Loading...
HomeMy WebLinkAboutArc Drainage Improvement Phase I Change 6 Augusta Richmond GA DOCUMENT NAME: A yc b "Co':, ""-"f """Sxr.v~v""", eJ't.. t>hoJ1 e i. Ch0 ~U DOCUMENT TYPE: c."~ O~ U' YEAR: C) t--\ BOX NUMBER: 25 FILE NUMBER: \1 L.[ 0 G2 NUMBER OF PAGES: "2 r .li , Change Order Form Change Order Number: Six Date:. 08/18/04 Project Title ARC Drainage Improvement Phase I Original Contract Date: 1-05-04 Project Number: 323-04-201823101 Owner: ARC P.O. Number: P84060 Contractor: Beams Contracting The following change order is hereby made to the proposal for the above project: See Attached TOTAL AMOUNT OF TIDSCHANGE ORDER $ 97.867.50 The Contract time will not be affected by this decrease in change order. Original Contract Amount $ 931.575.75 Previous Change Order (Increased I Deereased) $ 99.371.45 $ This Change Order (lBereased I Decreased) $ 97.867.50 TOT ALCONTRACT WITH CHANGE ORDER(S) $ 1.128.814.70 ************* Funding Source/Account Number: 322041110- 5414710 I 204822101-5414710 Submitted B Date: 8/1~~r Date: 'i/}/~/oY Date: ~/>-c(( dl( Date: ;/~ Date: ';UftY" I , Date: .,.. .. 2(J .; () y . r Requested By: Recommended By: Approved By: Accepted By: COPIES: Errick Thompson, P.E. Assistant Director-Engineering Purchasing, Geri Sams Kakoli Basu, Accountant, Public Works Pre Construction File Jv " t ~OJ~: lOCATION: CUSTOMER: BEAM'S CONTRACTING,INC. PROPOSAL ARC DRAINAGE IMPROVEMENTS Kentworth and Ashley Drive AUGUSTA-RICHMOND COUNTY,GA. BID DATE: ESTIMATE DATE: 6/25/2004 rev 7/12/04 ITEM ITEM UNIT TOTAL NO. DESCRIPTION UNIT QUANTITY PRICE BID AMOUNT 150-1000 TRAFFIC CONTROL Lump Sum 1 $2,500.00 $2,500.00 171-0010 SILT FENCE, TYPE .C" Ln.Ft. 200 $5.00 $1,000.00 207-0203 FOUND BACKFILL MATL., TP II CU.Yd. 150 $32.35 $4,852.50 210-0100 GRADING COMPLETE (Dress-Up) Lump Sum 1 $4,800.00 $4,800.00 230-1000 LUMP SUM CONSTRUCTION Lump Sum 1 $33,345.00 $33,345.00 441-6012 CONC. CURB & GUTTER, 6" X 24", TP 2 Ln.Ft. 50 $13.00 $650.00 550-1481 STORM DRAIN PIPE,48",H 10'-15', CPP Ln.Ft. 300 $87.00 $26,100.00 550-1481 STORM DRAIN PIPE,48",H 10'-15', RCP. Ln.Ft. 40 $121.50 $4,860.00 610-0209 REM.CHAIN LINK FENCE,4 FT. Ln.Ft. 300 $5.00 $1,500.00 643-1132 RESET CHAIN LINK FENCE,4 FT., 9 GA. Ln.Ft. 300 $15.00 $4,500.00 668-1200 CATCH BASIN, GP 2 Each 2 $2,500.00 $5,000.00 668-1210 CATCH BASIN, GP 2, ADD'L. DEPTH Ln.Ft. 10 $250.00 $2,500.00 668-5000 IJUNCTION BOX Each 1 $1,550.00 $1,550.00 700-6910 PERMANENT GRASSING Acre 0.7 $4,800.00 $3,360.00 xxx-XXX)( CAMERA-VIDEO EXIST.STORM PIPE Ln.Ft. 300 $4.50 $1,350.00 GRAND TOTAL AMOUNT $97,867.50 BEAM'S CONTRACTING, INC. Signed By: Buddy Rowland Title: Estimator Date: Uune 25th,2004 tAY6J.lSD~ND C))UNTY,GA. Approved By: "'[,.-vr ^ Title: ~... ~.r '-' Date: ~ I~ 1.1( . I NOTE: Unit Price Items Could Increase or Decrease Dependino On Quantities Installed at II Project Completion. R ReQuest 60 calendar days added to ARC Drainaoe Phase I contract (7/12/04)