Loading...
HomeMy WebLinkAboutS.R.56@ Old Waynesboro Road Intersection Augusta Richmond GA DOCUMENT NAME: 'S. \2.. '519 0 D\d ~\1eSbO'(() Rd. \rrrG'(sec-nCiJ DOCUMENT TYPE: w~t YEAR: ~<6 BOX NUMBER: cy--\ FILE NUMBER: \~~~() NUMBER OF PAGES: 6 -;;;;- . ~ . AUGUSTA-RICHMOND COUNTY, GEORGIA CPB# 55-8783-097 ~ ;- ,. CAPITAL PROJECT BUDGET AMENDMENT S.R. 56 @ OLD W AYNESBORO ROAD INTERSECTION IMPROVEMENTS CHANGE NUMBER ONE BE IT ORDAINED by the Commission-Council of Augusta-Richmond, County Georgia that the following Capital Project Budget is hereby amended: Section 1. section 2. Section 3. section 4. section 5. The project change authorized is to CPB#55-8783-097 adopted February 18, 1997. This change will increase the scope of the project by 5-laning Old Waynesboro Road at the intersection and expanding the driveway controls on the "cut-through". Therefore, additional engineering, rights-of-way and construction funds in the amount of $178,500 are required. These funds will come from special One Percent Sales Tax, Phase II Recaptured Funds. The project director is hereby instructed to proceed with the project within the terms of the funds appropriated herein. The following revenues are anticipated to be available to the Commission-Council to complete the project: Special One Percent Sales Tax, Phase II Ga. Department of Transportation Contract $416,000 (Unknown at this) The following amounts are appropriated for the project: BY BASIN BY DISTRICT Spirit $416,000 8th $416,000 Copies of this Capital Project Budget Amendment shall be made available to the Comptroller for direction in carrying out this project. Adopted this .3- ~t!-N- , / f l/~ day of Mayor to Original - Commission-Council Office Copy - Finance Department Copy - Public Works & Engineering Department Copy - Purchasing Department ...,; v 'J ,. ;- ~ AUGUSTA-RICHMOND COUNTY, GEORGIA CPB# 55-8783-097 CAPITAL PROJECT BUDGET AMENDMENT S.R. 56 @ OLD WAYNESBORO ROAD INTERSECTION IMPROVEMENTS CHANGE NUMBER ONE SOURCE OF FUNDS CURRENT CPB CPB CHANGE NEW CPB 1998 G/L AMOUNT Special 1% Sales Tax, Phase II 55-3131-00-0000 ($237,500) ($178,500) ($416,000) Recaptured Funds 55-4981-00-0606 ($178,500) TOTAL SOURCES ($237.500) ($178.500) ($416.000) USE OF FUNDS Advertising 55-8783-00-0606 $1,000 $1,000 Engineering 55-8783-00-0442 $11,500 $8,500 $20,000 $8,500 Contingency 55-8783-00-0606 $20,000 $20,000 Rights-of-Way 55-8783-00-0813 $5,000 $70,000 $75,000 $70,000 Construction 55-8783-00-0881 $200.000 $100.000 $300.000 $100,000 TOTAL USES: $237.500 $178.500 $416.000 $178.500 , ,...-, ~"='- ; " '. -; .' " ZEli35Te'fairStreet Ted W. Ellis, P.E" Chm, of Board, Emeritus [ii . Augusta, Georgia 30901.2494 J. J, Tankersley, P.E., President E N GIN E E R S J. R. Armstrong, PE., Vice-President , ZIMMERMAN, EVANS AND LEOPOLD, INC. (706) 724-5627 Jorge E, Jimenez, P,E,. Secretary J, T. Eubanks. PE., Treasurer C, D. Drown, PE. November 6, 1997 Mr. Jack Murphy, Pre-Construction Engineer Augusta - Richmond County Public Works Dept. Augusta, Ga. 30901 Re: Old Waynesboro Rd Intersection @ Hwy. 56 Change in Scope Dear Mr. Murphy: B~ed on our discussions about the needs for improvements to the referenced intersection, we include the changes in' scope required to address this project properly: ' 1. The probable location of a new school in the area served by Old Waynesboro Rd. makes it prudent to incorporate the future widening of Old Waynesboro Rd. into the geometry of the intersection. This results in an intersection with three out lanes (one right turn, two left turn) out to Hwy 56 and two in lanes (one right turn and one left turn offHwy 56). 2. Due to the existing private business (Johnson Market), the centerline of the road intersection must be moved south and additional right-of-way must be secured. However, because of the length of lanes and additional width, considerably more right of way is required than with the original intersection improvement concept prepared by the Ga, DOT to resolve the unsafe conditions at the old Old Waynesboro Rd. connection to Hwy 56. 3.' The existing intersection must be completely reconstructed in accordance with AASHTO and DOT standards (26 ft clear recovery area). '4:'". .A drainage system must be designed and constructed. 5. Curb and Gutter must be installed in islands around Johnson Market to accommodate the vertical differential between the expanded roadway and the market's parking lot. Access to property behind the market from the old section of Old Waynesboro Rd. must be eliminated. 6. A new dedicated exit (One Way Only) driveway will be provided for the Fire Department into Hwy 56. Access will be maintained from Old WaynesboroRd. for the Fire Department and the adjacent property owner. 7. The design must be completely done in the metric system. The increase scope amounts to a project 12 times as large and now includes the mitigation of the impact to the private property, We have attached the preliminary design layout that highlights the areas of increased scope. We have estimated the effort required to produce' the design with this increased scope and submit the same for your consideration. We ro ose to rovide the design services includin r aration of ri t of wa lats for an additional lump sum of$8,500. If you have any questions 10 t IS regard, please let us know. Sincerely, c:>.#' /J!!t ' , EVANS AND LEOPOLD, INC. / ~ o RO, INIERSECTIONPRO TNt doeum.nt II'PlOYed as )lP~7~~ ey ale