HomeMy WebLinkAboutARC Drainage Improvements,Phase I Augusta Richmond GA DOCUMENT NAME: ~ro..v~ Order- FonYl DOCUMENTTYPE: c.rorse, Orol<< YEAR: ~oo4-- BOX NUMBER: 7-0 FILE NUMBER: 1',0 CZ? Lo NUMBER OF PAGES: if f Change Order Form r Change Order Number: One Date: January 15,2004 Project Title ARC Drainage Improvements, Phase I Original Contract Date: 1-05-04 Project Number: 322-04-20l823101 Owner: ARC P.O. Number: 84060 Contractor: Beams Contracting Justification: See (Page Two) TOTAL AMOUNT OF THIS CHANGE ORDER $ 6,887.50 The contract time will be increased by 30 calendar days as a result of this change. As a result the new completion date is 6-02-04. Original Contract Amount $ 931,575.75 Previous Change Order(s) Total $ 0.00 This Change Order (Increased) $ $6,887.50 . TOT AL CONTRACT WITH CHANGE ORDERS(S) ****************************************** $ 938,463.25 Finance Endorsement: Date: /- /6 -09- , Date: o(~JlJcf Date: f (1. I { ~ y Date: . // /[1/ tJ I Requested By: Submitted By. Recommended By: Approved By: .f1At~y~ Contractor Date: Accepted By: Date: /--1'& -aV CC: Errick Thompson, P.E., Assistant Director-Engineering Purchasing Department, Geri Sams Eric Edwards, Pre-Construction Engineer Kakoli Basu Valerie Jenkins PreConstruction File Change Order Form ARC Drainage Improvements, Phase I Change Order Number One Project No.: 322-04-201823101 EXPLANA nON: Plans required the removal of a large box that connected two 72" RCP, plus the removal of the downstream portion of the 72". The purpose of this was to align the flow from this 72" RCP and that of the proposed adjoining concrete ditch paving with an existing double line of 72" RCP. Once the downstream portion of the 72" RCP and the connecting box was removed it was determined that the remaining 72" RCP was approximately 20-25 degrees out of the plan alignment. Three options were explored to accomplish what was proposed by this project. 1) Construct another connector box of cast-in-place concrete and reinforcing steel. 2) Construct the box with brick 3) Fabricate a joint of72" RCP with a 22 degree bend in it The third option was selected because it will cost approx. $4,000 less than the second option above and approx, $7,000 - $8,000 less than the fIrst option. The selected option also provides the most structurally sound and hydraulically desirable of the three solutions. This problem was discovered on Tuesday, 1-13-04 and pipe fabrication will take approx. 10 days. The east- in-place option would require approx. the same. The brick option is not acceptable due to the proposed alignment, volume and velocity and was not a viable option. BEAMS CONTRACTING,INC. 2335 ATOMIC ROAD BEECH ISLAND,SC 29842 Telephone (803) 827-0136 Fax (803) 827-1868 January 15, 2004 RICHMOND COUNTY PUBLIC WORKS 1815 MARVIN GRIFFIN ROAD AUGUST A,GEORGIA 30906 ATTENTION: Mr. Robert Clements RE: ARC-DRAINAGE IMPROVEMENTS-PHASE I,PROJECT NO.322-04-201823JOl V ASSAR DRIVE & OBERLIN ROAD SECTION. Dear Mr. Clements, We are writing this letter for the proposed changes of items that are needed for the above referenced project. Listed below are the items and there amounts. 1. Furnish and Install 72" R.C.Pipe,22 Deg.Bend, 1 EA. @ $3,233.00 2. Remov,e Existing 72" Pipe, 16 L.F. @$17.00 = $272.00 3. Furnish and Install Found Backfill,TP II 75C.Y. @ $23.10 = $1.732.50 4. Install 6' Chain Link Fence, 150 L.F. @ $11 .00 = $1,650.00 TOTAL AMOUNT FOR PROPOSED CHANGE ORDER = $6,887.50 We will need to add some days to this project since it will take up to two weeks for delivery of the R.C.Pipe Bend,and additional days for this change order to be processed we are requesting and additional 30 :.. Days be added. If you should have any questions or should need any further information please give us a call. Sincerely, Buddy Rowland Buddy Rowland Estimator BEAMS CONTRACTlNG,INC. 2335 ATOMIC ROAD BEECH ISLAND,SC 29842 Telephone (803) 827-0136 Fax (803) 827-1868 January 15,2004 RICHMOND COUNTY PUBLIC WORKS 1815 MARVIN GRIFFIN ROAD AUGUST A,GEORGIA 30906 ATTENTION: Mr. Robert Clements RE: ARC-DRAINAGE IMPROVEMENTS-PHASE I,PROJECT NO.322-04-201823101 VASSAR DRIVE & OBERLIN ROAD SECTION. Dear Mr. Clements, We are writing this letter for the proposed changes of items that are needed for the above referenced project. Listed below are the items and there amounts. 1. Furnish and Install 72" R,C.Pipe,22 Deg.Bend, 1 EA. @ $3,233.00 2. Remove Existing 72" Pipe, 16 L.F. @ $17.00 = $272,00 3. Furnish and Install Found Backfill,TP II 75C.Y. @ $23.10 = $1,732.50 4. Install 6' Chain Link Fence, 150 L.F, @ $11.00 = $1,650.00 TOTAL AMOUNT FOR PROPOSED CHANGE ORDER = $6,887.50 We will need to add some days to this project since it Will take up to two weeks for delivery of the R.C.Pipe Bend,and additional days for this change order to be processed we are requesting and additional 30 - Days be added. If you should have any questions or should need any further information please give us a call. Sincerely, Buddy Rowland Buddy Rowland Estimator