ENGINEERING CONTRACT CHANGE ORDER
co NUMBER
DATE
PROJECT TITLE
ORIGINAL CONTRACT DATE
OWNER AUGUSTA, GEORGIA
Administration Facility Design
2/5/02
PROJECT NUMBER
PO NUMBER
7
9/16/05
90100
P56752
The following change is hereby made to the contract for the above project:
Description of Change (for a more detailed description see attached proposal):
Revise 2nd and 3rd Floor layouts and add fire suppression sprinkler system.
PAYEE
TOTAL AMOUNT OF THIS CHANGE ORDER
$
Arcadis Geraghty & Miller
The contract time will be INCREASED by Q calendar days as a result of this change.
49,014.00
~~
PROJECT ENGINEER
I!lrP a
DElARTMENT HEAD
f\ J t~ DATE:
~MPTROLLER lnlJP.r
RECOMMENDEDBy,~~DATE:
~ ADM! TOR
APPROVED BY: J~ ~ ~ DATE:
MAY~
ORIGINAL CONTRACT AMOUNT
PREVIOUS CHANGE ORDER (INCREASE)
THIS CHANGE ORDER (INCREASE)
TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER
FUNDING NUMBER/ACCOUNT NUMBER
509043490
80190100
PROPOSED BY:
If ""oteJ /JoPQJ,ft. 1r1ll:":J
DESIGN ENGINEER
REQUESTED BY:
SUBMITTED BY:
FINANCE ENDORSEMENT:
$
$
$
$
DATE:
DATE:
DATE:
342,121.00
287,221.00
49,014.00
678,356.00
5213119 ~
5213119 ~
'1!ts-lor.t 7/II/or
I I I I
~;0r
Of /r~!tJ5
q _ &b_o$
1..11t /~r
/~/'i/!~
~. \ .'
~ ARCADIS
Infrastructure, environment, buildings
Mr. Douglas Cheek
Assistant Director
Augusta Utilities Department
360 Bay Street
Augusta, GA 30901-1546
Su~ect: ~ 7
Municipal Complex Program Change Order No. 3"\
~
Dear Mr. Cheek:
ARCADIS is in the process of addressing all owner comments for the Augusta
Municipal Complex project. Several design change options were requested;
therefore, ARCADIS is requesting a change order for the reengineering effort
resulting from those requests.
Scope of Work Changes
The requested design change is to add fire sprinkler systems to the administration,
crew, and warehouse buildings. We assume that the nearby water tank will supply an
adequate quantity of water for the fire main. If fire pumps need to be added, we will
reevaluate the design effort.
Compensation Requested
Fire Sprinkler System Upgrade
Schedule Impact
$22,014
The scope of work detailed above will require approximately four weeks from the
notice to proceed to complete. We will reissue the associated design packages upon
completion.
If you have any further questions, please do not hesitate to call. Thank you for your
consideration.
Copies:
M. Hicks, ADD
J. Holley, ADD
Clifford Carey, CH2M Hill
E. Newell, Giffels
Part of a bigger picture
G:\WpIGS028517\corlletO03.doc
ARCADIS G&M, Inc.
2849 Paces Ferry Road
Suite 400
Atlanta
Georgia 30339
Tel 770431 8666
Fax 770 435 2666
www.arcadis-u5.com
WATER RESOURCES
Date:
July 11, 2005
Contact:
Wayne Welch
Extension:
530
E-mail:
wwelch@arcadis~us.com
Our ref.
GS0285l7.0002.GA004
""t I
"
JA ARCADIS
Infrastructure, erMronment buildings
Mr. Douglas Cheek. Assistant Director
Augusta Utilities Department
360 Bay Street
Augusta, Ok 3090b1546
subjeCt: "-
Municipal Complex Program Change Order No. ~
i)<
7
Door Mr. Cheek:
ARCADIS is in the process of completing the plans and specifications for the Augusta.
Utilities Department (ADD) Municipal Complex project A design change to modifY the
space on the second floor and finish thetbirdfioor was requested; 'therefore,. ARCADIS
is requesting a change order fur the reengmeering effort resulting from, this request.
Scope of Work Changes
The requested design change is for modifying the second-floor offices and finishing
the third 'fioorwith office, space as detailed on drawmgSreceived from AUD. This
, will require modifications to architectural, electrical. and mecllanica1 drawings..
Compensation Requested
Seoond- and Third-Floor Modifications
Schedule Impact
$27,000
The sc~ ofwork.d~led above will be completed for, an Oct()Der 2005 bid date.
Once the drawings have been completed, Ii review set wiD be sent to ADD furre'View
and approval.
cD
}'De Welch, PH
Senior Project Manager
CoQIe$:
M. Hicks. AUD
J. Holley, ADD
C. Carey, CH2M Hill
R. Munger, ARC Capital Improvements
E. Newell, Giffbls
Thili Pf'OPoorJl and its contMts shafl not be dupfJcsmd, used, or dlscJoSfKl-...in Whole or in pt1f't-for any
purposa other than to evaluate the proposal. This profJO$af is not if1ltmded to be binding or form tho terms
of a controct. The scope and price of tMs proposal wilt be sup9I'St!ided by the contract. If /his proposal ilr
aocepted and a ctIl'IJract Is awarded ttI ARCADlS as 8 result of-cr in connection wilh-the s:ubmis8ion of
this proposal, ARCAD/S StId10rthe crjQm shaH have the right to make approprlste revisions of its 1t:lf'tl1S,
including sccpe and price. for ~ of the ,ocmtmct. Futttter; client tihaO hmte the right ID duplicate,
use, 01' disctose tho data oontainsd in this propot.iel only ttllh/1 extwK provided In the resllfting contract
lJ'~~1~0li.dD< .
ARCADlS G&M. 100.
2M9 ?aces Feny Road
Suite 400
Allam
Gl;orgla 3033ll
Tel 77D431 BB66
FIIll n043!i 211116
WMN.al'C8dls.us.oom
WATER RESOURCES
Data:
September 15. 2005
Conlllcl:
Wayne Welch
E!>dsnslon,
530
f5.maIl:
wwelcb@areadis-
us. com.
0IlI' '!l1l:
GS028511.0002.0AOO4