Loading...
HomeMy WebLinkAboutAIA DOCUMENT B 105 LISA LANNI AIA MCMILLAN PAZDAN SMITH ARCHITECTURE INFRASTRUCURE FOR FLORENCE STREET = =y Document B105 - 2007 Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project 1 AGREEMENT made as of the Fifteenth day of July in the year Two Thousand Ten (In words, indicate day, month and year.) ADDITIONS AND DELETIONS: The author of this document has BETWEEN the Owner. added information needed for its (Name, legal status, address and other information) completion. The author may also have revised the text of the original Chester Wheeler, Director AIA standard form. An Additions and City of Augusta Deletions Report that notes added Augusta Housing and Community Development information as well as revisions to 925 Laney Walker bivd the standard form text is available Augusta, GA 30901 from the author and should be reviewed. A vertical line in the left and the Architect: margin of this document indicates (Name, legal status, address and other information) where the author has added necessary information and where Lisa Lanni, AIA the author has added to or deleted McMillan Pazdan Smith Architecture from the original AIA text. 200 E. Broad Street This document has important legal Greenville, SC 29601 consequences. Consultation with an attorney is encouraged with respect for the following Project: to its completion or modification. (Name, location and detailed description) State or local law may impose requirements on contracts for home Laney Walker/Bethlehem Redevelopment improvements. If this document will Augusta, Georgia be used for Work on the Owner's Engineering Services for Design of Replatted Parcels and Infrastructure for Florence St. residence, the Owner should consult Project in the Laney Walker/Bethlehem Development Area.. local authorities or an attorney to verify requirements applicable to this The Owner and Architect agree as follows. Agreement. AIA Document 8105"" — 2007 (formerly 13155m — 1893). Copyright ® 1993 and 2007 by The American Institute of Architects. All rights reserved. WARNING: Init. This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software 8116:51:52 on 07/20/2010 under Order No.2048764075 1 which expires on 02/14/2011, and is not for resale. User Notes: (2034714165) ARTICLE 1 ARCHITECT'S RESPONSIBILITIES The Architect shall provide architectural services for the Project as described in this Agreement in a manner consistent with locally accepted standards for professional skill and care. The Architect shall assist the Owner in determining consulting services required for the Project. The Architect's services include the following consulting services, if any: Scope of Work Based on the scope of work identified in the Task Order, our team will provide the following: • Prepare a boundary, topographic and utility survey of the existing lots • Prepare site construction plan and details • Prepare landscaping and irrigation plans for the pocket park • Prepare technical specifications for the site work elements • Submit preliminary and final subdivision plans to City of Augusta approving authorities, including the plat of the new lot configuration • Prepare a material takeoff and cost estimate • Furnish Three (3) sets of the final plans and bid documents • Assist in the Bidding and Construction Phases of the project During the Design Phase, the Architect shall review the Owner's scope of work, budget and schedule and reach an understanding with the Owner of the Project requirements. Based on the approved Project requirements, the Architect shall develop a design. Upon the Owner's approval of the design, the Architect shall prepare Construction Documents indicating requirements for construction of the Project and shall coordinate its services with any consulting services the Owner provides. The Architect shall assist the Owner in filing documents required for the approval of governmental authorities, in obtaining proposals and in awarding contracts for construction. During the Construction Phase, the Architect shall act as the Owner's representative and provide administration of the Contract between the Owner and Contractor. The extent of the Architect's authority and responsibility during construction is described in AIA Document A105T"_2007, Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project. Generally, the Architect's services during construction include interpreting the Contract Documents, reviewing the Contractor's submittals, visiting the site, reviewing and certifying payments, and rejecting nonconforming Work. ARTICLE 2 OWNER'S RESPONSIBILITIES The Owner shall provide full information about the objectives, schedule, constraints and existing conditions of the Project, and shall establish a budget that includes reasonable contingencies and meets the Project requirements. The Owner shall provide decisions and furnish required information as expeditiously as necessary for the orderly progress of the Project. The Architect shall be entitled to rely on the accuracy and completeness of the Owner's information. The Owner shall furnish consulting services not provided by the Architect, but required for the Project, such as surveying, which shall include property boundaries, topography, utilities, and wetlands information; geotechnical engineering; and environmental testing services. The Owner shall employ a Contractor, experienced in the type of Project to be constructed, to perform the construction Work and to provide price information. ARTICLE 3 USE OF DOCUMENTS 1 (Paragrapl/ deletes ARTICLE 4 TERMINATION, SUSPENSION OR ABANDONMENT In the event of termination, suspension or abandonment of the Project by the Owner, the Architect shall be compensated for services performed. The Owner's failure to make payments in accordance with this Agreement shall be considered substantial nonperformance and sufficient cause for the Architect to suspend or terminate services. Either the Architect or the Owner may terminate this Agreement after giving no less than seven days' written notice if the Project is suspended for more than 90 days, or if the other party substantially fails to perform in accordance with the terms of this Agreement. AIA Document 8105'm — 2007 (formerly 8155Th' — 1993). Copyright ®1993 and 2007 by The American Institute of Architects. All rights reserved. WARNING: Init. This AIA Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, 2 or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:51:52 on 07/20/2010 under Order No.2048764075_1 which expires on 02/14/2011, and Is not for resale. User Notes: (2034714165) ARTICLE 5 MISCELLANEOUS PROVISIONS This Agreement shall be governed by the law of the place where the Project is located. Terms in this Agreement shall have the same meaning as those in AIA Document A105 -2007, Standard Form of Agreement Between Owner • and Contractor for a Residential or Small Commercial Project. Neither party to this Agreement shall assign the contract as a whole without written consent of the other. Nothing contained in this Agreement shall create a contractual relationship with, or a cause of action in favor of, a third party against either the Owner or the Architect. The Architect and Architect's consultants shall have no responsibility for the identification, discovery, presence, handling, removal or disposal of, or exposure of persons to, hazardous materials in any form at the Project site. ARTICLE 6 PAYMENTS AND COMPENSATION TO THE ARCHITECT The Architect's Compensation shall be: The Architect's Compensation shall be: The Owner shall pay the Architect an initial payment of Zero dollars and Zero cents ($0.00) as a minimum payment under this Agreement. The initial payment shall be credited to the final invoice. The Owner shall reimburse the Architect for expenses incurred in the interest of the Project, plus 0%. Payments are due and payable upon receipt of the Architect's monthly invoice. Amounts unpaid Fifteen (15) days after the invoice date shall bear interest from the date payment is due at the rate of One and Five Hundredth percent 1.5 %), or in the absence thereof, at the legal rate prevailing at the principal place of business of the Architect. At the request of the Owner, the Architect shall provide services not included in Article 1 for additional compensation. Such services may include providing or coordinating services of consultants not identified in Article 1; revisions due to changes in the scope, quality or budget; evaluating changes in the Work and Contractors' requests for substitutions of materials or systems; and services not completed within Twelve (12) months of the date of this Agreement through no fault of the Architect. ARTICLE 7 OTHER PROVISIONS Olsen' dercriplions ofotherservices andmodrfica/ions fo the teens ofllrisAgreemenl./ Please refer to our attached Revised Proposal dated July 20, 2010 Base services include Items 1 — 5 of the Fee proposal attached for $29,405.00 Additional services include Items 6 — 8 of the Fee proposal attached and are estimated at $12,900.00. These services will not be provided unless owner provides prior written consent to do so. snit. AIA Document B105TM — 2007 (formerly B155"` - 1993). Copyright © 1993 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This Ale Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Ale Document, 3 or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:51:52 on 07/20/2010 under Order No.2048764075_1 which expires on 02/14/2011, and is not for resale. User Notes: (2034714165) oi►- 'is/(e— This Agreement entered it : of the day and year first written above. OWNER ARCH! L# iG / / (Signature) /nature) Chester Wheeler, Director Lisa LanniAlA Principal (Printed name and title) (Printed name and title) (Signature)'. (Signature) Fred Russell (Printed name and title) (Printed name and title) — .. (Signature) / (Signature) Mayor Deke Copenhaver (Printed name and title) (Printed name and title) l n• lure (Signature) Lena Bonner, lure / (Signature) of Commission (Printed name a Ile) (Printed name and title) OWN j ARCHITECT /AO: (Signature) (Signature) Chester Wheeler, Director Lisa Lanni, Principal (Printed name and title) (Printed name and title) AIA Document B105"' — 2007 (formerly 8155'" — 1993). Copyright ®1993 and 2007 by The American Institute of Architects. All rights reserved. WARNING: Init. This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, 4 or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:51:52 on 07/20/2010 under Order No.2048764075_1 which expires on 02/14/2011, and is not for resale. User Notes: (2034714165) Additions and Deletions Report for AlA ® Document 9905 — 2007 This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 16:51:52 on 07/20/2010. PAGE 1 AGREEMENT made as of the Fifteenth day of July in the year Two Thousand Ten Chester Wheeler, Director City of Augusta Augusta Housing and Community Development 925 Laney Walker blvd Augusta, GA 30901 Lisa Lanni, A1A McMillan Pazdan Smith Architecture 200 E. Broad Street Greenville, SC 29601 Laney Walker/Bethlehem Redevelopment Augusta, Georgia En ineerin • Services for Desi l of Re .tatted Parcels and Infrastructure for Florence St. Pro'ect in the Lan - Walker /Bethlehem Development Area.. PAGE 2 Scope of Work Based on the scope of work identified in the Task Order, our team will provide the following: • Prepare a boundary, topographic and utility survey of the existing lots • Prepare site construction plan and details • Prepare landscaping and irrigation plans for the pocket park • Prepare technical specifications for the site work elements • Submit preliminary and final subdivision plans to Citv of Augusta approving authorities including the plat of the new lot configuration • Prepare a material takeoff and cost estimate • Furnish Three (3) sets of the final plans and bid documents • Assist in the Bidding and Construction Phases of the project Additions and Deletions Report for AIA Document B105" 2007 (formerly 8155' — 1993). Copyright ®1993 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 1 reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:51:52 on 07/20/2010 under Order No.2048764075_1 which expires on 02/14/2011, and is not for resale. User Notes: (2034714165) PAGE 3 The Architect's Compensation shall be: The Owner shall pay the Architect an initial payment of ($ —Zero dollars and Zero cents ($0.00 ) as a minimum payment under this Agreement. The initial payment shall be credited to the final invoice. The Owner shall reimburse the Architect for expenses incurred in the interest of the Project, plus pereent-(- 9 40 %0. Payments are due and payable upon receipt of the Architect's monthly invoice. Amounts unpaid (-4-Fifteen (15) days after the invoice date shall bear interest from the date payment is due at the rate of percent ( %) , One and Five Hundredth percent 1.5 %), or in the absence thereof, at the legal rate prevailing at the principal place of business of the Architect. At the request of the Owner, the Architect shall provide services not included in Article 1 for additional compensation. Such services may include providing or coordinating services of consultants not identified in Article 1; revisions due to changes in the scope, quality or budget; evaluating changes in the Work and Contractors' requests for substitutions of materials or systems; and services not completed within (-4-Twelve (12) months of the date of this Agreement through no fault of the Architect. Please refer to our attached Revised Proposal dated July 20, 2010 Base services include Items 1– 5 of the Fee proposal attached for $29,405.00 Additional services include Items 6 – 8 of the Fee proposal attached and are estimated at $12,900.00. These services will not be provided unless owner provides prior written consent to do so. PAGE 4 Additions and Deletions Report for AIA Document B105'M —2007 (formerly B155T' — 1993). Copyright ©1993 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 2 reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:51:52 on 07/20/2010 under Order No.2048764075_1 which expires on 02/14/2011, and is not for resale. User Notes: (2034714165) • it, " ARCHITECT ,Aer Air 40% itynalare) (Signature) Chester Wheeler, Director Lisa LanniAlA Principal Prin -d name and title2 (Printed name and title) e I I I (Signature) (Signature) •Fitd-66011 i arv a ka Allen 'for t • 2. (Printed name and title) I (Printed name and title) h4r ry efU.t , Cr1M' �O t' (Signature) V (Signature) (Si g ) Mayor Deke C • . enhaver (Printed name and tide) (Printed name and title) (Signature) (Signature) Lena Bonner Clerk of C•mmission Printed name a , itle (Printed name and title) • Chester eeler, Director Lisa Lanni, Principal Additions and Deletions Repot/ for AIA Document B105TM — 2007 (formerly B155TM — 1993). Copyright C 1993 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 3 reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by ALA software at 16:51:52 on 07/20/2010 under Order No.2048764075_1 which expires on 02/14/2011, and is not for resale. User Notes: (2034714165) Certification of Document's Authenticity AIA® Document D401 TM - 2003 1, Shirley Bolden, hereby certify, to the best of my knowledge, information and belief, that 1 created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 16:51:52 on 07/20/2010 under Order No. 2048764075_1 from AIA Contract Documents software and that in preparing the attached final document 1 made no changes to the original text of AIA Document B105 2007 - Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project, as published by the AIA in its software, other than those additions and deletions shown in the associated Additions and Deletions Report. • (Signed) / if Amy �/. _ (Title) ` / V2_0 z (Dated) AIA Document D401 — 2003. Copyright © 1992 and 2003 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties, Unauthorized reproduction or distribution of this AIA Document, or any portion of it, 1 may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by ALA software at 16 :51'52 on 07/20/2010 under Order No.2048764075 1 which expires on 02/14/2011, and is not for resale. User Notes: (2034714165) mcmillan I pazdan smith a r c h i t e c t u r e June 29, 2010 (Revised July 15, 2010) (Revised July 20, 2010) Mr. Chester Wheeler, Director City of Augusta Augusta Housing and Community Development 925 Laney Walker Blvd Augusta, GA 30901 RE: Laney Walker /Bethlehem Redevelopment Augusta, GA Task Order #5 — Engineering Services for Design of Re- Platted Parcels and Infrastructure for Florence Street Project in the Laney Walker /Bethlehem Development Area. Dear Chester: It is with pleasure we submit our Fee proposal for Engineering Services for Design of Re- Platted Parcels and Infrastructure for Florence Street Project in the Laney Walker /Bethlehem Development Area. We are very excited to be a part of this important project for Augusta and we look forward to working with you and your team to make this project a success. Project Understanding The Florence Street Duplex Project is one of many redevelopment projects planned for the Laney Walker /Bethlehem Neighborhood Revitalization being completed by the Augusta Housing and Community Development Department. This project provides for the reconfiguring of several parcels to accommodate three new duplex units. Specifically, this project includes the re- platting of six existing lots into three lots and the plans for the development of new duplex homes and the associated site work. This work is on the south side of Florence Street and includes the existing lots at 1120, 1124, 1128, 1134, 1136, and 1144. The demolition of existing buildings and the design of the duplex units are not a part of this agreement. A schematic plan of the project illustrating the layout is enclosed with this proposal. Scope of Work Based on the scope of work identified in the Task Order, our team will provide the following: • Prepare a boundary, topographic and utility survey of the existing lots • Prepare site construction plan and details • Prepare landscaping and irrigation plans for the pocket park • Prepare technical specifications for the site work elements • Submit preliminary and final subdivision plans to City of Augusta approving authorities, including the plat of the new lot configuration • Prepare a material takeoff and cost estimate • Furnish Three (3) sets of the final plans and bid documents po box 8922 greenville, sc 29604 o. 864 242 2033 f. 864 242 2034 mcmillanpazdansmith.com Mr. Chester Wheeler Re: Laney Walker/Bethlehem Redevelopment - Task #5 Augusta, GA June 29, 2010 (Revised July 15, 2010) (Revised July 20, 2010) Page 2 • Assist in the Bidding and Construction Phases of the project Task Prior to beginning the design for this project, we propose to conduct a project scoping /kickoff meeting with the August Housing and Community Development personnel to review the goals, scope and limitations of the project. We will review the existing schematic plan and research the local design guidelines before the meeting so that we can discuss any conflicts or major design issues. To the extent you desire, we can assist with the City coordination to address issues related to zoning, variances and special requirements. Following the kickoff meeting, we will perform the field surveying for this project, which will include all visible improvements, utilities identified by a local service, existing property lines, trees greater than 6 inches in diameter, and the topography of the affected property as shown on the enclosed project layout. The survey precision will be sufficient to produce elevation contours at one -foot intervals, supplemented by appropriate spot and structure elevations. The survey will be in Georgia State Plane coordinates and the vertical control will be based on the North American Vertical Datum of 1988. The survey will, as practicable, include existing utility lines including power, gas, water, telephone, sewer, storm sewer, and cable television. We will prepare preliminary plans for review and approval by the Housing and Community Development Department. Based on that approval, we will incorporate any comments received and prepare final construction plans and bidding documents for the reviews by the Department. After incorporating any final comments, we will submit the plans to the local reviewing authorities for approval. Once approved by the local issuing authorities, we will provide three sets of plans and bidding documents. The design plans will include the necessary driveways, parking, water and sewer services, and storm sewer plans required for the development of the site plan as part of a proposed subdivision of the existing property. It is anticipated that the development of a storm water detention facility will not be required. However, if detention is required, it can be accommodated in the storm system at no additional cost. Also, we do not anticipate that environmental permitting will be required and have not included in our fee any services for obtaining such permits Drawings will be prepared in ink on Mylar at an appropriate scale. Portions of the site plan may need to be enlarged and sectional drawings may be needed to show sufficient detail. The site plan sheets will be accomplished using computer- assisted design and drafting (CADD) equipment, and these will be available in AutoCAD 2010 computer disc format, if desired, at no additional fee. In the event of difference between the disk - reproduced drawings and the original tracing, the hard copy tracing will govern. To the extent that you desire, we propose to provide the following services during the Bidding and Construction Phases: attending pre -bid and bid opening meetings, issuing any necessary addenda, advising you concerning the award of a contract, preparing contract documents subject to your approval, issuing a notice to proceed, attending a pre - construction meeting, reviewing contractor material submittals, making periodic observations of the construction work as it progresses to observe the progress and general quality, furnishing written observations reports of the observations made during each visit, issuing instructions to the contractor, preparing any change orders required, reviewing the contractor's monthly applications for partial payment, determining the amounts owing to the contractor, interpreting the contract documents and technical specifications, making a final inspection to determine whether or not po box 8922 greenville, sc 29604 o. 864 242 2033 f. 864 242 2034 mcmillanpazdansmith.com Mr. Chester Wheeler Re: Laney Walker/Bethlehem Redevelopment - Task #5 Augusta, GA June 29, 2010 (Revised July 15, 2010) (Revised July 20, 2010) Page 3 the work has been completed substantially in accordance with the plans and specifications, and reviewing the contractor's application for final payment. Any construction observation services provided would be for the purpose of monitoring compliance with the plans, specifications and contract documents, and will not in any manner be a guarantee of the methods, appliances, or schedules employed by the contractor, nor for safety on the job. Time of Completion We are prepared to begin work at your direction and expect to complete the Boundary, Topographic and Utility Survey, Concept Validation and the Preliminary Design Phases within 45 days after receipt of your notice to proceed. Once the preliminary design has met your final approval, the final design phase will be completed within an additional 30 days. Additional time should be allowed for the completion of reviews by the local reviewing authorities, depending upon their promptness. Fee Proposal Design Phase Services Proposed Fee 1. Boundary, Topographic and Utility Survey Lump Sum $4,290.00 2. Concept Validation Phase Lump Sum $1,900.00 3. Preliminary De sign Phase Lump Sum $5,190.00 4. Final Design Phase Lump Sum $16,375.00 5. Record Plat and As- builts Lump Sum $1,650.00 Design Phase Subtotal $29,405.00 Additional Services Estimated Fee Items below will not be performed without prior written consent of owner. 6. Coordination with City Time and Material Estimate $2,050.00 7. Bidding Phase Services Time and Material Estimate $3,250.00 8. Construction Phase Services Time and Material Estimate $7,600.00 Additional Services Estimated Subtotal $12,900.00 Estimated Grand Total $42,305.00 po box 8922 greenville, sc 29604 o. 864 242 2033 f. 864 242 2034 mcmillanpazdansmith.com Mr. Chester Wheeler Re: Laney Walker/Bethlehem Redevelopment - Task #5 Augusta, GA June 29, 2010 (Revised July 15, 2010) (Revised July 20, 2010) Page 4 Additional Services Additional services include items not covered in this proposal and can be provided per a negotiated sum or hourly based on our attached Rate Schedule. Exclusions • Environmental Studies and permitting • Geotechnical Studies • 3D Renderings for Marketing • Signage Design /Procurement • Items not covered in this Proposal Reimbursable • Mileage to and from jobsite • Postage /Shipping • Printing /Plotting • Long Distance Telephone • Materials for Presentation Purposes • Travel expenses, such as lodging, meals, etc. Terms Invoices will be sent monthly for a percentage of the amount of work completed. Terms net 15 days. A service charge of 1.5% per month will be added to all unpaid Invoices 25 days past due date. Acceptance If this proposal is acceptable to you, please sign the enclosed copy and return to us for our files. We will then provide you with an AIA Contract for review and execution. We look forward to continuing to work with you on this important project. Sincerely, Lisa Lanni, AIA, LEED AP Attachment cc: Brad B. Smith Jesse Wiles File Accepted this day of , 2010 Chester Wheeler po box 8922 greenville, sc 29604 o. 864 242 2033 f. 864 242 2034 mcmillanpazdansmith.com mcmillanIpazdan smith a r c h i t e c t u r e Fee Structure Comparison Laney Walker /Bethlehem Development Augusta, GA McMillan Pazdan Smith Managing Principal $195.00/hr Principal $180.00/hr Project Architect I $155.00/hr Project Architect II $120.00/hr Intern Architect III $75.00/hr Administrative III $55.00/hr Consultants Cost plus 10 %* Cranston Engineering Group, P.C. Engineers - Planners- Surveyors Senior Principal Engineer /Planner $215.00/hr Senior Principal Engineer $185.00/hr Principal Engineer $170.00/hr Sr. Professional Engineer /Project Manager $130.00/hr Professional Engineer $115.00/hr Project Engineer II $ 80.00 /hr Project Engineer I $70.00/hr Engineering Technician II 75.00 /hr Engineering Technician I $65.00/hr Landscape Architect I $80.00/hr Landscape Designer I $70.00/hr Planner $70.00/hr Sr. Project Manager /Sr. Land Surveyor $140.00/hr Land Surveyor III $115.00/hr Project Surveyor II $80.00/hr Project Surveyor I $70.00/hr Field Project Supervisor $60.00 /hr Survey Party - 2 Person $115.00/hr Survey Party - 3 Person $135.00/hr Survey Party - 4- Person $150.00/hr Survey Party - GPS $150.00/hr Survey Party - Robotic Scanner $150.00/hr CADD Technician III $100.00/hr CADD Technician II $55.00/hr CADD Technician I $45.00/hr Asst. CADD Technician $35.00/hr Inspector II $70.00/hr po box 8922 greenville, sc 29604 o. 864 242 2033 f. 864 242 2034 mcmillanpazdansmith.com mcmillan I pazdan'smith a r c h i t e c t u r e Reimbursable Expenses Net Meetings Cost plus 10% Mileage $0.55 /Mile Xerox Copies (81/2 X 11) $0.10/EA (11 X 17) $0.20 /EA Color Copies (81/2 X 11) $.75 /EA (11 X 17 $1.25/EA Premium Photo Prints (8.5x11) $20.00/EA (11x17) $28.00/EA Bond Copies $0.40 /SF Color Plots $6.00/SF Writable CD's $10.00/EA Other Related Reimbursables Cost plus 10% po box 8922 greenville, sc 29604 o. 864 242 2033 f. 864 242 2034 mcmillanpazdansmith.com 1 1,I I I 11111 11PFW -41111.414, 11$1fr , ., • • • iii • , * AK lit IF IIIP lb i :',: • 1.,, • • . z ,. ,-. • - .:; • „ . .„ . •••, ,. •• • 4,* , • ..,.__ • *, _./ .... • ._, . • ...,, *,,. u * • • • • SbE'69 $ 996 g9Z'L $ EZ. 9666 $ LL $ 6 096 $ 8 ead Ie1 Ob6'Z$ 6aue6ulluoo aseyd uollonesuoo/asegd 6ulpplg 909'66 $ aed mg OZ9'Z$ eel luellnsuoo uo .noIJew %OL SEb'9L$ 681 909 $ LL LL SS $ 90b $ 6 £ $ Z 6 OLL $ 096 $ 8 9 OZL$ L uAlsap lewd 06L'b$ OS - $ 0 0 SS $ - $ 0 0 $ 1 L OLL $ - $ 0 0 06L $ 1 u61sac RJeulwlI0 d 099'9 $ 4S 099 $ 64 61 99 $ 069'1 $ 91 bL $ L l OLL $ - $ 0 0 OZl$ L 4omeseyw09epll8A l e :asegd 13 oE4 f x a x m x xm s a m x a G ; i; o = t$ z� I. s z �x i s m 1040.1 8 eel E , 1 K mei i. 8 ill 0 0 la - 1V1Ol sJnoH 11 ueloluyoal OOVO uosiad c-Aped A06 Iedlouud HMO Ja6eueyy loaloJd a 1:108V1 m 16401 0LOZ 'Zl AIN' a.npamply laaysvOM JOge1 'PPS uepzed uCII!N13Y.