Loading...
HomeMy WebLinkAboutBselle Terrace Senior Citiens Center Augusta Richmond GA DOCUMENT NAME: ~ \e- "\e:X',(Q('e., ~\CX CX\\ 'GC-D ~ ~G'r DOCUMENT TYPE: Clto...~ CXdex YEAR: C\ l BOX NUMBER: ()O) FILE NUMBER: \61f\l NUMBER OF PAGES: 4 .. ' Change Order AlA Document G701 - Electronic Format OWNER ARCHITECT CONTRACTOR FIELD OTHER [ ] [X] [X] [X] [ ] THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATfORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AlA DOCUMENT MAY BE MADE BY USING AlA DOCUMENT 0401. PROJECT: (name. address) Belle Terrace Senior Citizens Center Augusta, Richmond County, Georgia CHANGE ORDER NUMBER: One (1) DATE: January 7, 1997 ARCHITECT'S PROJECT NO: 96-016 TO CONTRACTOR: (name. address) CONTRACT DATE: September 24, 1996 Continental Construction Company, Inc. P.O. Box 204198 CONTRACT FOR: General Contracting Augusta, Georgia 30917 The Contract is changed as follows: Construction of a new 34 space double loaded asphalt parking lot adjacent to the Senior Citizens Center, as designed by Precision Planning, Inc. (See Sheet C-7 of the Construction Documents.) Total Proposed Amount: $23,955.00 Not valid until signed by the Owner, Architect and Contractor. The original (Contract Sum)(Gl:Iaranteed Ma)(imHffi Price) was Net change by previously authorized Change Orders The (Contract Sum)(Guaranteed Maximum Price) prior to this Change Order was The (Contract Sum)(Guaranteed Maximum Price) will be (increased)(de0reased) (uncAan;ed) by this Change Order in the amount of The new (Contract Sum)(Guaranteed MaXHnHffi Price) including this Change Order will be $ 471,579.00 $ 0.00 $ 471,579.00 $ 23,955.00 $ 495.534.00 The Contract Time will be (increased)(decreased)(l:IncAan;ed) by Fifteen (15) days. The date of Substantial Completion as of the date of this Change Order therefore is April 20, 1997 NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. CONTRACTOR OWNER Continental Construction Address P.O. B a, Georgia AKLHll bL 1 Precision Planning, Inc. Address 400 Pi encevilIe, Georgia DATE 1",11 AlA DOCUMENT G70 I _ CHANGE ORDER - 1987 EDITION - AlA - COPYRIGHT 1987 - THE AMERICAN INSTITUTE OF ARCHITECTS. 17J5 NEW '\"ORK A VENUE. N.W.. W.,\SHINGTON. D.C.. 20006-5292.. WARNING; Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecutil11l. This document was dectwnically produced with pemlission of the AlA and can be reproduc~d without violation until the date of expiration as noted below. Electronic Format G701-19S7 User Document: G701BELL.DOC -- 1/7/1997. AlA License Number 102405, which expires on 8/31/1997 -- Page #1 ...... RICHA RD L. HORTON. PRESIDENT RALPH C. (SKIP) NEWMAN. VICE PRESIDENT DIANNE MEESE. CORPORA TE SECRETARY 706-860-3846 706-863-0306 (FAX) CONTINENTAL CONSTRUCTION COMPANY, INC. P.O. BOX 204198 . AUGUSTA, GEORGIA 30917-4198 .J anuary 2, 1997 J II N ;\ Co -'9':)"'( . h .J I....,. Liz Hudson Precision Planning, Inc. P.O. Box 2210 Lawrenceville, Ga. 30246 Re: Belle Terrace Senior Citizens Center Liz: As requested, I have prepared a price for the additional parking on the above job. The price is $23,955.00. Breakdown as follows. Subcontractor Quote Contractor 10% $21,777.00 2.178.00 $23,955.00 If you have any questions, call. SN/dm SCOTT'S GRADING & PAVING CO., INC. AIKEN, SOUTH CAROLINA 29802 January 2, 1997 Continental Construction Co. P.O. Box 204198 , Augusta, Ga. ~0917 RE: Belle Terrace Phase 2 Dear Mr. Skip Newman; We are pleased to submit the following proposal on the above mentioned project. Our proposal is as follows: SITE.WORK: 264 cy Cut on site 264 cy Dirt to haul off 107 cy Topsoil to haul in PAVING: 1,112sy Mix & compact sub-grade 1,112 sy 6" Aggregate base 1,112 sy 2" Asphalt binder 1,li2 sy 1" Asphalt Type E or F topping 1,112 sy Tack coat 560 lf Striping CONCRETE: 322 If Curb & gutter 50 sy 4" Crusher run stone pad CONSTRUCTION STAKING Total proposal $ 2'1 , 7 7 7 . 0 0 .' / P.O. Box 483.1579 Edgefield Highway North. (803) 649-2087. (803) 649-2317. (803) 279-9762. Fax (803) 649-1125 _,._.,... ,.J,.. __...~ 1IlC;I4AIO L. HOIIfON, '..IICIIlT IlUKI e. (S1l'IP) tUWUAN. vtCl PlIUIDEHT W,HNI MIIIL (:OIl'OIA" UCIlITAIIY 706-S60~6 106~~~ (~A'lC) CONTINENTAL CONSTRUCTION COMPANY, INC. P.O. BOX 204'98 . AUGUSTA. GEOAGtA 30917.4198 . .1l\nuary 6, 1997 Liz Hudeon Precision Plnnning, Inn. P.O. Br..~ 2210 Lawrenceville, Ga. 30246 Re: Belle Terrace Senior Citlzeno C~nter f>ear Li2: As per our di8Cussion this morning, I will need an additional 15 days for the extra wor~ on the parkins lot. If you have any questions, P ease call. 6N/dm ,.., ,..,,' ,.., _ i' () 0 _ () ,",\1 . Il ~I -':J I . n'! . I ~ 1\\ n"l ..., H I N -=I N TIN ITl