HomeMy WebLinkAboutBedford Heights Water & Sewer Improvements Augusta Richmond GA DOCUMENT NAME: ~\d Daqm~ ~ c\ ~ex- \ {Y\?~(:jJeme!\+~ DOCUMENTTYPE:(jr(A~ C)~EJ( YEAR: 0\ BOX NUMBER: \ \ FILE NUMBER: \0dd-~ NUMBER OF PAGES: L\ J. . .~ ~ CHANGE ORDER CO NUMBER 8 BID ITEj'vI 99-089 DATE 01/10/01 PROJECT TITLE BEDFORD HEIGHTS WATER AND SEWER IMPROVENTS ORIGINAL CONTRACT DATE 6/29/1999 PROJECT NUMBER U-98-009 OWNER AUGUSTA COIVIMISSION PO NUMBER r1ill:Q The following change order is hereby made to the proposal for the above project: TOTAL AMOUNT OF THIS CHANGE ORDER $ 80,675.73 The contract time will be INCREASED by Q calendar days as a result of this change. ORIGINAL CONTRACT COST $ 896,771.02 PREVIOUS CHANGE ORDER (INCREASE) $ 201,388.65 THIS CHANGE ORDER (INCREASE) $ 80,675.73 TOTALCON~~CT\~THCHANGEORDER $ 1,178,835.40 FUNDING NUIvIBER/ ACCOUNT NUi'vIBER ] /L: 507043420- G/L: 89800090- 5425210 5425210 SUBMITTED BY: CM.~~ NGINEER il, ~ ~ DEPART~r I-WAD ~;j)iLU~~ . . ADrM/Y1 tiArA. 11 0 010 (')to COMPTROLLER DATE: ~IDl01 REQUESTED BY: FIN.~NCE ENDORSEivfENT: II/biOI '(11/01 DATE: .;; -~-cJ1 'tfp;; 'Z 11;(01 , DATE: APPRO\TED BY: DATE: RECOlvINfENDED BY: DATE: ~~ " Blair CONSTRUCTION, INC. PHONE (706) 868-1950. FAX # 868-1855. POST OFFICE BOX 770. EVANS, GEORGIA 30809 January 9, 2001 AUGUSTA-RlCHMOND UTILITIES DEPARTMENT 360 Bay Street, Suite ] 80 Augusta, GA 30901 Attn: Mag Akpo-Sanni Re: BEDFORD HEIGHTS WATER AND SEWER IMPROVEMENTS Blair Project No. 0002 " Dear Mag, Please find attached the requested proposal for the installation of sewer along Brentwood Place Road in the above noted project area. If you have any questions or need any additional information, please let me know. Sincerely, r-;::>-k- s. J.:>~ Patrick S. Dillard Chief Estimator rc: File -" , .~ ~ .. QUOTATION BLAIR CONSTRUCTION. INC. P. O. BOX 770 Evans, Georgia 30809 Date: January 9, 2001 To: Augusta Utilities Department 360 Bay Street, Suite 180 Augusta, GA 30901 Attn: Mag Akpo-Sanni Project: Bedford Heights Sewer Addition along Brentwood Place ITEM DESCRIPTION UNIT COST QUANTITY AMOUNT 1 8" PVC sanitary sewer, 6-8' cut $19.10 350 LF $6,685.00 2 8" PVC sanitary sewer, 8-10' cut $21.30 1 00 LF $2,130.00 2 6" sewer service with cleanout $369.40 3EA $1,108.20 3 Precast Sanitary Manhole, 6-8' cut $980.45 2 EA $1,960.90 4 Tie-In to existing manhole $2,500.00 1 EA $2,500.00 5 Asphalt removal and patch $52.00 182 SY $9,464.00 6 Asphalt Overlay $7.00 696 SY $4,872.00 7 Ciearing $2,653.00 LS $2,653.00 8 Grassing $1,154.00 LS $1,154.00 9 Remove and replace concrete curb/gutter $24.00 12 LF $288.00 10 Remove and replace concrete sidewalk $48.00 6 SY $288.00 11 Remove and replace fences, hedges & wail $2,652.10 LS $2,652.10 12 Mobilization $1,500.00 LS $1,500.00 13 Traffic Control $1,500.00 LS $1,500.00 14 As-Built Drawings $400.00 LS $400.00 15 Select Refill (Sand-Clav) $7.00 750 CY $5,250.00 TOTAL COST: I $44,405.20 I Respectfully Submitted Blair Construction, Inc. P.O. Box 770 Evans, Georgia 30809 (706) 868-1950 By: ----;:::> ~ s. --:D...P-- Patrick S. Dillard, Chief Estimator Date: I/"/D/ ,