HomeMy WebLinkAboutON CALL FIELD & LAB TESTING FOR NORTH LEG ROAD IMPROVEMENTS TO ATC ASSOCIATES_ SUPPLEMENTAL AGREEMENT NO. 1 AUGUSTA-RICHMOND COUNTY AUGUSTA, GA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT Augusta Richmond County Project Number(s): 235-041110 Supplemental Agreement Number: 1 Purchase Order Number: P355581 WHEREAS, We, "ATC Associates" Consultant, entered into a contract with Augusta-Richmond County on "December 6, 2016", for the "On Call Field & Lab Testing for North Leg Road Improvements", Project No. 235-041110- File Reference No. 14-014 (A), and WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Additional Engineering Services to perform Material testing and construction observations It is agreed that as a result of the above described modification the contract amount is increased by $71,500.00 from $72,500.00 to a new total of$144,000.00. Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, "ATC Associates", Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. RECOMMEND FOR APPROVAL: i CITY OF AUGUSTA-RICHMOND COUNTY ATC A sociates AUG U yT-AT G Ec5 v Honorab •"-; -avis,Jr r Jeffrey / 'mold, `E, B�h M•` tiger „Pm 6 0p 10 'pproietf�Oa ��� - -x `�-•� Approved: D‘te (o I Ltfro I : i 4 r , " ,' I [ATTACHED CORPORATE SEAL] e„o 0,al f. (144 d IL e i I r, ATTEST: l�,�1V�1 Ate.�'� f if :� dtka,,,,,u- y,, ��°�»�••sp i r 1----,:;'11'""4., ELAINE TETRAULT Pie° '% Notary Public, Georgia w C . .� Title: t t . h,.�,a� ,v .e Count4'4y v P 'p'R x,��,a a. - • i.-,„,„:,,:,,,,,,,,,f Poly om iissio"nn Expires 3 I ' ,%''• -.V5k l� '(SA02—For changes more than$20,000) m . f ATC ENVIRONMENTAL• GEOTECHNICAL BUILDING SCIENCES • MATERIALS TESTING May 30, 2019 Anthony Taylor Augusta Engineering Department 452 Walker Street Augusta, Georgia 30901 Subject: ARC On-Call Contract 14-014(A) Supplemental Increase ATC Project#ARC0660021 North Leg Road/C.R. 371 Improvements PO P355581 Dear Mr. Taylor: ATC is respectfully providing this supplemental increase request, in the amount $71,500.00 to perform materials testing and construction observations for the referenced project. This amount was conservatively estimated based on previous effort to complete ATC scope of services on unit rate basis, for an additional 9 months, targeting a completion date around February 2020, according to recent contractor expectations. ATC staff will be "On Call" in the event services are required and will continue to monitor and track quantities as well as provide testing services throughout the duration of the project. The above estimate may be more or less and will be based on contractor's construction schedule and logistics to complete the project. Fees will be applied in accordance with "On Call Field and Laboratory Testing for Soil, Construction Materials, Geotechnical Inspections and Investigations" contract 14-014(A), awarded November 18, 2014. If you have any questions please feel free to contact us. Y' Bertrand Tyler Wilson Operations Manager Attachments: Unit Rate Fee Schedule and Estimate Cc: Dr. Hameed Malik, P.E. Valerie Jenkins Lisa Walker 1453 Greene Street, Suite A Augusta, GA 30901 0: 706-722-3310 F: 706-722-3370 MATCGroup5ervices.com latiTC 1453 Greene Street,Suite A ENVIRONMENTAL•GEOTECHNICAL Augusta,GA 30901 BUILDING SCIENCES•MATERIALS TESTING www.atcassociates.com p:706.722.3310 f:706.722.3370 EXHIBIT I SCOPE OF WORK AND COST ESTIMATE FOR MATERIALS TESTING SERVICES NORTH LEG ROAD/C.R.371 IMPROVEMENTS ATC PROPOSAL NO.: 10158-19-1556 Trips/ Hrs per UNIT SERVICE DESCRIPTION . Units Trip UNIT.. COST COST. 1.0 SOIL AND EARTHWORK TESTING: • Engineering Technician monitoring structural fill 50 4 hour $55.00 $11,000.00 placement and backfill. • Sieve Analysis (ASTM D422) 0 test $60.00 $0.00 • Standard Proctor(ASTM D698) 0 test $100.00 $0.00 • Modified Proctor(ASTM D1557) 0 test $105.00 $0.00 • Atterberg Limits(ASTM D4318) 0 test $75.00 $0.00 Subtotal: $11,000.00 2.0 Site Inspections and Construction Observations: • Senior Engineering Technician to document construction 180 4 hour $65.00 $46,800.00 activities Subtotal: $46,800.00 3.0 CONCRETE TESTING: • Concrete Technician to sample and test concrete 12 4 hour $55.00 $2,640.00 (includes temperature, slump, air and unit weight) • Concrete Cylinder Compressive Strength(ASTM C39) 50 cyl. $10.00 $500.00 4"x 8"specimens • Concrete cylinder pick-up 25 0 hour $55.00 $0.00 Subtotal: $3,140.00 4.0 PAVEMENT EVALUATION: • Asphalt Technician 5 8 hour $65.00 $2,600.00 • Stone Proctor(ASTM D1557) 0 test $120.00 $0.00 • Asphalt Cores 10 test $25.00 $250.00 Subtotal: $2,850.00 2 1453 Greene Street,Suite A ENVIRONMENTAL•GEOTECHNICAL Augusta,GA 30901 BUILDING SCIENCES•MATERIALS TESTING www.atcassociates.com p:706.722.3310 f:706.722.3370 Proposal No. 10158-19-1556 Trips l Hrs per 'UNIT SERVICE DESCRIPTION,' , Units ,:.Trip UNIT COST COST 5.0 NPDES INSPECTIONS: • GSWCC qualified person to perform weekly and rain event 0 0 hour $65.00 $0.00 inspections. • Turbidity Tests 7 each $30.00 $210.00 Subtotal: $210.00 6.0 PROJECT MANAGEMENT: • Senior Geotechnical Engineer 0 hour $105.00 $0.00 • Project Engineer 100 hour $75.00 $7,500.00 Subtotal: $7,500.00 Proposal No. 10158-19-1556 SUMMARY 1_0 SOIL AND EARTHWORK TESTING $11,000.00 2_0 Site Inspections and Construction Observations' $46,800.00 3_0 CONCRETE TESTING- $3,140.00 4_0 PAVEMENT EVALUATION $2,850.00 5_0 NPDES INSPECTIONS- $210.00 6_0 PROJECT MANAGEMENT- $7,500.00 GRAND TOTAL: $71,500.00 The above budget estimate was prepared based upon the best available preliminary information. Services required beyond the Scope of Work listed will result in additional costs in accordance with Contract 14-014(A). We have assumed a 5 day per week work schedule with no overtime. The actual cost for our services will be based on the enclosed unit fee schedule. The hourly rates are portal to portal. Overtime rates will be applicable for services performed outside normal working hours and billed in accordance with contracted unit rates. 3