HomeMy WebLinkAboutARCADIS GERAGHTY & MILLER "'" < , ENGINEERING CONTRACT CHANGE ORDER co NUMBER DATE PROJECT TITLE ORIGINAL CONTRACT DATE OWNER AUGUSTA, GEORGIA Administration Facility Design 2/5/02 PROJECT NUMBER PO NUMBER 7 9/16/05 90100 P56752 The following change is hereby made to the contract for the above project: Description of Change (for a more detailed description see attached proposal): Revise 2nd and 3rd Floor layouts and add fire suppression sprinkler system. PAYEE TOTAL AMOUNT OF THIS CHANGE ORDER $ Arcadis Geraghty & Miller The contract time will be INCREASED by Q calendar days as a result of this change. 49,014.00 ~~ PROJECT ENGINEER I!lrP a DElARTMENT HEAD f\ J t~ DATE: ~MPTROLLER lnlJP.r RECOMMENDEDBy,~~DATE: ~ ADM! TOR APPROVED BY: J~ ~ ~ DATE: MAY~ ORIGINAL CONTRACT AMOUNT PREVIOUS CHANGE ORDER (INCREASE) THIS CHANGE ORDER (INCREASE) TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER FUNDING NUMBER/ACCOUNT NUMBER 509043490 80190100 PROPOSED BY: If ""oteJ /JoPQJ,ft. 1r1ll:":J DESIGN ENGINEER REQUESTED BY: SUBMITTED BY: FINANCE ENDORSEMENT: $ $ $ $ DATE: DATE: DATE: 342,121.00 287,221.00 49,014.00 678,356.00 5213119 ~ 5213119 ~ '1!ts-lor.t 7/II/or I I I I ~;0r Of /r~!tJ5 q _ &b_o$ 1..11t /~r /~/'i/!~ ~. \ .' ~ ARCADIS Infrastructure, environment, buildings Mr. Douglas Cheek Assistant Director Augusta Utilities Department 360 Bay Street Augusta, GA 30901-1546 Su~ect: ~ 7 Municipal Complex Program Change Order No. 3"\ ~ Dear Mr. Cheek: ARCADIS is in the process of addressing all owner comments for the Augusta Municipal Complex project. Several design change options were requested; therefore, ARCADIS is requesting a change order for the reengineering effort resulting from those requests. Scope of Work Changes The requested design change is to add fire sprinkler systems to the administration, crew, and warehouse buildings. We assume that the nearby water tank will supply an adequate quantity of water for the fire main. If fire pumps need to be added, we will reevaluate the design effort. Compensation Requested Fire Sprinkler System Upgrade Schedule Impact $22,014 The scope of work detailed above will require approximately four weeks from the notice to proceed to complete. We will reissue the associated design packages upon completion. If you have any further questions, please do not hesitate to call. Thank you for your consideration. Copies: M. Hicks, ADD J. Holley, ADD Clifford Carey, CH2M Hill E. Newell, Giffels Part of a bigger picture G:\WpIGS028517\corlletO03.doc ARCADIS G&M, Inc. 2849 Paces Ferry Road Suite 400 Atlanta Georgia 30339 Tel 770431 8666 Fax 770 435 2666 www.arcadis-u5.com WATER RESOURCES Date: July 11, 2005 Contact: Wayne Welch Extension: 530 E-mail: wwelch@arcadis~us.com Our ref. GS0285l7.0002.GA004 ""t I " JA ARCADIS Infrastructure, erMronment buildings Mr. Douglas Cheek. Assistant Director Augusta Utilities Department 360 Bay Street Augusta, Ok 3090b1546 subjeCt: "- Municipal Complex Program Change Order No. ~ i)< 7 Door Mr. Cheek: ARCADIS is in the process of completing the plans and specifications for the Augusta. Utilities Department (ADD) Municipal Complex project A design change to modifY the space on the second floor and finish thetbirdfioor was requested; 'therefore,. ARCADIS is requesting a change order fur the reengmeering effort resulting from, this request. Scope of Work Changes The requested design change is for modifying the second-floor offices and finishing the third 'fioorwith office, space as detailed on drawmgSreceived from AUD. This , will require modifications to architectural, electrical. and mecllanica1 drawings.. Compensation Requested Seoond- and Third-Floor Modifications Schedule Impact $27,000 The sc~ ofwork.d~led above will be completed for, an Oct()Der 2005 bid date. Once the drawings have been completed, Ii review set wiD be sent to ADD furre'View and approval. cD }'De Welch, PH Senior Project Manager CoQIe$: M. Hicks. AUD J. Holley, ADD C. Carey, CH2M Hill R. Munger, ARC Capital Improvements E. Newell, Giffbls Thili Pf'OPoorJl and its contMts shafl not be dupfJcsmd, used, or dlscJoSfKl-...in Whole or in pt1f't-for any purposa other than to evaluate the proposal. This profJO$af is not if1ltmded to be binding or form tho terms of a controct. The scope and price of tMs proposal wilt be sup9I'St!ided by the contract. If /his proposal ilr aocepted and a ctIl'IJract Is awarded ttI ARCADlS as 8 result of-cr in connection wilh-the s:ubmis8ion of this proposal, ARCAD/S StId10rthe crjQm shaH have the right to make approprlste revisions of its 1t:lf'tl1S, including sccpe and price. for ~ of the ,ocmtmct. Futttter; client tihaO hmte the right ID duplicate, use, 01' disctose tho data oontainsd in this propot.iel only ttllh/1 extwK provided In the resllfting contract lJ'~~1~0li.dD< . ARCADlS G&M. 100. 2M9 ?aces Feny Road Suite 400 Allam Gl;orgla 3033ll Tel 77D431 BB66 FIIll n043!i 211116 WMN.al'C8dls.us.oom WATER RESOURCES Data: September 15. 2005 Conlllcl: Wayne Welch E!>dsnslon, 530 f5.maIl: wwelcb@areadis- us. com. 0IlI' '!l1l: GS028511.0002.0AOO4