HomeMy WebLinkAboutBush Field a Viation Commision
Augusta Richmond GA
DOCUMENT NAME: 13uSh r:ielJ A V ja-f(on
DOCUMENT TYPE: ~ ye,eh1eYlt
YEAR:
/ qqSI
,-
BOX NUMBER: ~?
FILE NUMBER: I j 1 'l q
NUMBER OF PAGES: / ()
COlnmiSSiof?
~,- 'l'
\
WORK AUTHORIZATION FORM
BUSH FIELD A VIA TION COMMISSION
Work Authorization for Professional Services
AR209004
(Project Ide.ntification No.)
Four (4)
(Work Authorization No.)
TERMINAL AREA IMPROVEMENTS: BUSH FIELD AIRPORT
PREDESIGN. ARCHITECTURAL SCHEMA TIC DESIGN. AND PRELIMINARY CIVIL
ENGINEERING DESIGN SERVICES (Project Title)
It is agreed to undertake the following work in accordance with the provisions of our MASTER
AGREEMENT for Professional Services dated May 1, 1997,
A. Des(Tiption of Asshmment:
The Project includes the following services:
1. Preliminary Civil Engineering Design (Basic Services) for: Curb Road Improvements,
Terminal Building Area Improvements including Apron, Rental Car Ready Parking Lot
Rehabilitation, Long-Term Parking Lot Expansion, and Terminal Building Water Line,
hereinafter referred to as Site Improvements;
2. Architectural Schematic Design (Basic Services) for Terminal Building Additions and
Renovations; and,
..
3. Predesign (Special Services) for Terminal Building and Site Improvements.
1. The CONSULTANT shall provide basic services, as described in Exhibit "C", Section I, B
and Exhibit "D", Section I, B of the MASTER AGREEMENT, for the Terminal Area
Improvements Project at the Bush Field Airport, herein after referred to as the PROJECT.
a)
PRELIMINARY CIVIL ENGINEERING DESIGN - Includes the following:
- Plan Layouts 'of Site Improvements,
- Utilities Coordination of Site Improvements.
- Preliminary Drainage Plans for Site Improvements.
- Cost Estimate(s).
- Coordination with Landscape Architect.
~age 1 of 5
040198
, ~
b) ARCHITECTURAL SCHEMATIC DESIGN - Includes the following:
Architectural:
Code Review and Agency Coordination.
Develop Alternative Approaches to design of project (sketches).
Develop Alternative Approaches to construction (phasing) of project.
Coordinate through Program Management with Airline Representatives,
Financial Consultants, and the Federal Aviation Administration.
Provide Cost Estimate(s) for each Alternative Approach.
Provide Final Schematic Floor Plans, Elevations, Major Building Sections,
and Materials Selection.
Provide Final Schematic Design Cost Estimate.
Provide Schematic Design Report.
Mechanical:
Disposition of Existing System, Narrative describing New Systems,
Coordination of Space Requirements, Cost Estimates, and Plans.
Plumbing:
Disposition of Existing System, Narrative describing New Systems,
Coordination of Space Requirements, Cost Estimates, and Plans.
Electrical:
Disposition of Existing System, Narrative describing New Systems,
Coordination of Space Requirements, Cost Estimates, and Plans.
Structural:
Schematic Plan of New Structure (3) and Cost Estimate(s).
Telecommunications:
Disposition of Existing System, Narrative describing New Systems,
Coordination of Space Requirements, Cost estimates, and Plans.
Fire Protection:
Disposition of Existing System, Narrative describing New Systems,
Coordination of Space Requirements, Cost estimates, and Plans.
..
II. The CONSULTANT shall also provide special services, as described in Exhibit "C",
Section II, and Exhibit "D" Section II, of the MASTER AGREEMENT, for the
PROJECT, which includes:
a) Architectural! Engineering Survey: Perform a survey of terminal building existing
conditions as necessary for PROJECT to include:
Inventory and "As-Builts" of existing conditions including the following:
Architecture:
Collect and review Existing Owner Documents. Provide CADD-generated
Plans, Sections (4), Elevations, Schedules, and Materials List.
Page 2 of 5
040198
~n. ' ~
Mechanical:
Review Terminal Area Study Inventory and provide updated Plans,
Schedules, and Notes.
Plumbing:
Review Terminal Area Study Inventory and provide updated Plans,
Schedules, and Notes.
Electrical:
Review Terminal Area Study Inventory and provide updated Plans,
Schedules, and Notes.
Structural:
Review Terminal Area Study Inventory and provide updated Plans, Sections,
Schedules, and Notes.
Telecommunications:
Provide Narrative Report describing Fire Alarm, Paging, Security, Telephone,
and Network Systems,
b) Predesign Field Survey: Perform a predesign field survey as necessary for the
PROJECT to include:
Curb Road and Building Comers, Terminal Airside, Floor, Curb and Road
Elevations, and Utilities.
c) Predesign Geotechnical Services: Perform predesign subsurface investigation and
testing and provide a geotechnical analysis and recommendations for the PROJECT.
d) Inventory of Hazardous Materials: Provide survey and testing of existing conditions
for the PROJECT to determine extent of hazardous materials and Cost Estimates to
remove materials.
B. Basis of Compensation / Period of Services:
~
I. Compensation:
a) For Preliminary Civil Engineering Design (Basic Services) for Site Improvements, as
described in Exhibit "C", Section I of the MASTER AGREEMENT, for the
assignment outlined in Section A of this Work Authorization, the CONSULTANT
shall be paid the lump sum fee of Thirtv Thousand Two Hundred and Sixty Five
Dollars ($30.265), as described in Exhibit "F", Section I, of the MASTER
AGREEMENT.- A breakdown of this lump sum amount is shown in Attachment 1.
Page 3 of 5
040198
. l'
b) For Architectural Schematic Design phase Basic Services for Terminal Building
Additions and Renovations, as described in Exhibit "D", Section I, B of the
MASTER AGREEMENT, for the assignment outlined in Section A of this Work
Authorization, the CONSULTANT shall be paid the lump sum fee of One Hundred
Eight Thousand Eight Hundred and Forty Four Dollars ($108.844) as described
in Exhibit "F", Section I, of the MASTER AGREEMENT. A breakdown of this
lump sum amount is shown in Attachment 2.
(c) For Special Services, the CONSULTANT shall be paid the following sums:
1, Architectural/Engineering Survey: As compensation for performing
predesign field surveys as outlined in Section A, IT, a. of this Work
Authorization, the OWNER shall pay the CONSULTANT, the lump sum
fee of Thirty Five Thousand Four Hundred and Thirty Eight Dollars
($35,438).
2. Predesign Field Survey: As compensation for performing predesign field
survey as outlined in Section A, IT, b. of this Work Authorization, the
OWNER shall pay the CONSULTANT the lump sum fee of Twelve
Thousand Dollars ($12.000).
3. Predesign Geotechnical Services: As compensation for predesign geotechnical
services, as outlined in Section A, IT c. of this Work Authorization, the
OWNER shall pay the CONSULTANT the lump sum fee of Eleven
Thousand Dollars ($11.000).
4. Inventory of Hazardous Materials: As compensation for inventory of hazardous
materials, as outlines in Section A, IT, e. of this Wark Authorization, the
OWNER shall pay the CONSULTANT the lump sum fee of Two Thousand
Four Hundred and Twelve Dollars ($2,412).
A breakdown of these lump sum amounts are shown in Attachment 3.
IT.
The services described under Section A above shall be completed within three
hundred and sixty-five (365) days after the Notice-To-Proceed is issued for the
PROJECT.
Schedule:
.,
(THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK)
Page 4 of 5
040198
Agreed as to scope of services, time schedule, and budget:
RECOMMB:NDED BY:
&A W-
For BUSH FIELD A VIA TION COMMISSION
For THE LPA GROUP INCORPORATED
Date:
Date:
.J-' I j. <j y
flJl~/
UNTY COMMISSIO
cP
Attest
TIlII ~ ~l'lWtd Ii
~~~~~~
Date
Attachments: Attachment 1 (Preliminary Civil Engineering Cost Breakdown)
Attachment 2 (Architecture Schematic Design Cost Breakdown)
Attachment 3 (Predesign [Special] Services Cost Breakdown)
Page 5 of 5
040198
0@tl:J
tT1~C:
(/) (/)
2) ::r:
Z~@
~~l'
:::0>0
~~~
tT1>~
(/)~~
:::0>-3
o
<:
tT1
S
~
(/)
.
.
..,
'"tl
~
i
~
-<
(")
~
trl
Z
~
tz
trl
trl
~
~
t:l
~
....
~
z
n""nt/)l'o-l~ Q;f~~ t"'"
o::r:oiiio~ Vl___<n ~
3:0"" 0 m 3' ~. ~ 0
~-t/)C)<n VI -. CI:I ??
~ f;lu;......m>-l __::I _.
-. ~ 3:: ~
:;;:;;trl6~n 3 ...
"tl ~ tJ g.
" :;l:I>-~Z"""l.;.)O ... ::s
t'l >< nOgCll iJ'oa
t"'" ,...., ~m@'>-l
W -.. ~ C/)
~ w;gzc~@" ::s
@t/)C)@~{,A
Z {,A~"""{,A 0\
> 0\ -tv 0
" ~ C) VI ---
~ ...,m@---
n :r- ,...., {,A
o - l.;.)
~ ~@e
Fl {,A
t'l -
0
Z 8
C') E;
~
t'l o ~
~ ~ ~
C') (') o-l
0 >-l ~
~ (') o-l #
o <
...... CIlmCll CIl
c;':l ~tHg g
z
>-l >-lm>-l >-l
0 0,....,0 0
>-l >-lC;>-l >-l
E- ~~~ >
t"'"
l'
l'>-
~~
"" oi':'
w "" {,A i':'::r:
<:> .:-' {,A .:- {,A {,A {,A {,A no
N lJ1 - .,. -J_WV) OC:
~ I.:> .,. VI ~8g(j~gg t/)i':'
lJ1 OQ VI l.;.) o-lt/)
I--
{,A tvt.:c;.:oo PR'
l.;.)
':....l
00 l.;.)
l.;.) \0
:c OOW SR.
00
~ .,.
tv 0\
{,A oo::j~oo ENt
\0
"0
.,. 0
-.l \0
:c 000\..... DE~;
ON
':....l
N 00
0 0
...... rEC
.... N.....
0\ ooN
t .,.
0 0
"" VI EC
N
~OQ {,A
~N
~ .....
-.l VI VI
OJ.
~
J.
IGNER
>
~
~
UU ~
Z
~
.....
I
MAN.
ENG.
H.
i:'"
~(
'<>!!,
" :>
~~
~
;J'
""
~
0@tl:J
tT1~C:
(/) (/)
2) ::r:
~>@
tT1t""l'
:::o~O
$~>
Q>~
(/)~o
..,,:::0
:::0>-3
o
<:
tT1
S
Z
>-3
(/)
'..
n"'nClll'o-l~ en 3:::P:P:P:P:P:P:PQ????~ t"'"
~~~~~ ~ ~ ~ ~ ~ ~ ~ ~ 0 < < >
o::r:oc:Oi':' t;T::
~O"'tllo>- g. Ci Ci ~ 0.: ~ 0.: Ct ~ ~ ~ ~ C
~5lf:!lc)<ll ~uu ~ ... ... ... ... ... ... ... ::s ~ ~ ... ??
~ t/)-tn>-l "'CIlCllt/)"I'1"1'1"1'1)>'" <
:;;:;;t;!53:<i ~ n n n _. _. -. - ~ )> '" -.
:r-:r-:r-::S::S::S ~ 0 --...
..............~~~B::sog~
i':'i:<~Z-;:::O\~ ~3 8 3 t/)t/)t/)", ~ 3 >-g
c 3 g @ g. >-l ~ ~ ~ (') n n _ _. ~ _
> N-- ~cn ~ > ~ g. g. g. g- ~ ~ <" So ~. 0 0-
0'" ---.... .. """I'1oo333~<~3~
" @OZ~(j@ n ~
(") 8 0 0 ~ ~ ~ n ~ ~ ~. n
t/)C) ___.... ::r: en 8 '" -. -. -. 0 . <::s
~ ....~---{,A 0\ ~ .. _. 0 dQ' nr n n en 0 ""1;j n n
0\ -IV 0 2~::.1 '\jn:S!-~ :7"'(;)''<
~ C) VI --- (i ~. i':' [ 0 g t;1 i':' el --- <i
~ tn @ --- q ... 0 0 ~ ...... _. r--.. 0
II :r- ___ {,A "1'1 ::s '8 5' tn.'" 3'.g ~ ~ Q
~ o - 0\ ~ "'" ~"'tn Vl "'0.
E; @ g 2. ~ ;:1 '" ~. 0" * ~ g. 5'
~ --- --- r.n Vl ~ 3 < '(;;"..,' n ~
fA e: =' ~ ~ '-' =: Vl-'
0\ ::3 en n _. ::I '-' 0
0 oq -0 n ::3
CIl 8 Vl ~~ ~
II E; )> ~ ._.
::r: en 0 t/) ::s
~ CIl ... '"
t'l 3:: ~ ~. U ::s
~ 0 n
Z o' a
~ <i '" ::s
u; 0 u; ~ S" ...
::l ...
o-l Z o-l l' g (;
(") II ~ en ~ '" -:...,
0 >-l '< 0.
II ::l ? ::l 0 3::
t'l " Q
en ~tiien o-l < In' '"
- ~tnen en r>
c;':l ~tHg g :].
z >-ltH~ '"
t;;
>-l >-ltn>-l >-l t/)
0 0---0 o~o 0 ...
>-l >-lC;>-l >-l->-l >-l 0"
~ ~~~ >o~ ~ n
t""'~ ~.
0
::s
l' '"
l'~
~o
"" oi':'
- "" .... .... i':'::r:
<:> "" .... fA W .... I.;.) tA{;A-~
OQ ~.,. .... :>' .:-............ .... OQ I.;.) .,. OOO\NO\ no
00 - I.;.) -.l \00\ O\-&o'l UJ '(.. ~ 00 000,000, 0<::
A <:> -.l I.;.) NOO-.l-.lO\ W 00 VI ~g8g CIli':'
A w I.;.) 0 OOOVlVlO lJ1 VI 0 o-lt/)
-
.... i!3NNNNNNN~NNN PR
00
\0
N \0
.j>. N
.... 0\ N oo~oooooo~~ SR
0\
tv
0 ~
00
.... ~~o;~~t;oo~i!3i!3o; l4.R
IV
.j>.
\0 w
0
0 0
0
{,A - OQI.;.)AN _ I.;.) DE
\0 0\ NO.j>. N N
0, ......
-.l
0\ ~
.... ooUJW-WVJt3~t...>t-..l TE'
-
.j>. NNIVNIVO .j>..,.
':....II.;.)
NN
00
"" ON~O\ .j>.~00.j>. .j>. TEl
~ fA
~ -
1:.. \0
<:> O<l~
~
OJ. MAN.
ARCH.
CH.
SIGNER
>
~
~
:J~
I
>
iXl
(")
e=
>-3
trl
(")
~
~
~
~
(")
~
~
~
....
(")
t:l
~
....
~
Z
CH.
::~
~~
~~
~;l;
~
."
~
~
...
t:l@tl:J
tT1~C:
(/) (/)
2) ::r:
Z~;:!J
(/)>tT1
tT1t""l'
:::o~t:l
;:S~>
Q>~
(/)~~
:::0>-3
o
<:
~
tT1
~
(/)
.
~
~
~
II
n"'nt/)l'o-l~ CIl n"'-i':' t"'"
;!l>-C)tn3::~~ o ..., ::s (ll >
O::r:OiijOi':' tnt/)tnl't11 o ... < < tl:l
:;:0'" 0> l'tllOt11ni':'n a. ~ g O' 0
"'~rnf:!lQ<<i Of3ltriq::r:Bo S' ... 0 ~ ??
~ CIlZt11>-l CIlo-lni':'>- Z ~ O~ 0
:;;:;;triC)~ll ... ..., tn ~ )>
~~::r:n3c:~ '"
~. ~. ~. ~ ..,
i':')>-:;l:Iz""".j:>.o tii~~f:~~>-l n
><_<iO\gCll 5- ~ S' ;; :r-
.-.. ~tn@'>-l ::::
r::; -. ~ CI'J ~~f:~ ~ ~.Vl~o ...
o '"'0 ~....- {A .. n
@OZ:;j@> g'zn2 ....
o 0'3 r::
t/)C) ___......., t11 i: CIl g r> ::s ... ..,
{,Ao-l,....,.... O\g. -< &. .. '" '" e: ::s ...
0\ )>- ..... N 0_. ::s " ~ ~. In'
11 C) VI --- to (JQ
t11@--- n o-l ::;- () 0
;j ...,.... .... ... ~ ~ ~
g--=~ E; 0- In' 0.
" " @ 8 ... n "
0 0-
3:: .::, --- 3 '"
....
~ N 3 0
0 " .....
8 ::s tn
)>- )>- o' g.
)> '"
~ 0 eno ~. S'
o ~ ~ ~ 0
g, ~
"tl ~ ~ <i Z n
" o - 0
0 ""1:1 Z ~ ::s
< ~ <i -l en ~ ~
trl >-l ~ o'
3: t:l II o-l ? -l ::s
t'l Vl
t'l o < >-l - Q
en >tiien
~ - ent11en en
c;':l ~tHg ~tHg g
en Z
>-l >-l >-lt11>-l >-ltn>-l >-l
0 0 0,....,0 0,....,0 0
>-l >-l >-l->-l >-lC;>-l >-l
)> )> ~o)> ~~~ >
.c. l:. ~t"'" t"'"
Vt t'"'
l'>-
>-tll
tllO
- "" "" .... .... .... Oi':'
I.:> ~ "" .... w .... w C;~C;t5:c~ i':'::r:
I.:> <:> N fA N ~~:c~:c~ I.:> w .0\ no
I.:> 00 1:.. IV iv "....l 0, '\0';-'00000)::" 0<::
~ Ul w t: C; ~8g8~i!3 ~ V; VI ~~8~g8 CIli':'
<:> <:> - -.l N o-lCll
"""" -
.... ~A N PR
N
\0
- w
0 0
N R.
....
.....
\0
.j:>. N
.... -..J:::l..w- l<\R
-.l NONIV
'i.o
0\ \0
00 0\
.
fA w IoE
N
00
00 w
00 N
fA .j>.gg~.j>. [rnl
VI
U. -
N
0 IV
0
Vt .j>. !rEI
-
J'O ~
0\ -
lJ1 -.l
N IV .j>.
OJ. MAN.
ARCH.
CH.
SIGNER
>
--3
--3
>
:R. IT ~
Z
~
~
I
:::H.
~~
"' c
oo!l-
~E
:il~
~5f
~
~
."
"
""
~
""
\.
.,
FROM : BUSH F r 8..D
PHONE ~n
705 798 ~. 14 1~ 1J..:..I~__ ----
APPROVED \,. . 1~11a~lf/wl iii
~L!lY () ~ 1998 I Lnr":" ~J
; APR 1 4 81 ,.
cOU"'" rOlj"ICSI/'~" .'
(AUGUSTA-RICI!!~2.tl.L_~~'':;. .
I Bl/~A'-' r.-- ->~~ ..,
...,.,,11 rlCLU ~
AUGUSTA AIRPORT
AUGUST A-RICHMONO COUNTY
AOMINJSTRATOR'S OFFJCE'
"',
AGENDA ITEM r.d:3
(1'0 be completed by auk of Commuliod)
TO:
Honorable Larry E. Sconyers, Mayor
Honorable Willie H. Mays, III) Chairman and Members of the
Public Services Committee
Charles R. Oliver, Administrator
FROM::
DA T.E:
Albert L. McDill, Director
Bush Field Airport
April 14, 1998
SUBJElCT:
Public Services Committee meeting of April 23, 1998 (and regular Ccmmission
meeting of May 5, 1998): Approval of Work Authorization No. 4 for
professional services during schematic design of Terminal Building
Renovation Project.
CAFI'JON:
Approval ofLPA Group, Inc., Work Authorization No.4 fOT professional
services during schematic design of Terminal Building Renovation :Project.
BACKGJlOUND:
Work Authorization No. 4 provides for basic and special professional services
for the Terminal Building Renovation Project at Bush Field Airport.. These
services are to be provided in accordance with the five-year GeneoU
Consulting Service Agreement. which was approved by Commission. along
with Work Authorizations No.1 and No.2, on Tuesday, June 3, 1997.
This phase of the project includes architectural schematic design (basic
services) for Terminal Building Renovations and Additions, and pre-design
(special services) for Terminal Building site improvementS. It also indudes
preliminary civil engineering design (basic services) for: Curb Road
Jmprovement~ Terminal Area Building Improvements including Apron,
Rental Car Ready Parking Lot Rehabilitation, Long-Term Parking Lot
Expansion, and Terminal Building Water Line Improvements.
This project is undertaken in accordance with Bush Field's Tem1inal Area
Demand/Capacity Study completed in 1996_ The study also identified
requirements needed to existing roads and parking areas to accommodate safe
and efficient public access.
1
04-14-1998 11:29AM
706 7981551
P.02
, .
FROM BUSH FI R.D
PHONE NJ. 706 7981551
Apr. 14 1998 11: 17AM P3
.-
Agenda [Ian
Page 2
ANALYSIS:
This work authorization must be accepted to complete projects noted to
provide an acceptable leveJ of ser\'ice to the general public.
The initial outlay of Airport funds will be $200,000. This project ~ included
in the current year budget.
FlNANnAL
IMPAClr:
ALTERNATIVES:
Without approval, Bush Field will be unable to complete the project and
provide the required level of service to the general public.
RECOMMENDATION: Approve Work Authoriz3tion No. 4 for professional services during
conceptual design of the Terminal Building Renovation Project, as
reconunended and approved by the Aviation Commission on Apo12, 1998.
MRPORT ~ -rl-
DIRECTOR: u
COUNTY , ~.o~
ADMINISTRATOR: q",c.~
FUNDS ARE A V AILABLE IN THE
FOLLOWING ACCOUNTS:
7 ~f703-O()"0441
@) tj/l ~-I&.i-9g
~ /t>-(c,r
FINANCE:?~ -LJ~ ~
COMMTITEE ACflON:
2
04-14-1998 11: :29AM
706 7981551
P.03