Loading...
HomeMy WebLinkAboutAugusta Canal Pedestrain and Bike Trail Phase 1 Augusta Richmond GA DOCUMENT NAME: ft, lJ S ~ 61-0- ~(). n Cl \ rp<z- c\ .e. S+ 'f; 0- V1 0.. VI c( ~'I.\u -r (V--\ \ 1''<1 t>- S~ I DOCUMENT TYPE: L \,t\o..n ~e- Ov-d e ~ YEAR: ;)00\ BOX NUMBER: 1)- FILE NUMBER: ) S?- 71.o NUMBER OF PAGES: 3 .I <). Public Works and En.gine~ring Department Teresa C. Smith, P.E., Director Room 701, 530 Greene St. Augusta, Georgia 30911 (706) 821-1706 FAX (706) 821-1708 Clifford A. Goins, Assistant Director Engineering Division March 7, 200 I Mr. Hugh W. Wilson L-J, Inc. 220 Stoneridge Drive, Suite 405 Columbia, SC 29210 RE: Augusta Canal Pedestrian and Bike Trail, Phase I Project Reference: .327-04-296812019 File Reference: 93-036(8) Dear Mr. Wilson: Enclosed herewith for your records is a copy of the executed Change Order #1 on the above referenced project. If you have any qu ,tions, please contact me at 821-1714. 14-~ Clifford A. oins Assistant Director CAG/dlh xc: Ms. Lena Bonner, Clerk of commission, w/copy of change order Ms. Geri Sams, Director of Purchasing, w/copy'of change order Ms. Teresa Smith, P.E., Director of Public Works & Engineering, w/copy of change order Ms. Donna Williams, Interim Comptroller, w/copy of change order Mr. Robert Clements, Assistant Pre-Construction Engineer, w/copy of change order ;..r 'Ii. Change Order Number: One Date: 2-8-00 Project Title Augusta Canal Pedestrian and Bicycle Trail. Phase I Original Contract Date: 7/21/99 Project Number: 327-04-296812019 Owner: ARC P.O. Number: 11906 Contractor: L-J. Inc. The following change order is hereby made to the proposal for the above project: See Attached Sheet TOTAL Al\'10UNT OF THIS CHANGE ORDER $ 10.906.50 The Contract time will be Increased/Decreased by 45 calendar days as a result of this change. The date of completion including this change order is 10-16-99 Original Contract Amount Previous Change Order (Increased / Decreased) This Change Order (Increased / Decreased) TOTAL CONTRACT \VITH CHANGE ORDER(S) ************* $ 207.100.60 $ 00.00 $ 10.906.50 $ 218.007.10 Funding Source/Account Number: , ,27-04-1110-5414212-2'6812019 - 54/4 2/ ~ Requested By: Date: Date: ():J- / (),- / () I / Date: ~/ ~/ ~ / Date: Approved By: Date: Accepted By: Date: :: . ~ . , Attachment February 8, 2000 AUGUSTA CANAL PEDESTRIAN AND BICYCLE TRAIL, PHASE I CHANGE ORDER NUMBER ONE A. ADD: 5 c. yds. Concrete Abutments @ $ 1,200.00/c.yd. $ 6,000.00 (A) Total $ 6,000.00 B. ADD: 490 LF Pressure Treated 2xl0 Lumber@ $4.80/LF 70 LF Pressure Treated 2x8 Lumber @ $3.00/LF 35 LF Pressure Treated 2x6 Lumber @ $2.40/LF 60 LF Pressure Treated 2x4 Lumber @ $1.80/LF Sub Total Graded Aggregate Base = 48.34yds. @ $1 O.OO/s.y. Asphaltic Concrete HE" = 39.55yds. @ $12.00/s.y. Concrete Valley, 6 Inch = 2.75yds. @ $35.00/s.y. Remove Curb & Gutter - All Sizes = 20LF @ $30.00/LF Sub Total (B) Total C. ADD: Vehicle Barriers (Bollards) = 2 each @ $400.00 $ (C) Total $ $ 2,352.00 $ 210.00 $ 84.00 $ 108.00 $ 2,754.00 $ 483.40 $ 474.60 $ 94.50 $ 300.00 $ 1.352.50 $ 4,106.50 800.00 800.00 Total Change Order (A) + (B) + (C) = $10,906.50 Page 2 of2