Loading...
HomeMy WebLinkAboutLEE H BRANDENBURG ERIC BRANDENBURG Augusta Richmond GA DOCUMENT NAME: Q D ~ 0 IS )(11::: '-IS I ON A tV D c..o G T ~).l. A t< I Ai ~ A ~~<Ef7> E"rr DOCUMENT TYPE: (t'<3 R- ~ EM f::tt0T YEAR: 1~q<6 BOX NUMBER: 1.p FILE NUMBER: 1 Ll D ~ ::<. NUMBER OF PAGES: :s- 'f' :".:I:\, .', ~. ROAD EXTENSldN AND COST SHARING AGREEMENT THIS AGREEMENT is entered into this ~ day of &r; 9 1998, by and between AUGUSTA, GEORGIA, a political subdivision of the State of Georgia, acting by and through the Augusta-Richmond County Commission (hereinafter "Augusta"), LEE H. BRANDENBURG and ERIC ]La BRANDENBURG (hereinafter "Brandenburg") and RIVER WATCH, LLC9 a Georgia limited liability company (hereinafter "Storey"); WIT N E SSE T H: WHEREAS, Augusta has plans to construct improvements on certain property located north of Riverwatch Parkway, near the intersection of Riverwatch Parkway and Interstate 20 to include road improvements and sewer, water and storm water facilities as shown on Exhibit "A" attached hereto and depicted on a site plan prepared by Southern Partners dated July 31, 1998, a copy of which is attached hereto as Exhibit "B" (hereinafter the "Project"); and WHEREAS, Storey plans to construct a proposed office building on said land adjoining said Project; and WHEREAS, Augusta, Brandenburg and Storey recognize the benefit of joint planning of construction with regard to the Project and desire to work together to complete the same in accordance with the terms and conditions set forth below; and WHEREAS, Brandenburg and Augusta have and do hereby agree to share the cost of the Proj ect; NOW, THEREFORE, for and in consideration of Ten and no/IOO ($10.00) Dollars, the mutual promises and covenants contained herein, and the benefits to be derived therefrom, the Parties agree as follows: 1. Storey shall cause to be constructed the Project in accordance with the specifications and site plan attached hereto as Exhibits "A" and "B". 2. Augusta and Brandenburg will share costs associated in completing the Project with Augusta's total participation toward the Project costs being Two Hundred Thirty-Eight Thousand and no/IOO ($238,000.00) Dollars. . .4.~ J" 131 . 3. All improvements in the Project shall be built in accordance with the specifications and site plan attached hereto as Exhibits "A" and "B." 4. Brandenburg and Storey shall dedicate or cause to be dedicated to Augusta, at no cost to Augusta (except as set out herein), the right-of-way for the road system and the required easements for the sewer, sanitary storm drainage facilities (exclusive of the siltation pond) and water lines which are a part of the Project depicted in the plans referenced in the above described contract. 5. Brandenburg shall pay, or cause to be paid, all costs associated with the Project, as and when they become due, and pursuant to the above described contract. Upon completion of the Project and acceptance by Augusta, Augusta shall pay to Brandenburg the sum of Two Hundred Thirty-Eight Thousand and nolIOO ($238,000.00) Dollars. IN WITNESS WHEREOF, the parties have hereunto caused this instrument to be executed by their duly authorized officials. AUGUSTA, GEORGIA By: ~ . , ,- . --., r _""':::,.. _.- ...:::-;- . -~-" ..~.~:~"I: [SIGNATURES CONTINUED ON FOLLOWING PAGE] 2 . ::-~"" '". J.. ) >, .' ~#~,~ __ (L.S.) LEE H. BRANDENBURG ' tfC <. !iA",ttf4~.S.) RIC L. BRANDENBURG By: 3 [TEM DESCR! p'rrON NO. EXHIBrr .. 0 ESTIMATED UNIT QUANTITY r.'~ . '7 ., 3RANOEN8URG WOR~ 1 .CLEARING/GRUBBING 2 . LANDSCAPING AND SIGNAGE 3.GRADING 4 .SUBGRADE PREP 5 . 6" GRADED AGGR. BASE 6 . 4 " ASPHALT "B" BINDER 7 . TACK COAT 8 . 1-1/2" ASPHALT "E" 9 .30" CONC.CURB AND GUTTER TP 7 10 .30" ,CONC.CURB AND Gt1TTER TP 2 11 . 6" CONC. MEDIAN PAVING l' WIDE 12 . GRASSII-lG COMPLETE 13 . EROSION CONTROL 14 . CONSTRUCTION STJUaNG 15 .8" C - 900 CLASS 200 PVC PIPE 16 . FIRE HYDRANTS (COMPLETE) 17 . 8" VALVE/BOX 18 .8" PLUG 19 .8" TEE 20 .8" 45 BENDS 21 . 8" 22 1/2 BENDS 22 . 8" 90 BENDS 23 .TIE TO EXISTING LINE 24 . TESTING & CHLORINATION 25 . DOUBLE HBT WI HOOD 9031L 26 . S. W. T. ~7 . 18" RC? 1-10 28 .TIE TO EX. SAN MH W/SOOT 29 .s~~rTARY MANHOLE TYPE 1 0'_6' \0 . SAA.\fITARY MANHOLE TP 1 ADD' L DEPTH )1 .8" PVC SANITARY SEWER 8-10 \2 .8" ?VC S~'lITARY SEWER 10-12, \3 .8" D!P SANITARY S~"'ER 2-4 ,4 .SOLZD TRAE STRIPE,S" WH/YL :S . ?'fMT ~K:::NG, SINGLE ARROW '6 . SOLID TR.!\F STRI FE, 24" WHITE 7 . SOLID TRAF STRIPE, S" WHITE 8 .SKI? TRAfFIC STRIPE,S" SGL WH 9 .TRAFFrc STRIPING, A.~EA o .RAIS~u PVMT ~~KINGS, TYP 1,2,3 4 1 42125 9665 4697 1034 1000 393 1050 1096 29 14.75 1 1 2833 4 5 2 1 6 4 2 1 1 2 2 304 1 3 6 574 212 50 4000 o 33 890 1470 61 10 1 of 2 ACRES LUMP SUM CU YDS SQ YDS SQ YDS TON GAL TON LIN FT LIll FT SQ YDS ACRE LUMP SUM LUMP SUM ..I:IN FT EACH, _ EACH',', ' EACH EACH EACH EACH EACH EACH LUMP SUM EACH EACH LIN FT EACH EACH '* '* LIN E"!' LIN E"l' LIN IT LZN :'!' LIN IT EACH LIN E'T LIN FT GR LIN FT SQ YOS EACH UNIT PRICE ~ TOTAL: PRICE; S3,500.00 S 14,000.00 535,000.00 I $35,000.00 $2.00 584,250.00 SO.25 I $2,416.25 56.05 528,416.85 $35.60 536,810.40 $1. 00 51,000.00 539.00 515,327.00 $9.75 $10,237.50 S9.50 $10,412.00 $16.50 $478~50 $1,250.00 $18,'437.50 $5,500.00 $5,500.00 $9,000.00 $9,000.00 $12.70 $35,979.10 $1,950.00 $7,800.00 5605.001 53,025.00 $175.00 i $350.00 5185.00 ! S185.00 $147.001 $882.00 $148.00! 5592.00 5154.001 5308.00 $500.001 5500.00 52,250.00 I 52,250.00 I I Sl,550.00' 53,100.00 I 51,200.00 52,400.00 S24.25 57,372.00 I saso.oo S850.00 $965.00 $111. 25 516.80 519.30 · S l8 ,00 ' SO.80 ' $70.00, S5 .00 i $2 .ZS I SO.41 : $4.~5 S6.00 52,895.00 I I 5667.501, 59,643.20 ! 54,091. 60 1 5900.00 : 53,200.00 ; 5420.001 S165.00 I 52,002.50 i S692.70J S259.25 : $60,00 I .' ....~t.. ~.;,..'_ . '. EXHIBIT~P ESTIMATED UNIT UNIT .'~ TOTAL1 'jl1'EM NO. QUANTITY PRICE PRICE I 41 . GRASSING COMPLET~ 0.25 ACRE Sl,250.00! S312.50 42 .EROS!ON CONTROL 1 LUMP SUM $500.00 I $500.00 43 . CONSTRUCTION STAKING 1 LUMP SUM $300.00 I $300.00 44 .8" C - 900 CLASS 200 PVC PIPE 380 LIN E'T $12.70! $4,826.00 45 . FIRE HYDRANTS (COMPLETE) 1 EACH $1,950.00 $1,950.00 46 .S" PLUG 1 EACH $175.00 $175.00 47 .S" TEE 1 EACH $185.00 $185.00 48 .TESTING & CHLORINATION 1 LUMP SUM $250.00 $250.00 49 . STORM MANHOLE 101LA 1 EACH $1,000.00 I $1,000.00 SO ~ S. W. T. 2 EACH $1,200.00 $2,400.00 51 .18" RCP 30 . LIN iT $24.25 $727.50 52 .24" RCP 366 LIN iT $.31. 25 $11,437.50 DESCRIPTION NOTE: ITEMS 41 THROUGH 52 ARE rOR DELTA DRIVE~ BRANDENBURG WORK SUBTOTAL ===-=u:a> I $385,849.351 ADDITIONS: ' Brandenburg, SedimentlDrainage Share: ($42,619.40 x 65%) $ 27,702.61 $413.551.96 CREDITS: River Watch. LLC SedimentIDrainage Land Share: ($70,000 x .54 x 35%) ~ ' ($ 13,230.00) TOTAL BRANDENBURG SHARE ("Seller Improvement Cost") $400,.321.96 ,fI)1) ,nl99tU ~a~" 1b ~w. )U,.,..~ i>t,T ("'''''~ . ... .. . . ( 'I,'lIt1)( IS~ '/f.air ~._ nJ,i y..J.1 ~wII;,. tf ,~~ .tZ'~~ . . " . .. , ~ z,-z, ,II. ~ 2.1. 9'10. 00 ~DoO' -='-) t. .. ,. ,\ .. " . - ... . . .. . . ~ {t 1 3q~ '67. !' 7CJ71ff- ~ ~~ ..r~. - - - 2 of 2 ~