CHANGE ORDER
Number:
Date: February 10, 1997
PROJECT TITLE: Advanced Wastewater Treatment - Constructed Wetlands Project
ORIGINAL CONTRACT DATE: June 20, 1994 PRO). #: U-96-36
OWNER: Augusta-Richmond County Commission P.O. #:
CONTRACTOR: ZEL Engineers, Inc.
The following change order is hereby made to the proposal for the above project:
Increase scope of work to include design of Chlorine System rehabilitation in accordance
proposal dated December 1 3, 1 996
Total Amount of this Change Order:
Not to Exceed $2 J ,220
The contract time will be increased/decreased by N/ A calender days as a result of this
change.
ORIGINAL CONTRACT AMOUNT: $499,674
PREVIOUS CHANGE ORDERS:
THIS CHANGE ORDER: Not to Exceed $21,220
TOTAL CONTRACT WITH CHANGE ORDERS: $520,894
**************************************************************
FUNDING SOURCE/ACCOUNT NUMBER:
REQUESTED BY: ~ b. w~
ENGIN
SUBMITTED BY:
FINANCE ENDORSEMENT:
DA TE:
DATE: l'}fj
DATE: :l, Y-- ~ "
DATE: a.. - '* - ~ "
DATE: ~//fj?7
,
2 E 1ii35 Telfair Street
Ted W, Ellis, P.E., Chm, of Board, Emeritus ~ Augusta, Georgia 30901,2494
J, J, Tankersley. PE, President E N GIN E E R S
J, R, Armstrong, PE, Vice' President
Jorge E, Jimenez, P,E., Secretary
J, T, Eubanks. P,E.. Treasurer
C. D. Drown, P.E.
ZIMMERMAN, EVANS AND LEOPOLD, INC.
(706) 724-5627
December 13, 1996
Mr. Tom Wiedmeier, P. E.
Assistant Director
Augusta-Richmond Utilities Department
2760 Peach Orchard Rd.
Augusta, Ga. 30906
Re: J. B. Messerly WWTP A WWT - CWS
Additional Services for Chlorine System Rehabilitation
Dear Mr. Wiedmeier:
We have estimated. the cost of the additional services needed to rehabilitate and
replace the Chlorine System to provide for safeguard against wetland plants being
subjected to cWorine toxicity and to replace the chlorine system which is quite aged.
The scope recommended is attached to this letter. We will provide the design
within sixty days.
We recommend the installation of this system be expedited to have it on line
concurrent with placing the constructed wetlands on line. Our estimate of the
engineering costs for the complete renovation of this system is $21,220. We request
approval to provide these services as additional services under our contract to
design fue Constructed Wetlands System dated June 20, 1994. We will not exceed
this cost without prior approval.
Sincerely
ZIMMERMAN, EV ANS AND LEOPOLD, Inc.
JEJ:st
9416 Add Serv.doc
Augusta Richmond County
J. B. Messerly WWTP Chlorine System Rehabilitation
Scope Description
December, 1996
The 1. B. Messerly WWTP Chlorination Facilities was first constructed in 1968 as a
system for the original 23 mgd Primary Wastewater Treatment Facility. System
modifications were constructed in J 986 as part of the expansion of the plant to its present
size and configuration. In order to provide safeguards against cWorine toxicity, and since
the system is beyond its life expectancy, ZEL Engineers recommends the following
modifications to the existing system:
. Replacement of all cWorinators,
· Re-installation of two cWorine cylinder scales.
() ~;, . Interconnection of six chlorine tanks on two banks.
'11-') · Rehabilitation of the Chlorine Bldg., replacement of doors, windows, electric and
water service.
1 · Replacement of the non-potable water pump to provide water supply redundancy as
required by reliability criteria.
(1\ a1 9{
· Installation of replacement cWorine solution lines to the RAS lines of both north and
south plants.
7 · Installation of non-potable water supply line to the rapid mix bldg to replace the
effluent supply pumps that provide solution water for the CSO, RAS, and Cascade
chlorination points.
1 · Acquisition of one replacement Water Champ chlorination mixer.
1<~ · Provide control loops to provide dosage adjustment based on chlorine residual at the
effluent Parshall flume,
~ <~ · Provide control loop to provide automatic chlorination in the event of a Cascade
discharge.
vf.t '7 · Provide control loop to sound an alarm in the event of chlorine residuals above
allowable maximum enters the Constructed Wetlands distribution channel.
'ZEL, ENGINEERS I
t) g
<1) ._
.0' :t:::
1-0""0
P-.""O
C/)~
""0 C/)
]]
t) 5b
;3:~
""0 ro
<1)C/J
.....
0""0
2 a
.....
C/) c::
c:: 0
o ,_
u~
P-.:E
t-< .-
;3:.g
o;3:~
c:: ;;>-.. n
-1:'0
n <1) ....
C/) C/) .....
1-0 C/) c::
<1) <1) 0
~~u
.5/) . <1) \0
c:: co c:: ~
lJ-l C/).c M
<1) 0 ......
~R:aN
lJ-l@u......
N-.
...
C"
<;,.
~
""
'-
p
o onon~ 00
on 0 on ...... (~ g g ~ on on ~
t-< Nn ~ On M.- \On On On O\n ~ On ...:
C/J......&'7......NM-.:too:rN&'7......N
0&'7 &'7&'7&'7&'7&'7&'7 &'7&'7
U
....,,,,OV\r-r-OV'lV'lOoon-.:t
C<l~N ......-.:tOOOOOO\O............N
o -.:t
t-<
c:: ONOonV'lV'lon N
..c:: NonV'l\OM M
2 N
t-<
....
<1)
<1)
~C::O ononOOOV'lV'l 0
.- ...... N N N...... 0
c:: ......
VilJ-l
C/)
.EOonONV'lOOOonV'lN
::E~ -"" ........-lNP-""I-""O\
lJ-l
p-.
E
-,::3
elL;
.... .
c~
o n
U X
o
oECO
.~ 0
-, ::>;:::.
.gp -, E! n
_ bI) Q bI)
co .S _ :2
<1) 0.. ro co
C/) c:: .- 0
g 'C P-. .C .x
.- 0 "E t) ~
.-::: C/) :a cd ~, c::
""0""0 U>-W~C/)O
c:: <1) '-' '-' 0 C c:: .-
o <1) 0 .....
u Z ...... N M -.:t ".;:j E!
"" bI) bI) bI) bI) ro 1;;
~J E c:: c:: c:: c:: c:: 0 .2
c:: "' 0 bI)._ .- .- .- q::
.- ~ c:: > > > > .- '8
~ ~ -- .~ ~ ~ ~ ~ u
. C/)..... > rorororo<1)
Z R;;>-..2;;> 1-0.... 1-0 l-o 0..""0
O<1)C/J-E!QQQQC/J~
4-<4-<<1)1""\
"""oOC/JI-<C::C::C::C::C::C::
t-< ~ 0 0 0 000
~ c:: c:: C .... .- .- .- .- .- .-
o 0 <1) .9 t) t) 0 0 0 t)
'~ .~ E :E 2 2 2 2 2 2
u ::3 ::3 " e. 0 1;; 1;; 1;; 1;; 1;; 1;;
~ ~ ~ ::3 E c:: c:: c:: c:: c:: c::
~ > > ~ <1) 0 0 0 0 0 0
QlJ-llJ-llJ-lQuuuuuu
......
<1)
bI)
ro
P-.