subject pipe by Flowmore Services (see attached quote) .....""".......--.. $19.953.00
. Fumish material. Jabor & equipment for access end other eSBlstam::e
as detailed in attached quote .........................................................................."......... $15.015.00
Rental, delivery, fusion. etc. for the use of 24" HOPE pipe for
300 LF of temporary discharge piping ................__..__m.............................................. $12,800.00
Ovemea(f/Profit (10'%) ...... ...... ..... ,........_____........ .................... ......'....... ........... ............. $4.776.80
Total Cost ..............".......................................... $52,544.60
AlTERNATE NO.2
. Cleaning of Gubjeat pIpe by Flawmore Services (see atta.ched quote) .......--............. $19,953.00
FumlstJ material, labor & equipment for access and Qther sssistance
as detailed In attacl1ed quote .........................................__.......................................... $14.945.00
. Furnisn 100 LF of 24" DIP to go along with the existing 160 I..F of 24" pipe
delivered to t/1e site. Pipe will be used for the temporary dlscnarge piping
for ttle cleaning operation. At completion of c1e3n'f1g the 160 J.F will be
disassembled and ullll%ed In the project as orfglnally proposed.............................:..... $3.392.00
Overhead/Profit (1 Oil/g) ....... ............. ...................... ....... .... ................. .... ........." ............ $3,e29.00
Total Cost .......................................................... 542,119.DO
Respe(:tfully Submitted
By:
~s.~
Patrick $. Dillard, Chief Estimator
Date:
5/II)q(
, ,
11:: File wI attat;hment
cc: Mr. Jorge E. Jfmen~ P.E. w/arr.a.ehment
· OS/2,112001 02: .~4 FAX
RECEI~E6; 6/11/01 6:09; -~CH2M HILL; N4~O; PAGE 3
BLAIR CONSTRUCTION
PIPELINE PIG!3lN!3 PRODIXTS
~003
MAY.ll'2001 08:28 7066661656
/
_ ,MAY-08-:gal U!I:32
#419'7 P.003/004
P.02
;..-:;~
ttb<<' f" .
"'''~~___I~~ '0.:..01
~~:~~'~'~:~::',<'.",;';:' ":',: ; t
~~ ", . ..... .....'!, ........__..; \..
-=-D
FLOWMORE SERVICES
A O/V. Of: PIPEUNE PIGGING, PRODUCTS, INC,
IMay 8, 2001
1M. William Mutitner
alai,. Construction, Ine
I~. O. Box 770
IEvansr 6A 30809
I)H: (706) 868-1950
I:"AX~ (706) 868-1855
1:tE; Cleaning of approxi~ly 17IXJrJ of 18- cement fined cost iron pipeline.
I)er your requ~, please find bctow our quotmion for the abovz mentioned wo~
I=or the amount of $ 19,953.00 FJowmo.-e Services would prcvide 'the following ;
t Mobilization and two man pipeli~ cleaning crew.
:!. All required pipeline d~ning pigs. ( up to 9 pig$ )
:5. Temporary lS-launcher.
4. Two lIIfrt/ radio communication,
Ii. Pressure profiling equIpment.
~;. Pig tro.ckl"9 equipment.
~r. 2 rn.illion $ })ubllc liabill'ty insurance.
'Ne. woutd ask others to provide the faUowing:
L At:~ to each end of the pipelin'l (lBO# 18" flonged connections)
;~_ Lift equipm~t for mountJng kwnchao.
~t Adequate.ater pressur., to pig the line. (6" 1tro11' flarged CoM. 2000-4OOO
~,pm @ 80 ~i)
4t Ass~nce wtfh the. installation of temporary pigging equipment.
~s. Disposal of used pigs and effluents.
~t. As~istance in operatillg pumps, vaI~1 efc, etc.
-- ------------- ..----------------- ---. -- -. --....
,
05/21<~00~ 02~~ FAX
.
RECEIVeO; 6/11/01 8=Oe~
141 004
!
_>CH2M HrL~; #460. PAGE 4
MAY.ll'2001 08:29 7068681855
,. ~-a3-20l2l1 10: 33
BLAIR CONSTRUCTION
PlPELlNE P1OOI!'G PROIX.lCTS
#4197 p.004/004
P.03
......';
f-ME 2
Fknnnol'e ,Se.rviceC dou not accept re!IpOnslbiUiy for stuck ptgs due to
obstructions in the pipe. whether man mode or ncl1'I.H"CI. We will be able to locate
a.rry obstructions with our pig trtlcki"9 equipment. We feel this work should be
con,pIeted tn 4 days.
A"" deIclys not CGVJed directly by Flo.-more services Will ~ charged at the rate
of :f 187.50 per hour, 010"9 with arty addltlond expenses i..curred, sum os moTel.
rerl'tol car, rental equipment, per diem, flignt c:hGrges, c:tc, ete.
If you
orry que$fions, pi"" do not hesitctr, to COJltod' me.
Re
~
CharUe Dickey
Fi.~d Servj~ Teduli~id"