CHANGE ORDER
NUMBER 1
DATE 09/22/98
PROJECT TITLE Belair Hills Water Line Improvements
OR1GINAL CONTRACT DATE 02/17/98 PROJECT NUMBER
OVVNER Augusta-Richmond County Commission-Council P.O. NUMBER
CONTRACTOR Blair Construction, Inc.
U-97-017
148846
Thl~ following change order is hereby made to the proposal for the above project:
1. Purchase & Installation of Grass Sod = +$800.00
2. Purchase & Installation of Juniper Shrubs' +$100.00
3. Deduct 10' of 6" PVC WaterLine (iiJ $1.10ILF = -$101.00
4. Installation of (1) 6" Gate Valve @ $386 +$386.00
5. Installation of (1) Fire Hydrant (iiJ $1,350 +$1,350.00
6. Installation of (2) 6x6 MJ Tees (iiJ $140 +$280.00
7. Installation of 44.92 SY of 1-112" Type "E" Asphalt Concrete
Pavement Patch (iiJ $I1.45/SY = +$514.33
8. Installation of 44.92 SY of 8" Thick Concrete Road Patch (iiJ
$28.00/SY = +$1,257.70
TOTAL AMOUNT OF THIS CHANGE ORDER
$
4,587.03
Tht~ contract time will be increased/decreased by 0 Calendar days as a result of this
change.
ORIGINAL CONTRACT AMOUNT
$
42,839.50
PREVIOUS CHANGE ORDER (INCREASEIDECREASE) $ 0.00
THIS CHANGE ORDER (INCREASE/DECREASE)
$
4,587.03
TOTAL CONTRACT WITH CHANGE ORDER
$
47,426.53
************************************************************************
FUNDING SOURCE/ACCOUNT NUMBER
James W. RUShcr~
ENGINEER
62-4461-00-0891
REQUESTED BY:
DATE: 09122/98
;0., ";1"'~ .
t {~ '^'.
.e' .-
SUBMITTED BY:
FINANCE ENDORSEMENT:
A:g.
RECOMMENDED B y:<:SAo..AO..o...c. 12.
APPROVED BY:
DATE: 09/22/98
DATE: Q/z3/:J f
DA TE~ /'2--3/ c;.f
"
DATE 11.11'f