Loading...
HomeMy WebLinkAboutBarton Chapel Road, Phase II Augusta Richmond GA DOCUMENT NAME: ~ ARlo'" C-Hr-!-pe: L 'Ko A\)I ? \-\ t'l SE: JI: DOCUMENT TYPE: C,)..\. A rJG--E. OR-v ~ YEAR: d..C:O S- BOX NUMBER: :;2.. S- FILE NUMBER: 'll Le ~ 4> NUMBER OF PAGES: 3 " " - t '~ Change Order Form Change Order Number: Six Date: February 28, 2005 Project Title Barton Chapel Road. Ph. II Original Contract Date: 04-15-03 Project Number: 322-04-292822678 Owner: ARC P.O. Number: P75245 Contractor: Beams Pavement Maintenance Co. The following change order is hereby made to the proposal for the above project: See Attached Sheet TOTAL AMOUNT OF THIS CHANGE ORDER $ 9.120.15 The Contract time will be increased by 7 additional days due to this change order. Original Contract Amount $ 2.364.707.93 Previous Change Order (Increased / Deoreased) $ 205.582.20 This Change Order (Increased / Decreased) $ 9.120.15 - TOTAL CONTRACT WITH CHANGE ORDER(S) $ 2.579.410.28 Jt- ~ ************* Recommended By: Requested By: Date: Submitted By: Date: Approved By: Date: '0 I I Vj~ Date: <J/;//c .J'- Date: '/17~S , f Date: .7 - ;( ~Ub Accepted By: Copies: Assistant Director-Engineering Procurement Geri Sams Kakoli Basu, Accountant, PWE Pre-Construction File . 6-27-1995 7:51PM FROM P.2 " .; # \' Beam's Contracting. Bobby Matthews. 2335 Atomic Road Beech Island S.C. 29842 Thursday 2/24/05 Ricky LaBrew Re: Catch basin 46 Barton Chapel, Change To 18" Pipe Additional cost for installing Catch basin 46 and l11110ing pipe to catch basin 53 and changing to 18" pipe 1) lnstal1465' of 18" pipe @18.33 a foot 2) Delete 50' of 15" pipe @ ]5.20 a foot $8523.45 ($760.00) +$7763.45 Total change for pipe 3) Reconstruct catch basin 53 +iJ 356.70 Total extra cost for change order $9120.15 Total time needed 7 Days Thanks 4-I4~ Bobby Matthews ~ , "" '" ;' ; Project :Barton Chapel Road Improvements Phase II Project CPB #: 322-04-292822678 A conflict with an existing 20" water main and sewer lines are preventing the installation of 15" RCP storm drain pipes from catch basin # 45 to catch basin #46. 18" RCP storm drain pipes will be used in lieu of the 15" RCP storm drain pipes. The total cost of $9.120.15 is available in the project construction account for Change Order #6. ITEM # Description OTY. UNIT PRICE TOTAL AMOUNT 550-1180 Storm Drain Pipe, 465FT. $18.33 $8,523.45 18 In, H 1-10 611-3000 Reconstruct catch 1LS $1,356,70 $1.356.70 Basin #53 Total: $9,880.15 The 50 feet of the 15" RCP storm drain pipe will not be used as shown in the plans between catch basin #45 to #46. The 50 ft. will be deleted from the total cost needed for Change Order #6. ITEM# 550-1150 Description Storm Drain Pipe, 15 In, H 1-10 UNIT PRICE $15.20 TOTAL AMOUNT - $760.00 OTY. - 50 Total Cost: $9,880.15 - $760.00 = $9.120.15 Comment: 7 additional days are requested to complete this work.