HomeMy WebLinkAboutJ & B CONSTRUCTION AND SERVICE INC DIAMOND LAKES COMMUNITY CENTER PHASE1A LOCKER ROOM 1A
:;
"
1997 EDITION
AlA DOCUMENT A10l-1997
i~l~1Jda,.dfor"!of Agreement Between Owner and Contractor
whe'rethebasisof payment is a STIPULAIED SUM
Nineteenth
day of
December
This document has !mportant
legal consequences.
Consultation with im
attorney is encouraged
with respect to its
completion or modification.
Richmond County
eene Street
GA 30911
AlA Document A201-1997.
General Conditions of the
Contract for Construction. is
adopted in this document by
reference. Do not use with
other general conditions
unless this document is
modified.
on'and Servmce,
Highway
GA 30813
Inc.
This document has been
approved and endorsed by
The Associated General
Contractors of America.
Center - PhaSe IA
. '
. . . .
..' .
The Wood h ur s tP,aTt"Iler s hip
information} 607 F i fte en th St reet
Augusta, GA 30901
.w.
.~,~.
......... ....
.Ie"
-
Q1997 AIA@
, AlA DOCUMENT Al01-1997
OWNER-CONTRACTOR
AGREEMENT
,TheC)~Iler add CQntractor agree, as. fQllows.
The American Institute
of Architects
1735 New York Avenue, NW.
Washington, D.C. 20006.5292
C?pyrightlJ15,)918,1925,1937i1951~1958,1961, 1963, 1967, 1974, 1977, 1987, CO 1997 by The American Institute of
....rc~it!!~,ti;R,eetoducti~,;)of!~,emN7ri~lberein or substantial quotation of its provisions without permission of the
{\!....viol'!t'lS!l1ecopyrightJil't'softhelJpited States and will subject the violator to legal prosecution.
. vi,oJUlIN(;:;ijnlii:~iise~ pho,i",,?PYi;,i :vi(llil1esU.s. copyright laws and will subject the violator to legal prosecution.
ARTICLE 1 THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General,
Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to
execution of this Agreement, other documents listed in this Agreement and Modifications issued
after execution of this Agreement; these form the Contract, and are as fully a part of the Contract
as if attached to this Agreement or repeated herein. The Contract represents the entire and
integrated agreement between the parties hereto and supersedes prior negotiations, representa-
tions or agreements, either written or oral. An enumeration of the Contract Documents, other
than Modifications, appears in Article 8.
ARTICLE 2 THE WORK OF THIS CONTRACT
The Contractor shall fully execute the Work described in the Contract Documents, except to the
extent specifically indicated in the Contract Documents to be the responsibility of others.
ARTICLE 3 DATE ,OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
3.1 The date of commencement of the Work shall be the date of this Agreement unless a
. different date is stated below or, provision is made for the date to be fixed in a notice to proceed
issued by the Owner. ' . ,
(Insert the date of commencement if it differs from the. date of this Agreement or, if applicable, state that the
date will be fixed in a notice to proceed.)
The date of commencement will be fixed 1n a Notice to Proceed
If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechan-
ic's liens and other security interests, the Owner's time requirement shall be as follows:
3.2 The Contract Time shall be measured from the date of commencement.
3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than
1 8 0 c ale n d a r . days from the date of commencement, or as follows:
(Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of
commencement. Unless stated elsewhere in the Contract Documents, insert any requirements for earlier
Substantial Completion of certain portions of the Work.)
, subj~ct to adjustments ofthis' Contract Time as provided in the Contract Documents.
(Insert provisions, if any, for liquidated damages relating to failure to complete on time or for bonus payments
for early completion of the Work.)
WARNING: Unlicensed photocopying violates U.s. copyright laws and will subject the violator to legal prosecution.
11'11
'" <7
o. .0-
O'.~~ .'0
o~<:::>
c:::::::J
Q1997 AIA@
AlA DOCUMENTA101-1997
OWNER-CONTRACTOR
AGREEMENT
The American Institute
of Architects
1735 New York Avenue, N.W.
Washington, D.C. 20006-5292
ARTICLE 4 CONTRACT SUM
4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's
performance of the Contract. The Contract Sum shall be One Hundred Fifty Seven Thousand Six
Hundred & Twenty-Five Dollars ($1 57 ,625.00
subject to additions and deductions as provided in the Contract Documents. '
4.2 The Contract Sum is based upon the following alternates, if any, which are described in the
Contract Documents and are hereby accepted by the Owner:
(State the numbers or other identification of accepted alternates. If decisions on other alternat~s are to be made
by the Owner subsequent to the execution of this Agreement, attach a schedule of such other alternates showing
the amount for each ,and the date when that amount expires.)
N/A
4.3 Unit prices, if any, are as follows:
ARTICLE 5 PAYMENTS
5.1 PROGRESS PAYMENTS
5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and
Certificates for Payment issued by the Architect, the Owner shall make progress payments on
account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract
Documents.
5.1.2 The period covered by each Application for Payment shall be one calendar month
ending on the last day of the month, or as follows:
5.1.3 Provided that an Application for Payment is received by the Architect not later than the
T wen t y. - f 0 u r t h day of a month, the Owner shall make payment to the Contractor not
later than the Fifteenth dayofthefollowing month. Ifan
Application for Payment is received by the Architect after the application date fixed above, pay-
ment shall be made by the Owner not later than T h i r t y - 0 n e days after the Architect
receives the Application for Payment.
5.1.4 Each Application for Payment shall be based on the most recent schedule of values submit-
ted by the Contractor in accordance with the Contract Documents. The schedule of v;llues shall
allocate the entire Contract Sum among the various portions of the Work. The schedule of values
shall be prepared in such form and supported by such data to substantiate its accuracy as the
Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis
for reviewing the Contractor's Applications for Payment.
WARNING: Unlicensed photocopying vlolat,es U.S. copyright laws and will subject the violator to legal prosecution.
11111
<>. 0
o. .0
0'. m,. ,'0
o~~
c::=J
co1997 AIA@
AlA DOCUMENT Al01-1997
OWNER-CONTRACTOR
AGREEMENT
The American Institute
of Architects
1735 New York Avenue, N.W.
Washington, D.C. 20006-5292
5.1.5 Applications for Payment shall indicate the percentage of completion of each portion of the
.Work as of the end of the period covered by the. Application for Payment.
5.1.6 Subject to other provis~ons of the Contract Documents, the amount. of each progress pay-
ment shall be computed as follows:
.1 Take that portion of the Contract Sum properly allocable to completed Work asdeter-
mined by multiplying the percentage completion of each portion of the Work by the
share of the Contract Sum allocated to that portion of the Work in the schedule of val-
ues, less retainage of t en percent ( 1 0 %). Pending final determi-
nation of cost to the Owner of changes in the Work, amounts not in dispute shall be
included as provided in Subparagraph 7.3.8 of AlA Document 1\201-1997;
.2 Add that .portion of the Contract Sum properly allocable to materials and equipment
delivered and suitably stored at the site for subsequent incorporation in the completed
construction (or, if approved in advance by the Owner, suitably stored off the site at a
location agreed upon in writing), less retainage of T €IIi percent (10 %);
3. Subtra~nhe aggregat~of previous payments made by the Owner; and
~4""Subtract'amounts, ifapy, for'rhicl:1 the Architect has withheld or nullified a Certificate
" for Paym~nt as provided in J?~agraph9.5 of AlA Document 1\201-1997.
5.1.7 The progres~ payment amount determined in accordance with Subparagraph 5.1.6 shall be
further modified under the Jollowing circumstlUlces:
.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total pay-
ments to the full amount of the Contract Sum, less such amounts as the Architect shall
determine for incompleteWork,retainage applicable to such work and unsettled claims;
and (Subparagraph 9.8~5of AlA Document A201-1997 requires release of applicable retainage upon
Substantial Completion of Work with consent of surety, if any.)
.2 Add, iffinalcompletion of the Work is thereafter materially delayed through no fault of
the Conti-actor, apy additional amounts payable in accordance with Subparagraph 9.10.3
of AlA Document 1\201-1997.
5.1.8 Reduction or limitation of retainage, if any, shall be as follows:
(If it is intended, priorto Substantial Completion of the entire Work, to reduce or limit the retainage resulting
from the percentages inserted in Clauses 5.1.6.1 and 5.1.6.2 above, and this is not explained elsewhere in the
Contract Documents, insert here provisions for such reduction or limitation.)
5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments
to suppliers for materials or equipment which have not been delivered and stored at the site.
5.2 FINAL PAYMENT
5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made
by the Ownerto the ContractorwlIen:
.1 the Contractor has fully performed the Contract except for the Contractor's responsibil-
ity to correct Work as provided in Subparagraph 12.2.2 of AlA Document 1\201-1997, and
to satisfyother requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution.
"
oo'cC'h'~<:>
c:==:J
Ci)1997 AIA@
AlA DOCUMENT Al01-1997
OWNER-CONTRACTOR
AGREEMENT
The American Institute
of Architects,
1735 New York Avenue, N.W.
Washington. D.C. 20006-5292
5.2.2 The Owner's final payment to the ContractDr shall be made no later than 30 days after the
issuance of the Architect's final Certificate for Payment, or as follows:
ARTICLE 6 TERMINATION OR SUSPENSION
6.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14
of AlA DocumenfA201-1997.
6.2 The Work may be suspended by the Owner as provided in Article 14 of AlA Document
1\201-1997.
ARTICLE 7 MISCELLANEOUS PROVISIONS
7.1 Where reference is made in this Agreement to a provision of AlA Document 1\201-1997 or
another Contract Document, the reference refers to that provision as amended or supplemented
by other provisions of the Contract Documents. .
7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is
due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time
at the place where the Project is located. . .
(Insert rate of interest agreed upon, if any.)
(Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit
laws and other regulations at the Owner's and Contractor's principal places of business, the location of the
Project and elsewhere may affect the validity of this provision. Legal advice should be obtained with respect to
deletions or modifications, and also regarding requirements such as written disclosures or ~aivers.)
7.3 The Owner's representative is:
(Name, address and other information)
N/A
7.4 The Contractor's representative is:
(Name, address and other information)
N/A
7.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days'
written notice to the other party.
7.6 Other provisions:
N/A
WARNING: Unlicensed photocopying violates U:S. copyright laws and will subject the violator to legal prosecution.
II
oo't::i2:'h.~<:>
C=:J
co 1997 AIA@
AlA DOCUMENT Al01-1997
OWNER-CONTRACTOR
AGREEMENT
The American Institute
of Architects
1735 New York Avenue, N.W.
Washington, D.C. 20006-5292
ARTICLE 8 ENUMERATION OF CONTRACT DOCUMENTS
8.1 The Contract Documents, except f<;>r Modifications issued after execution of this
Agreement, are enumerated as follows:
8.1.1 The Agreement is this executed 1997 edition of the Standard Form of Agreement Between
Owner and Contractor, AlA Document AlOl-l997.
8.1.2 The General Conditions are the 1997 edition of the General Conditions of the Contract for
Construction, AIA Document A20l-1997.
8.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project
Manual dated N ov em be r 21, 2007, and are as follows:
Document Title Pages
H305 ContTactor.ts QualificationsStatement, 1-6
Sec. E Special Conditions, E-1 through E-12
Set. B Bid Form, B-1 through B-3
H701 Ins~ructions to Bidders, 1 5
8.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 8.1.3,
and are as follows:
(Either list the Specifications here or refer to an exhibit attached to this Agreement.)
Section
Title
Pages
SEE ATTACHED EXHIBIT "B"
".8.1.5 The Drawings are as follows, and are dated
different date is shown below:
(Either list the Vrawingshere or, refer to an exhibit attached to this Agreement.)
Number
Title
Date
SEE ATTACHED EXHIBIT "A"
WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution.
unless a
~II
oo.a:::h'~o
c:::::J
co1997 AIA@
AlA DOCUMENT A10l-1997
OWNER-CONTRACTOR
AGREEMENT.
The American Institute
of Architects
1735 New York Avenue, N.W.
Washington, D.C. 20006-5292
~lJ~r/f
.W.
.~,~.
-;'Iii'",.
-
8.1.6 The Addenda, if any, are as follows:
Number
Date
Pages
N/A
Portions of Addenda relating to, bidding ,requirements are not part of the ContractDocuments
unless the bidding requirements are also enumerated in this Article 8.
8.1.7 Other documents, if any, forming part of the Contract Documents are as follows:
(List here any additional documents that are intended to form part of the Contract Documents. AlA Document
A201-1997 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders,
sample forms' and the Contractors bid are not part of the Contract Documents unless enumerated in this
Agreement. They should be listed here only if intended to be part of the Contract Documents.)
This Agreementis entered into as of the day and year first written above and is executed in at least
three original copies, of which'one istQ,be delivered to the Contractor, one to the Architect for use
~ in the administratio~2}),~~ Coritiact,~~~t:hi\" remainder to the Owner.
~ ~'.,., .,,.,
(), "l ..." t, .".
\1l ~ g\?':~;~~
'V' ,', ., ,,': ...,~~:
(/jju;~ OW ER(Si '/:!t~~~. ~':""",:'~""," ,,~,,/~' J ~:; ~,O RACTOR(Signature
'- ~" ,:','{", ,- /) ~.,
I '..' /." ,;-.. .:/" 1jL: J-- 0---
""Q .~!,..;; :;. IS,'-
. {', """," ...,cP~y , ~ t c) IV\. \ UN f:J
(Printed name(lnd titl~Ji\;;",. ~::::::~:,).?> ..:-;}-'f" (Printed name and title)
D eke C op en h a v''e:,r,~~' 'M'a;v O::'r
~M" ............~~-;.;J.~
"
\' 136. Qi\
v\\~
CAUTION: You should sign an original AlA document or a licensed reproduction. Originals contain the AlA logo
printed in red; licensed reproductions are those produced in accordance with the Instructions to this document.
WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution.
co1997 AIA@
AlA DOCUMENT Al01-1997
OWNER-CONTRACTOR
AGREEMENT
The American Institute
of Architects
1735 New York Avenue, N.W.
Washington, D.C. 20006-5292
EXHI BIT A DRAWING LIST FOR DRAWING BID SET DATED NOVEMBER 21,2007
LOCKER ROOM BUILD OUT DIAMOND LAKES COMMUNITY CENTER PHASE IA
AUGUSTA, GEORGIA
AflCHITECTURAL
TS-1 COVER SHEET
A 1-1 FLOOR PLAN
PLUMBING
P1-1 PARTIAL PLUMBING PLAN - FIRST FLOOR WASTE
P2-1 PARTIAL PLUMBING PLAN - FIRST FLOOR WATER
P4-1 PLUMBING SCHEDULE, LEGEND, NOTES AND DETAILS
MECHANICAL
M1-1 HVAC PARTIAL PLAN - FIRST FLOOR
M2-1 HVAC PARTIAL PLAN - FIRST FLOOR
M3-1 HVAC DETAILS
M4-1 HVAC SCHEDULES, NOTES & LEGEND
M4-2 HVAC SCHEDULES, NOTES & LEGEND
ELECTRICAL
E1-1 LEGEND, FIXTURE SCHEDULE, NOTES AND DETAILS
E3-1 LIGHTING PLAN - COMMUNITY CENTER
E4-1 POWER PLAN - COMMUNITY CENTER
E5-1 MECHANICAL POWER PLAN - COMMUNITY CENTER
E6-1 FIRE ALARM SYSTEMS PLAN
E7-2 PANELBOARD SCHEDULES
E8-1 DETAILS
EXHIBIT "B"
PROJECT MANUAL
CONDITIONS OF THE CONTRACT AND SPECIFICATIONS
DIAMOND LAKES COMMUNITY CENTER - PHASE IA
LOCKER ROOM BUILD OUT
FOR AUGUSTA-RICHMOND COUNTY
RECREATION & PARKS DEPARTMENT
TABLE OF CONTENTS
SECfION TITLE
BIDDING REQUIREMENTS
A Invitation to Bid
B Bid Form
C Instructions to Bidders
CONDITIONS OF THE CONTRACf
D General Conditions and Form of Agreement Between Owner & Contractor
E Special Conditions
DIVISION 1 - GENERAL REQUIREMENTS
01020 Alternates
01045 Cutting and Patching
01050 Field Engineering
01400 Quality Control
01500 Construction Facilities and Temporary Controls
DIVISION 2 - SITE CONSTRUCfION - NOT APPLICABLE
DIVISION 3 - CONCRETE
03300 Cast-in-place Concrete
DIVISION 4 - MASONRY
04200 Unit Masonry
1
DIVISION 5 - METALS
05500 Metal Fabrications
DIVISION 6 - WOOD AND PLASTIC
06100 Rough Carpentry
06200 Finish Carpentry
06402 Interior Architectural Woodwork
DIVISION 7 - THERMAL AND MOISTURE PROTECfION
07210 Building insulation
07270 Firestopping
07811 Sprayed Fire-Resistive Materials
07901 Joint Sealants
DIVISION 8 - DOORS AND WINDOWS
08305 Access Doors
DIVISION 9 - FINISHES
09200 Lath and Plaster
09255 Gypsum Board Assemblies
09300 Tile
0%78 Resilient Wall Base and Accessories
09680 Carpet
09900 Painting
DIVISION 10 - SPECIALTIES
10155 Toilet Compartments
10426 Signs
10505 HOPE Lockers
10800 Toilet and Bath Accessories
DIVISION 11 - EQUIPMENT - NOT APPLICABLE
DIVISION 12 - FURNISIDNGS - NOT APPLICABLE
DIVISION 13 - SPECIAL CONSTRUCfION - NOT APPLICABLE
DIVISION 14 - CONVEYING SYSTEMS - NOT ApPLICABLE
'2
15000
15050
15100
15135
15145
15170
15171
15241
15250
15325
15411
15420
15430
15440
15510
15845
15855
15891
15910
15975
15985
15990
16000
16015
16020
16030
16040
16050
16060
16100
16110
16120
16130
16140
16160
16175
16200
16220
DIVISION 15 - MECHANICAL
General Mechanical Provisions
Basic Mechanical Materials and Methods
Valves
Meters and Gages
Hangers and Supports
Motors
Motor Controllers
Mechanical Vibration Controls and Seismic Restraints
Mechanical Insulation
Fire-Suppression Piping
Water Distribution Piping
Drainage and Vent Piping
Plumbing Specialties
Plumbing Fixtures
Hydronic Piping
Air Terminals
Diffusers, Registers, Grilles and Louvers
Metal Ductwork
Duct Accessories
Control Systems Equipment
Sequence of Operation
Testing, Adjusting, and Balancing
DIVISION 16 - ELECTRICAL
General
Fuses
Raceways
Conductors
Outlets
Wiring Devices & Device Plates
Lighting Fixtures & Lamps
Pull Boxes and Junction Boxes and Fittings
Grounding
Equipment Identification
DataIV oice Conduit & Outlet System
Fire Alarm System
Transient Voltage Surge Suppressor
Fire Stopping
Building Communication & Program System
Construction Reviews Inspection and Testing
END OF TABLE OF CONTENTS
3