Change Order Form
Change Order Number: Six Date:. 08/18/04
Project Title ARC Drainage Improvement Phase I
Original Contract Date: 1-05-04 Project Number: 323-04-201823101
Owner: ARC P.O. Number: P84060
Contractor: Beams Contracting
The following change order is hereby made to the proposal for the above project:
See Attached
TOTAL AMOUNT OF TIDSCHANGE ORDER
$ 97.867.50
The Contract time will not be affected by this decrease in change order.
Original Contract Amount
$ 931.575.75
Previous Change Order
(Increased I Deereased)
$ 99.371.45
$
This Change Order
(lBereased I Decreased)
$ 97.867.50
TOT ALCONTRACT WITH CHANGE ORDER(S) $ 1.128.814.70
*************
Funding Source/Account Number: 322041110- 5414710 I 204822101-5414710
Submitted B
Date: 8/1~~r
Date: 'i/}/~/oY
Date: ~/>-c(( dl(
Date: ;/~
Date: ';UftY"
I ,
Date: .,.. .. 2(J .; () y
. r
Requested By:
Recommended By:
Approved By:
Accepted By:
COPIES: Errick Thompson, P.E. Assistant Director-Engineering
Purchasing, Geri Sams
Kakoli Basu, Accountant, Public Works
Pre Construction File
Jv
" t
~OJ~:
lOCATION:
CUSTOMER:
BEAM'S CONTRACTING,INC.
PROPOSAL
ARC DRAINAGE IMPROVEMENTS
Kentworth and Ashley Drive
AUGUSTA-RICHMOND COUNTY,GA.
BID DATE:
ESTIMATE DATE:
6/25/2004
rev 7/12/04
ITEM ITEM UNIT TOTAL
NO. DESCRIPTION UNIT QUANTITY PRICE BID AMOUNT
150-1000 TRAFFIC CONTROL Lump Sum 1 $2,500.00 $2,500.00
171-0010 SILT FENCE, TYPE .C" Ln.Ft. 200 $5.00 $1,000.00
207-0203 FOUND BACKFILL MATL., TP II CU.Yd. 150 $32.35 $4,852.50
210-0100 GRADING COMPLETE (Dress-Up) Lump Sum 1 $4,800.00 $4,800.00
230-1000 LUMP SUM CONSTRUCTION Lump Sum 1 $33,345.00 $33,345.00
441-6012 CONC. CURB & GUTTER, 6" X 24", TP 2 Ln.Ft. 50 $13.00 $650.00
550-1481 STORM DRAIN PIPE,48",H 10'-15', CPP Ln.Ft. 300 $87.00 $26,100.00
550-1481 STORM DRAIN PIPE,48",H 10'-15', RCP. Ln.Ft. 40 $121.50 $4,860.00
610-0209 REM.CHAIN LINK FENCE,4 FT. Ln.Ft. 300 $5.00 $1,500.00
643-1132 RESET CHAIN LINK FENCE,4 FT., 9 GA. Ln.Ft. 300 $15.00 $4,500.00
668-1200 CATCH BASIN, GP 2 Each 2 $2,500.00 $5,000.00
668-1210 CATCH BASIN, GP 2, ADD'L. DEPTH Ln.Ft. 10 $250.00 $2,500.00
668-5000 IJUNCTION BOX Each 1 $1,550.00 $1,550.00
700-6910 PERMANENT GRASSING Acre 0.7 $4,800.00 $3,360.00
xxx-XXX)( CAMERA-VIDEO EXIST.STORM PIPE Ln.Ft. 300 $4.50 $1,350.00
GRAND TOTAL AMOUNT $97,867.50
BEAM'S CONTRACTING, INC.
Signed By: Buddy Rowland
Title: Estimator
Date: Uune 25th,2004
tAY6J.lSD~ND C))UNTY,GA.
Approved By: "'[,.-vr ^
Title: ~... ~.r '-'
Date: ~ I~ 1.1(
. I
NOTE:
Unit Price Items Could Increase or Decrease
Dependino On Quantities Installed at II
Project Completion. R
ReQuest 60 calendar days added to ARC Drainaoe Phase I contract (7/12/04)