AGREEMENT
BETWEEN
DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
, AND
AUGUSTA-RICHMOND COUNTY, GEORGIA
for
WriQhtsboro Road from Belair Road to Barton Chapel Road
This AGREEMENT is made and entered into this -5 day of Ikt;usr , 1997,
by and between the DEPARTMENT OF TRANSP~RTATION, an agency of the State
of Georgia, hereinafter called ,the' "DEPARTMENT", and AUGUSTA-RICHMOND
COUNTY, GEORGIA, acting by and through its Mayor and the Augusta-Richmond
County Commissioners, hereinafter called the "COUNTY".
WHEREAS, the COUNTY has represented to the DEPARTMENT a desire to
improve the roadway facilities along Wrightsboro Road from Belair Road to Barton
Chapel Road, in the CITY of Augusta, Richmond County, Georgia, currently described
as Georgia Department of Transpor1ation Project Number STP-7001 (9), P. I. Number
250510, hereinafter referred to as the "PROJECT"; and
,'.
WHEREAS, the, COUNTY has represented to the DEPARTMENT a desire to
participate in providing the preconstruction engineering activities needed for the
improvements, reiocating the utilities, and other costs as specified in the AGREEMENT,
and the DEPARTMENT has relied upon such representations; and
f';
,',
,- \ ~
t 7 ~
\:..
i~~,
;,,~~:
;:~.~
I ~ ..
~.i-
,'.
~;f
\;'\
1'\
~~l
,~
'"
~o\
f:~
W
~~
;-
WHEREAS, the DEPARTMENT has expressed a willingness to participate in the
funding of the construction of the PROJECT with funds of the DEPARTMENT, funds
apportioned to the DEPARTMENT by the Federal Highway Administration, hereinafter
referred to as the "FHWA", under Title 23, United States Code, Section 104, or a
combination of funds from any of the above sources; subject to those certain conditions
set forth in the AGREEMENT.
THEREFORE in consideration of the mutual promises made and of the benefits
to flow from one to the other, the DEPARTMENT arid the COUNTY hereby agree each
with the other as follows:
1. Primary Consultant firms hired by the COUNTY to provide services on the
PROJECT shall be prequalified with the DEPARTMENT in the appropriate area-
classes. The DEPARTMENT shall, on request, furni~h the COUNTY with a list of
prequalified consultant firms in the appropriate area-classes.
2. The PROJECT construction plans shall be prepared in metric units and right
of way plans shall be prepared in dual units - English and metric.
3. The COUNTY shall contribute towards the PROJECT by funding all cost for
the preconstruction engineering (design). The preconstruction engineering activities
shall be accomplished in accordance with the DEPARTMENT's Plan Development
Process, the applicable guidelines of the American Association of -State Highway and
Transportation Officials (AASHTO), the DEPARTMENT's Standard Specifications for
the Construction of Roads and Bridges, the DEPARTMENT's Plan Presentation Guide,
PROJECT schedules, and applicable guidelines of the DEPARTMENT. The COUNTY's
responsibility for design shall include, but is not limited to the following items:
',-'
"
)i
~~
i-
i:"
;;.
,'I
.~..,
~~
i;;
i;
..
I'~
;.,
g
~..
l~:
-~
ib
~
~
:i
t:!
n:
\:~
a. Prepare the PROJECT concept report in accordance with the format
used by the DEPARTMENT. The concept for the PROJECT shall be developed to
accommodate the future traffic volumes as generated by the COUNTY and approved
by the DEPARTMENT. The concept report shall be approved by the DEPARTMENT
prior to the COUNTY beginning further development of the PROJECT plans. It is
recognized by the parties that the approved concept may be modified by the COUNTY
as required by the DEPARTMENT and reapproved by the DEPARTMENT during the
course of design due to public input, environmental requirements, or right of way
considerations.
b. Develop the PROJECT's base year (year facility is expected to be open
to traffic) and design year (base year plus 20 years) traffic volumes. This shall include
average daily traffic (ADT) and morning (am) and evening (pm) peak hour volumes.
The traffic shall show all through and turning movement volumes at intersections for the
ADT and peak hour volumes and shall indicate the percentage of trucks expected on
the facility.
c. Validate (check and update) the approved PROJECT concept and
prepare a Project Design Book for approval by the DEPARTMENT prior to the
beginning of preliminary plans.
d. Prepare environmental studies, documentation, and reports for the
PROJECT that show the PROJECT is in compliance with the provisions of the National
Environmental Protection Act and Georgia Environmental Protection Act, as appropriate
to the PROJECT funding. This shall include any and all archaeological, historical,
ecological, air, noise,. underground storage tanks (UST), and hazardous waste site
studies required. The COUNTY shall submit to the DEPARTMENT all environmental
documents and reports for review and approval by the DEPARTMENT and the FHWA.
:;1.,:
l\:;
~;.\~:
.J,:)
i-;...
::;n
:'Jtj.I;:...
i:~~
}f~
~~~::
-""
r,'o:,
~"'
r,"
~~
e. Prepare all public hearing and public information displays and conduct
all required public hearings and public information meetings in accordance with
DEPARTMENT practice.
f. Perform all surveys, mapping, and soil investigation studies needed for
design of the PROJECT.
g. Perform all work required to obtain project permits, including, but not
limited to, US Army Corps of E~gineers 404 and Federal Emergency Management
Agency (FEMA) approvals. These efforts shall be coordinated with the DEPARTMENT.
h. Prepare the PROJECT's drainage design including erosion control
plans and the development of the hydraulic studies for the Federal Emergency
Management Agency Floodways. and acquisition of all necessary permits associated
with the drainage design.
i. Prepare traffic studies, preliminary construction plans, preliminary and
final utility plans, preliminary and final right of way plans, staking of the required right of
way, and final construction plans including erosion control, traffic handling, and
construction sequence plans and specifications including special provisions for the
PROJECT.
j. Provide certification, by a Georgia Registered Professional Engineer,
that the construction plans have been prepared under the guidance of the professional
engineer and are in accordance with acceptable industry standards.
:."
4. The DEPARTMENT shall reView and has approval authority for all aspects of
the PROJECT. The DEPARTMENT will work with the FHWA to obtain all needed
approvals with information furnished by the COUNTY.
'.
"
f;',
"
:. ~:
5. Upon the COUNTY's determination of the rights of way required for the
PROJECT and the approval of the right of way plans by the DEPARTMENT, the
t,';
"
~~~
~:
~.~I,
E:
~1
',\
l~,
:':"1
&
t~
~~
~"
~
COUNTY shall fund the acquisition and acquire the necessary rights of way for the
PROJECT. Right of way acquisition shall be in accordance with the law and the rules
and regulations of the FHWA including.but.not limited to, Title 23, United States Code;
(Uniform Act), and 49 CFR Part 24, and the rules and regulations of the
DEPARTMENT. Failure to follow these requirements will result in loss of Federal
funding for the project and it will be the responsibility of the COUNTY to make up the
loss of that funding. All required right of way shall be obtained and cleared of
obstructions, including underground storage tanks, prior to the DEPARTMENT's
advertising the project for bids. The COUNTY shall further be responsible for making all
changes to the approved right of way plans, as deemed necessary by the
DEPARTMENT, for whatever reason, as needed to purchase the right of way or to
match actual conditions encountered.
6. The COUNTY shall be responsible for all utility relocation costs necessary for
the construction of the PROJECT.
7. The COUNTY shall be. responsible for all costs for providing energy,
8. The COUNTY shall follow the DEPARTMENT's procedures for identification
of existing and proposed utility facilities on the PROJECT. These procedures, in part,
. require all requests for existing, proposed, or relocated facilities to flow through the
DEPARTMENT's Project Liaison and the District Utilities Engineer.
,.
;..
I.,
I> ~~
9. Upon completion and approval of the PROJECT plans, certification that all
. needed rights of way have been obtained and cleared of obstructions, and certification
'.;:"1
"
.'
~t
L~~
I;~
~~
if.
;p;'
"~
~
L
ir;
'" 1". .. .
. .
,
....... "
that all needed permits for the PROJECT have been obtained by the COUNTY, the
DEPARTMENT shall let the PROJECT for construction. Except as provided herein and
upon receipt of an acceptable bid, the DEPARTMENT shall bear all costs for
construction, including all costs 'associated with inspection and materials testing during
construction. The DEPARTMENT shall be solely responsible for securing and awarding
the construction contract for the PROJECT.
10. The COUNTY. agrees that all reports, plans, drawings, studies,
specifications, estimates, maps, computations, 'computer diskettes and printouts, and
any other data prepared under the terms of this agreement shall become the property
of the DEPARTMENT. This data shall be organized, indexed, bound, and delivered to
the DEPARTMENT no later than the advertisement of the PROJECT for letting. The
DEPARTMENT shall have the right to use this material without restriction or limitation
and without compensation to the COUNTY.
11. The COUNTY shall be responsible for making all revisions to the plans
including revisions made after the PROJECT is let and under construction. All revisions
shall be coordinated with the DEPARTMENT prior to issue.
12. The COUNTY. shall prepare all shop drawings for approval by the
DEPARTMENT.
.!;
,
,.
.'
;J\
13. This AGREEMENT is made. and entered into in Fulton County, Georgia, and
shall be governed and construed under the laws of the State of Georgia. The covenants
herein contained shall, except as otherwise provided, accrue to the benefit of and be
binding upon the successors and assigns of the parties hereto.
~;~
,,'
'.,
.'
.'.
:~i
l~;;
::,
"
",
~:';
~,:
~;~
~
l),
~
~
I
'. '.' ., ... '- -'. .,. ... ...... ...~..... '.
. ;.', .,..... ~- .
;;
IN WITNESS WHEREOF, the DEPARTMENT and the COUNTY have
caused these presents to be executed under seal by their duly authorized
representatives.
RECOMMENDED:
~
Walker W. Sc t, Jr.
Director of Preconstruction
Fr2iL~?1i
Chief Engineer
DEPARTMENT OF TRANSPORTATION.
No Pre-AW~d Exa: O~A SPORTATtOIQ
'Rf4Uired~~t 12--- . ~" .
AUGUSTA-RICHMOND COUNTY
COMMISSIONERS
RICHMOND County; Georgia
o....u
This 1Il.1Il '~roved as
~~,~Id rorpl
~y"'l
Signed~ 7Jealed and delivered this /5-
day of,~f.cll.s., 1997, in the
presence of:
~~~i.
W't - -,,:. - -. ':" '" < ~ .. .
I ness : -':'_ -:: - : I ~..'" "
. YJelAt iJ Jl7J8P~~ ~
Notary P~<N '-:::,,-. -: .::-~ .'.': ," .:' ~j
otary PUb~lc::C9IuP.'lbla County;"G&~18
My CommISSlon.~~~res,June !1;:1998
. " ~ ...- .....~-
-;r
-....c "",
.\:
..~:~r:"'7~~ p_. -_~~ , .; y
.......... I.... .
,
:~
,
:'{
"'-
,~l.
1" ~
:L
;~
:;~
,,'
f~
:.~
1'1
~'i
'S
~
.~
~
l'
\
\'\
COMMISSIONER
DEPARTMENT OF TRANSPORTATION
State of Georgia
#2 Capitol Square, S. w.
Atlanta, Georgia 30334-1002
STEVE PARKS
WAYNE SHACKELFORD
DEPUTY COMMISSIONER
FRANK DANCHETZ
CHIEF ENGINEER
BILLY SHARP
TREASURER
'-'
September 17, 1997
The Honorable Larry Sconyers, Chairperson-Mayor
Augusta-Richmond County Commission Council
City County Municipal Building
Augusta, Georgia 30911
Dear Mr. Sconyers
SUBJECT: Project No. STP-7001(9) Augusta-Richmond Co., Pol. #250510
Wrightsboro Road from Belair Road to Barton Chapel Road
I am returning for your :files an executed agreement between the Georgia Department of
Transportation and Augusta-Richmond County for the above project.
We look forward to working with you on the successful completion of this joint project. Should you
have any questions please call me at (404)656-5320.
. HTG:jb
attachment
CC: Percy Middlebrooks, w/attachment
Joe Palladi, w/attachment
Sandra Burgess, w/attachment
Charles Norris, w/attachment
--~