Change Order Number: Five Date: 05/13/04
. Project Title ARC Drainage Improvement Phase I
Original Contract Date: 1-05-04 Project Number: 323-04-201823101
Owner: ARC P.O. Number: P84060
Contractor: Beams Contracting
The following change order is hereby made to the proposal for the above project:
See Attached
TOTAL AMOUNT OF THIS CHANGE ORDER
$ (5.685.00)
The Contract time will not be affected by this decrease in change order.
Original Contract Amount
Previous Change Order
(Increased 1 Decreased)
This Change Order
(Iaereased 1 Decreased)
TOTAL CONTRACT WITH CHANGE ORDER(S)
*************
FUnding Sourcel Account Number:
Requested :By: ~
$ 931.575.75
$ 105.056.45
$
$ (5.685.00)
$ 1.030.947.20
0- 5414710/203824022-5414710
Approved By:
Date:
Date:
Submitted By: "
Date:
Finance Endorsement:
Date:
Recommended By:
Date:
Date:
Accepted By:
COPIES: Errick Thompson, P.E. Assistant Director-Engineering
Purchasing, Geri Sams .
Kakoli Basu, Accountant, Public..Works
Pre Construction File
s:- /3 -/Jj?'
1#J; :;
t) P"1~ oy
iJ/21/c y
(, h,f,c/
f f
[5' '-/'f~o<l
,
l
Once field work b~gan it is became apparent that the piopdsed 6i1casement woulcl be mu~h more
economical than the originally planned relaying of this sewer.
As shown on the attached quote from Beams the cost is reduced from $9,710.00 to $4,025.00, a savings of
$5,685.00. '
" .
~\
BEAM'S CONTRACTING,INC.
2335 ATOMIC ROAD
BEECH ISLAND,SC 29842
Phone No. 803-827-0136 . Fax No. 803-827-1868
May 12, 2004
RICHMOND COUNTY PUBLIC WORKS
1815 MARVIN GRIFFIN ROAD
AUGUST A,GEORGIA 30906
ATTENTION: Mr. Erick Thompson,P.E.
Assistant Director-Engineering
RE: ARC-DRAINAGE IMPROVEMENTS-PHASE I,PROJECT NO.322-04-2018231 0 1
ELLIOT BOULEVARD
Dear Mr. Thompson,
We are writing this letter to propose a change and cost savings for the above
referenced project. In lieu of relaying the 10" sanitary sewer under the precast
box culvert we propose to install 16" casing around the existing 10" ductile iron
pipe. We have meet with Gerald Wall with Richmond County Utilities and he will
accept this change if Public Works approves it.
Delete item 660-081O,Sanitary Sewer Pipe, 10" D.I.P. 90 L.F. @ $71.00= $6,390.00
Delete item 668-3300,Sanitary Sewer Manhole, TP 1, 2 Each @ $1,660.00 =$3,320.00
TOTAL AMOUNT OF DELETIONS = $9,710.00
Addition 16" Steel Casing, 35 L.F. @ $115.00 = $4,025.00
TOTAL AMOUNT OF COST DIFFERENCE = $5,685.00
We would need to add a pay item for the 16" Steel Casing.