CHANGE ORDER
,
"
NUMBER 1
DATE 03-26-97
PROJECT TITLE: Belair Road Extension 12" Water Main Relocation
ORIGINAL CONTRACT DATE:
01-29-97
PROJECT NO. U-96-049
OWNER: Augusta-Richmond County Commission
P.O. No.
132816
CONTRACTOR:
J.D. Haire Construction Co.
The following change order is hereby made to the proposal for the
above project.
I} Delete $2,511.50 from oriqinal bid
(see breakdown on next sheet)
-$2,511.50
2} Add $11,083.50 for replacement and lowerinq
of existinq 12" water main
(see breakdown on next sheet)
+$11,083.50
3) Add $18,000.00 for chanqe in location of
new 12" crossinq
(see breakdown on next sheet)
+$18,000.00
TOTAL AMOUNT OF CHANGE ORDER:
$
26,572.00
The Contract time will be increased/decreased by
days as a result of this change.
o
calendar
ORIGINAL CONTRACT AMOUNT:
$
52,753.00
PREVIOUS CHANGE ORDERS (INCREASE/DECREASE): $
0.00
THIS CHANGE ORDER (INCREASE)
$
$
26,572.00
TOTAL CONTRACT WITH CHANGE ORDERS:
79,325.00
*******************************************************************
FUNDING SOURCE/ACCOUNT NUMBER: 62-4461-00-0891
~~ S.~jL
,E;:I;,INEER ~
1/DEP~MENT HEAD
FINANCE ENDORSEMENT: ~~
CO TROLLER
RECOMMENDED BY: ~ IG_~
AD N TRATOR
3- Z-fo -'7)
REQUESTED BY:
DATE:
5/tt/t}7
, ,
~
~/'/a,l
SUBMITTED BY:
DATE:
DATE:
DATE:
DATE:
C!/ffl
APPROVED BY: I
/~. :~'"
Change Order #1
J.D. Haire Construction
T Page 2
Item 1 - Deletion of $2,511.50 of original bid.
Delete Vertical Change #1 at $2,000 Lump Sum
Delete 50% of Vertical Change #2 at $2,200 Lump Sum
Delete $550 of $750 for As-Built Drawings
Add 69 LF of 12" water main at $16.50/LF
= $2,000.00
= $1,100.00
= $550.00
$1.138.50
$2,511. 50
Item 2 - Additional $11,083.50 due to replacement and lowering of
457 LF of existing 12" water main.
Add one 12" Gate Valve at $l,OOO/each
Add one 12" Tee at $300/each
Add one 12" 22 degree bend at $200/each
Add one 12" 90 degree bend at $250/each
Add one 12" 45 degree bend at $250/each
Add 135 LF of 12" water line (4' depth) at $16.50/LF
Add 322 LF of 12" water line (8' depth) at $18.00/LF
Add two In Line Blocks (6 Yards Concrete)
Add 100 LF all thread rod at $3.00/LF
Add extra cut in line
Add two extra MJ caps at $100/each
= $1,000.00
$300.00
$200.00
= $250.00
$250.00
=$2,227.50
= $5,796.00
$360.00
$300.00
$200.00
$200.00
$11,083.50
Item 3 - Additional $16,840.00 due to change in location of
new 12" crossing.
Add two 45 degree bends at $250/each
Add two Concrete Thrust Blocks
Add four Mega Lugs at $60/each
Add 20 LF all thread rod at $3.00/LF
Add one 1" service bore across Wrightsboro Rd.
Add 225 LF of carrier pipe with 12" water main
installed 13' deep backfilled and compacted
to DOT Standards at $74.98/LF
$500.00
= $30.00
$240.00
= $60.00
'$300.00
= $16.870.00