CPB# 322-04-299822391
CAPITAL PROJECT BUDGET
SKINNER MILL ROAD CULVERT EXTENSION
CHANGE NUMBER TWO
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project authorized is for engineering addendum to the
proposal for Extension of Skinner Mill Road Box Culvert for
Improvements to Raes Creek in the vicinity of Chelsea Drive. The
concept is to provide you with a design and produce contract
drawings for construction of the creek re-routing. The
estimated engineering cost of this project is $3,000.00 and will be
fuilded by the Special One Percent Sales Tax, Phase II Recapture.
Section 2: The following revenues are anticipated to' be available to the
Consolidated Government to complete the project:
Special 1 % Sales Tax, Phase II Recapture
$156,100
Section 3:
The following amounts are appropriated for the project:
By District
By Basin
7th $156,100
Rae's Creek $156,100
Section 4:
Copies of this Capital Project Budget shall be made available to
the Comptroller for, direction in carrying out this project.
day of ntlJ.--l!.c'll-
7iJ-
,e2()tJ ?J
Adopted this
~
Original- Commission-Council Office
Copy -Public Works
Copy - Finance Department
Copy - Purchasing Department
AUGUSTA-RICHMOND COUNTY, GEORGIA
CPB# 322-04-299822391
CAPITAL PROJECT BUDGET
SKINNER MILL ROAD CULVERT EXTENSION
CHANGE NUMBER TWO
CPB AMOUNT CPB NEW 2000 G/L
SOURCE OF FUNDS CPB CHANGE CPB AMOUNT
SPECIAL 1% SALES TAX, PHASE II
321-04-1110-0000000-000000000 ($153,100) ($3,000) ($156,100) $0
RECAPTURE FUNDS
322-04-1110-XXXXXXX-292833222 $0 $0 $0 ($3,000)
TOTAL SOURCES: ($153,100) ($3,000) ($156,100) ($3,000)
USE OF FUNDS
ADVERTISING
321-04-1110-5233119-299822391 $1,000 $0 $1,000 $0
ENGINEERING
321-04-1110-5212115-299822391 $10,100 $3,000 $13,100 $3,000
RIGHT~OF-WAY
507-04-3410-5425110-299822391 $5,000 $0 $5,000 $0
CONSTRUCTION
322-04-1110-5414710-299822391 $125,000 $0 $125,000 $0
CONTINGENCY
322-04-1110-60111 10-299822391 $12,000 $0 $12,000 $0
TOTAL USES: $153,100 $3,000 $156,100 $3,000
----- ~ c::J
~
"
\
d
~
HAM,
~
R GENT
o~-
~ ~
0...
'-'t?<T
.'
"
~
~.
~
344 Telfair Street
Augusta, Georgia 30901
Tel (706) 828-0808
Fax (706) 828-0819 '
E-mail SPGodefroy@aol.com
SSOClA TES
Consulting eM' Engineering
January 12, 2000
Mr. Jack F. Murphy, Director
Augusta-Richmond County
Public Works and Engineering Department
1815 Marvin Griffin Road
Augusta, Georgia 30906
RE:
Eng~_neering Addendum to the Proposal for Extension of Skinner
Mill Road Box'-cuivert' for Improvements to'Rae's Creek. in the
Vicinity of Chelsea Drive.
Our File No. 99-053
Dear Mr. Murphy:
Thank you for the opportunity to provide you with a an addendum to our
original proposal to engineer a re-routing of Rae's Creek in the vicinity of
Chelsea Drive to provide a smoother turn of the creek bed. Based upon our
previous meeting and our understanding of the project, we would
respectfully submit the following p~oposal:
Scope: We would propose the following sequence of work and
associated costs:
1. Obtain an as-built and topographic survey of the area of the proposed
creek re-routing. This will include the necessary information in order to
design the rerouting as well as determine the extent of cut and filling
required to stabilize the channel and provide an inproved channel
section through this area. Elevations will be based upon mean sea level.
for this we would propose to us_Bennie C. Harbin, RLS. Upon notice to
proceed, we should have the surveying accomplished within 2 weeks.
2. Design and produce plans ready for construction to include a detailed
estimate in accordance with GA DOT standards. Preliminary plans
should be complete within 2 weeks upon receipt of the surveying data.
After your review, we should be able to complete the plans within a week
after your review, barring major changes.
3. We would propose that the surveying services be on a lump sum amount
of$I,OOO.OO.
.'
y
Skinner Mill Road Culvert Extension Proposal
August 19, 1999
4. We would propose that our engineering fee to accomplish the work as
detailed, be a lump sum fee of $2,000.00. This will include all work
necessary to design and produce contract drawings for construction of
the creek re-routing.
5. As a summary the following is a list of the work and proposed costs:
Addendum Proposal
Surveying -
Engineering -
$1,000.00
$2,000.00
Total (Addendum Proposall. - $3,000.00
Again thank you for the opportunity to provide you with a proposal on this
project and trust you will be pleased with the quality of our work. Should
you have any questions, please do not hesitate to call me at (706) 828-
0808.
Sincerely,
~~
cc File No. 99.053
AAAAAAA*Ak~AAAAAAAAAAAAAAAAAAA.4AAA~~AAA~AAAAAAAAAAAA4AAAAAAAk***AAAAAAAAAAAAAAA
Acceptance of Proposal:
Jack F. Murphy, Public Works Director Date