Loading...
HomeMy WebLinkAboutGEORGIA POWER ST SEBASTIN WAY GREEN ST 15STREET .... ... ,. . RELOCATION AGREEMENT City of Augusta / Richmond County Greene St. / St. Sebastian Way Project GDOT Project: DE-OOMS (389) Richmond, PI 262750 THIS AGREEMENT, made and entered into as of the 28th day of July, 2006, by and between City of Augusta / Richmond County, State of Georgia (hereinafter referred to as the "County"), and GEORGIA POWER COMPANY (hereinafter referred to as the "Company"). WIT N E SSE T H: WHEREAS, the County proposes under the above written Project to construct the Greene St. / St. Sebastian Way Project; GDOT Project: DE-OOMS (389) Richmond, PI 262750 (hereinafter "Project"); and . WHEREAS, due to the constructi.on of this Project, it will become necessary for the Company to make certain adjustments to the Company's existing facilities, in accordance with the estimate of $2,385,659.00, a copy of which estimate is attached hereto, and incorporated into this Agreem~- Exhibit "A'" and t- ' Co~:\- ?c WHEREAS, it has been established between the parties that the Companllf"cquired lmen rights for its electrical facilities prior in time to acquisition of the road(s), all as in"volved in said Project; and . WHEREAS, the County agrees to bear the lesser of one hundred percent (100%) of actual or $2,385,659.00 of said relocation expenses; and WHEREAS, the location of said presently existing facilities and the proposed new location of such facilities are shown on the Company plans previously provided to the County. A description of work is incorporated into this Agreement as Exhibit "B". NOW, THEREFORE, in consideration of the promises and the mutual covenants of the parties hereinafter set forth, it is agreed: Section 1. The Company, with its regular construction or maintenance crews and personnel, at its standard schedule of wages and working hours (as may be applicable from time to time during this Agreement), and working in accordance with the terms of its agreements with such employees, will make such changes in its facilities as previously agreed upon with the County. The Company may elect to contract any portion of the work contemplated. Section 2. Upon completion by the Company of the work contemplated herein, the County will pay the Company a sum equal to lesser of the County's one hundred percent (100%) actual cost or share of the total Project relocation expenses estimate set forth herein, $2,385,659.00. Section 3. The County will not be bound to pay any amount for facilities relocation in excess of the reimbursable portion of the detailed cost estimate, Exhibit "A" attached hereto and made a part hereof, nor for any items of relocation work not provided for in said detailed cost estimate, except as shall be specifically approved in writing by the County. The County shall, however, also be responsible to the Company for one hundred percent (100%) of any and all costs incurred in acquiring additional easements for rights of way, including without limitation, easements for lines, access, tree trimming, guy wires, anchors, and other devices, appliances and facilities, and any and all other such easements and property rights as may be necessary for the Company's installation, operation and maintenance of its facilities. , I Section 4. It is further mutually agreed that the final cost of the changes in the facilities of the Company covered by the detailed cost estimate, Exhibit "A" attached hereto and made a part hereof, shall be borne by the County. Section 5. The Company shall make a reasonable effort to provide signing and other traffic control measures during construction as contemplated under this Agreement in accordance with PART VI of the U.S. Department of Transportation Manual on Uniform Traffic Control Devices, current edition, all at the expense of the County. Section 6. The covenants herein contained shall, except as otherwise provided, accrue to the benefit of and be binding upon the successors and assigns of the parties hereto. Section 7. It is mutually agreed between the parties hereto that this document shall be deemed to have been executed in Georgia. IN WITNESS WHEREOF, the parties hereto acting through their duly authorized agents have caused this Agreement to be signed, sealed and delivered. / 1--0-- ~V\'-o/~/ Dated this (p day of _~ 20 D 7 . ) ~ &CCOUNTY" JJ .;r CITY OF U,GUSTA I :;.~~~~~~~~y By. ", ...; 1:'...0' t,... . r'>, <t~. Name: .;,\ \\ Y'... \'.. Title' 0 (~A . '.", ~~; ~;~ Attest: "... L':(-SEAL)i . #i-'t~~/....-..- d_ ~"t. l:''::- Name: J ";.. \ > y.,". "," j '~..." \9'11> 0'" .- Title: 't1. ."""l),o""~<)o....,,, .if::'''''' '\l-. G'.~ .- 'l\\ GEOR ~ ~,~~~...,.,....q.: ;~'J;lI:Y.Pu ol!1~'. ,... ~ 00 00 "'<" t,t ...~. o~; I" / ~OTAI)t!~ \ ~ ~ it 0 r ~ "" I.. -'- o;i! ~ : AI. (j : ~ 'u'~ ~. vB\..~ ; ~ 1 J~ ('\ o.~.o <:,'b 00 ~ ~ ..t .$:. &. . J '/.r:J .0_\ ' -II. ~." -.... Iii". 06, ."r<t"" "'" ._ "'7.,~",~,. -Ff , .. r;. Q:'ro Ii\~ ,.,.- ..~,,'-,,'-,~;!>~ ~;;''''~..' :,.. ';r];'>~--' ,t4~~ iJ~ , -WItness - ~,~ CJ Notary Public &.xe:- <t.- r ~-~( .. ! EXHIBIT A GEORGIA POWER Transmission Estimating and Management System Estimate number 1130906, 1130907, 1130908,1130909 and 1130910 (38 pages attached) TMCRET40 Page: 1 of 2 Project Item: 1130906 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name: FIFTEENTH STREET - SOUTH AUGUSTA 230KV (BLACK) Nearest Town: AUGUSTA Description: Relocate line between structures #48 and #51. Build a new line section parallel and to the southwest of the existing line, with a 30' separation. Position the new structures to avoid the St. Sebastian Way canal bridge crossing. Structure #50 may be reused for the relocation of the Fenwick St. - 15th St. 115 kV line in TEAMS #1130907. Discipline / Retirement Unit UM I> Version: GEORGIA POWER COMPANY ESTIMATED COST BY RETIREMENT UNITS Current Date: 07/21/2006 Time: 01:42:46PM Quantity Work Order: Schd Const Finish Date: 09/11/2007 Originator: NASH, RT Material Equipment Labor Total PLANT ADDITIONS CONSTRUCTION (Estimator: CURYLO, KW) GROUNDING-DRIVEN RODS EA INSULATOR-SUSPENSION 230KV SE POLES/TOWERS-ACCESSORIES LT STEEL POLE LT WIRE-ACSR,SGL COND 1351 KCMIL FT WIRE-STEEL (OH GRND 5/16" FT WIRE-STEEL(OH GND LT Discipline 3 3 1 1 4,400 1,467 1 Total ENGINEERING (Estimator: BERRY, DR) DIRECT ENGINEERING LT 1 Discipline Total LAND (Estimator: MOCK, DM) TRANS, MEALS, ETC. LT 1 Discipline Total PLAN & PROJ (Estimator: BERRY, DR) DIRECT ENGINEERING LT 1 Discipline Total RIGHT OF WAY (Estimator: BERRY, DR) FOUNDATIONS-RIGID BASE STRS EA 3 RIGHT-OF-WAY CLEARING LT 1 Discipline Total Sub-Total Additions PLANT TRANSFER ADDITIONS Discipline Total Sub-Total Plant Transfer Additions TOTAL PLANT ADDITIONS WITHOUT OVERHEADS PLANT REMOVALS CONSTRUCTION (Estimator: CURYLO, KW) INSULATOR-SUSPENSION 230KV SE POLES/TOWERS-ACCESSORIES LT STEEL POLE LT STEEL POLE - 70' EA STEEL POLE - 85' EA WIRE-ACSR,SINGLE CONDUCTOR LT WIRE-STEEL(OH GND LT Discipline 1 1 1 1 1 1 1 Total RIGHT OF WAY (Estimator: BERRY, DR) FOUNDATIONS-RIGID BASE STRS EA 1 Discipline Total Sub-Total Removals PLANT TRANSFER REMOVALS Discipline Total Sub-Total Plant Transfer Removals TOTAL PLANT REMOVALS WITHOUT OVERHEADS MAINTENANCE Discipline Total TOTAL MAINTENANCE 267 3,429 537 4,233 1,341 522 78 1,941 43 729 108 880 122,061 10,587 1,566 134,214 11,170 17,787 6,812 35,769 259 4,447 660 5,366 75 567 84 726 135,216 38,068 9,845 183,129 0 18,120 542 18,662 0 18,120 542 18,662 239 3,518 105 3,862 239 3,518 105 3,862 0 281 8 289 0 281 8 289 0 51,261 12,480 63,741 0 21,108 630 21,738 0 72,369 13,110 85,479 135,455 132,356 23,610 291,421 0 0 0 0 0 0 0 0 135,455 132,356 23,610 291,421 o o o o o o o o 174 26 200 122 18 140 3,529 522 4,051 2,750 407 3,157 3,056 452 3,508 232 38 270 388 57 445 10,251 1,520 11,771 8,544 2,080 10,624 8,544 2,080 10,624 18,795 3,600 22,395 0 0 0 0 0 0 18,795 3,600 22,395 0 0 0 0 0 0 o o o o o o o } TMCRET40 Page: 2 of 2 Project Item: PE: 6055 PE Type Work: Facility Name: Nearest Town: Version: 1130906 Item: MODIFICATION FIFTEENTH STREET AUGUSTA GEORGIA POWER COMPANY ESTIMATED COST BY RETIREMENT UNITS Current - SOUTH AUGUSTA 230KV (BLACK) Date: 07/21/2006 Time: 01:42:46PM Work Order: Schd Const Finish Date: 09/11/2007 originator: NASH, RT Overheads Plant Additions (Labor, MatI, Egp) Overheads Plant Removals (Labor, MatI, Egp) ESTIMATE SUMMARY TOTALS Total Plant Additions Total Plant Removals Plant Salvage Plant Transfer Additions (Material Only) Total PI CIAC Original Cost Retired Plant Transfer Removal (Material) ...... Total Cash Required Total Maintenance Cost *** End of Report *** 291,421 101,127 392,548 22,395 5,982 28,377 420,925 o o o o 1 o } TMCRET39 Page: 1 of 3 Project Item: 1130906 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name - FIFTEENTH Nearest Town: AUGUSTA Description: Relocate line between structures #48 and #51. Build a new line section parallel and to the southwest of the existing line, with a 30' separation. position the new structures to avoid the St. Sebastian Way canal bridge crossing. Structure #50 may be reused for the relocation of the Fenwick St. - 15th St. 115 kV line in TEAMS #1130907. GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01:42:50PM Work order: Version: WC Schd Const Finish Date: 09/11/2007 STREET - SOUTH AUGUSTA 230KV (BLACK) Originator: NASH, RT Discipline/Activity UM Quantity Material Labor Equipment PLANT ADDITIONS CONSTRUCTION (Estimator: CURYLO, KW) CONDUCTORS - STRINGING & SAGGING, ALL FT 4,400 11,170 17,787 6,812 GROUNDING - ALL (COUNTERPOISE, RODS, ETC.. .) EA 3 267 3,429 537 OHGW - STRINGING & SAGGING ( STEEL, ALUM, FIBER, ETC... ) FT 1,467 259 4,447 660 POLES - FRAMING & SETTING (W/INSULS, ARMS, BANDS, CLIPS, ETC... ) EA 3 122,179 11,883 1,758 SMALL EQUIPMENT (SWITCHES, ARRESTERS, MOTORS, SCADA, ARMS, INSULS, ETC... ) EA 3 1,341 522 78 Discipline Total 135,216 38,068 9,845 ENGINEERING (Estimator: BERRY, DR) DRAFTING - LINE LT 1 0 618 18 ENGINEERING/DESIGN - LINE LT 1 0 7,120 213 FIELD ACTIVITY - LINE LT 1 0 1,602 48 PRE-ENGINEERING WORK LT 1 0 237 7 PRELIMINARY ENGINEERING - LINE LT 1 0 2,373 71 PRELIMINARY ENGINEERING - LINE -FOUNDATION DESIGN LT 1 0 2,373 71 PRELIMINARY ENGINEERING - LINE -REVIEW MFGR DESIGN HR 24 0 1,424 43 PRELIMINARY ENGINEERING - LINE -SITE TEST DRILLING HR 40 0 2,373 71 Discipline Total 0 18,120 542 LAND (Estimator: MOCK, DM) FINAL STAKING LT 1 239 3,518 105 Discipline Total 239 3,518 105 PLAN & PROJ (Estimator: BERRY, DR) PLANNING LT 1 0 281 8 Discipline Total 0 281 8 RIGHT OF WAY (Estimator: BERRY, DR) * - Replacement TMCRET39 Page: 2 of 3 Project Item: 1130906 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name - FIFTEENTH Nearest Town: AUGUSTA GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 - Time: 01:42:50PM Work order: Version: WC schd Const Finish Date: 09/11/2007 STREET - SOUTH AUGUSTA 230KV (BLACK) Originator: NASH, RT Discipline/Activity UM Quantity Material Labor Equipment FOUNDATION - DRILLED PIER (DO NOT USE - USE N1) EA 3 0 51,261 12,480 RIGHT OF WAY - ENVIRONMENTAL (ROW PERSONNEL ONLY) LT 1 0 21,108 630 Discipline Total 0 72,369 13,110 Sub-Total Plant Additions 135,455 132,356 23,610 PLANT TRANSFER ADDITIONS Discipline Total 0 0 0 Sub-Total Plant Transfer Additions 0 0 0 TOTAL PLANT ADDITIONS WITHOUT OVERHEADS 135,455 132,356 23,610 PLANT REMOVALS CONSTRUCTION (Estimator: CURYLO, KW) CONDUCTORS - STRINGING & SAGGING, ALL OHGW - STRINGING & SAGGING (STEEL, ALUM, FIBER, ETC...) POLES - FRAMING & SETTING (W/INSULS, ARMS, BANDS, CLIPS, ETC... ) SMALL EQUIPMENT (SWITCHES, ARRESTERS, MOTORS, SCADA, ARMS, INSULS, ETC. ..) FT 1 o 232 38 FT 1 o 199 29 EA 3 o 9,646 1,427 EA 1 Discipline Total o o 174 10,251 26 1,520 RIGHT OF WAY (Estimator: BERRY, DR) FOUNDATION - DRILLED PIER (DO NOT USE - USE N1) EA 1 Discipline Total TOTAL PLANT REMOVALS WITHOUT OVERHEADS 8,544 2,080 8,544 2,080 18,795 3,600 0 0 0 0 18,795 3,600 0 0 0 0 Sub-Total Plant Removals o o o PLANT TRANSFER REMOVALS Discipline Total Sub-Total Plant Transfer Removals o o MAINTENANCE Discipline Total o TOTAL MAINTENANCE o * - Replacement TMCRET39 Page: 3 of 3 Project Item: 1130906 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name - FIFTEENTH Nearest Town: AUGUSTA GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01:42:50PM Work order: Version: WC Schd Const Finish Date: 09/11/2007 STREET - SOUTH AUGUSTA 230KV (BLACK) Originator: NASH, RT ESTIMATE SUMMARY TOTALS Plant Additions (Labor, Matl, Eqp) 291,421 Overheads 101,127 Total Plant Additions 392,548 Removals (Labor, Matl, Eqp) 22,395 Overheads 5,982 Total Plant Removals 28,377 Plant Transfer Credit (Material Only) o Plant Salvage Credit o Customer Contribution o Total Cash Required 420,925 Total Maintenance Cost o Original Cost Retired 1 Plant Transfer Removal (Material) o *** End of Report *** TMCRET44 Page: 1 of 3 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Date: 07/21/2006 Time: 01:42:56PM Project Item: Work Order: PE: Facility: Nearest Town: 1130906 Estimate Version: WC 6055 PE Item: FIFTEENTH STREET - SOUTH AUGUSTA 230KV (BLACK) AUGUSTA Description: Relocate line between structures #48 and #51. Build a new line section parallel and to the southwest of the existing line, with a 30' separation. Position the new structures to avoid the St. Sebastian Way canal bridge crossing. Structure #50 may be reused for the relocation of the Fenwick St. - 15th St. 115 kV line in TEAMS #1130907. Area(s): MIDDLE GA-AUGUSTA Construction Start Date: 08/30/2007 Facility Required Date: 06/30/2006 Crew Type Desc / Activities Activity Quantity UM Manhours DRAFTER LINE DESIGN Drafting - Line 1.0 LT 14.0 Activities Subtotal 14.0 Total Productive Time Non Productive Time 14.0 0.0 Total Manhours Estimated Duration (Days) 14.0 2.1 ENGINEER LINE DESIGN Engineering/Design - Line Pre-Engineering Work Field Activity - Line Preliminary Engineering - Preliminary Engineering Test Drilling Preliminary Engineering -Foundation Design Preliminary Engineering Mfgr Design Line Line -Site 1.0 1.0 1.0 1.0 LT LT LT LT 120.0 4.0 27.0 40.0 40.0 HR 40.0 Line 1.0 LT 40.0 Line -Review 24.0 HR 24.0 Activities Subtotal 295.0 Total Productive Time Non Productive Time 295.0 0.0 Total Manhours Estimated Duration (Days) 295.0 55.0 PLANNER Planning 1.0 LT 4.0 Activities Subtotal 4.0 TMCRET44 Page: 2 of 3 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Project Item: Work Order: PE: Facility: Nearest Town: 1130906 Estimate Version: WC 6055 PE Item: FIFTEENTH STREET - SOUTH AUGUSTA 230KV (BLACK) AUGUSTA Area(s): MIDDLE GA-AUGUSTA Construction Start Date: 08/30/2007 Facility Required Date: 06/30/2006 Crew Type Desc / Activities Activity Quantity Date: 07/21/2006 Time: 01:42:56PM UM Manhours Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) 0.6 LINE CONSTRUCTION CONTRACT CREW 12 MAN Ohgw - Stringing & Sagging (Steel, Alum, Fiber, Etc...) Small Equipment (Switches, Arresters, Motors, Scada, Arms, Insuls, Etc. ..) Grounding - All (Counterpoise, Rods, Etc. . .) Poles - Framing & Setting (W/Insuls, Arms, Bands, Clips, Etc. ..) Conductors - Stringing & Sagging, All Removals 1,467.0 FT 3.0 EA 3.0 EA 3.0 EA 4,400.0 FT 1.0 LT Activities Subtotal Material Handling Supervision Travel Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) 5.9 Special Equipment Required 150 FT CONDOR BACKHOE CRANE 75 TON ROAD TRACTOR TRAILER WjPERM. MOUNTED EQP. ROW-FOUNDATION CONTRACT CREW Foundation - Drilled Pier (Do Not Use - Use Nl) Removals 3.0 1.0 4.0 0.0 4.0 36.1 4.2 27.8 96 .4 144.3 83.1 391. 9 86.2 39.2 235.1 752.4 0.0 752.4 Hours 18.2 4.2 18.2 22.2 18,2 EA LT 255.0 42.5 TMCRET44 Page: 3 of 3 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Project Item: Work Order: PE: Facility: Nearest Town: 1130906 Estimate Version: WC 6055 PE Item: FIFTEENTH STREET - SOUTH AUGUSTA 230KV (BLACK) AUGUSTA Area(s): MIDDLE GA-AUGUSTA Construction Start Date: 08/30/2007 Date: 07/21/2006 Time: 01:42:56PM Facility Required Date: 06/30/2006 Crew Type Desc / Activities Activity Quantity OM Manhours Activities Subtotal 297.5 Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) CONTRACT CREW FOR RIGHT OF WAY CLEARING Right Of Way - Environmental (Row Personnel Only) Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) LAND ENGR SURVEY CREW Final Staking Activities Subtotal Total Productive Time Non productive Time Total Manhours Estimated Duration (Days) ** End of Report ** 297.5 0.0 297.5 6.0 1.0 LT 210.0 210.0 210.0 0.0 210.0 7.0 1.0 LT 30.0 30.0 30.0 0.0 30.0 3.0 TMCRET40 Page: 1 of 2 Project Item: 1130907 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name: FENWICK STREET - FIFTEENTH STREET 115 KV Nearest Town: 1.3 Description: Relocate line between structures #57 and #59A. Build a new line section to cross the canal twice. Use the old 15th St. - South Augusta 230 kv line ROW that was rerouted in TEAMS #1130906. This ROW will follow the top of the canal levee. Position the new structures to avoid the St. Sebastian Way canal bridge crossing. Build at 230 kV specification. Relocate structure #62 also to accommodate the 15th Street widening DOT project. Discipline / Retirement Unit UM Version: GEORGIA POWER COMPANY ESTIMATED COST BY RETIREMENT UNITS Current Date: 07/21/2006 Time: 01:43:14PM Quantity Work Order: Schd Const Finish Date: 12/06/2007 Originator: NASH, RT Material Equipment Labor Total PLANT ADDITIONS CONSTRUCTION (Estimator: BERRY, DR) GROUNDING-DRIVEN RODS EA INSULATOR-SUSPENSION 230KV SE POLES/TOWERS-ACCESSORIES LT STEEL POLE LT STEEL POLE - 135' EA STEEL POLE - 60' EA WIRE-ACSR,SGL COND 1351 KCMIL FT WIRE-STEEL (OH GRND 5/16" FT WIRE-STEEL(OH GND LT Discipline 6 7 1 1 3 1 4,400 1,500 1 Total ENGINEERING (Estimator: BERRY, DR) DIRECT ENGINEERING LT 1 Discipline Total LAND (Estimator: MOCK, DM) TRANS, MEALS, ETC. LT 1 Discipline Total PLAN & PROJ (Estimator: BERRY, DR) DIRECT ENGINEERING LT 1 Discipline Total RIGHT OF WAY (Estimator: BERRY, DR) FOUNDATIONS-RIGID BASE STRS EA 6 RIGHT-OF-WAY CLEARING LT 1 Discipline Total Sub-Total Additions PLANT TRANSFER ADDITIONS Discipline Total Sub-Total Plant Transfer Additions 534 9,084 1,422 11,040 3,606 1,811 267 5,684 71 1,643 241 1,955 77,873 6,660 985 85,518 136,899 14,028 2,076 153,003 32,324 3,643 540 36,507 12,549 37,428 11,271 61,248 320 7,589 1,122 9,031 135 1,500 222 1,857 264,311 83,386 18,146 365,843 0 17,942 537 18,479 0 17,942 537 18,479 239 3,518 105 3,862 239 3,518 105 3,862 0 281 8 289 0 281 8 289 0 102,522 24,960 127,482 0 21,108 630 21,738 0 123,630 25,590 149,220 264,550 228,757 44,386 537,693 0 0 0 0 0 0 0 0 264,550 228,757 44,386 537,693 TOTAL PLANT ADDITIONS WITHOUT OVERHEADS PLANT REMOVALS CONSTRUCTION (Estimator: BERRY, DR) INSULATOR-SUSPENSION 230KV SE POLES/TOWERS-ACCESSORIES LT STEEL POLE - 135' EA STEEL POLE - 60' EA WIRE-ACSR,SGL COND 1351 KCMIL FT WIRE-STEEL (OH GRND 5/16" FT WIRE-STEEL(OH GND LT Discipline 5 1 1 2 3,700 1,233 1 Total RIGHT OF WAY (Estimator: BERRY, DR) FOUNDATIONS-RIGID BASE STRS EA 5 Discipline Total Sub-Total Removals PLANT TRANSFER REMOVALS Discipline Total Sub-Total Plant Transfer Removals TOTAL PLANT REMOVALS WITHOUT OVERHEADS MAINTENANCE Discipline Total TOTAL MAINTENANCE o o o o o o o o 1,155 170 1,325 1,053 156 1,209 4,676 692 5,368 14,572 2,160 16,732 12,025 4,735 16,760 4,809 712 5,521 1,250 185 1,435 39,540 8,810 48,350 42,720 10,400 53,120 42,720 10,400 53,120 82,260 19,210 101,470 0 0 0 0 0 0 82,260 19,210 101,470 0 0 0 0 0 0 o o o o o o o TMCRET40 Page: 2 of 2 Project Item: PE: 6055 PE Type Work: Facility Name: Nearest Town: Version: 1130907 Item: MODIFICATION FENWICK STREET 1.3 GEORGIA POWER COMPANY ESTIMATED COST BY RETIREMENT UNITS Current - FIFTEENTH STREET 115 KV Date: 07/21/2006 Time: 01:43:14PM Work Order: Schd Const Finish Date: 12/06/2007 Originator: NASH, RT OVerheads Plant Additions (Labor, Matl, Eqp) Overheads Plant Removals (Labor, Matl, Eqp) ESTIMATE SUMMARY TOTALS 537,693 186,573 Total Plant Additions 724,266 101,470 27,110 Total Plant Removals Plant Salvage Plant Transfer Additions (Material Only) Total PI CIAC Original Cost Retired Plant Transfer Removal (Material) 128,580 Total Cash Required Total Maintenance Cost *** End of Report *** 852,846 o o o o 1 o GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01:43:19PM TMCRET39 Page: 1 of 4 Project Item: 1130907 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name - FENWICK STREET - FIFTEENTH STREET 115 KV Nearest Town: 1.3 Description: Relocate line between structures #57 and #59A. Build a new line section to cross the canal twice. Use the old 15th St. - South Augusta 230 kV line ROW that was rerouted in TEAMS #1130906. This ROW will follow the top of the canal levee. Position the new structures to avoid the St. Sebastian Way canal bridge crossing. Build at 230 kV specification. Relocate structure #62 also to accommodate the 15th Street widening DOT project. Discipline/Activity Work order: Version: WC Schd Const Finish Date: 12/06/2007 Originator: NASH, RT UM Quantity Material Labor Equipment CONSTRUCTION (Estimator: BERRY, DR) CONDUCTORS - STRINGING & SAGGING, ALL GROUNDING - ALL (COUNTERPOISE, RODS, ETC...) OHGW - STRINGING & SAGGING (STEEL, ALUM, FIBER, ETC...) POLES - FRAMING & SETTING (W/INSULS, ARMS, BANDS, CLIPS, ETC... ) SMALL EQUIPMENT (SWITCHES, ARRESTERS, MOTORS, SCADA, ARMS, INSULS, ETC...) PLANT ADDITIONS FT 12,549 37,428 4,400 EA 9,084 6 534 FT 320 7,589 1,500 EA 6 247,302 27,474 EA 7 Discipline Total 3,606 264,311 1,811 83,386 ENGINEERING (Estimator: BERRY, DR) DRAFTING - LINE ENGINEERING/DESIGN - LINE FIELD ACTIVITY - LINE PRE-ENGINEERING WORK PRELIMINARY ENGINEERING - PRELIMINARY ENGINEERING -FOUNDATION DESIGN PRELIMINARY ENGINEERING -REVIEW MFGR DESIGN PRELIMINARY ENGINEERING -SITE TEST DRILLING LINE LINE LINE LINE LAND (Estimator: MOCK, DM) FINAL STAKING LT LT LT LT LT 618 7,120 1,424 237 2,373 1 1 1 1 1 o o o o o LT 2,373 1 o HR 1,424 24 o HR 40 Discipline Total 2,373 17,942 o o LT 1 Discipline Total 3,518 3,518 239 239 PLAN & PROJ PLANNING (Estimator: BERRY, DR) LT 1 Discipline Total o o 281 281 * - Replacement 11,271 1,422 1,122 4,064 267 18,146 18 213 43 7 71 71 43 71 537 105 105 8 8 TMCRET39 Page: 2 of 4 Project Item: 1130907 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name - FENWICK Nearest Town: 1.3 GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01:43:19PM Work order: Version: WC Schd Const Finish Date: 12/06/2007 STREET - FIFTEENTH STREET 115 KV Originator: NASH, RT Discipline/Activity UM Quantity Material Labor Equipment RIGHT OF WAY (Estimator: BERRY, DR) FOUNDATION - DRILLED PIER (DO NOT USE - USE N1) RIGHT OF WAY - ENVIRONMENTAL (ROW PERSONNEL ONLY) EA 6 0 102,522 24,960 0 21,108 630 0 123,630 25,590 264,550 228,757 44,386 0 0 0 0 0 0 264,550 228,757 44,386 LT 1 Discipline Total Sub-Total Plant Additions PLANT TRANSFER ADDITIONS Discipline Total Sub-Total Plant Transfer Additions TOTAL PLANT ADDITIONS WITHOUT OVERHEADS PLANT REMOVALS CONSTRUCTION (Estimator: BERRY, DR) CONDUCTORS - STRINGING & SAGGING, ALL OHGW - STRINGING & SAGGING (STEEL, ALUM, FIBER, ETC...) POLES - FRAMING & SETTING (W/INSULS, ARMS, BANDS, CLIPS, ETC.. .) SMALL EQUIPMENT (SWITCHES, ARRESTERS, MOTORS, SCADA, ARMS, INSULS, ETC. ..) FT 3,700 o 12,025 4,735 FT 1,233 o 4,809 712 EA 5 o 21,551 3,193 EA 5 Discipline Total o o 1,155 39,540 170 8,810 RIGHT OF WAY (Estimator: BERRY, DR) FOUNDATION - DRILLED PIER (DO NOT USE - USE N1) EA 5 Discipline Total 42,720 10,400 42,720 10,400 82,260 19,210 0 0 0 0 82,260 19,210 0 0 Sub-Total Plant Removals o o o PLANT TRANSFER REMOVALS Discipline Total Sub-Total Plant Transfer Removals o o TOTAL PLANT REMOVALS WITHOUT OVERHEADS MAINTENANCE Discipline Total o i * - Replacement TMCRET39 Page: 3 of 4 Project Item: 1130907 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name - FENWICK Nearest Town: 1.3 Discipline/Activity GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01:43:19PM Work order: Version: WC Schd Const Finish Date: 12/06/2007 STREET - FIFTEENTH STREET 115 KV Originator: NASH, RT UM Quantity Equipment Material Labor TOTAL MAINTENANCE o * - Replacement o o TMCRET39 Page: 4 of 4 Project Item: 1130907 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name - FENWICK Nearest Town: 1.3 GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01: 43: 19PM Work order: version: WC Schd Const Finish Date: 12/06/2007 STREET - FIFTEENTH STREET 115 KV Originator: NASH, RT ESTIMATE SUMMARY TOTALS Plant Additions (Labor, MatI, Eqp) 537,693 Overheads 186,573 Total Plant Additions 724,266 Removals (Labor, MatI, Eqp) 101,470 Overheads 27,110 Total Plant Removals 128,580 Plant Transfer Credit (Material Only) o Plant Salvage Credit o Customer Contribution o Total Cash Required 852,846 Total Maintenance Cost o Original Cost Retired 1 Plant Transfer Removal (Material) o *** End of Report *** TMCRET44 Page: 1 of 3 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Date: 07/21/2006 Time: 01:43:23PM Project Item: Work Order: PE: Facility: Nearest Town: 1130907 Estimate Version: WC 6055 PE Item: FENWICK STREET - FIFTEENTH STREET 115 KV 1.3 Description: Relocate line between structures #57 and #59A. Build a new line section to cross the canal twice. Use the old 15th St. - South Augusta 230 kV line ROW that was rerouted in TEAMS #1130906. This ROW will follow the top of the canal levee. Position the new structures to avoid the St. Sebastian Way canal bridge crossing. Build at 230 kV specification. Relocate structure #62 also to accommodate the 15th Street widening DOT project. Area(s): MIDDLE GA-AUGUSTA Construction Start Date: 11/07/2007 Facility Required Date: 06/01/2006 Crew Type Desc / Activities Activity Quantity UM Manhours DRAFTER LINE DESIGN Drafting - Line 1.0 LT 14.0 Activities Subtotal 14.0 Total Productive Time Non Productive Time 14.0 0.0 Total Manhours Estimated Duration (Days) 14.0 2.1 ENGINEER LINE DESIGN Engineering/Design - Line Pre-Engineering Work Field Activity - Line Preliminary Engineering - Preliminary Engineering Test Drilling Preliminary Engineering -Foundation Design Preliminary Engineering Mfgr Design Line Line -Site 1.0 1.0 1.0 1.0 LT LT LT LT 120.0 4.0 24.0 40.0 40.0 HR 40.0 Line 1.0 LT 40.0 Line -Review 24.0 HR 24.0 Activities Subtotal 292.0 Total Productive Time Non Productive Time 292.0 0.0 Total Manhours Estimated Duration (Days) 292.0 54.5 PLANNER Planning 1.0 LT 4.0 TMCRET44 Page: 2 of 3 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Project Item: Work Order: PE: Facility: Nearest Town: 1130907 Estimate Version: WC 6055 PE Item: FENWICK STREET - FIFTEENTH STREET 115 KV 1.3 Area(s}: MIDDLE GA-AUGUSTA Date: 07/21/2006 Time: 01:43:23PM Construction Start Date: 11/07/2007 Facility Required Date: 06/01/2006 Crew Type Desc / Activities Activity Quantity UM Manhours Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) LINE CONSTRUCTION CONTRACT CREW 12 MAN Ohgw - Stringing & Sagging (Steel, Alum, Fiber, Etc...) Small Equipment (Switches, Arresters, Motors, Scada, Arms, Insuls, Etc...) Grounding - All (Counterpoise, Rods, Etc. . .) Poles - Framing & Setting (W/Insuls, Arms, Bands, Clips, Etc...) Conductors - Stringing & Sagging, All Removals Activities Subtotal Material Handling Supervision Travel Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) Special Equipment Required 150 FT CONDOR BACKHOE CRANE 75 TON ROAD TRACTOR TRAILER W/PERM. MOUNTED EQP. ROW-FOUNDATION CONTRACT CREW Foundation - Drilled Pier (Do Not Use - Use N1) 0.6 1,500.0 FT 7.0 EA 6.0 EA 6.0 EA 4,400.0 FT 1.0 LT 15.2 6.0 4.0 4.0 0.0 4.0 61.5 14.7 73.7 222.8 303.6 320.7 997.0 219.3 99.7 598.2 1,914.2 0.0 1,914.2 Hours 37.0 11.2 37.0 60.8 37.0 EA 510.0 TMCRET44 Page: 3 of 3 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Project Item: Work Order: PE: Facility: Nearest Town: 1130907 Estimate Version: WC 6055 PE Item: FENWICK STREET - FIFTEENTH STREET 115 KV 1.3 Area(s): MIDDLE GA-AUGUSTA Construction Start Date: 11/07/2007 Date: 07/21/2006 Time: 01:43:23PM Facility Required Date: 06/01/2006 Crew Type Desc / Activities Removals Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) CONTRACT CREW FOR RIGHT OF WAY CLEARING Right Of Way - Environmental (Row Personnel Only) Activities Subtotal Total productive Time Non Productive Time Total Manhours Estimated Duration (Days) LAND ENGR SURVEY CREW Final Staking Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) ** End of Report ** Activity Quantity UM Manhours 1.0 LT 212.5 722.5 722.5 0.0 722.5 14 .5 1.0 LT 210.0 210.0 210.0 0.0 210.0 7.0 1.0 LT 30.0 30.0 30.0 0.0 30.0 3.0 TMCRET40 Page: 1 of 2 Project Item: PE: 6055 PE Type Work: Facility Name: Nearest Town: Description: Survey, map and acquire a new easement, parallel to the existing #47 and #50 for the relocation in TEAMS #1130906. Discipline / Retirement Unit UM Quantity 1130908 Item: LAND ACQUISITION FIFTEENTH STREET AUGUSTA Version: GEORGIA POWER COMPANY ESTIMATED COST BY RETIREMENT UNITS Current Date: 07/21/2006 Time: 01:43:45PM - SOUTH AUGUSTA 230KV (BLACK) Work Order: Fac Rqrd Date: 06/01/2006 originator: NASH, RT line easement, between structures Material Labor Equipment Total PLANT ADDITIONS LAND (Estimator: CARUTH, CH, DIRECT ENGINEERING EASEMENT OR RIGHT, PERPETUAL TRANS, MEALS, ETC. MOCK, DM) LT AC LT Discipline 1 1. 600 1 Total 1,445 740,073 1,213 742,731 TOTAL PLANT REMOVALS WITHOUT OVERHEADS 61,884 2,307 65,636 0 0 740,073 429 13 1,655 62,313 2,320 807,364 844 25 869 844 25 869 63,157 2,345 808,233 0 0 0 0 0 0 63,157 2,345 808,233 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PLAN & PROJ (Estimator: MOCK, DM) DIRECT ENGINEERING LT 1 Discipline Total Sub-Total Additions o o 742,731 PLANT TRANSPER ADDITIONS Discipline Total Sub-Total Plant Transfer Additions o o TOTAL PLANT ADDITIONS WITHOUT OVERHEADS 742,731 PLANT REMOVALS Discipline Total o o Sub-Total Removals PLANT TRANSPER REMOVALS Discipline Total Sub-Total Plant Transfer Removals o o MAINTENANCE Discipline Total o TOTAL MAINTENANCE o TMCRET40 Page: 2 of 2 Project Item: PE: 6055 PE Type Work: Facility Name: Nearest Town: Version: 1130908 Item: LAND ACQUISITION FIFTEENTH STREET AUGUSTA GEORGIA POWER COMPANY ESTIMATED COST BY RETIREMENT UNITS CUrrent Date: 07/21/2006 Time: 01:43:45PM - SOUTH AUGUSTA 230KV (BLACK) Work Order: Fac Rqrd Date: 06/01/2006 Originator: NASH, RT Overheads Plant Additions (Labor, Matl, Eqp) Overheads Plant Removals (Labor, Matl, Eqp) ESTIMATE SUMMARY TOTALS 808,233 64,576 Total Plant Additions 872,809 o Total Plant Removals o Plant Salvage Plant Transfer Additions (Material Only) o Total PI CIAC Original Cost Retired Plant Transfer Removal (Material) o o Total Cash Required 872,809 Total Maintenance Cost o *** End of Report *** TMCRET39 Page: 1 of 2 Project Item: 1130908 PE: 6055 PE Item: Type Work: LAND ACQUISITION Facility Name - FIFTEENTH STREET Nearest Town: AUGUSTA Description: Survey, map and acquire a new easement, parallel to the existing line easement, between structures #47 and #50 for the relocation in TEAMS #1130906. GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01:43:48PM Work order: Version: WC Facility Required Date: 06/01/2006 - SOUTH AUGUSTA 230KV (BLACK) Discipline/Activity UM Quantity PLANT ADDITIONS LAND (Estimator: CARUTH, CH, AERIAL PHOTOGRAPHY AERIAL PHOTOGRAPHY WORK DOCUMENTATION FIELD ENGINEERING LINE SELECTION,RESEARCH,SURVEY OFFICE ENGINEERING PROPERTY RESEARCH ROW ACQUISITION TITLE EXAMINATION MOCK, DM) MI MI HR HR HR HR HR HR HR Discipline 1. 000 1. 000 1 18 5 16 1 67 3 Total PLAN & PROJ PLANNING (Estimator: MOCK, DM) LT 1 Discipline Total Sub-Total Plant Additions PLANT TRANSFER ADDITIONS Discipline Total Sub-Total Plant Transfer Additions TOTAL PLANT ADDITIONS WITHOUT OVERHEADS PLANT REMOVALS Discipline Total Sub-Total Plant Removals PLANT TRANSFER REMOVALS Discipline Total Sub-Total Plant Transfer Removals TOTAL PLANT REMOVALS WITHOUT OVERHEADS MAINTENANCE Discipline Total TOTAL MAINTENANCE * - Replacement Originator: NASH, RT Material Labor Equipment 964 249 1,445 o o o o 740,073 o 742,731 0 0 0 0 0 0 18,344 548 2,354 70 14,742 899 429 13 25,736 769 708 21 62,313 2,320 844 25 844 25 63,157 2,345 0 0 0 0 63,157 2,345 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 742,731 o o 742,731 o o o o o o TMCRET39 Page: 2 of 2 Project Item: 1130908 PE: 6055 PE Item: Type Work: LAND ACQUISITION Facility Name - FIFTEENTH STREET Nearest Town: AUGUSTA GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01:43:48PM Work order: Version: WC Facility Required Date: 06/01/2006 - SOUTH AUGUSTA 230KV (BLACK) Originator: NASH, RT Plant Additions (Labor, Matl, Eqp) Overheads Removals (Labor, Matl, Eqp) Overheads Plant Transfer Credit (Material Only) Plant Salvage Credit Customer Contribution Original Cost Retired Plant Transfer Removal (Material) ESTIMATE SUMMARY TOTALS Total Plant Additions Total Plant Removals Total Cash Required Total Maintenance Cost *** End of Report *** 808,233 64,576 872,809 o o o o o o 872,809 o o o TMCRET44 Page: 1 of 3 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Date: 07/21/2006 Time: 01:43:51PM Project Item: Work Order: PE: Facility: Nearest Town: 1130908 Estimate Version: WC 6055 PE Item: FIFTEENTH STREET - SOUTH AUGUSTA 230KV (BLACK) AUGUSTA Description: Survey, map and acquire a new easement, parallel to the existing line easement, between structures #47 and #50 for the relocation in TEAMS #1130906. Area(s): MIDDLE GA-AUGUSTA Total Manhours Estimated Duration (Days) Facility Required Date: 06/01/2006 Activity Quantity OM Manhours 16.0 HR 160.0 160.0 160.0 0.0 160.0 21.3 1.0 LT 12.0 12.0 12.0 0.0 12.0 1.9 Construction Start Date: Crew Type Desc / Activities DRAFTER Office Engineering Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) PLANNER Planning Activities Subtotal Total Productive Time Non Productive Time LAND ENGINEERING Total Manhours Estimated Duration (Days) 0.0 0.0 0.0 0.0 0.0 5.0 HR 40.0 40.0 Activities Subtotal Total productive Time Non Productive Time STAFF ATTORNEY Row Acquisition Activities Subtotal TMCRET44 Page: 2 of 3 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Date: 07/21/2006 Time: 01:43:51PM Project Item: Work Order: PE: Facility: Nearest Town: 1130908 Estimate Version: WC 6055 PE Item: FIFTEENTH STREET - SOUTH AUGUSTA 230KV (BLACK) AUGUSTA Area(s): MIDDLE GA-AUGUSTA Construction Start Date: Total Manhours Estimated Duration (Days) Facility Required Date: 06/01/2006 Activity Quantity UM Manhours 40.0 0.0 40.0 5.0 5.0 HR 40.0 40.0 40.0 0.0 40.0 6.7 3.0 HR 24.0 24.0 24.0 0.0 24.0 3.6 30.0 HR 240.0 240.0 240.0 0.0 240.0 40.0 30.0 HR 240.0 Crew Type Desc / Activities Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) LOCATION ENGINEER Line Selection,Research,Survey Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) RECORD RESEARCHER Title Examination Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) RIGHT OF WAY AGENT A Row Acquisition Activities Subtotal Total Productive Time Non Productive Time SENIOR RIGHT OF WAY AGENT Row Acquisition TMCRET44 Page: 3 of 3 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Date: 07/21/2006 Time: 01:43:51PM Project Item: Work Order: PE: Facility: Nearest Town: 1130908 Estimate Version: WC 6055 PE Item: FIFTEENTH STREET - SOUTH AUGUSTA 230KV (BLACK) AUGUSTA Area(s): MIDDLE GA-AUGUSTA Construction Start Date: Total Manhours Estimated Duration (Days) Facility Required Date: 06/01/2006 Activity Quantity UM Manhours 240.0 240.0 0.0 240.0 40.0 12.0 HR 240.0 0.0 HR 6.9 246.9 246.9 0.0 246.9 16.5 6.0 HR 60.0 60.0 60.0 0.0 60.0 Crew Type Desc / Activities Activities Subtotal Total Productive Time Non Productive Time SURVEY CREW Field Engineering Property Research Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) SURVEY SUPERVISOR Field Engineering Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) 8.0 ** End of Report ** TMCRET40 Page: 1 of 2 Project Item: PE: 6055 PE Type Work: Facility Name: Nearest Town: Description: Acquire, survey, map the ROW to allow the 115 kV line to cross the canal twice for the relocation in TEAMS #1130907. Discipline / Retirement Unit 1130909 Item: LAND ACQUISITION FENWICK STREET - 1.3 Version: GEORGIA POWER COMPANY ESTIMATED COST BY RETIREMENT UNITS Current Date: 07/21/2006 Time: 01:44:09PM FIFTEENTH STREET 115 KV Work Order: Fac Rqrd Date: 06/01/2006 Originator: NASH, RT UM Quantity Material . Labor Equipment Total PLANT ADDITIONS LAND (Estimator: CARUTH, CH, DIRECT ENGINEERING EASEMENT OR RIGHT, PERPETUAL TRANS, MEALS, ETC. MOCK, DM) LT AC LT Discipline 1 1. 000 1 Total 1,445 48,182 1,213 50,840 TOTAL MAINTENANCE o 66,842 2,455 70,742 0 0 48,182 429 13 1,655 67,271 2,468 120,579 844 25 869 844 25 869 68,115 2,493 121,448 0 0 0 0 0 0 68,115 2,493 121,448 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PLAN & PROJ (Estimator: MOCK, DM) DIRECT ENGINEERING LT 1 Discipline Total Sub-Total Additions o o 50,840 PLANT TRANSFER ADDITIONS Discipline Total Sub-Total Plant Transfer Additions o o TOTAL PLANT ADDITIONS WITHOUT OVERHEADS 50,840 PLANT REMOVALS Discipline Total o o Sub-Total Removals PLANT TRANSFER REMOVALS Discipline Total Sub-Total Plant Transfer Removals o o TOTAL PLANT REMOVALS WITHOUT OVERHEADS MAINTENANCE Discipline Total o TMCRET40 Page: 2 of 2 Project Item: PE: 6055 PE Type Work: Facility Name: Nearest Town: Version: 1130909 Item: LAND ACQUISITION FENWICK STREET - 1.3 GEORGIA POWER COMPANY ESTIMATED COST BY RETIREMENT UNITS Current Date: 07/21/2006 Time: 01:44:09PM FIFTEENTH STREET 115 KV Work Order: Fac Rqrd Date: 06/01/2006 Originator: NASH, RT Overheads Plant Additions (Labor, MatI, Eqp) OVerheads Plant Removals (Labor, MatI, Eqp) ESTIMATE SUMMARY TOTALS 121,448 9,702 Total Plant Additions 131,150 o Total Plant Removals o Plant Salvage Plant Transfer Additions (Material Only) o Total PI CIAC Original Cost Retired Plant Transfer Removal (Material) o o Total Cash Required 131,150 Total Maintenance Cost o *** End of Report *** TMCRET39 Page: 1 of 2 Project Item: 1130909 PE: 6055 PE Item: Type Work: LAND ACQUISITION Facility Name - FENWICK STREET - FIFTEENTH STREET 115 KV Nearest Town: 1.3 Description: Acquire, survey, map the ROW to allow the 115 kV line to cross the canal twice for the relocation in TEAMS #1130907. GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01:44:13PM Discipline/Activity UM Quantity PLANT ADDITIONS LAND (Estimator: CARUTH, CH, AERIAL PHOTOGRAPHY AERIAL PHOTOGRAPHY WORK DOCUMENTATION FIELD ENGINEERING LINE SELECTION, RESEARCH, SURVEY OFFICE ENGINEERING PROPERTY RESEARCH ROW ACQUISITION TITLE EXAMINATION MOCK, DM) MI MI HR HR HR HR HR HR HR Discipline 1. 000 1. 000 1 22 5 16 1 66 3 Total PLAN & PROJ PLANNING (Estimator: MOCK, DM) LT 1 Discipline Total Sub-Total Plant Additions PLANT TRANSFER ADDITIONS Discipline Total Sub-Total Plant Transfer Additions TOTAL PLANT ADDITIONS WITHOUT OVERHEADS PLANT REMOVALS Discipline Total Sub-Total Plant Removals PLANT TRANSFER REMOVALS Discipline Total Sub-Total Plant Transfer Removals TOTAL PLANT REMOVALS WITHOUT OVERHEADS MAINTENANCE Discipline Total TOTAL MAINTENANCE * - Replacement . Work order: Version: WC Facility Required Date: 06/01/2006 Originator: NASH, RT Material Labor Equipment 964 249 1,445 o o o o 48,182 o 50,840 0 0 0 0 0 0 23,302 696 2,354 70 14,742 899 429 13 25,736 769 708 21 67,271 2,468 844 25 844 25 68,115 2,493 0 0 0 0 68,115 2,493 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 50,840 o o 50,840 o o o o o o TMCRET39 Page: 2 of 2 Project Item: 1130909 PE: 6055 PE Item: Type Work: LAND ACQUISITION Facility Name - FENWICK STREET - Nearest Town: 1.3 GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01:44:13PM Work order: Version: WC Facility Required Date: 06/01/2006 FIFTEENTH STREET 115 KV \ Originator: NASH, RT ESTIMATE SUMMARY TOTALS Plant Additions (Labor, MatI, Eqp) 121,448 Overheads 9,702 Total Plant Additions 131,150 Removals (Labor, MatI, Eqp) o Overheads o Total Plant Removals o Plant Transfer Credit (Material Only) o Plant Salvage Credit o Customer Contribution o Total Cash Required 131,150 Total Maintenance Cost o Original Cost Retired o Plant Transfer Removal (Material) o *** End of Report *** TMCRET44 Page: 1 of 3 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Date: 07/21/2006 Time: 01:44:17PM Project Item: Work Order: PE: Facility: Nearest Town: 1130909 E~timate Version: WC 6055 PE Item: FENWICK STREET - FIFTEENTH STREET 115 KV 1.3 Description: Acquire, survey, map the ROW to allow the 115 kV line to cross the canal twice for the relocation in TEAMS #1130907. Area(s): MIDDLE GA-AUGUSTA Construction Start Date: Total Manhours Estimated Duration (Days) Facility Required Date: 06/01/2006 Activity Quantity UM Manhours 16.0 HR 160.0 160.0 160.0 0.0 160.0 21.3 1.0 LT 12.0 12.0 12.0 0.0 12.0 1.9 Crew Type Desc / Activities DRAFTER Office Engineering Activities Subtotal Total Productive Time Non Productive Time PLANNER Planning Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) LAND ENGINEERING Activities Subtotal Total Manhours Estimated Duration (Days) 0.0 0.0 0.0 0.0 0.0 5.0 HR 40.0 40.0 40.0 Total Productive Time Non Productive Time STAFF ATTORNEY Row Acquisition Activities Subtotal Total Productive Time Facility Required Date: 06/01/2006 Activity Quantity OM Manhours 0.0 40.0 5.0 5.0 HR 40.0 40.0 40.0 0.0 40.0 6.7 3.0 HR 24.0 24.0 24.0 0.0 24.0 3.6 30.0 HR 240.0 240.0 240.0 0.0 240.0 40.0 30.0 HR 240.0 TMCRET44 Page: 2 of 3 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Project Item: Work Order: PE: Facility: Nearest Town: 1130909 Estimate Version: WC 6055 PE Item: FENWICK STREET - FIFTEENTH STREET 115 KV 1.3 Area(s): MIDDLE GA-AUGUSTA Construction Start Date: Crew Type Desc / Activities Non Productive Time Total Manhours Estimated Duration (Days) LOCATION ENGINEER Line Selection, Research, Survey Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) RECORD RESEARCHER Title Examination Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) RIGHT OF WAY AGENT A Row Acquisition Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) SENIOR RIGHT OF WAY AGENT Row Acquisition Date: 07/21/2006 Time: 01:44:17PM TMCRET44 Page: 3 of 3 Project Item: Work Order: PE: Facility: Nearest Town: 1130909 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Estimate Version: WC 6055 PE Item: FENWICK STREET - FIFTEENTH STREET 115 KV 1.3 Area(s): MIDDLE GA-AUGUSTA Construction Start Date: Crew Type Desc / Activities Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) SURVEY CREW Field Engineering Property Research Activities Subtotal Total Productive Time Non productive Time Total Manhours Estimated Duration (Days) SURVEY SUPERVISOR Field Engineering Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) Date: 07/21/2006 Time: 01:44:17PM Facility Required Date: 06/01/2006 Activity Quantity UM Manhours 240.0 240.0 0.0 240.0 40.0 16.0 HR 320.0 0.0 HR 6.9 326.9 326.9 0.0 326.9 21.8 6.0 HR 60.0 60.0 60.0 0.0 60.0 ** End of Report ** 8.0 TMCRET40 Page: 1 of 2 Project Item: 1130910 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name: FENWICK STREET Nearest Town: Description: Relocate fiber old 15th St. - follow the top #1130907. Discipline / Retirement Unit Version: GEORGIA POWER COMPANY ESTIMATED COST BY RETIREMENT UNITS Current Date: 07/21/2006 Time: 01:44:37PM - FIFTEENTH STREET 115 KV (FIBER) Work Order: schd Const Finish Date: 11/26/2007 Originator: NASH, RT between structures #57 and #59A. Extend the fiber to cross the canal twice. Use the South Augusta 230 kv line ROW that was rerouted in TEAMS #1130906. This ROW will of the. canal levee. This item is associated with the line relocation work in TEAMS OM Quantity Material Labor Equipment Total PLANT ADDITIONS CONSTRUCTION (Estimator: BERRY, DR) FIBER OPTIC CABLE FT 6,200 Discipline Total TOTAL PLANT ADDITIONS WITHOUT OVERHEADS 15,418 41,043 8,607 65,068 15,418 41,043 8,607 65,068 0 9,134 274 9,408 0 9,134 274 9,408 0 281 8 289 0 281 8 289 15,418 50,458 8,889 74,765 0 0 0 0 0 0 0 0 15,418 50,458 8,889 74,765 ENGINEERING (Estimator: BERRY, DR) DIRECT ENGINEERING LT 1 Discipline Total PLAN & PROJ (Estimator: BERRY, DR) DIRECT ENGINEERING LT 1 Discipline Total Sub-Total Additions PLANT TRANSPER ADDITIONS Discipline Total Sub-Total Plant Transfer Additions PLANT REMOVALS CONSTRUCTION (Estimator: BERRY, DR) FIBER OPTIC CABLE FT 6/200 Discipline Total o o o TOTAL PLANT REMOVALS WITHOUT OVERHEADS 17,793 4,385 22,178 17,793 4,385 22,178 17,793 4,385 22,178 0 0 0 0 0 0 17,793 4,385 22,178 0 0 0 0 0 0 Sub-Total Removals PLANT TRANS PER REMOVALS Discipline Total Sub-Total Plant Transfer Removals o o MAINTENANCE Discipline Total o TOTAL MAINTENANCE o TMCRET40 Page: 2 of 2 Project Item: PE: 6055 PE Type Work: Facility Name: Nearest Town: Version: 1130910 Item: MODIFICATION FENWICK STREET Overheads Plant Additions (Labor, MatI, Eqp) Overheads Plant Removals (Labor, MatI, Eqp) GEORGIA POWER COMPANY ESTIMATED COST BY RETIREMENT UNITS CUrrent - FIFTEENTH STREET 115 KV (FIBER) ESTIMATE SUMMARY TOTALS Total Plant Additions Total Plant Removals Plant Salvage Plant Transfer Additions (Material Only) Total PI CIAC Original Cost Retired Plant Transfer Removal (Material) Total Cash Required Total Maintenance Cost *** End of Report *** 74,765 9,840 84,605 22,178 1,146 23,324 107,929 Date: 07/21/2006 Time: 01:44:37PM Work Order: schd Const Finish Date: 11/26/2007 Originator: NASH, RT o o o o 1 o GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01:44:41PM TMCRET39 Page: 1 of 3 Project Item: 1130910 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name - FENWICK Nearest Town: Description: Relocate fiber between structures #57 and #59A. Extend the fiber to cross the canal twice. Use the old 15th St. - South Augusta 230 kV line ROW that was rerouted in TEAMS #1130906. This ROW will follow the top of the canal levee. This item is associated with the line relocation work in TEAMS #1130907. Work order: Version: WC schd Const Finish Date: 11/26/2007 STREET - FIFTEENTH STREET 115 KV (FIBER) Originator: NASH, RT Discipline/Activity Quantity Labor Equipment Material UM PLANT ADDITIONS CONSTRUCTION (Estimator: BERRY, DR) OHGW - STRINGING & SAGGING (STEEL, ALUM, FIBER, ETC...) FT 1 Discipline Total 15,418 41,043 8,607 15,418 41,043 8,607 0 353 11 0 4,747 142 0 1,424 43 0 237 7 0 2,373 71 0 9,134 274 0 281 8 0 281 8 15,418 50,458 8,889 0 0 0 0 0 0 15,418 50,458 8,889 ENGINEERING (Estimator: BERRY, DR) DRAFTING - LINE LT ENGINEERING/DESIGN - LINE LT FIELD ACTIVITY - LINE LT PRE-ENGINEERING WORK LT PRELIMINARY ENGINEERING - LINE LT Discipline 1 1 1 1 1 Total PLAN &: PROJ PLANNING (Estimator: BERRY, DR) LT 1 Discipline Total Sub-Total Plant Additions PLANT TRANSFER ADDITIONS Discipline Total Sub-Total Plant Transfer Additions TOTAL PLANT ADDITIONS WITHOUT OVERHEADS PLANT REMOVALS CONSTRUCTION (Estimator: BERRY, DR) OHGW - STRINGING & SAGGING (STEEL, ALUM, FIBER, ETC...) FT 1 Discipline Total 0 17,793 4,385 0 17,793 4,385 0 17,793 4,385 0 0 0 0 0 0 17,793 4,385 Sub-Total Plant Removals PLANT TRANSFER REMOVALS Discipline Total Sub-Total Plant Transfer Removals TOTAL PLANT REMOVALS WITHOUT OVERHEADS MAINTENANCE * - Replacement TMCRET39 Page: 2 of 3 Project Item: 1130910 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name - FENWICK Nearest Town: Discipline/Activity TOTAL MAINTENANCE * - Replacement GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01:44:41PM Work order: Version: WC Schd Const Finish Date: 11/26/2007 STREET - FIFTEENTH STREET 115 KV (FIBER) Originator: NASH, RT UM Quantity Labor Equipment Material Discipline Total o o o o o o TMCRET39 Page: 3 of 3 Project Item: 1130910 PE: 6055 PE Item: Type Work: MODIFICATION Facility Name - FENWICK Nearest Town: GEORGIA POWER COMPANY ESTIMATED COST BY ACTIVITIES Date: 07/21/2006 Time: 01:44:41PM Work order: Version: WC Schd Const Finish Date: 11/26/2007 STREET - FIFTEENTH STREET 115 KV (FIBER) Originator: NASH, RT ESTIMATE SUMMARY TOTALS Plant Additions (Labor, MatI, Eqp) 74,765 OVerheads 9,840 Total Plant Additions 84,605 Removals (Labor, Matl, Eqp) 22,178 Overheads 1,146 Total Plant Removals 23,324 Plant Transfer Credit (Material Only) o Plant Salvage Credit o Customer Contribution o Total Cash Required 107,929 Total Maintenance Cost o Original Cost Retired 1 Plant Transfer Removal (Material) o *** End of Report *** TMCRET44 Page: 1 of 2 Date: 07/21/2006 Time: 01:44:46PM GEORGIA POWER COMPANY LABOR MANHOUR REPORT Project Item: Work Order: PE: Facility: Nearest Town: 1130910 Estimate Version: WC 6055 PE Item: FENWICK STREET - FIFTEENTH STREET 115 KV (FIBER) Description: Relocate fiber between structures #57 and #59A. Extend the fiber to cross the canal twice. Use the old 15th St. - South Augusta 230 kV line ROW that was rerouted in TEAMS #1130906. This ROW will follow the top of the canal levee. This item is associated with the line relocation work in TEAMS #1130907. Area(s): MIDDLE GA-AUGUSTA Construction Start Date: 11/12/2007 Facility Required Date: 06/01/2006 Activity Quantity UM Manhours 1.0 LT 8.0 8.0 8.0 0.0 8.0 1.2 1.0 LT 80.0 1.0 LT 4.0 1.0 LT 24.0 1.0 LT 40.0 148.0 148.0 0.0 148.0 27.6 1.0 LT 4.0 4.0 4.0 0.0 4.0 0.6 Crew Type Desc / Activities DRAFTER LINE DESIGN Drafting - Line Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) ENGINEER LINE DESIGN Engineering/Design - Line Pre-Engineering Work Field Activity - Line Preliminary Engineering - Line Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) PLANNER Planning Activities Subtotal Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) TMCRET44 Page: 2 of 2 GEORGIA POWER COMPANY LABOR MANHOUR REPORT Project Item: Work Order: PE: Facility: Nearest Town: 1130910 Estimate Version: WC 6055 PE Item: FENWICK STREET - FIFTEENTH STREET 115 KV (FIBER) Area(s): MIDDLE GA-AUGUSTA Construction Start Date: 11/12/2007 Date: 07/21/2006 Time: 01: 44: 46PM Facility Required Date: 06/01/2006 Crew Type Desc 1 Activities Activity Quantity LINE CONSTRUCTION CONTRACT CREW 12 MAN Ohgw - Stringing & Sagging (Steel, Alum, Fiber, Etc...) Removals 1.2 1.0 Activities Subtotal Material Handling Supervision Travel Total Productive Time Non Productive Time Total Manhours Estimated Duration (Days) 7.2 Special Equipment Required BACKHOE BUCKET TRUCK 80 FT. ROAD TRACTOR TRAILER W/PERM. MOUNTED EQP. ** End of Report ** UM Manhours FT LT 332.9 144.3 477.2 105.0 47.7 286.3 916.2 0.0 916.2 Hours 1.6 50.2 20.0 50.2 . . . EXHIBIT B Description of Work: Georgia Power Company will relocate: . the Fifteenth St. - South Augusta 230 kV (Black) line between structures #48 and #51 to allow for the new St. Sebastian Way canal bridge crossing. Acquisition of new right of way easement will be required for this work. This line will remain all overhead construction. . the Fenwick St. - Fifteenth St 115 kV line between structures #57 and #59A. Build new line sections to cross the canal twice. Use the old Fifteenth St. - South Augusta 230 kV line ROW that was vacated as part of this project. This ROW will follow the top of the canal levee. Position the new structures to avoid the St. Sebastian Way canal bridge crossing. This line will remain all overhead construction. . the fiber optic communication line attached to the Fenwick St. - Fifteenth St 115 kV line as part of the transmission line relocation. See Attachment 1 for an overall scope drawing. i I _I ., e! <C I- :z: Lo.I ~ X (.) <C S L&- a ~ (.) I 10 ,ell.11 .1I.1i1 I ~D.I.eD4a I I I ihlll!lull 1111 11111 loz'.o....c.. R I I liP I I nlHlIll1I .4.......D. - i _I I' I ~! < ~ fa C) g ::) 0 (.) Q Z 0 :2 CD 0 I-'- i:E z ~ 1.1.I :::E :x: ::) ~ C) S :a a.... 0 ~ (.) I 1;0 d :ii d .., I-I I _II .1I.lu I ~c.I..a4a I I I !hl'I!I,1I11 11111 I III llZt.o....c.. R I 1 ill! s' I 11.11111111 .4...~.III.a.