Loading...
HomeMy WebLinkAboutDepartment of Public Works & Engineering (2) Augusta Richmond GA DOCUMENT NAME:d~. c::1\- ~'o\\C- lJ0O'("V-:') ~ er.g\('ee'(\~ DOCUMENTTYPE:~~~~~ YEAR: D ~ BOX NUMBER: \ C1 FILE NUMBER: \Loq~\ NUMBER OF PAGES: 5 ~ AUGUSTA-RICHMOND COUNTY DEPARTMENT OF PUBLIC WORKS & ENGINEERING SUPPLEMENTAL AGREEMENT Project No. 324-04-201824371 SUPPLEMENTAL AGREEMENT NO. 1 P66409 WHEREAS, We, Lowe & Associates, Inc., Consultant, entered into a contract with Augusta-Richmond County on November 6, 2002 for engineering design services associated with the Washington Road Intersection Improvements Project, Project No. 324-04-201824371, File Reference No. 03-014 (A), and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Additional Engineering services required to conduct a Phase II Subsurface Investigation to assess an environmental condition that would potentially present a threat to the project site and provide an Environmental Assessment Report. See attached proposal dated July 15, 2003. It is agreed that as a result of the above modification the contract amount is increased by the amount of$4,800.00 from $53,548.81 to $58,348.81. Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, W. R. Toole Engineers, Inc., Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This 1" day of ~ ,2003. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA-RICHM7ND UN'{Y AUG:;t GE~~ >~ ~ ~.~ George Kolb, Administrator Approved: Date (/~(r3 t;;:sAteCh.~~ Approved: Date B / It; jo g . . [ATTAC CO ORAT SEAL] ArrES Title: (SAO 1 - For changes less than $10,000) .. .', '. ~ -. July 15, 2003 Eric A. Edwards Pre-Construction Engineer Augusta Public Works & Engineering Department 1815 Marvin Griffin Rd Augusta, GA 30906 ADDITIONAL SERVICES AUTHORIZATION # 1 Project: Washington Road Intersection Improvements (Boy Scout Road) LAI Project # TT2016 Date of Contract: November 5, 2002 Original Contract Amount: $53,548.81 <D cc v' Description of Additional Services: LAI will provide a Phase II Subsurface Investigation to ac~~ss the impact of a GA EPD Leaking Underground Storage Tank site northeast of the project site in accordance with a January 30, 2003 proposal by Gallet and Associates (attached and incorporated by reference). Fee for Additional Services: $4800.00 New Contract Amount: ~$"(~.3118. P / cOI:'C'hT Submitted, LAI Engineering (formerly Lowe & Associate , Inc.) Client: Title Louis A. Chalmers, P.E. Vice President Date -'. ~ & ASS 0 C I A T ES January 30, 2003 LAI/Lowe & Associates, Inc. 1395 S. Marietta Parkway Marietta, GA 30067 Attention: Mr. Louis A. Chalmers, Jr. PE RE: Proposal for Limited Phase II Subsurface Investigation Washington Road at Boy Scout Road Road Improvements Washington Road and Boy Scout Road Augusta, Richmond County, Georgia Gallet Proposal #: 03EOI07 Dear Mr. Chalmers: Gallet & Associates Inc. (Gallet) appreciates the opportunity to submit this proposal and cost estimate for your review. This proposal has been prepared to provide a Limited Phase II Investigation on the property referenced above in response to your request-for-proposal. Gallet performed a Phase I Environmental Site Assessment (ESA) for the proposed road improvements (road widenings) along Washington Road, Boy Scout Road, and Center West Parkway, near the intersection of Washington Road and Boy Scout Road, in Augusta, Richmond County, Georgia (report dated December 18, 2002). According to this Phase I ESA, a review of specific environmental regulatory listings indicated a facility that would potentially present an environmental threat to the subject site. The facility is located east- northeast of the subject site along Washington Road, and is listed in the Georgia Environmental Protection Division (GA EPD) Leaking Underground Storage Tank (LUST) database as follows: GA-069 (Crown Central Petroleum) 2851 Washington Road Augusta, Georgia 30909 EDR ill No: U003003224 Distance/Location: 647 ftJEast-northeast According to the Environmental Data Resources, Inc. (EDR) records review and the GA EPD, a confirmed release of a petrolewn product was reported on February 24, 1994 at the GA-069 (Crown Central Petrolewn) facility. The facility is currently under a corrective action plan (CAP-B), and a progress report was expected at the GA EPD at the end of December 2002. However, no further information was available at the time the Phase I ESA was completed. In addition, due to the topography at the facility, the groundwater is expected to flow in a westerly and southwesterly direction (towards the subject site). Based on the lack of information available on the regulatory status of the GA-069 facility, the prevailing groundwater flow, and the close proximity of the facility to the subject site, the GA-069 (Crown Central Petroleum) facility is considered a recognized environmental condition in connection with the subject site. The purpose of this Limited Phase II Investigation will be to gather information regarding the possible presence of petrolewn constituents in the groundwater near the subject property. 1 Environmental Services. Geotechnical Services' Materials Testing Services 1341 Capital Circle. Suite L . Marietta, GA 30067 Phone: (770) 612-0609' Fax: (770) 612-0114 . ~ & ASS 0 C I A T ES LIMITED PHASE II SUBSURFACE INVESTIGATION Field activities conducted will include the following: 1. Gallet will conduct a subsurface investigation to investigate on-site soil and groundwater quality. Four (4) borings will be advanced (near the eastern edge of the subject site) using Geoprobeā„¢ technology, direct- push sampling methodology. The location of the borings will be determined in the field by the environmental professional. Groundwater sampling will be performed at each of the boring locations, to a maximum of 30 feet or until groundwater is encountered. 2. As a field indicator, soils will be screened using on-site headspace analysis of organic vapors by method of a photoionization detector (Pill). The screening process provides field data to help determine if soil has been impacted by petroleum from past site usage. 3. Groundwater samples will be collected and submitted to an accredited independent laboratory, for analysis of constituents related to on-site and off-site activities in accordance with Georgia EPD requirements. Parameters include: Volatiles including Benzene, Toluene, Ethylbenzene and Xylene (BTEX) using EPA Method 8260, and Semi-Volatiles including Polyaromatic Hydrocarbons (PARs) using EPA Method 8270. Upon completion of the fieldwork and laboratory analysis, an environmental assessment document will be prepared and will include fmdings, conclusions, and recommendations. COMPENSATION AND SCHEDULE We can complete the scope of services discussed above at a cost of: $ 4,370.00. Drilling Costs Laboratory Analytical Costs Field W ork/Report Preparation/Expenses Total: $ 1,500.00 $ 550.00 $ 2.320.00 $ 4,370.00 We are prepared to initiate the project immediately upon your written authorization to proceed. We anticipate the field program to commence within I week of written authorization. A verbal report of the analytical laboratory results will be provided within 1 week of field activities. Three copies of the final report will be submitted following our receipt of laboratory data. If another schedule is required, we are flexible to your specific needs. 2 Environmental Services' Geotechnical Services' Materials Testing Services 1341 Capital Circle. Suite L . Marietta. GA 30067 Phone: (770) 612-0609' Fax: (770) 612-0114 .. .t I, .. , ~ & ASSOCIATES Underground utility location will require a 72-hour notice prior to the subsurface investigation. We ask that you obtain permission from the owner for access and subsurface investigation. Also, because this investigation will entail advancing borings on the roadways or the roadway's righ-of-ways, we ask that you obtain permission from the appropriate government agency (i.e. Georgia Department of Transportation or the City of Augusta). CLOSING Thank you for considering Gallet for your environmental consulting services and allowing us to submit this proposal. We appreciate the opportunity to work with you as part of your TEAM and look forward to assisting you on this project. Should you have any questions conceming this proposal, please call at (770) 612-0609. Sincerely, GALLET & ASSOClA TES, INC. ~u~. 7 Sr. Project Scientist/Biologist 5m~t Ron E. Mathis, P.G. Executive Vice President Attachments: Gallet Proposal Acceptance Sheet Gallet General Conditions - Environmental Services ~ 3 Environmental Services. Geotechnical Services. Materials Testing Services 1341 Capital Circle. Suite L . Marietta. GA 30067 Phone: (770) 612-0609. Fax: (770) 612-0114