Loading...
HomeMy WebLinkAboutBROWN RD 3 MG ELEVATED STORAGE TANK-CHANGE ORDER . . CONSTRUCTION CONTRACT CHANGE ORDER CO NUMBER BID ITEM DATE PROJECT TITLE ORIGINAL CONTRACT DATE OWNER AUGUSTA, GEORGIA Brown Road 3 MG Elevated Storage Tank 07/15/2003 PROJECT NUMBER PO NUMBER 01 03-069 3/15/2005 10425 74940 The following change is hereby made to the contract for the above project: Description of Change (for a more detailed description see attached proposal): This is a deduct change order to the original contract amount. The reason for this deduct is, the additional logo and subsequent lighting was removed from this project. In addition, The Augusta Utilities Department provided their prefered altitude valve. As such, the original altitude valve, additional logo and lighting was removed and deducted from the original contract amount. PAYEE TOTAL AMOUNT OF THIS CHANGE ORDER $ The contract time will be effected by Q calendar days as a result of this change. ORIGINAL CONTRACT AMOUNT $ PREVIOUS CHANGE ORDER (N/ A) $ THIS CHANGE ORDER (DECREASE) $ TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ FUNDING NUMBER/ACCOUNT NUMBER 509043410 80110425 PROPOSED BY: DATE: REQUESTED BY: DATE: SUBMITTED BY: ENGINEER 11- DtlLrilfY1: DATE: ~ ~~ J<:J-' DATE: FINANCE ENDORSEMENT: ~~ A {~ (/ COM ~rJ/j{ '~/lt\W~ RECOMMENDED BY: ~~I DATE: / n _AV~I ISTRATOR APPROVED BY(j 'Iv" \)0""11~... o (J 0 MA OR DATE: Chicago Bride and Iron -13,491.60 2,469,600.00 0.00 (13,491.60) 2,456,108.40 5425110 ~ 5425110~ 4/+/or- I ~/or- .f( f~ 5 4/4/ () ~ , ~J2rJ)tf'- , ~fsf~