Change Order
AlA Document G701 -
Electronic Format
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER [ ]
[X]
[X]
[X]
[ ]
THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATfORNEY IS ENCOURAGED WITH RESPECT TO ITS
COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AlA DOCUMENT MAY BE MADE BY USING AlA
DOCUMENT 0401.
PROJECT:
(name. address)
Belle Terrace Senior Citizens Center
Augusta, Richmond County, Georgia
CHANGE ORDER NUMBER: One (1)
DATE: January 7, 1997
ARCHITECT'S PROJECT NO: 96-016
TO CONTRACTOR:
(name. address) CONTRACT DATE: September 24, 1996
Continental Construction Company, Inc.
P.O. Box 204198 CONTRACT FOR: General Contracting
Augusta, Georgia 30917
The Contract is changed as follows:
Construction of a new 34 space double loaded asphalt parking lot adjacent to the Senior Citizens Center, as designed by
Precision Planning, Inc. (See Sheet C-7 of the Construction Documents.)
Total Proposed Amount: $23,955.00
Not valid until signed by the Owner, Architect and Contractor.
The original (Contract Sum)(Gl:Iaranteed Ma)(imHffi Price) was
Net change by previously authorized Change Orders
The (Contract Sum)(Guaranteed Maximum Price) prior to this Change Order was
The (Contract Sum)(Guaranteed Maximum Price) will be (increased)(de0reased)
(uncAan;ed) by this Change Order in the amount of
The new (Contract Sum)(Guaranteed MaXHnHffi Price) including this Change Order will be
$ 471,579.00
$ 0.00
$ 471,579.00
$ 23,955.00
$ 495.534.00
The Contract Time will be (increased)(decreased)(l:IncAan;ed) by Fifteen (15) days.
The date of Substantial Completion as of the date of this Change Order therefore is April 20, 1997
NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been
authorized by Construction Change Directive.
CONTRACTOR OWNER
Continental Construction
Address
P.O. B a, Georgia
AKLHll bL 1
Precision Planning, Inc.
Address
400 Pi encevilIe, Georgia
DATE 1",11
AlA DOCUMENT G70 I _ CHANGE ORDER - 1987 EDITION - AlA - COPYRIGHT 1987 - THE AMERICAN INSTITUTE OF ARCHITECTS. 17J5 NEW '\"ORK
A VENUE. N.W.. W.,\SHINGTON. D.C.. 20006-5292.. WARNING; Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecutil11l. This
document was dectwnically produced with pemlission of the AlA and can be reproduc~d without violation until the date of expiration as noted below.
Electronic Format G701-19S7
User Document: G701BELL.DOC -- 1/7/1997. AlA License Number 102405, which expires on 8/31/1997 -- Page #1
......
RICHA RD L. HORTON. PRESIDENT
RALPH C. (SKIP) NEWMAN. VICE PRESIDENT
DIANNE MEESE. CORPORA TE SECRETARY
706-860-3846
706-863-0306 (FAX)
CONTINENTAL CONSTRUCTION COMPANY, INC.
P.O. BOX 204198 . AUGUSTA, GEORGIA 30917-4198
.J anuary 2, 1997
J II N ;\ Co -'9':)"'(
. h .J I....,.
Liz Hudson
Precision Planning, Inc.
P.O. Box 2210
Lawrenceville, Ga. 30246
Re: Belle Terrace Senior Citizens Center
Liz:
As requested, I have prepared a price for the additional
parking on the above job. The price is $23,955.00. Breakdown as
follows.
Subcontractor Quote
Contractor 10%
$21,777.00
2.178.00
$23,955.00
If you have any questions,
call.
SN/dm
SCOTT'S
GRADING & PAVING CO., INC.
AIKEN, SOUTH CAROLINA 29802
January 2, 1997
Continental Construction Co.
P.O. Box 204198 ,
Augusta, Ga. ~0917
RE: Belle Terrace Phase 2
Dear Mr. Skip Newman;
We are pleased to submit the following proposal on the above
mentioned project. Our proposal is as follows:
SITE.WORK:
264 cy Cut on site
264 cy Dirt to haul off
107 cy Topsoil to haul in
PAVING:
1,112sy Mix & compact sub-grade
1,112 sy 6" Aggregate base
1,112 sy 2" Asphalt binder
1,li2 sy 1" Asphalt Type E or F topping
1,112 sy Tack coat
560 lf Striping
CONCRETE:
322 If Curb & gutter
50 sy 4" Crusher run stone pad
CONSTRUCTION STAKING
Total proposal
$ 2'1 , 7 7 7 . 0 0
.'
/
P.O. Box 483.1579 Edgefield Highway North. (803) 649-2087. (803) 649-2317. (803) 279-9762. Fax (803) 649-1125
_,._.,... ,.J,.. __...~
1IlC;I4AIO L. HOIIfON, '..IICIIlT
IlUKI e. (S1l'IP) tUWUAN. vtCl PlIUIDEHT
W,HNI MIIIL (:OIl'OIA" UCIlITAIIY
706-S60~6
106~~~ (~A'lC)
CONTINENTAL CONSTRUCTION COMPANY, INC.
P.O. BOX 204'98 . AUGUSTA. GEOAGtA 30917.4198 .
.1l\nuary 6, 1997
Liz Hudeon
Precision Plnnning, Inn.
P.O. Br..~ 2210
Lawrenceville, Ga. 30246
Re: Belle Terrace Senior Citlzeno C~nter
f>ear Li2:
As per our di8Cussion this morning, I will need an
additional 15 days for the extra wor~ on the parkins lot.
If you have any questions, P ease call.
6N/dm