Loading...
HomeMy WebLinkAboutARC Drainage Improvement Phase I (2) Augusta Richmond GA DOCUMENT NAME: A A C. UCZA ,tV "'1J lO :r fh f RO II I<;(Y> ",oJ. Ip /-fA S EO :1 DOCUMENT TYPE: C. U AN ~ E () c<- \) lS-c<- YEAR: ;;2 DC> ~ BOX NUMBER: ;}.. Y FILE NUMBER: J f L( s S- NUMBER OF PAGES: 3 ... ~~ , Change Order Form Change Order Number: Seven Date: 09/10/04 Project Title ARC Drainage Improvement Phase I Original Contract Date: 1-05-04 Project Number: 323-04-201823101 Owner: ARC P.O. Number: P84060 Contractor: Beams Contracting The following change order is hereby made to the proposal for the above project: See Attached TOTAL AMOUNT OF THIS CHANGE ORDER $ 5.400.00 The Contract time will not be affected by this decrease in change order. Original Contract Amount $ 931.575.75 Previous Change Order (Increased / Decreased) $ 197.238.95 This Change Order (Increased / Decreased) $ 5.400.00 TOTAL CONTRACT WITH CHANGE ORDER(S) $ 1.134.214.70 ************* Requested By: Date: !{)/U/o'-{ Submitted B : Date: /()~~ ~ I Date: I 0; t7/ I.J"/ Recommended By: Date: 1(/ /I,/e i' Approved By: Date: Accepted By: /2; ir /1 Date: ~~74 t/ ontractor COPIES: Errick Thompson, P.E. Assistant Director-Engineering Purchasing, Geri Sams Kakoli Basu, Accountant, Public Works Pre Construction File .., ~ "; t Project: ARC DRAINAGE IMPROVEMENTS Location: Kentworth and Ashlev Drive Change Order Number 6 was approved for $97,867.50. Change Order Number 7 is for $5,400.00. This Change Order is to replace the 48" CPP Storm Drain pipe that was setup in Change Order #6. 48" RCP Storm Drain Pipe will be used in lieu of the CPP Storm Drain Pipe. ITEM # 550-1481 ITEM Added Storm Drain Pipe, 48", H 10'-15', RCP Unit Price Total $105.00 $31,500.00 Total: $31,500.00 ~ 300 ITEM # 550-1481 ITEM Deleted Storm Drain Pipe, 48", H 10'-15', CPP Unit Price Total $87.00 $-26,100.00 Total: $-26,100.00 ~ -300 Amount needed: $5,400.00 Total Amount for Kentworth and Ashley Drive:$97,867.50 + $5,400.00 = $103,267.50 Date: To: From: J ~ Subject: Project No.: File Reference No.: l?ublic Works and Engineering Department , . eresa C. Smith, P.E., Director Pre-Construction Section 1815 Marvin Griffin Road Augusta, Georgia 30906 (706) 796-5040 Fax (706) 796-5045 Errick L. Thompson, P.E., Assistant Director Engineering Division MEMORANDUM OF TRANSMITTAL October 21, 2004 Lena Bonner Clerk of Commission Teresa C. Smith, P.E., Director Public Works and En2ineerin2 AU2usta-Richmond County Draina2e Improvements, Phase I 323-04-201823101 04-014(A) We are sending you ~ attached 0 under separate cover: # Copies Dated Description 1 9/10/04 Orh!inal Chant!e Order #7 for above subiect project. Comments: For your records. cc: Pre-Construction File