Change Order Form
Change Order Number: Seven Date: 09/10/04
Project Title ARC Drainage Improvement Phase I
Original Contract Date: 1-05-04 Project Number: 323-04-201823101
Owner: ARC P.O. Number: P84060
Contractor: Beams Contracting
The following change order is hereby made to the proposal for the above project:
See Attached
TOTAL AMOUNT OF THIS CHANGE ORDER
$ 5.400.00
The Contract time will not be affected by this decrease in change order.
Original Contract Amount
$ 931.575.75
Previous Change Order
(Increased / Decreased)
$ 197.238.95
This Change Order
(Increased / Decreased)
$ 5.400.00
TOTAL CONTRACT WITH CHANGE ORDER(S)
$ 1.134.214.70
*************
Requested By: Date: !{)/U/o'-{
Submitted B : Date: /()~~
~ I
Date: I 0; t7/ I.J"/
Recommended By: Date: 1(/ /I,/e i'
Approved By: Date:
Accepted By: /2; ir /1 Date: ~~74 t/
ontractor
COPIES: Errick Thompson, P.E. Assistant Director-Engineering
Purchasing, Geri Sams
Kakoli Basu, Accountant, Public Works
Pre Construction File
.., ~
";
t
Project: ARC DRAINAGE IMPROVEMENTS
Location: Kentworth and Ashlev Drive
Change Order Number 6 was approved for $97,867.50. Change Order Number 7 is for
$5,400.00. This Change Order is to replace the 48" CPP Storm Drain pipe that was setup
in Change Order #6. 48" RCP Storm Drain Pipe will be used in lieu of the CPP Storm
Drain Pipe.
ITEM #
550-1481
ITEM Added
Storm Drain Pipe,
48", H 10'-15', RCP
Unit Price Total
$105.00 $31,500.00
Total: $31,500.00
~
300
ITEM #
550-1481
ITEM Deleted
Storm Drain Pipe,
48", H 10'-15', CPP
Unit Price Total
$87.00 $-26,100.00
Total: $-26,100.00
~
-300
Amount needed: $5,400.00
Total Amount for Kentworth and Ashley Drive:$97,867.50 + $5,400.00 =
$103,267.50
Date:
To:
From:
J
~
Subject:
Project No.:
File Reference No.:
l?ublic Works and Engineering Department
, .
eresa C. Smith, P.E., Director
Pre-Construction Section
1815 Marvin Griffin Road
Augusta, Georgia 30906
(706) 796-5040 Fax (706) 796-5045
Errick L. Thompson, P.E., Assistant Director
Engineering Division
MEMORANDUM OF TRANSMITTAL
October 21, 2004
Lena Bonner
Clerk of Commission
Teresa C. Smith, P.E., Director
Public Works and En2ineerin2
AU2usta-Richmond County Draina2e Improvements, Phase I
323-04-201823101
04-014(A)
We are sending you ~ attached 0 under separate cover:
# Copies Dated Description
1 9/10/04 Orh!inal Chant!e Order #7 for above subiect project.
Comments: For your records.