Loading...
HomeMy WebLinkAboutBalair Hills Estates Augusta Richmond GA DOCUMENT NAME: Wo\ '( \-\\ \ \ S Cotod- e0 DOCUMENT TYPE, ~+ YEAR: ~l BOX NUMBER: D 3 FILE NUMBER: \6dW NUMBER OF PAGES: LP to ,. '~~. AUGUSTA-RICHMOND COUNTY, GEORGI,A., CPB# 51,-8604-,097 CAPITAL PROJECT BUDGET BELAIR IllLLS ESTATES MASTER PLAN c BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital proj ect Budget is hereby adopted: section 1. The project authorized is for the Belair Hills Estates Master Plan. The total cost of the engineering effort to produce this Master Plan is $33,700 and will come from Special One Percent Sales Tax, Phase I Recapture Funds. Section 2. The following revenues are anticipated to be available to the Commission-Council to complete the project: Special 1% Sales Tax Program, Phase I $33,700. Sec."cion 3. The following amounts are to be expended for the proj ect.: BY BASIN BY DISTRICT Butle,r $33,700 $33,700 3rd Adopted this day of -.September 2 lqq7 .Approved: Mayor ~ Original - Commission-Council Office Copy - Finance Department Copy - Originating Department Copy - Purchasing Department ~~, 'j, ....~. . .. AUGUSTA-RICHMOND COUNTY, GEORGIA CPB# 51-8604-097 CAPITAL PROJECT BUDGET BELAIR HILLS ESTATES MASTER PLAN SOURCE OF FUNDS SPECIAL 1% SALES TAX, PHASE I 55-3131-00-0000 Recaptured Funds 51-4981-00-0606 TOTAL SOURCES: USE OF FUNDS Engineering Study 51-8604-00-0442 TOTAL USES: CPB AMOUNT ($33,700) $ ($33,700) ~33,700 $33,700 1997 G/L AMOUNT ($33,700) ($33,700) $33,700 $33,700 . "1"': 7068685464 SWIFT & HSSOCIATE'3 165 POl HUG 22 '97 13:40 ~... 4",/--, . . . JAMES G. SWIFT & ASSOCIATES ~G ENGINEERS Phone #706-868-8803 Fax #706-868-5464 August 21, 1997 Mr. Jack Nlurphy AUGUSTA RICTh'VIOND COUNTY PUBLIC WORKS DEPT. 1815 ivlarvin Griffin Road Augusta, GA 30906 RE: Belair Hills Infrastructure Improvements Study Dear Mr. tvlurphy: We are pleased to submit this proposal for providing engineering services in connection with the above referenced project. The srudy area will comprise an area bounded as follows; South - Paine Street and existing subdivision limits West - Limits of existing subdivision North - Saybrook Drive, Avalon Avenue East - Flagler Road, NIarshall Street, & Grape Avenue James G. Swift & Associates will provide the following services: 1. Provide research and ground surveys necessary to determine location and size of existing drainage systems and water systems 2, Establish limits of existing roadways (street stubs) 3. Prepare overall map of area showing existing drainage systems, water systems, and roadways 4. Prepare drainage stlldy of area 5. Prepare layout of new sanitary sewer system, water system, and roadway improvements 6. Show proposed improvements on overall map 7. Prepare cost estimate of proposed improvements and make recomnlendadons for phasing of work. 1206 Interstate Parkway · Augusta, Georgia 30909 ...;.., . . ',. ;". '- ; . Page 2 Jack Murphy August 22, 1997 1 ames G. Swift & Associates will provide the above listed services for a lump sum fee of $33,700. \Ve appreciate the opportunity to submit this proposal. If you should have any questions or comments, please do not hesitate to call. ASSOCIATES BSH:psh '.,: ,"V JAMES G. SWIFT & ASSOCIATES ~~G ENGINEERS Phone #706-868-8803 Fax #706-868-5464 August 21, 1997 Mr. Jack Murphy AUGUSTA RICHMOND COUNTY PUBLIC WORKS DEPT. 1815 Marvin Griffin Road Augusta, GA 30906 RE: Belair Hills Infrastructure Improvements Study Dear Mr. Murphy: We are pleased to submit this proposal for providing engineering services in connection with the above referenced project. The study area will comprise an area bounded as follows: South - Paine Street and existing subdivision limits West - Limits of existing subdivision North - Saybrook Drive, Avalon Avenue East - Flagler Road, Marshall Street, & Grape Avenue James G. Swift & Associates will provide the following services: 1. Provide research and ground surveys necessary to determine . .-- -- _ Joc.ation~,a11(Lsize._oLexis.ting drainage-systems and water systems 2. Establish limits of existing roadways (street stubs) 3. Prepare overall map of area showing existing drainage systems, water systems, and roadways 4. Prepare drainage study of area 5. Prepare layout of new sanitary sewer system, water system, and roadway improvements 6. Show proposed improvements on overall map 7. Prepare cost estimate of proposed improvements and make recommendations for phasing of work. 1206 Interstate Parkway · Augusta, Georgia 30909 ..... \ " , , .. Page 2 Jack Murphy August 22, 1997 James G. Swift & Associates will provide the above listed services for a lump sum fee of $33,700. We appreciate the opportunity to submit this proposal. If you should have any questions or comments, please do not hesitate to call. ASSOCIA TES BSH:psh