RIGHTS OF WAY ENCROACHMENT GUIDELINES
Development Document #15
Augusta-Richmond County, Georgia
June 1999
."
RIGHTS OF WAY ENCROACHMENT GUIDELINES
I. Title.
This article will be known as the "Augusta, Georgia Rights of Way Encroachment
Guidelines." This article is a support document to Title 7-Chapter 3-Article 3
"Excavations" and Article 4 "Use of County Rights of Way"
II. Definitions.
A. Active Project - A utility activity that has been permitted that is within the time
period from the "Beginning ofW ork" until the expiration of the I8-month "Warranty
Period".
B. . Applicant - The individual or the agency he represents that has completed and signed
the "Application and Permit for Utility Facility Encroachment" Form.
C. Application and Permit for Utility Facility Encroachment - A form provided by the
Department of Public Works and Engineering that is to be filled out by the
"Applicant". Upon such time that the application is signed by the City Engineer the
application shall serve as the Permit.
D. Beginning of Work - The initial activity as part of an approved permit as determined
by the City Engineer.
E. City Engineer - The City Engineer shall include the City Engineer or one of his
designated representatives which includes, but is not limited to, the Utility Inspector.
F. Permit - The approved application form that is signed by the City Engineer.
G. Utility Company - Any eJltity installing a utility facility. This shall include all
subcontractors performing work for the Utility Company.
H. Utility Activity- Any activity conducted on a site that is in conjunction with an
approved permit. This can include utility locating, traffic control, erosion control,
etc.
1. Warranty Period - The period of time from the acceptance of completed permitted
work to the end of an I8-month period.
J. Working Day - This shall include any day, Monday through Friday, excluding
Augusta, Georgia holidays, from 8:30 a.m. to 5:00 p.m.
III. Exceptions
This article shall apply to any encroachment within City right of way undertaken by any
person except for the following:
A. Projects operating with an approved Site Plan. This does not include projects
operating with an approved Grading Permit.
B. Short side taps within an approved Subdivision Development.
C. Individual residential taps that do not require crossing or encroaching the roadway.
Multiple residential taps on the same street will require a permit.
D. Individual aerial service taps.
III. Requirements.
No encroachment or excavation shall begin within any public rights of way (street, road,
alley, lane or other public thoroughfare) of Augusta, Georgia until the following
requirements have been met:
A. Financial Security Proof: The applicant must provide proof of financial security in the
amount of three thousand dollars ($3,000) for one (1) to three (3) active projects, five
thousand dollars ($5,000) for four (4) to five (5) active projects, and ten thousand
dollars ($10,000) for six (6) or more active projects as approved by the City Engineer.
An "Active Project" is defined as one that is within the time period from the
beginning of work until the expiration of the I8-month warranty period. The
"Beginning of Work" is defined as the initial activity on the site as approved by the
City Engineer. The I8-month warranty period begins after final acceptance of the
permitted work.
The following three fonns of proof of a Financial Security are acceptable:
1. Letter of Escrow - A Letter of Escrow from a chartered state or national bank
or savings and loan institution which confirms an escrow deposit by the
contractor or applicant designating the City of Augusta, Georgia as the
obligee.
2. Letter of Credit - A Letter of Credit from a chartered state or national bank or
savings and loan institution which designates the City of August?, Georgia as
the obligee.
3. Permit Bond - A Permit Bond from an authorized bonding agency located
which designates the City of Augusta, Georgia as the obligee. The bond shall
have a continuous beginning date, and only the City Engineer can release the
bond.
2
B. Submittal Package Approval
1. Application and Permit for Utility Facility Encroachment - This form is
provided by the Department of Public Works and Engineering and shall be
completed by the applicant. The form shall be returned to the Department of
Public Works and Engineering for review. The application is not valid until
signed by the City Engineer at which time the application form will serve as the
permit. .
2. Plans - Two sets of plans shall be submitted to the City Engineer providing
the details regarding the proposed utility installation and/or repair. The plans
shall show the type, location, depth, etc. of the proposed activities, and the
plans shall include, but are not limited to, the location of existing utilities,
references in relation to existing edges of pavement and/or backs of curbs,
dimensions, rights of way, etc. The plans shall show any proposed road jack
or bore locations and details and any proposed traffic flow alterations such
as lane closures or detours. Approval ofthe application does not grant
approval of the proposed traffic flow alteration. That approval process is
discussed in "Section IV.A. Request for Traffic Flow Alteration" of this
article.
3. Verification of Financial Securities. Verification ofa financial security in an
adequate amount based on the number of active projects per Section A _
"Financial Security Proof' shall be provided with each application. If this is an
initial submission for an encroachment, the person signing the security and the
Utility application shall be the same.
C. Permit Validation - The permit shall be on site at all times in a weather protected
legible state. Failure to produce the permit shall be cause for an immediate stop work
order. All related special requirements as outlined on the back of the permit shall be
followed at all times. All permitted work shall begin within twelve (12) months of
the approval date.
Following submission of the Submittal Package as described herein, the Department of
Public Works and Engineering shall have a period of thirty (30) days to take action to
approve, to approve with conditions, or to disapprove the package. The applicant may
agree in writing to waive the thirty- (30) day take action period if the results of the action
would result in disapproval.
IV. Notification.
A. Request for Traffic Flow Alteration
1. Detours and Road Closures - A request for a detour shall be submitted, in writing,
to the City Engineer. Upon the determination by the City Engineer that a. detour
3
is required and no viable alternative is available, a detailed Traffic Control/Detour
Plan shall be received by the City Engineer two (2) weeks prior to the expected
date the detour is to begin. Written approval by the City Engineer will be
required prior to implementing any detour. After approval, public notification in
the form of press releases regarding the detour will be handled by the Department
of Public Works and Engineering.
1. Lane Closures - Approval for all lane closures shall be obtained from the City
Engineer. Lane closure requests shall be received by the City Engineer a
minimum of forty-eight (48) hours in advance of the expected date and time of the
lane closure. Any required public notification in the form of press releases would
be determined and handled by the Department of Public Works and Engineering.
In emergency or routine maintenance situations requiring short durations, as
defined in the MUTCD, a notification will not be necessary. However, whenever
practical, the Department of Public Works and Engineering should be notified.
B. Commencement of Work - The Department of Public Works and Engineering shall be
notified at least twenty four (24) hours prior to the beginning of any permitted
activity. A minimum of one (1) hour advance notice during regular working hours
(8:30 a.m. to 5 p.m., Monday - Friday, excluding Augusta, Georgia Holidays) shall
be given by the applicant prior to beginning any backfill operation or any concrete or
asphalt placement in any City roadway or in conjunction with any activity that by
improperly backfilling could cause a public safety hazard or create a maintenance
problem. Any backfill accomplished without this minimum one (1) hour advance
notice shall be removed in its entirety. The applicant must obtain permission from
the City Engineer before placing concrete or asphalt. This notification process does
not prohibit the applicant from backfilling or placing asphalt or concrete if the City
Engineer has been properly notified and is not on site within one hour.
C. Intermittent Notification Requirements - Anytime that the permitted work is to be
suspended for more than three (3) working days, the applicant shall contact the
Department of Public Works and Engineering a minimum of one (1) working day
prior to the suspension. The applicant shall contact the Department of Public Works
and Engineering a minimum of twenty-four (24) hours prior to beginning any
roadway jack and/or bore activities. This includes excavating the jack or bore pit.
D. Completion of Work - The applicant shall notify the Department of Public Works and
Engineering as soon as practical after completion of permitted work which shall be no
more than one (1) working day. The Department of Public Works and Engineering
shall have up to three (3) working days after notification of completion to inspect the
completed work. Upon acceptance of the permitted work, the I8-month warranty
period will commence.
E. Outside of Normal Working Hours - The cost of inspection by the City of Augusta,
Georgia before or after regular working hours, on Saturdays, Sundays, or Augusta,
Georgia Legal Holidays, shall be paid for by the applicant requiring the inspection at
4
a rate of 1-Y2 times the regular salary per hour of the inspector plus 7.65% for the
employer's FICNMedicare match. Approval for the inspection outside of normal
working hours shall be obtained from the City Engineer forty-eight (48) hours in
advance. Prior to the commencement of work requiring inspection outside of normal
working hours, the applicant shall sign a form which is furnished by the Department
of Public Works and Engineering agreeing to pay the overtime. The Department of
Public Works and Engineering will bill the Contractor for payment.
F. Damage to Property of Others - Any damage to City rights of way, existing utilities,
existing storm drainage systems, private property, etc. which occurs while working on
an active project shall be reported to the Department of Public Works and
, Engineering immediately. The applicant is responsible for the repair of any such
damage.
V. Construction. When any prOVlSlons of this article do not meet the mInImum
requirements of the Georgia Department of Transportation - Standard Specifications,
Current Edition, the Georgia Department of Transportation-Standard Specifications,
Current Edition controls.
A. Traffic Control- when any provisions of this section- of this article do not meet
the minimum requirements of the Manual of Uniform Traffic Control Devices
(MUTCD), Current Edition, or the Georgia Department of Transportation Standard
Specifications and Supplemental Specifications "Section 150- Traffic Control", the
MUTCD shall contro 1.
All work within City rights of way requires traffic control measures. Rights of way
includes but is not limited to all streets, roads, alleys, lanes, other public
thoroughfares, shoulders, easements, etc. No work shall begin within City rights of
way until the appropriate traffic control devices have been placed in accordance with
the minimum requirements. Alterations to traffic flow shall not commence unless all
notification requirements are met and all labor, materials, and equipment necessary
to make the alterations are available on the site.
There shall be one designated Contractor's representative capable of, and charged
with, the responsibility for traffic control on the site. This individual's traffic control
responsibilities shall have priority over all other assigned duties and responsibilities.
This individual shall have a copy of "Part VI. Standards and Guides For Traffic
Controls for Street and Highway Construction, Utility and Incident Maintenance
, Management Operations" of the MUTCD on the job site at all times. Copies may be
obtained from the Federal Government Printing Office:
Superintendent of Documents
u.,S. Printing Office
Washington, DC 20402-9325
Stock # 050-001-00290-6
5
When flaggers are required, the flaggers shall be state certified, and the flaggers must
have the State Certification Card on site at all times. Failure to produce the State.
Certification Card will result in an immediate stop work order until a state certified
flagger with an up-to-date State Certification Card can be designated to replace the
uncertified flagger.
B. Verification of Field Conditions - It is the Utility Company's representative or the
applicant's responsibility for locating and maintaining any existing utilities, and any
cost associated with the relocation of existing utilities shall be at the expense of the
Utility Company and/or the applicant. It is the applicant's responsibility to verify the
, limits of right of way, the location of existing utilities, and the location of existing
storm drainage systems prior to commencing work.
C. Road Cuts - All road cut excavations shall conform to the Augusta Utility Road Cut
Detail. This detail supercedes the Georgia Department of Transportation Standard
1401 - "Pavement Patching Detail".
1. Backfill - All backfill shall be compacted in lifts no more than eight (8) inches,
loose measure, spread and compacted uniformly. In all cases the backfill shall
be compacted to 95% ofthe maximum laboratory dry density, to within
twelve (12) inches of the top of subgrade. The top, twelve (12) inches of the
backfill shall be compacted to at least 100% of the maximum laboratory dry
density. The top of subgrade is that elevation located immediately beneath all
base and paving materials. The maximum laboratory dry density shall be
determined from the Standard Proctor Test. A mechanical compactor and
qualified operator shall be on site prior to beginning any excavations. The
mechanical compactor shall remain on site at all times during the backfilling
operation.
Backfilling with sand, using jetting and/or flooding to achieve compaction must
be approved by the City Engineer.
2. Concrete Cap - An eight (8) inch thick Portland Cement Concrete, Class "A" or
better, concrete cap, shall be placed twelve (12) inches wider, each side, than the
excavated trench/ditch. All edges shall be squared. All concrete shall be
protected for twenty-four (24) hours after placement and no asphalt shall be
placed during this period. Ifhigh early strength concrete is used, asphalt
patching within the twenty-four (24) hour period will be considered based on
early break cylinders obtq.ining a compressive strength of 3000 PSI. All costs
associated with verifying compressive strength shall be borne by the applicant.
3. Asphalt Patch - All edges of the existing asphalt shall be sawed vertically to
provide a clean, neat surface. Prior to placing the asphalt patch, the edges ofthe
existing asphalt shall be tacked in accordance with the Georgia Department of
Transportation Standard Specifications, Current Edition, "Section 413 _
6
Bituminous Tack Coat". The minimum thickness of the asphalt patch shall be
one and one half (1-Y2) inches after compaction. Unless otherwise directed by the
City Engineer, a mechanical spreader shall be used to place the asphalt for a
permanent patch. After placement of the asphalt and after proper rolling, the final
grade of the asphalt patch shall match the existing grade of the surrounding
pavement Hot Mix Asphaltic Concrete is required for permanent patches per
Georgia Department of Transportation Standard Specifications, Current Edition,
"Section 400 - Hot Mix Asphaltic Concrete Construction". Cold Mix Asphaltic
Concrete will be allowed for temporary patches per Georgia Department of
Transportation Standard Specifications, Current Edition, "Section 401 - Cold Mix
For Patching" at the discretion of the City Engineer.
4. Asphalt Overlay - AU utility road cuts require an asphalt overlay. The minimum
width shall be one full lane width. The minimum length is fifty feet which is a
minimum twenty-five (25) feet on each side of the center of the utility cut. In
certain unique circumstances the City Engineer may decrease the minimum fifty-
(50) feet length. The minimum thickness of the asphalt overlay is one (1) inch
after compaction. Overlay for diagonal and longitudinal cuts shall begin and end
a minimum of ten (10) feet beyond the cut extremities. Refer to the applicable
"Asphalt Overlay Detail". All asphaltic concrete shall be in accordance with
Georgia Department of Transportation Standard Specification, Current Edition,
"Section 400 - Hot Mix Asphaltic Concrete Construction".
D. Jack and/or Bore Method - No pavement will be cut for utility installation or repair
unless authorized by the City Engineer.
1. No jacks or bores are to be made in or near roadways using any type of
directional boring equipment or methods unless the contractor and the method
have been approved by the City Engineer.
2. Jacks or bores under the roadways where the diameter of the bore is greater than
two (2) inches in diameter than the utility being installed will require casings or
conduits. The outside diameter of the casings or conduits shall be no more than
two (2) inches s~aller than the diameter of the borehole. Casing material requires
the approval of the City Engineer.
3. Road jacks or bores shall have a minimum cover of forty-eight (48) inches. Road
jack and/or bore details and locations shall be shown on the plans that are
submitted with the permit request.
4. Jack or bore entrance and exit pits and set backs are to be a minimum of three
(3) feet from the edge of road or the back of curb.
5. All contaminated water shall be either contained on site or removed from the site.
There shall be no discharge of any contaminated water from the jack or bore
operation into the municipal separate storm water system per "Title 5 - Utilities"
7
and "Title 7 - Article 5 - Soil Erosion and Sediment Control" of the Municipal
Code.
E. Utility Corridor - All utilities including water and sewer shall install their respective
utility facility in accordance with the following:
1. The width of the utility corridor is 9'-6" from the back of curb or the edge of
pavement. If the right-of-way is less than fifty (50) feet, or the utility corridor is
less than nine 9'-6", or if a utility has to encroach on any other utility, a
coordination meeting with the involved utility companies and the City Engineer is
required. '
2. The following depths and distances from the back of curb or edge of pavement
shall be adhered to:
Utility
CATV
GAS
PHONE
POWER
WATER
Depth
I' - 6"
3' - 0"
2' - 0"
3' - 0"
4' - 0"
Distance
2' - 6"
4' - 4" (Opposite Side of Water)
6' - 2"
8' - 0"
4' - 4" (Opposite Side of Gas)
A tolerance of six (6) inches horizontally from either side will be readily
accepted. However, the' vertical tolerance will only allow the utility to be
installed deeper than the above-designated depth. The depth is measured to the
top of the facility.
3. Whenever possible, water mains shall be installed on the North or East Side, and
gas mains shall be installed on the opposite side from the water mains.
4. In subdivisions where a ditch section is utilized, a coordination meeting may be
necessary to clarify the utility corridor.
5. Reference can be made to the "Utility Corridor Detail" for additional information.
F. General
1. At no time shall material be placed in curb or gutter lines. Material may be
placed on roadways only when an approved lane closure is in place, and the
material shall be removed in its entirety at the end of the working day and
prior to removing the lane closure. This includes, but is not limited to, excavated
soil or construction materials.
2. Every effort to prevent damage to asphalt, concrete or soil surfaces by equipment
outriggers, buckets, tracks, tires, etc. and/or associated equipment fluids such as
diesel fuel or hydraulic fluid shall be made at all times. The repairs of this
8
damage is the responsibility of the applicant.
3. The maximum length of an open trench is 150 linear feet unless approved by the
City Engineer. All pits, trenches or cuts that when left unbackfilled create a
safety hazard shall be backfilled daily. Temporary backfilling procedures for
safety reasons will be considered at the discretion of the City Engineer. Steel
plating of roadway trenches will be considered at the discretion of the City
Engineer.
4. The Utility Protection" Center (OPC) Georgia State Dig Law, commonly referred
to as the "Georgia One Call System" shall be adhered to at all times.
5. Grassing, mulching and the implementation of Best Management Practices
(BMP's) for the control of erosion and sediment shall be done in accordance with
the "Manual for Soil Erosion and Sedimentation Control in Georgia", Current
Edition.
6. All blasting shall be conducted in accordance with the Georgia Blasting Standard
Act, Current Edition and the Georgia Department of Transportation-Standard
Specifications, Current Edition, "Section 107.12- Use of Explosives".
7. Utility installation within longitudinal drainage ditch lines shall not be allowed
unless approved by the City Engineer. If approved, a minimum cover of forty-
eight (48) inches below the lowest point of the drainage ditch line will be
required. Sanitary sewer line depths will be dictated by design requirements.
8. In wet areas where excavations for utility installations are conducted, Type II
Foundation Backfill Material (#57 Stone) will be required as directed by the City
Engineer.
9. All backfill in trench construction shall be compacted in lifts no more eight (8)
inches, loose measured, spread and compacted uniformly. The backfill shall be
compacted to 95% of the Maximum Laboratory Dry Density of the existing soil.
The Maximum Laboratory Dry Density shall be determined from the Standard
Proctor Test. Compaction efforts shall be conducted by mechanical means. A
mechanical compactor and qualified operator shall be on site prior to beginning
any excavations. The mechanical compactor shall remain on site at all times
during the backfilling operation.
10. All trenches and backfilled material shall be left in a condition such that surface
runoff water will adequately drain and not collect.
11. Plowing to install utilities will be allowed but must be approved by the City
Engineer.
9
. 12. Whenever applicable and possible, joint trenches to install utilities are
recommended.
13. A representative from any utility company within an approved subdivision shall
be at the designated preconstruction conference.
VI. Warranty Period
The Utility Company and/or applicant shall agree to an 18-month warranty period which
commences at the acceptance of the permitted work. During the I8-month warranty period the
Utility Company and/or applicant is responsible for correcting any deficiencies which are related
to soil erosion control, backfill settlement, structure and mechanical failures, etc. Upon
notification of a deficiency requiring correction, the Utility Company and/or applicant shall have
three (3) calendar days to correct the deficiency unless approved by the City Engineer. Any
deficiency creating a public safety hazard shall be corrected immediately.
In the event that the Utility Company and/or applicant fails to repair the deficiency in the
designated time frame, the Utility Company and/or applicant shall agree to be responsible to the
City of Augusta, Georgia for payment in full of the costs associated. with repairing the
deficiency. This may include, but is not limited to, the forfeiture of any previously approved
financial securities.
VII. Failure to Complete Work.
In the event the Utility Company and/or applicant fails to complete the permitted work in a
satisfactory manner, the Utility Company and/or applicant shall agree to be responsible to the
City of Augusta, Georgia for payment "in the amount of twice" the costs associated with
completing or repairing the deficiency. This can include, but is not limited to, the forfeiture of
any previously approved financial securities.
VIII. Emergency Permits.
Emergency permits may be. obtained from the City Engineer, by telephone and must be verified
in writing within twenty-four (24) hours, or the next working day, by the Utility Company and/or
applicant. All requirements contained herein shall apply to emergency permits as deemed
feasible by the City Engineer.
IX. Article Update
These guidelines are to be reviewed and updated if necessary on a yearly basis by the Utilities
Subcommittee of the Subdivision Review Committee. The review will be tentatively scheduled
in June of each year beginning in June 2000.
10
x. Appendix.
A. Utility Road Cut Detail
B. Utility Corridor Detail
C. Asphalt Overlay Details
11
Utility Road Cut Detail
>:i:!:!J~0>
""]",~~~sg
iT! s:::::u:r:
::U!i;NC~>
O~01S:::-<Cj
Os:::- .
s:::c M 0
~~~Z:i:!~
OO-l~"'f!2
:j~0 s:::>
~:i:!ZVlZ-<
. ",~~ I
~f)F~>
:r:CD F
:r(/)",~c
"'6-.,0::1
>"'=Tj:i:!c
~~~Vl~
:r: :r:
>:r~>~
Cj",.eF>
o 0"" OJ 0
~",,,,,,,o
::uz~oc
);m~ffltri
-< --~
Vloo....F
:I:"TJ:I:-
>:i:!Uj);:::O
F", z'"
OJ >",g
"'~S:::~::ij
oczo'"
z",~~:r>
c Z
-os:::>>
-c z
--j~OVl
-. \l
Z :r:
o z:i:!>
:r: ~"'Cj
OVlO>\l;;18z00
~~g~~~C)('));g
\l"'zsa:r:(')Z"'~VlO
:::0 O>"'-j(/)(/)Vl;o
",C)",rO-<(/) .'"
~ :I! ::u", -j 0 "TJ :r: ~ ~ ~
- "'Oco>o
~Oo>::ucr",oo
"TJOJ-Iz::ur;a;o>
Vl<..l>~C)_OJ \l
,...-tOVl- 1\)"'''' OJ ,
;oo"'Z-l~ >",
"'00C):r:-(/)0~
z - D:r: >
C)\lO~Vl:r:C z
:r~z--i-og>~. ",
",:r:"';o::tloo-
(/) >z22(/)"'!"1oC)
:r:>::u 0 !=' z:r:
>Fr:I!!='~>:ro~
F -<", ~F>~CD
OJgOJ 'Ti;o zM':'
",(/)~;:I 0-1 Z
-I>r:;a;\lo:r:(')(')
OJ (/)"zC));Z"'>:r:
~>O~:r:o~",:O-l
(/) "''''x:r:
ffl(/)~"TJ~r-;(')(/);;:;:
o o:::o"''''>:r:"
OJ06CrZ(/)<>"
-<>",;o-<-I:r:>F\l
:ra~N~~FaOJ~
", o.:t.Rlo "';::l
>~CD:r:zz~;d\l>
~:2~g~0\l~~6
r<~::u >::U~"'o
O"'Z o(/)o'do",
>;oC)\lO-o-l s:::
z- ", :r:/'T1 ;:I",
;-i~>22~~~~~z
z(")o::U-lI""I:r:r-i
C)oo",(/)o. r;;(')
3:~rTt:r:"TJ 0
\l >O>_Z
::uF-.::UF-o
", (/)F 1\);0
(/) "'1""1
(/)OJcCIJ -l
_"'(/)1""1 1""1
~ ~ .
:I!g~~>
"'3:~:::O~
",\lS:::::l:r:
X>c(")>
-(")s:::>r
(/)::1 F-l
ggg-<"'O
C). "'0-1>
~ :r0~
:r \l
~"'~~I
1""I:!J-lS>
oz:r:or
"TJUj",,,,r
:r:r:>>",
",~~(')~
(/)>>M(/)
COr>
;o"'-lZO
::u ."TJ
g~~ffl:I!
6:rd>'"
_",:r:-l",
Z (/)x
C)>~cUj
>~>~::l
~:r:F>5
:r:> 0
>rCD"'>
r-l",>(/)
-I"'O~z\l
>>::!:o:r:
-"cio-l~
M:r:->-I
;o(/)~(")(/)
":r:
\l:I:-",>
::u > z(") 0 F
OF .
\l :r:
~~{ri:r~
:::O-l>"'(/)
0(')""] >
E::tiT! ~
z ;0 0
P
TRENCH r<>
::;l'"
~~
-(/)
(')::1
>z
rC)
"'C)
>;0
(')>
:r:o
(/)",
60
"'"TJ
>
(/)
\l
::t
>
r
-l
D[JI~I~
1""1 1""1 U) 0 > >
x X 1""1 0 U) U)
Uj en r Z "'0 \l
::I ::I ~ 0 :r: :r:
z z -j ~ ~ ~
C) C') CIJ rTt -l -l
CIJ > > \l 0
f) ~ ~ 0 > ~
" :r: :!J ~ d ;0
:!J ~ F :r: );
F -l s::: -<
o >
;0 M
CIJ ;0
> -
(/) >
1""1 r
3::
>
M
22
>
r
,.,.
II!
c:~
::l~
CE
~f
;ll
~g
=<~
+I'l
!')Q
~j
~
-lZ(")(/)>:i:!(")~);z~~
OO~~F",~CIJOJ>~o
~()"'OFOJ-I"'O~~F-I~
,,>> >0> > _-'-'
~~9OJ(/)"'O~~-I()CDF
,., aJ'TI'" "'p10>'"
;;;~:::OO>~O ~~z'
gF~~6~0:roU)~F
3::~~~\lCD>"'~:r{ri
-o()~_>C)-I-I 1""1' OJ
> zS;o 00 r>
g9~85~M"'O~~g~
oE J'TI>;:I(/)(')(/)-"
~z~;BS:::Uj~~:J9"'F
C') 0> r' F3::
ffl...:~S:::M:rO;;;-l ",~
:::1-1 :::0 0 0(/)>>
>:2J'T1:i:!>~~-::- :r:~F
F "'O",r Ol\)~>;o
o U) 22 (/) !'l p:1 "TJ '" :r F ,'" CIJ
~>O-l ", -- ",
rr1Z;o>:r<-lZZCIJ(/)
00 z >::to "'\l(')
. '-lo",::If'Tl::t;:l ;00
co> 03:~r:;g"'3:
saCIJ:::OS:::z> rs:::~~
z",o>r~O~\l ()
C')9"'O~03:"TJ >>--1
~z:::o~(,)c-l-(,)z8
"'~os:::>S:::::t;:;Mo
~z(') Mr"''''o()z
zC)(3ro>CD- 0
C')>;o6;-CIJo>~03:C
Z 03: (")::t "'0-"
>-<M::03:~,,,,,co>i:ri
:z .(/)>'" :!J(/)c.nC">
~"';-i-iS2dF ~MZ
o~ ~>;o ~ooo
;o>>-<M-<~ ""cs:::
< ro>:r--fZO
~~s:::~-<;oF",::t:;;;o
00"'-<r:D-< "'0'"
~~~o~g~(3S:::~:r
z. >",,,,z "'0>;=>
C') ~z>(/) o~-<z
- (") (/) --I =i "TJ s::: .
z>-:r:-< c
r~. s:::
zc
O-f
-; -
-;'
0---1
(J)-<
()
>;0
~O
)>
o
o
C
---1
o
rrl
---1
)>
r
Oi,
01 ~ <..l I\) ~rg
d~~ gi~ g;d~ ~~ f6;B~> ~
;o~F c,,~ ~~U) 9'" !:ti6;o~ .
cs:::~ Z ,." (/)0 z> >>2Sz
:::100 ~(/)-I :;"'0'" ~\l ::I-<z~
cZ;o (3) O~;o\l O(/)C')c
::10" "'zz;o ;0;= C z::t::t3:
", "'''' -I C1J() >0
(/) g U) ~'" > > (/) ", > 0 F c 0
c:r: z.,;:(/) ::Ic dZ;o ;oZ
oz;!: "':0,' o"'O;o-l OJ(J)I""I
eJ~1- ~F::;l z~"'s::: ~"'_-::-
Z r:D' CIJ =tl ~ (') "'0 C -< C') ~'"
>221""1 ",J'TI >8);~ ()~<..l::t
~~z ::0=0 Z", (')0 oZ~o
", (/) - z . c
;1~> Dd ~-l 5~ ~"'O?;o
10 f;c o:r: >",22 >
og;oz ", Oz -1000
"TJ::tl "'0 ~C') 0 1""I::tl <
10 0> 01""1 Z"'O 0 01>
~~ >g ....0 ~~ ::tlOo~
-< 0 (J) Z I ~ ", ~ > C1J-8 1""1
",1""1 QCIJ .> M(J) (/)",. Z
Z ::tl> \l ~ \l~30
() ~ ", () > g ~ ZO :r:> Z'-::I
;0:2 0" S"'O ,....Z' ()
~ M:!J 3:> >.." -IZS:::J'TI
():2 OF ~;o~;o -oC')oo
~J'TI ~s::: -I~ ~~ ~~6~
~> -l~ "'O~!:i-l 3::-<=<~
-lc ::t/'T1 >-I.:r: I""ICIJ
C') ",22 dO ", z>:2;o
c >:r:"" () ;-i();o~
(J) ,.... z 0 "ce:
);! C')' ~ :!J >
J ~ F ;0
Utility Corridor Detail
----
g
~
~
~
en
-i
\a
o
M
l'1,
I
0>
.
-
U!,
I
0>
.
tn
O.
I
o
.
~
z
Sl
x
o
~
~
!!l
!a
o
M
-
U!,
I
0>
.
l'1,
I
0>
.
SS CLEAN OUT
(DEPTH VARIES)
POWER ~ 3'-0.
PHONE ~ 2'-0.
~ GAS _ 3'-0.
I ....
0 0>
. . CATV "-8"
~ .,.,
. I ....
~ ~
I
0>
.
~
0;1
ltl2
~2
'0
I~
(I)~
.Z
~
if
-7-- -
.,.... en
O~
ltl_
~i
~-<
-I'l
g~ ~~
. :2
'0
I~
O>~
.z
~
if
~
...
-
N
~ ~ "-8.
I .
.,.
CJ!, . CATV
I
Ql ~ 4'-0"
J"
0 WATER"'"
.
t 2'-0.
PHONE -v
~ 3'-0.
'POWER v
SS CLEANOUT
(DEPTH VARIES' -
~ "tl "tl C
0 :J: G") C') :::j
M ~ 0 )> )> C
z en '< ~
;tl :::0 /TJ
~ ~ ~ ~ ..... 0
f I I I J rTJ
"'U
0 0 0 0 Q) ~
. . . . .
~ ~
J I
~
~ .
.
......
...... 0
0 "tl
"tl "tl 52
"tl CX!. ~ 0
0 !a ~ (/)
!a J I iT! I ~
iT! 0 I'V Q) Z
en . . ~ . (')
5 0 rTJ
/TJ
/TJ
0
0 .."
.."
C) ~
)> M
en
......, :::0
........
zc
0---1
-i _
-fl
0---1
<.11-<
()
>0
MO
;a
;a
o
o
;a
o
fTl
---f
)>
I
rf')
0) C.1l ~ ~ I\J.....~
<Z~ /TJ)>.~ ~enz~ 00-4<3!:::::l~ /TJZC""'"'lCU;/TJu;~ ~ :
>U))> z F o:I:o> ..,,/TJOfTI,'^' z<-4:J:::1 0 :I: I ,
:3!-4~ C')~ /TJ)>:::O;:;:j "tlCD:::O,O--i QoE/TJcI~co/TJ I
~~;;! ~c~ "F~:::o ~~/TJ~CD3::?2 ffl!<-fC=<~ ,';; S
. I > en 0 :::0 /TJ en > /TJ /TJ /TJ I'T1 .:< ::1 en 0 0) 0 '-J
[3~ Q~~ ~ffl~~ ~;'~I:::o~~ ~O)>~8~~ .~ ~
en 3: I - - Z-4-4/TJ/TJz -c -<:::O:I: ;a /TJ
)>/TJ /TJ:::O~ "'"""lZ/TJ~ Qo)>o>:::oC') en~C') :::0>)>00 en
-4~ zC').... :I:en)> C ,'0 /TJ :::OIO:I:-Z~3!::"
~:::o ~~F ;~~~ ;<~8~~~~ 8~~G;~~~-l~ ~
/TJ...... 0 0 )> I en )> Z )> /TJ C - -i -I Z :I: /TJ F
CD en :::0 ~ ffl -4 [3 5 F og ~ C') o!a ;0 8 ~ 0 Vi -< :-t /TJ
>U) ....., /TJ /TJ /TJIO,C').."X /TJ coO _
'-' c -:::0 lD "tl /TJ /TJ 03: ::1 /TJ I""'"' "Z
~ C')~ g Z 3!:: ~ ~ /TJ ~ ~ ~ ~ ~~ . ~ ~ ~ ~.8 :;; f) -I f2
oM -c>)> Oz _:::O'/TJ/TJ_ ~ :::oen ~^:I: C
..,,~ ffl~g z~G")U) en~o~oz ~~~-4~/TJ0/TJ g
-4 en -< 0 U) > -I 3: Z /TJ C') /TJ C') :J: /TJ " C
~ g o:::o;:Q . 0 U) ~ /TJ ~ -<' :I: !a ~ >z z=l :J: ~.-4 ::2 C') f2 ~
I" -4 :::0 -....., "tl I )> 0 G") en G') C _' ..-
:::oen 52~~ ~~a ~~~~~:I: oG")~~~~~=< M
~~ ~fg ~~~ a:~~8~ ~~~~~~~g:
I C')O;; /TJ<;. N o' /TJ I :::0 Z
.g I "'1" ~ ~ d ~ ~ ~ 52 ~ 8 ~ ~ 0 :E ~ ~ 0
~ CD . :e /TJ z /TJ /TJ ~ -4 C /TJ /TJ :::0 )> /TJ oen
:J: /TJ > -4 -4 )> )> )> Z :::0 - -< :::0 /TJ
-<:I: :I:-4C ZI -I"" ~
/TJ /TJ1'T1::j C')~ -< :::0
-4OE /TJ .
S6 =<
Asphalt Overlay Details
NO~
. .
THE OVERLAY SHALL BE 50' IN LENGTH OR 10' BEYOND
EACH CUT EXTREMITY WHICHEVER IS GREATER.
I-
Z
W
~
W
>
<(
c..
lL..
o
W
'-'
Cl
w
a::
o
w
Z
-J
END OVERLAY
>-
1-1-
:::)-
()~
. 0:::
01-
.......x
W
BEGIN OVERLAY
1_ MIN. WIDTH _I
ONE LANE WIDTH
DIAGONAL ROAD CUT
NOT TO SCALE
>-
I- I-
:::)-
()~
. 0:::
01-
.......x
W
I-
Z
w
~
w
>
<(
c..
lL..
o
W
.. '-'
Cl
w
a::
o
w
z
:::i
w
z
<(
-J
.
o
ll)
II
:r:
I-
'-'
Z
W
-J
z
~
I--
Z
W
~
W
>
~
a..
u..
o
,
,
w "
e""
a \.
w '
"
,
c::: '
o
w
z
:J
w
z
~
....J
NOTE '
THE OVERLAY SHALL BE 50' IN LENGTH OR 10', BEYOND
EACH CUT EXTREMITY WHICHEVER IS GREATER.
END OVERLAY
>-
1-1-
::)-
u~
- ~
01-
"'"""x
W
/
/
/
/
/
/
/
/
"
,
, "
,
,
,
"0
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
/b
I'
/
/
/
/
/
/
/
/
I--
Z
W
~
W
>
<(
0..
u..
o
W
e"
a
w
c:::
o
w
z
:J
w
z
<(
....J
o
I.{')
II
:r:
I--
e"
Z
W
....J
z
~
~I
LONGITUDINAL ROAD CUTS
NOT TO SCALE
/
/ >-
1-1-
::>-
u~
- ~
01-
"'"""x
W
BEGIN OVERLAY
I..
MIN. WIDTH
ONE LANE WIDTH
-----------.------------------
I--
Z
W
~
W
>
~
0..
u..
o
W
e"
a
w
c:::
o
w
z
:J
w
z
<(
....J
END OVERLAY
>-
I- I-
::>-
u~
- ~
01-
...--X
W
/
./
./
./
./
./
././
./
./
./
/
/
/
/
/
o'/~
/ Z
./ W
/ ~
W
>
<(
0..
u..
o
W
e"
a
w
c:::
o
w
z
:J
w
z
<(
....J
.-1
--------.----.----.--.---__0.... _.._.._.___._ _p _. ... _ .._.___.. _.. ___.______._.. _
>-
1-1-
::>~
Uw
~
01-
...--x
W
BEGIN OVERLAY
I~
MIN. WIDTH
ONE LANE WIDTH