I-li II wood erG-Ie. / Whfehc,cf i}:lJ.e.
lkc," n fA. C;U -:J;-Y\ plD'Je YhLI1 .K
'T3uj~
FILE NUMBER: I:J- 10 If
NUMBER OF PAGES: 'I
. Augusta-Richmond County, Georgia
CPB# 57-8356-096
CAPIT AL PROJECT BUDGET
HlLLWOOD CIRCLEIWHITEHEAD DRIVE DRAINAGE IMPROVEMENTS
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that
the following capital project budget is hereby adopted:
Section 1. The project authorized is for the installation of a storm drainage system along the
north side of Whitehead Drive and between Hillwood Circle and Hillwood Lane, The
preliminary engineering costs are $23,800 and are to be funded by Special 1% Sales Tax, Phase
III as this project is on the approved list.
Section 2. The following revenues are anticipated to be available to the Commission-Council to
complete the project:
Special ] % Sales Tax, Phase III
$23,800
Section 3. The following amount are to be expended for the project:
BY BASIN
Rae's $23,800
BY DISTRICT
3rd $ 7,854
7th $15,946
$23,800
Adopted this 21- day of
MAY
,1996,
Approved:
Original - Commission-Council Office
Copy - Finance Department
Copy - Suburban Public Works Department
Copy - Purchasing Department
Augusta-Richmond County, Georgia
CPB# 57-8356-096
CAPIT AL PROJECT BUDGET
HILL WOOD CIRCLE/WHITEHEAD DRIVE DRAINAGE IMPROVEMENTS
SOURCE OF FUNDS
Special 1 % Sales Tax, Phase III
57 - 313 1 -00-0000
CPB
AMOUNT
($23,800)
USE OF FUNDS
Engineering
57-8356-00-0442
$23,800
"
~:;.
~--: ~
: ':' I;
........ r ~/ ::--"
BRIAN G. BESSON and ASSOCIATES, PoCo
. ' .
1005 EMMETT STREET, SUITE B 'AU~USTA, GEORGIA 30904. ,(706) 733-6456 FA)((706) 736-6249
April 23, 1 996
Mr. Jack Murphy
. Augusta-Richmond County Public Works
1815 Marvin Griffin Road
Augusta, Georgia 30906
RE: Engineering Proposal.
HillwoodCirclelWhitehead Dr..
Drainage II1?provements .
Dear Mr. Murphy,
Weare pleased to present the following proposal for providing engineering services to
control storm water in the vicinity of the above referenced project.
A SCOPE:
. Prepare construction plans showing the installation of storm pipe along the rear
properties between Hillwood.Circleand Hillwood Lane and along properties on the
north side, ofWhiteh,ead Drive,
B. SERVICE:
"1. Perform a topographicalslJrVeyalong aU properties affect~d to accurately
:.deterwine the alignment and elevation of the existing channel. A location survey.
will also be done to establish property lines to,assist in establishing utility
. easements.
2, Prepare complete construction plans suitable.for developing the project and in
. compliance with all local regula~6ry ,agencies.
3, . Prepare a Detailed .Estimate showing 'York. items to be done and estimated
quantities,
, 4: Prepare individual easement platsior.all properties affected. A p,ermanent
easement will be established along the proposed storm drainage improvements,
ENGINEERING
PLANNING
. SURVEYING
i' ..:' ? "::,,':.
..
.,
C. FEE:
'. A maximum fee of twenty three thousand eight. hundred, dollars ($23;800.00) is
proposed. This is based on an engineering and de~ign fee of nineteen thousand
five hundred dollars ($19,500.00) and a surveying fee of four thousand three.
hundred dollars ($4,300,00),
. 'D. TIME OF COMPLETION:
A time of completion of 105 calendar days is anticipated after your Notice ,to Proceed,
A construction cost of three hundred twenty five thousand dollars ($325,000.00) has been
estim,ated for this project. .
I greatly appreciate being considered for this project and look forward to our continued
good working relationship, . .. . '
Sincerely,
Brian G, Besson, P,E.
- -