HomeMy WebLinkAboutAdvanced Wastewater Treatment Augusta Richmond GA DOCUMENT NAME: OO\JQ\(tC\ ~~\--r<-EGtt\0l~ DOCUMENT TYPE: ~ C)'{oex YEAR: q"l BOX NUMBER: Od FILE NUMBER: \ ~ \ \ NUMBER OF PAGES: l.\ "\ CHANGE ORDER Number: Date: February 10, 1997 PROJECT TITLE: Advanced Wastewater Treatment - Constructed Wetlands Project ORIGINAL CONTRACT DATE: June 20, 1994 PRO). #: U-96-36 OWNER: Augusta-Richmond County Commission P.O. #: CONTRACTOR: ZEL Engineers, Inc. The following change order is hereby made to the proposal for the above project: Increase scope of work to include design of Chlorine System rehabilitation in accordance proposal dated December 1 3, 1 996 Total Amount of this Change Order: Not to Exceed $2 J ,220 The contract time will be increased/decreased by N/ A calender days as a result of this change. ORIGINAL CONTRACT AMOUNT: $499,674 PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: Not to Exceed $21,220 TOTAL CONTRACT WITH CHANGE ORDERS: $520,894 ************************************************************** FUNDING SOURCE/ACCOUNT NUMBER: REQUESTED BY: ~ b. w~ ENGIN SUBMITTED BY: FINANCE ENDORSEMENT: DA TE: DATE: l'}fj DATE: :l, Y-- ~ " DATE: a.. - '* - ~ " DATE: ~//fj?7 , 2 E 1ii35 Telfair Street Ted W, Ellis, P.E., Chm, of Board, Emeritus ~ Augusta, Georgia 30901,2494 J, J, Tankersley. PE, President E N GIN E E R S J, R, Armstrong, PE, Vice' President Jorge E, Jimenez, P,E., Secretary J, T, Eubanks. P,E.. Treasurer C. D. Drown, P.E. ZIMMERMAN, EVANS AND LEOPOLD, INC. (706) 724-5627 December 13, 1996 Mr. Tom Wiedmeier, P. E. Assistant Director Augusta-Richmond Utilities Department 2760 Peach Orchard Rd. Augusta, Ga. 30906 Re: J. B. Messerly WWTP A WWT - CWS Additional Services for Chlorine System Rehabilitation Dear Mr. Wiedmeier: We have estimated. the cost of the additional services needed to rehabilitate and replace the Chlorine System to provide for safeguard against wetland plants being subjected to cWorine toxicity and to replace the chlorine system which is quite aged. The scope recommended is attached to this letter. We will provide the design within sixty days. We recommend the installation of this system be expedited to have it on line concurrent with placing the constructed wetlands on line. Our estimate of the engineering costs for the complete renovation of this system is $21,220. We request approval to provide these services as additional services under our contract to design fue Constructed Wetlands System dated June 20, 1994. We will not exceed this cost without prior approval. Sincerely ZIMMERMAN, EV ANS AND LEOPOLD, Inc. JEJ:st 9416 Add Serv.doc Augusta Richmond County J. B. Messerly WWTP Chlorine System Rehabilitation Scope Description December, 1996 The 1. B. Messerly WWTP Chlorination Facilities was first constructed in 1968 as a system for the original 23 mgd Primary Wastewater Treatment Facility. System modifications were constructed in J 986 as part of the expansion of the plant to its present size and configuration. In order to provide safeguards against cWorine toxicity, and since the system is beyond its life expectancy, ZEL Engineers recommends the following modifications to the existing system: . Replacement of all cWorinators, · Re-installation of two cWorine cylinder scales. () ~;, . Interconnection of six chlorine tanks on two banks. '11-') · Rehabilitation of the Chlorine Bldg., replacement of doors, windows, electric and water service. 1 · Replacement of the non-potable water pump to provide water supply redundancy as required by reliability criteria. (1\ a1 9{ · Installation of replacement cWorine solution lines to the RAS lines of both north and south plants. 7 · Installation of non-potable water supply line to the rapid mix bldg to replace the effluent supply pumps that provide solution water for the CSO, RAS, and Cascade chlorination points. 1 · Acquisition of one replacement Water Champ chlorination mixer. 1<~ · Provide control loops to provide dosage adjustment based on chlorine residual at the effluent Parshall flume, ~ <~ · Provide control loop to provide automatic chlorination in the event of a Cascade discharge. vf.t '7 · Provide control loop to sound an alarm in the event of chlorine residuals above allowable maximum enters the Constructed Wetlands distribution channel. 'ZEL, ENGINEERS I t) g <1) ._ .0' :t::: 1-0""0 P-.""O C/)~ ""0 C/) ]] t) 5b ;3:~ ""0 ro <1)C/J ..... 0""0 2 a ..... C/) c:: c:: 0 o ,_ u~ P-.:E t-< .- ;3:.g o;3:~ c:: ;;>-.. n -1:'0 n <1) .... C/) C/) ..... 1-0 C/) c:: <1) <1) 0 ~~u .5/) . <1) \0 c:: co c:: ~ lJ-l C/).c M <1) 0 ...... ~R:aN lJ-l@u...... N-. ... C" <;,. ~ "" '- p o onon~ 00 on 0 on ...... (~ g g ~ on on ~ t-< Nn ~ On M.- \On On On O\n ~ On ...: C/J......&'7......NM-.:too:rN&'7......N 0&'7 &'7&'7&'7&'7&'7&'7 &'7&'7 U ....,,,,OV\r-r-OV'lV'lOoon-.:t C<l~N ......-.:tOOOOOO\O............N o -.:t t-< c:: ONOonV'lV'lon N ..c:: NonV'l\OM M 2 N t-< .... <1) <1) ~C::O ononOOOV'lV'l 0 .- ...... N N N...... 0 c:: ...... VilJ-l C/) .EOonONV'lOOOonV'lN ::E~ -"" ........-lNP-""I-""O\ lJ-l p-. E -,::3 elL; .... . c~ o n U X o oECO .~ 0 -, ::>;:::. .gp -, E! n _ bI) Q bI) co .S _ :2 <1) 0.. ro co C/) c:: .- 0 g 'C P-. .C .x .- 0 "E t) ~ .-::: C/) :a cd ~, c:: ""0""0 U>-W~C/)O c:: <1) '-' '-' 0 C c:: .- o <1) 0 ..... u Z ...... N M -.:t ".;:j E! "" bI) bI) bI) bI) ro 1;; ~J E c:: c:: c:: c:: c:: 0 .2 c:: "' 0 bI)._ .- .- .- q:: .- ~ c:: > > > > .- '8 ~ ~ -- .~ ~ ~ ~ ~ u . C/)..... > rorororo<1) Z R;;>-..2;;> 1-0.... 1-0 l-o 0..""0 O<1)C/J-E!QQQQC/J~ 4-<4-<<1)1""\ """oOC/JI-<C::C::C::C::C::C:: t-< ~ 0 0 0 000 ~ c:: c:: C .... .- .- .- .- .- .- o 0 <1) .9 t) t) 0 0 0 t) '~ .~ E :E 2 2 2 2 2 2 u ::3 ::3 " e. 0 1;; 1;; 1;; 1;; 1;; 1;; ~ ~ ~ ::3 E c:: c:: c:: c:: c:: c:: ~ > > ~ <1) 0 0 0 0 0 0 QlJ-llJ-llJ-lQuuuuuu ...... <1) bI) ro P-.