Loading...
HomeMy WebLinkAboutAMENDMENT #2 TO ARTICLES OF AGREEMENT BUTLER CREEK NATURE CORRIDOR-LOMBARD MILL POND TRAIL $100,000 END DATE DEC 31,2010 AMENDMENT #2 STATE OF GEORGIA COUNTY OF FULTON AMENDMENT TO ARTICLES OF AGREEMENT THIS AMENDMENT to an Agreement for Project Grant No. NRT -05(4) dated the 19th day of June, in the year TWO THOUSAND EIGHT (2008), and amended on the 13 day of January, 2010, made and entered into this fliAlay of fjc. tok :V" , 2010, by and between the Department of Natural Resources (hereinafter DEPARTMENT), whose address is 2 Martin Luther King, Jr. Drive, S. E., Suite 1352, Atlanta, Georgia 30334, acting for and on behalf of the State of Georgia, and Augusta- Richmond County (hereinafter referred to as the GRANTEE), whose address is 530 Greene St., Augusta, GA 30901. WITNESSETH: WHEREAS the purpose of the original agreement between the parties was for construction of approximately 2.6 miles of trail in the Lombard Mill Pond area, and installation of trailhead amenities; and WHEREAS the DEPARTMENT allocated grant funds in the amount of ONE HUNDRED THOUSAND DOLLARS ($100,000.00) from the Georgia Recreational Trails Fund to assist the GRANTEE with the above project; and WHEREAS, due to unforeseen costs of construction of the project, the GRANTEE has requested to modify the scope of the project and revise the cost estimate; and WHEREAS the GRANTEE has proposed to modify the scope so that it would include a handicapped accessible parking area, a wheelchair- accessible path from the road to the overlook area, a wheelchair accessible observation deck, approximately 100 feet of concrete trail extending northward from the observation deck, and an aggregate- surface trail approximately 770 feet long traveling southwest with wooden drainage crossings; and WHEREAS the DEPARTMENT has reviewed the request for modification and finds that it would be beneficial to the successful completion of the project; NOW, THEREFORE, in consideration of the request from the GRANTEE and the premises, conditions and covenants set forth in the original AGREEMENT, the parties agree to amend said AGREEMENT as follows: Page 1 of 2 Page 2 of 2 1) The Project scope is now modified in accordance with the GRANTEE's proposal, and the scope shall be described as construction of a handicapped accessible parking area, a wheelchair - accessible path from the road to the overlook area, a wheelchair accessible observation deck, approximately 100 feet of concrete trail extending northward from the observation deck, and an aggregate- surface trail approximately 770 feet long traveling southwest with wooden drainage crossings; and 2) The cost estimate is now revised in accordance with the GRANTEE's proposal to modify the scope of the project, and is attached to this Amendment as an Exhibit; and 3) The GRANTEE and DEPARTMENT mutually agree that all other terms and conditions of the agreement shall be and remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT, to be given effect as of the day and year first above written. GEORGIA DEPARTMENT OF NATURAL AUGUSTA - RICHMOND COUNTY, GEORGIA RESO RCES t A BY ( i _. ..r.... _ .1� BY (S----A'-- ----- BECKY KEL , DI CTOR DEKE COPEN AVER, MAYOR PARKS, REC • ION &. HISTO' IC • TES . 4-, ) ' ://' /j / AN A . // i , et+ 1 WITNESS t WI ; ° ° ° °°°° ° ° ° ° > 4 1 4. r s :%, $ P • DATE 0 ATE 4. w: : • 0 i 'v °o°° ,� Georgia Recreational Trails Application EXHIBIT Appropriation Year 2008 ITEM DESCRIPTION GRANT FUNDS MATCHING MATCHING TOTAL ($) ($) IN -KIND ($) CASH ($) Design & Engineering (10% maximum) $10,000 $19,500 $29,500 Break down costs and purpose: (Richmond County) Direct labor costs $13,200 $3,200 $18,200 Salaries or actual costs: (not applicable) (1,500 hrs) (200 hrs) Volunteers or donated Tabor:* $1,800 (150 hrs) Special service purchase contract N/A N/A Specify what contract will include or attach copy: Purchase or rental of equipment $1,000 $5,000 $6,000 Specify type of equipment/cost/days: (Land Trust) (Richmond County) Construction contract $90,000 $42,500 $132,500 Contractor to Build FY2010 FY2010 and Install ADA Accessible 0,`? Concrete Trail sPLCs % { (see attached for fundtbg SP) detailed description) available by funds): ; rf rY2 1 ) FY20 Purchase of Materials Included above in $5,000 $2,500 $7,500 Materials cost for concrete portion of trail construction (Pollard (American included in construction contract. contract Lumber Co & Hiking Matched materials include small Fireside Society) boardwalk sections and labor to build dirt Ministries) portions of trail. Other: Trailhead and Amenities Included above in $1,000 $3,000 construction (Land Trust) contract $2,000 (Richmond County) TOTALS: $100,000 $24,000 $72,700 $196,700 ($372.700 70th / ( 4 ¢7, 700 FY 01) by '_' ` ', *Volunteer labor rates: Laborer (no skills required): $11.40 per hour Semi- skilled (limited skills, can work alone): $12.40 per hour Supervisor (ability to take charge): $13.40 per hour. Volunteers who donate job specific skills and /or equipment (for example, grading contractors, plumbers) can value their time and /or equipment at their standard rates for this purpose. 33