CHANGE ORDER
CO NUMBER 8
BID ITEj'vI 99-089
DATE 01/10/01
PROJECT TITLE
BEDFORD HEIGHTS WATER AND SEWER IMPROVENTS
ORIGINAL CONTRACT DATE 6/29/1999
PROJECT NUMBER U-98-009
OWNER AUGUSTA COIVIMISSION
PO NUMBER
r1ill:Q
The following change order is hereby made to the proposal for the above project:
TOTAL AMOUNT OF THIS CHANGE ORDER
$
80,675.73
The contract time will be INCREASED by Q calendar days as a result of this change.
ORIGINAL CONTRACT COST
$
896,771.02
PREVIOUS CHANGE ORDER (INCREASE)
$
201,388.65
THIS CHANGE ORDER (INCREASE)
$
80,675.73
TOTALCON~~CT\~THCHANGEORDER
$
1,178,835.40
FUNDING NUIvIBER/ ACCOUNT NUi'vIBER
] /L: 507043420-
G/L: 89800090-
5425210
5425210
SUBMITTED BY:
CM.~~
NGINEER
il, ~ ~
DEPART~r I-WAD
~;j)iLU~~ . .
ADrM/Y1 tiArA. 11 0 010 (')to
COMPTROLLER
DATE:
~IDl01
REQUESTED BY:
FIN.~NCE ENDORSEivfENT:
II/biOI
'(11/01
DATE:
.;; -~-cJ1
'tfp;;
'Z 11;(01
,
DATE:
APPRO\TED BY:
DATE:
RECOlvINfENDED BY:
DATE:
~~ "
Blair
CONSTRUCTION, INC.
PHONE (706) 868-1950. FAX # 868-1855. POST OFFICE BOX 770. EVANS, GEORGIA 30809
January 9, 2001
AUGUSTA-RlCHMOND UTILITIES DEPARTMENT
360 Bay Street, Suite ] 80
Augusta, GA 30901
Attn: Mag Akpo-Sanni
Re: BEDFORD HEIGHTS WATER AND SEWER IMPROVEMENTS
Blair Project No. 0002
"
Dear Mag,
Please find attached the requested proposal for the installation of sewer along Brentwood Place Road in the above
noted project area.
If you have any questions or need any additional information, please let me know.
Sincerely,
r-;::>-k- s. J.:>~
Patrick S. Dillard
Chief Estimator
rc: File
-"
,
.~
~
..
QUOTATION
BLAIR CONSTRUCTION. INC.
P. O. BOX 770
Evans, Georgia 30809
Date: January 9, 2001
To: Augusta Utilities Department
360 Bay Street, Suite 180
Augusta, GA 30901
Attn: Mag Akpo-Sanni
Project: Bedford Heights Sewer Addition along Brentwood Place
ITEM DESCRIPTION UNIT COST QUANTITY AMOUNT
1 8" PVC sanitary sewer, 6-8' cut $19.10 350 LF $6,685.00
2 8" PVC sanitary sewer, 8-10' cut $21.30 1 00 LF $2,130.00
2 6" sewer service with cleanout $369.40 3EA $1,108.20
3 Precast Sanitary Manhole, 6-8' cut $980.45 2 EA $1,960.90
4 Tie-In to existing manhole $2,500.00 1 EA $2,500.00
5 Asphalt removal and patch $52.00 182 SY $9,464.00
6 Asphalt Overlay $7.00 696 SY $4,872.00
7 Ciearing $2,653.00 LS $2,653.00
8 Grassing $1,154.00 LS $1,154.00
9 Remove and replace concrete curb/gutter $24.00 12 LF $288.00
10 Remove and replace concrete sidewalk $48.00 6 SY $288.00
11 Remove and replace fences, hedges & wail $2,652.10 LS $2,652.10
12 Mobilization $1,500.00 LS $1,500.00
13 Traffic Control $1,500.00 LS $1,500.00
14 As-Built Drawings $400.00 LS $400.00
15 Select Refill (Sand-Clav) $7.00 750 CY $5,250.00
TOTAL COST: I $44,405.20 I
Respectfully Submitted
Blair Construction, Inc.
P.O. Box 770
Evans, Georgia 30809
(706) 868-1950
By:
----;:::> ~ s. --:D...P--
Patrick S. Dillard, Chief Estimator
Date:
I/"/D/
,