HomeMy WebLinkAboutAugusta Canal Pedestrain and Bike Trail Phase 1
Augusta Richmond GA
DOCUMENT NAME: ft, lJ S ~ 61-0- ~(). n Cl \ rp<z- c\ .e. S+ 'f; 0- V1 0.. VI c( ~'I.\u
-r (V--\ \ 1''<1 t>- S~ I
DOCUMENT TYPE: L \,t\o..n ~e- Ov-d e ~
YEAR: ;)00\
BOX NUMBER: 1)-
FILE NUMBER: ) S?- 71.o
NUMBER OF PAGES:
3
.I
<).
Public Works and En.gine~ring Department
Teresa C. Smith, P.E., Director
Room 701, 530 Greene St.
Augusta, Georgia 30911
(706) 821-1706 FAX (706) 821-1708
Clifford A. Goins, Assistant Director
Engineering Division
March 7, 200 I
Mr. Hugh W. Wilson
L-J, Inc.
220 Stoneridge Drive, Suite 405
Columbia, SC 29210
RE: Augusta Canal Pedestrian and Bike Trail, Phase I
Project Reference: .327-04-296812019
File Reference: 93-036(8)
Dear Mr. Wilson:
Enclosed herewith for your records is a copy of the executed Change Order #1 on the above referenced
project.
If you have any qu ,tions, please contact me at 821-1714.
14-~
Clifford A. oins
Assistant Director
CAG/dlh
xc: Ms. Lena Bonner, Clerk of commission, w/copy of change order
Ms. Geri Sams, Director of Purchasing, w/copy'of change order
Ms. Teresa Smith, P.E., Director of Public Works & Engineering, w/copy of change order
Ms. Donna Williams, Interim Comptroller, w/copy of change order
Mr. Robert Clements, Assistant Pre-Construction Engineer, w/copy of change order
;..r
'Ii.
Change Order Number: One Date: 2-8-00
Project Title Augusta Canal Pedestrian and Bicycle Trail. Phase I
Original Contract Date: 7/21/99 Project Number: 327-04-296812019
Owner: ARC P.O. Number: 11906
Contractor: L-J. Inc.
The following change order is hereby made to the proposal for the above project:
See Attached Sheet
TOTAL Al\'10UNT OF THIS CHANGE ORDER
$ 10.906.50
The Contract time will be Increased/Decreased by 45 calendar days as a result of
this change. The date of completion including this change order is 10-16-99
Original Contract Amount
Previous Change Order
(Increased / Decreased)
This Change Order
(Increased / Decreased)
TOTAL CONTRACT \VITH CHANGE ORDER(S)
*************
$ 207.100.60
$ 00.00
$ 10.906.50
$ 218.007.10
Funding Source/Account Number:
,
,27-04-1110-5414212-2'6812019 - 54/4 2/ ~
Requested By:
Date:
Date: ():J- / (),- / () I
/
Date: ~/ ~/ ~ /
Date:
Approved By:
Date:
Accepted By:
Date:
:: . ~
. ,
Attachment
February 8, 2000
AUGUSTA CANAL PEDESTRIAN AND BICYCLE TRAIL, PHASE I
CHANGE ORDER NUMBER ONE
A. ADD: 5 c. yds. Concrete Abutments @ $ 1,200.00/c.yd. $ 6,000.00
(A) Total $ 6,000.00
B. ADD: 490 LF Pressure Treated 2xl0 Lumber@ $4.80/LF
70 LF Pressure Treated 2x8 Lumber @ $3.00/LF
35 LF Pressure Treated 2x6 Lumber @ $2.40/LF
60 LF Pressure Treated 2x4 Lumber @ $1.80/LF
Sub Total
Graded Aggregate Base = 48.34yds. @ $1 O.OO/s.y.
Asphaltic Concrete HE" = 39.55yds. @ $12.00/s.y.
Concrete Valley, 6 Inch = 2.75yds. @ $35.00/s.y.
Remove Curb & Gutter - All Sizes = 20LF @ $30.00/LF
Sub Total
(B) Total
C. ADD: Vehicle Barriers (Bollards) = 2 each @ $400.00
$
(C) Total $
$ 2,352.00
$ 210.00
$ 84.00
$ 108.00
$ 2,754.00
$ 483.40
$ 474.60
$ 94.50
$ 300.00
$ 1.352.50
$ 4,106.50
800.00
800.00
Total Change Order (A) + (B) + (C) = $10,906.50
Page 2 of2