Loading...
HomeMy WebLinkAboutBarton Chapel Road Improvement Phase 1 Augusta Richmond GA DOCUMENT NAME~\ -\-ol ~cl "?o::d \ fn'PrQlfeJ"Y"'ff\tz:, ~l DOCUMENT TYPE: Q}'C0{je c::Jrdec- YEAR: ~ 9 BOX NUMBER: 'b FILE NUMBER: \ Y 6 d.O NUMBER OF PAGES: d ~;" . .""" i ", , Change Order Number: 2 Date: October 22, 1999 Project Title: Barton Chapel Road Improvements, Phase I Original Contract Date: January 26, 1998 Project Number: 322-04-292822675 Owner: Augusta-Richmond County P.O. Number: 155955 Contractor: APAC- GA , Tne The following change order is hereby made to the proposal for the above project: See Attachments. TOTAL AMOUNT OF THIS CHANGE ORDER $ 18,800.00 . The Contract time will be Increased by 112 calendar days as a result of this change. The date of completion including this change order is December 24, 1998. Original Contract Amount $ 965,886.40 Previous Change Order (Increased / Decreased) $ 27,994.90 This Change Order (Increased / Decreased) $ 18,800.00 TOTAL CONTRACT WITH CHANGE ORDER(S) $1.012.681.30 ************* Funding Source/Account Number: 321-04-1110-6011110-288821675 ($18,800.00) Date: 11/1"/19 I . . Requested By: Submitted By: Date: Date:~ Date: \ 2/(D/~9. Date: \ 7-110/99 I Recommende Approved By: Accepted By: Date: .;-7 c:.? /c:/'-ZZ-- // ~,~ . 1'. " . . I ATTACHMENT BARTON CHAPEL ROAD IMPROVEMENTS, PHASE I CHANGE ORDER NUMBER TWO PROJECt NUMBER:322-04-292822675 OCTOBER 22, 1999 Item No.1: 30" Rep shown on plans but inadvertently left off Detailed Estimate. This was a required item. GADOT will participate in cost. 40 L.F. @ $55.45/L.F. = $2,218.00 Item No.2: Flood of July 16; 1998 washed away the Barton Chapel Road roadway just East of Glenn Hills Drive. Contractor had to install a gate valve and box on an existing 8" ductile iron pipe so the water could be cut off without disrupting service. LUMP SUM Cost = $ 970.00 Item No.3: Proposed pavement widening required an existing water vault be adjusted to the new grade. This was not provided for in the plans but was a required item. Total Cost = $3,795.00 Item No.4: Approximately 3 1/2 months after the adjustment in Item No.. 3 above the doors and hinges broke under traffic. New hinges and doors had to be installed. LUMP SUM Cost = $2,300.00 Item No.5: The aforementioned July 16,1998 Flood washed away a portion of Barton Chapel Road, causing Augusta-Richmond County to close the road for a week while the contractor repaired the road. The detoured traffic damaged a private drive and parking area during this time period. Repairs required an additiomil: a) 220 Tons Asphalt "E" @$36.35/Ton = $7,997.00 b) 65 Tons"GAB @..$1.6.0QlTon- . .0_' = $L520.00 Item No.5 Total = $9,517.00 SUMMARY Item No.1 = $ 2,218.00 . Item No.2 = $ 970.00 Item No.3 = $ 3,795.00 Item No.4 = $ 2,300.00 Item No.5 == $ 9.517.00 Total =$18,800.00 . TOTAL THIS CHANGE ORDER = $18,800.00 Page 2 of2