CONSTRUCTION CONTRACT CHANGE ORDER
co NU:rvlliER 3
BID ITEM 02-146
DATE 6/18/2003
PROJECT TITLE
ORIGINAL CONTRACT DATE
OWNER AUGUSTA, GEORGIA
Brown Road Elevated Storage Tank Demolition
1/21/2003
PROJECT NUMBER
PO NUMBER
.1M22
EQ1lli
The following change is hereby made to the contract for the above project:
Description of Change (for a more detailed description see attached proposal):
Ibis is a deduct change order to the project. The initial design for this project took into account potential
remediation concerns and were subsequendy placed in the contract as a bid item. Both pre and post demolition
testing was performed which determined that all of the test samples were below the Georgia Department of
Natural Resources HSRA levels. Since the test results were below expectable levels the contractor did not
perform any remediation onsite. Ibis change order is to adjust out the unused remediation portion of the
contact that was not uti1ized.
PAYEE
TOTAL AMOUNT OF THIS CHANGE ORDER
Empire Dismandement Corporation
$
-0-
The contract time will be UNEFFECTED by Q calendar days as a result of this change.
ORIGINAL CONTRACT AMOUNT $ 119,610.00
PREVIOUS CHANGE ORDER $ 57,970.00
THIS CHANGE ORDER ($14,200) $ (14,200.00)
TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ 163,380.00
FUNDING NUMBER/ACCOUNT NUMBER 509043410 5425110
5425110 ~'111N-
~
. DATE: 6/18/03
. pROPOSED BY:
C N'ffiACTOR
REQUESTED BY: David H~PreS~dent DATE: (P/~bl D3
'7tt. ~Vo-'\.
NGJ ER ' .
SUBMITTED BY: DATE: 61z1/o~
FINANCE ENDORSEl1E DATE: 0)?ojo3
RECOMMENDED BY: DATE: -y~~
APPROVED BY: t DATE: ~A~~