Loading...
HomeMy WebLinkAboutCONTRACT BETWEEN AUGUSTA, GEORGIA AND ALL SOUTH SIDING, WINDOW & ROOFING FOR INDUSTRIAL ELASTOMERIC METAL ROOF COATING SYSTEM FOR HANGAR ONE CONTRACT FOR BID ITEM #18-261A INDUSTRIAL ELASTOMERIC METAL ROOF COATING SYSTEM FOR HANGAR ONE AUGUSTA, GEORGIA FOR THE AUGUSTA REGIONAL AIRPORT This Contract for Bid Item #18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One (hereinafter designated as the "Contract") made and entered into as of this 51 day of pi/t2018, by and between the Augusta Aviation Commission for the Augusta Regional Airport, (hereinafter designated as "Airport") and All South Siding, Window & Roofing, Co. (hereinafter designated "Contractor"), a company authorized to do business in the State of Georgia, whose address is 514 Georgia Avenue, North Augusta, South Carolina 29841. WITNESSETH: WHEREAS, the City of Augusta (the City) is the owner and operator of a full service commercial airport known as the Augusta Regional Airport at Bush Field(the Airport); WHEREAS, the City solicited bids for a contractor to provide an Industrial Elastomeric Metal Roof Coating System for Hangar One at the Airport;and WHEREAS, Contractor provided a bid in compliance with City ordinances and all other applicable state and federal regulations. NOW,THEREFORE, in consideration of the mutual covenants, promises, and agreements herein contained,the Airport and Contractor hereby agree as follows: OBJECTIVES OF SERVICES The objective of contracting the services described in this Contract is the provision of an Industrial Elastomeric Metal Roof Coating System for Hangar One in accordance with the specifications set forth herein. The Airport is a full-service, non-hub commercial airport serving more than 550,000 passengers annually (2015&16) with daily flights to both Atlanta and Charlotte on Delta Air Lines and American Airlines respectively. The facilities are operated twenty-four (24) hours/day, seven (7) days/week and three hundred sixty-five days per year. The work involves the application of an Industrial Elastomeric Metal Roof Coating System for Hangar One. SECTION 1.0 ARTICLE 1 SCOPE OF WORK 1.1 The term "Work" means the construction, labor, materials, equipment, tools, machinery, testing, temporary services and utilities, supervision, administration, coordination, planning, insurance, transportation, security, and all other services and things necessary to provide the Airport with the facilities, improvements,features, and functions described in the Specifications identified in Attachment A. The Specifications are hereby incorporated into and made a part of this Contract. The Contractor agrees to complete the Work in a good, firm, substantial and workmanlike manner in strict conformity with this Contract. 1.2 Additionally, the following specific items shall be considered a part of the Contract Documents by reference when appropriately executed. 1.2.1 The Certificate of Insurance Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 2 of 32 r 1.2.4 The Contractor's completed Bid Form dated November 2, 2018 1.2.5 The Contractor's statement of qualifications 1.2.6 All required submittals 1.3 Unless otherwise modified by a written and properly executed Change Order, the Contractor shall furnish all of the Work in accordance with the Contract and all incidental work necessary to complete the Project in an acceptable manner, ready for use, occupancy, or operation by the Airport. The Contractor shall be responsible for the entire Work and every part thereof. ARTICLE 2 TIME,TERM AND PAYMENT 2.1 Contract Time. The Contractor shall commence the Work under this Contract within ten (10) calendar days from the date of receiving the Notice to Proceed, as evidenced by official receipt of certified mail or acknowledgment of personal delivery and shall fully complete the Work within thirty (30) calendar days from receiving such Notice to Proceed. The Contract Time may be extended only by Change Order approved and executed by the Aviation Commission and the Contractor in accordance with the terms of this Contract. 2.2 Contract Price. As full payment for the faithful performance of this Contract, the County shall pay the Contractor the Contract Price, which is an amount not to exceed the amount of $64,579.00 unless changed by written Change Order in accordance with the terms of this Contract. Any increase of the Contract Price shall be by Change Order adopted and approved by the Aviation Commission, the City and the Contractor in accordance with the terms of this Contract. 2.3 Invoices. Original invoice(s)must be submitted as follows: Augusta Regional Airport 1501 Aviation Way Augusta, GA 30906 Attn: Risa Bingham Ph.: (706)798-3136 FAX: (706)798-1551 ARTICLE 3 FEDERAL WORK AUTHORIZATION Pursuant to O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10-1-.02, the City cannot enter a Contract for the physical performance of services unless the Contractor and its Subcontractors register and participate in the Federal Work Authorization Program to verify specific information on all new employees. 3.1 Contractor certifies that it has complied and will continue to comply with O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10-1-.02. 3.2 Contractor has executed an affidavit evidencing its compliance with O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10-1-.02. The signed affidavit is attached to this Contract as Attachment B. 3.3 Contractor agrees that in the event that it employs or contracts with any Subcontractor(s) in connection with this Contract, Contractor will secure from each Subcontractor an affidavit that indicates the employee-number category applicable to that Subcontractor and certifies the Subcontractor's current and continuing compliance with O.C.G.A. §13-10-91 and Georgia Department of Labor Rule 300-10-1-.02. Any signed Subcontractor affidavit(s) obtained in connection with this Contract shall be attached hereto as Attachment B. Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 3 of 32 ARTICLE 4 CORPORATE AUTHORITY Contractor has executed a Certificate of Corporate Authority attached hereto as Attachment B. The officials of the Contractor executing this Contract are duly and properly in office and are fully authorized and empowered to execute the same for and on behalf of the Contractor. Contractor has all requisite power and authority to enter into and perform its obligations under this Contract. The execution and delivery by the Contractor of this Contract and the compliance by the Contractor with all of the provisions of this Contract (i)is within the purposes, powers, and authority of the Contractor; (ii) has been done in full compliance with applicable law and has been approved by the governing body of the Contractor and is legal and will not conflict with or constitute on the part of the Contractor a violation of or a breach of or a default under any indenture, mortgage, security deed, pledge, note, lease, loan, or installment sale agreement, Contract, or other agreement or instrument to which the Contractor is a party or by which the Contractor is otherwise subject or bound, or any license, judgment, decree, law, statute, order, writ, injunction, demand, rule, or regulation of any court or governmental agency or body having jurisdiction over the Contractor; and (iii) has been duly authorized by all necessary action on the part of the Contractor. This Contract is the valid, legal, binding and enforceable obligation of the Contractor. ARTICLE 5 INDEPENDENT CONTRACTOR Contractor is acting, in performance of this Contract, as an independent Contractor. Personnel supplied by the Contractor or its agents or subcontractors hereunder are not the City's or the Aviation Commission's employees, or agents and Contractor assumes full responsibility for their acts. Contractor shall be solely responsible for the payment of compensation to its employees and subcontractors. The City shall not be responsible for payment of Worker's Compensation, disability benefits, and unemployment insurance or for withholding and paying employment taxes for any Contractor employee, its subcontractors or agent's employees, but such responsibility shall be solely that of Contractor. This clause of the Contract does not prevent the City or Airport from requiring Contractor to have its employees follow normal rules and guidelines for work performance, redirecting the efforts of the employees to meet the needs of the facilities, performing safety or from requiring Contractor to perform the requirements of this Contract satisfactorily, according to the terms set forth herein. No act or direction of the City or Airport shall be deemed to be the exercise of supervision or control of the Contractor's performance hereunder. ARTICLE 6 CONTRACTOR'S PERFORMANCE 6.1 Contractor shall, at its own expense, furnish all necessary equipment, management, supervision, labor, technical support and other accessories and services for maintenance, and the performance of other services as described in these Contract Documents. Such services shall be performed in strict accordance with the terms herein. 6.2 All performance shall be subject to inspection and approval by the Aviation Director or his designee as provided in said Performance Work Statement. If the Contractor's performance is, or becomes unsatisfactory, as determined by the Aviation Director, an appropriate reduction in payment due may be made from Contractor's invoice and Contractor shall correct any unsatisfactory performance. The correction of unsatisfactory performance shall be at no additional cost to Airport. ARTICLE 7 AUTHORIZED REPRESENTATIVES 7.1 AIRPORT'S REPRESENTATIVE(S) AIRPORT'S REPRESENTATIVE: shall be Paul Strycharz/Adrienne Ayers-Allen. 7.2 CONTRACTOR'S REPRESENTATIVE(S) Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 4 of 32 Contractor must designate in writing a person(s) acceptable to Airport to serve as its representative ("Contractor's Representative") in all dealings with Airport. Contractor's Representative may be changed upon prior written notice delivered to Airport's Representative. Contractor's representative shall be Kevin Tierney. ARTICLE 8 PATENT INDEMNITY Except as otherwise provided, the Contractor shall indemnify the City and its Board of Commissioners, the Aviation Commission, and their officers, agents and employees against liability, including costs and expenses for infringement upon any letters or patent of the United States arising out of the performance of this Contract or out of the use or disposal by or for the account of the City of the equipment furnished or construction work performed hereunder. ARTICLE 9 CHANGES The Airport may, during the Contract period, make changes to the Scope of Work, which may result in changes to the general scope of the Contract and its provisions. Written agreements, changes, or amendments to this Contract shall not be binding upon the Airport except through a properly executed Change order. ARTICLE 10 CONTRACTOR'S OBLIGATIONS The Contractor shall, in good workmanlike manner, do and perform, all Work and furnish all supplies and materials, machinery, equipment, facilities, and means, except as herein otherwise expressly specified, necessary, or proper to perform and complete all the Work required by this Contract, within the time herein specified, in accordance with the provisions of this Contract and said of the Work covered by this Contract and any and all supplemental drawings of the Work covered by this Contract. Contractor shall furnish, erect, maintain, and remove such equipment, construction, and such temporary works as may be required. Contractor alone shall be responsible for the safety, efficiency, and adequacy of its equipment, installations, and methods, and for any damage which may result from their failure or their improper construction, installation, maintenance, or operation. The Contractor shall observe, comply with, and be subject to all terms, conditions, requirements and limitations of the Contract and Specifications, local ordinances, and state and federal laws; and shall do, carry on, and complete the entire Work. ARTICLE 11 TEMPORARY SUSPENSION OR DELAY OF PERFORMANCE OF CONTRACT To the extent that it does not alter the scope of this Contract, the Airport may unilaterally order a temporary stopping of the Work or delaying of the Work to be performed by Contractor under this Contract. ARTICLE 12 RIGHTS AND REMEDIES The rights and remedies of the City and Airport provided in this paragraph are not exclusive and are in addition to any other rights and remedies provided by law or under this Contract. ARTICLE 13 NON-DISCRIMINATION Notwithstanding any other provision of this Contract, during its performance the Contractor, for itself, its heirs, personal representatives, successors in interest and assigns, as part of the consideration of this Contract does hereby covenant and agree that: 13.1 No person on the grounds of age, race, color, religion, sex or national origin shall be excluded from participation in, denied the benefits of, or otherwise be subjected to discrimination; and Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 5 of 32 13.2 In the furnishing of services or materials herein or hereon, no person shall, on the grounds of age, race, color, religion, sex or national origin, be excluded from participation in, or denied the benefits of, such activities, or otherwise be subjected to discrimination. ARTICLE 14 DEFECTIVE PRICING To the extent that the pricing provided by Contractor is erroneous and defective, the parties may by agreement, correct pricing errors to reflect the intent of the parties. ARTICLE 15 REPRESENTATIONS AND WARRANTIES 15. Contractor's Representations and Warranties Regarding Capacity to Contract and Perform Work/Services. In order to induce the Airport to enter into this Contract, Contractor hereby represents and warrants that as of the date above written that: 15.1. Contractor is duly organized and validly existing in good standing under the laws of the state in which it is organized, is qualified to do business in all jurisdictions in which it is operating, and has the power and authority to execute and deliver and to perform its obligations under this Contract and the documents to which it is signatory; and 15.2 The execution, delivery and performance by Contractor ' and its undersigned representative(s)of this Contract and other documents to which Contractor is a signatory do not require the approval or consent of any other person, entity or government agency and do not result in any breach of any agreement to which Contractor is a party or by which it is bound; and 15.3 The execution, delivery and performance by Contractor of this Contract and other documents to which it is a signatory have been duly authorized by all necessary action, and constitute legal, valid and binding obligations of Contractor, enforceable against Contractor in accordance with its terms; 15.4 No action, suit or proceeding to which Contractor is a party is pending or threatened that may restrain or question this Contract, or any other document to which it is a signatory, or the enjoyment of rights or benefits contemplated herein;and 15.5 Contractor has not been debarred by any city, state or federal agency. ARTICLE 16 ASSIGNMENT 16. Without the prior written consent of Airport, Contractor may not assign, transfer or convey any of its interests under this Contract, nor delegate any of its obligations or duties under this Contract except as provided herein. 16.1 Consent of Airport Required. Any assignment of this Contract or rights under this Contract, in whole or part, without the prior written consent of Airport shall be void, except that, upon ten (10) calendar days prior written notice to Airport, the Contractor may assign monies due or to become due under this Contract. Any assignment of monies will be subject to proper setoffs in favor of the Airport and to any deductions provided for in this Contract. 16.2 No Relief of Responsibilities. No assignment will be approved which would relieve Contractor of its responsibilities under this Contract. 16.3 Parties Bound. This Contract will be binding upon and inure to the benefit of the Airport and Contractor and their respective successors and assigns. Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 6 of 32 ARTICLE 17 NOTICES 17. Delivery. All notices given by either party to the other under this Contract must be in writing and may be delivered by: (i) regular mail, postage prepaid; (ii) certified or registered mail; (iii)facsimile; or (iv) hand-delivery, to the parties at the addresses and facsimile numbers set forth in the Clause titled"Addresses". 17.1 Receipt. Notices sent by mail will be deemed to be received upon deposit in the mail, properly addressed. Notices sent by certified or registered mail will be deemed to be received upon the date of the acknowledgment. Notices sent by facsimile will be deemed to be received upon successful transmission to the proper facsimile number. Notices delivered by hand-delivery will be deemed to be received upon acceptance by the respective party or its agent. 17.2 Change of Address or Facsimile Number. Either party may, at any time, change its respective address or facsimile number by sending written notice to the other party of the change. 17.3 Addresses. To Airport: For all notices to City the address will be: Executive Director Augusta Regional Airport 1501 Aviation Way Augusta, Georgia 30906 With a copy to: Augusta General Counsel Augusta Law Department 535 Telfair Street, Bldg., 3000 Augusta, Georgia 30901-2286 Ph: (706)842-5550 Fax: (706)842-5556 To CONTRACTOR: For all notices to CONTRACTOR the address will be: All South Siding,Window& Roofing, Co. 514 Georgia Avenue North Augusta, South Carolina 29841 Attn: Allsouth.tierney@comcast.net Ph: (803)599-7380 Fax: 599-7347 ARTICLE 18 COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS Contractor covenants and agrees that it, its agents and employees will comply with all Georgia, county, state, and federal laws, rules, regulations, Airport Rules and Regulations and City ordinances applicable to the Work to be performed under this Contract, and that it shall obtain all necessary permits, pay all license fees and taxes to comply therewith. Further, Contractor agrees that it, its agents, and employees will abide by all rules, regulations, and policies of the Airport during the term of this Contract, including any renewal periods. All references to the City, Airport or Federal codes, provisions, regulations, and rules are incorporated by reference as if fully set forth herein. Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 7 of 32 ARTICLE 19 RIGHT TO INSPECT PREMISES The Airport may, at reasonable times, inspect the part of the plant, place of business, or work site of Contractor or any of its subcontractor or subunit thereof which is pertinent to the performance of this Contract. ARTICLE 20 ROYALTIES AND PATENTS The Contractor shall indemnify, hold and save the Augusta Aviation Commission, Augusta, GA and its elected and appointed officials, officers, agents, servants, and employees, harmless from liability of any nature or kind, including cost and expenses for, or on account of, any patented or unpatented invention, process, article, equipment or appliance manufactured or used in the performance of the Contract, including its use by the City, unless otherwise specifically stipulated in the Contract. ARTICLE 21 INSURANCE During the term of this Contract, Contractor shall provide, pay for, and maintain with companies reasonably satisfactory to the City and the Aviation Commission,the types of insurance as set forth in the Augusta-Richmond County Code, and Georgia law, as the same may be amended from time to time, and as described herein. All insurance shall be issued by insurance companies eligible to do business in the State of Georgia and with an Insurer rated "A" or better by AM Best. All policies shall include hold harmless provisions. In the event of a conflict between the provisions of the Augusta-Richmond County Code and this Contract, the more stringent requirement shall govern. In no event shall Contractor maintain any insurance less than the requirements set forth in the Augusta-Richmond County Code, as amended. 21.1 All liability policies of Contractor and its subcontractors shall provide coverage that includes, or has the same substantive effect as the following: 21.2 The Contractor shall procure and maintain continuously in effect throughout the term of its activities upon the Airport at Contractor's sole expense, insurance of the types and in at least such minimum amounts as set forth in this Section. 21.3 The Contractor's insurance policies as required by this Contract shall apply separately to the City as if separate policies had been issued to Contractor and City. The Contractor's Comprehensive General Liability policy shall protect Augusta, GA, its officers, elected and appointed officials, employees, agents and the Aviation Commission and its employees against any and all liability created by reason of Contractor's conduct. 21.4 The Contractor's insurance shall not be subject to cancellation or material alteration until at least thirty(30)days written notice has been provided to the City's Risk Manager. (a) Contractor shall furnish to the Risk Manager Certificates of Insurance evidencing that all of the herein stated requirements have been met.The amount or amounts of all required policies shall not be deemed a limitation of the Contractor's Contract to indemnify and hold harmless Augusta, GA, its officers, elected and appointed officials, employees, agents and the Aviation Commission and its employees; and in the event Contractor or Augusta, GA shall become liable in an amount in excess of the amount or amounts of such policies, then the Contractor shall save Augusta, GA, its officers, elected and appointed officials, employees, agents and the Aviation Commission and its employees harmless from the whole thereof,except in the event of gross negligence of Augusta, GA. 21.5 The Contractor is required to maintain minimum insurance to protect the Contractor and Augusta, GA from the normal insurable liabilities that may be incurred by Contractor. In Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 8 of 32 the event, such insurance as required shall lapse, Augusta, GA and the Aviation Commission reserve the right to obtain such insurance at the Contractor's sole expense. 21.6 The insurance policies for coverage listed in this Section shall contain a provision that written notice of cancellation or any material change in policy by the insurer shall be delivered to the City no less than thirty(30)days prior to cancellation or change. 21.7 Contractor shall carry the following types and minimum amounts of insurance coverage at the Airport: (a) Worker's Compensation Insurance-With employer's liability coverage of at least $1,000,000 each accident, $1,000,000 each employee and a$1,000,000 disease policy limit. The foregoing insurance shall be endorsed to state that that the workers' compensation carrier waives its right of subrogation against the Augusta-Georgia its officers, agents, elected and appointed officials, representatives, volunteers, and employees, and the Aviation Commission and its employees. (b) Comprehensive General Liability Insurance — In the amount of Five Million ($5,000,000)against claims for bodily injury, death or property damage occurring on, in about the Contractor's premises and the Airport, in an amount recommended by the Risk Manager and acceptable to the City. Said coverage shall include products and completed operations. The foregoing insurance shall be endorsed to state that it will be primary to the City and the Aviation Commission's insurance and that the carrier waives its right of subrogation against Augusta-GA, the Aviation Commission, and their officers, agents, elected and appointed officials, representatives, volunteers, and employees. Augusta, GA, the Aviation Commission, their officers, employees, agents, elected and appointed officials shall be added as additional insureds on said policies, including products and completed operations. Said policy shall contain Severability of Interest Clause and shall include Contractual Liability coverage at least as broad as that given in the most current CG 00 01 ISO form. (c) Automobile Insurance. For any vehicles authorized in writing by the Executive Director to operate on the Aircraft Operating Area (AOA) of the Airport, Automobile Insurance in the minimum amount of Five Million Dollars ($5,000,000.00) combined single limit coverage. If the Contractor's Comprehensive General Liability coverage includes vehicular operations on the Airport, separate automobile insurance shall not be required. The foregoing insurance shall be endorsed to state that it will be primary to the Augusta GA and the Aviation Commission's insurance and that the carrier waives its right of subrogation against Augusta, GA, the Aviation Commission, and their officers, agents, elected and appointed officials, representatives, volunteers, and employees. Augusta GA, the Aviation Commission, and their officers, agents, employees, elected and appointed officials shall be added as additional insureds on said policies. Said policy shall contain Severability of Interest Clause and shall include contractual liability coverage at least as broad as that given in the most current CA 00 01 ISO form. (d) All such evidence of insurance shall be in the form of certificates of insurance satisfactory to the City and its Risk Manager, accompanied by a certified true copy of an endorsement to each policy containing the above language. The insurance coverage and limits required shall be evidenced by properly executed certificates of insurance. These certificates shall be signed by the authorized representative of the insurance company shown on the certificate. The required policies of insurance shall be in compliance with the laws of the State of Georgia. Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 9 of 32 21.8 If at any time the Aviation Executive Director requests a written statement from the insurance company as to any impairments to the aggregate limit, Contractor shall promptly authorize and have delivered such statement to the Aviation Commission. Contractor authorizes the Aviation Commission and/or the City's Risk Manager to confirm with Contractor's insurance agents, brokers, and insurance companies all information furnished. 21.9 The acceptance of delivery to the City and the Aviation Commission of any certificate of insurance evidencing the insurance coverage and limits required under this Contract does not constitute approval or acceptance by the City or the Aviation Commission that the insurance requirements in this Contract have been met. No operations shall commence at the Airport unless and until the required certificates of insurance are in effect and approved by the City. 21.10 The Contractor and the City and the Aviation Commission understand and agree that the minimum limits of the insurance herein required may, from time to time, become inadequate, and Contractor agrees that it will increase such minimum limits upon receipt of written notice defining the basis of the increase. The Contractor shall furnish the City, within ten(10)days of the effective date thereof, a certificate of insurance evidencing that such insurance is in force. 21.11 If at any time the Airport Executive Director requests a written statement from the insurance companies as to any impairments to the Aggregate Limit, prompt authorization and delivery of all requested information will be given to the Aviation Commission. Renewal Certificates of Insurance must be provided to the City and Aviation Commission as soon as practical but in every instance prior to expiration of current coverage. 21.12 The amounts and types of insurance shall conform to the following minimum requirements with the use of Insurance Service Office policies, forms, and endorsements or broader, where applicable. Notwithstanding the foregoing, the wording of all policies, forms, and endorsements must be reasonably acceptable to the City and Aviation Commission. 21.13 An insurance binder letter or a Certificate of Insurance must be sent to: Augusta Regional Airport 1501 Aviation Way Augusta, Ga. 30901 Attn: Executive Director ARTICLE 22 DEFAULT AND TERMINATION Termination by Airport. This Contract shall be subject to termination by the Airport at any time in the opinion of the Airport the Contractor fails to carry out the Contract provisions of any one or more of the following events occurs: 22.1 The default by Contractor in the performance of any of the terms, covenants or conditions of the Contract, and/or the failure of Consultant to remedy, or undertake to remedy with sufficient forces and to the Airport's reasonable satisfaction. The Airport shall provide the Contractor with notice of any conditions which violate or endanger the performance of the Contract. If after such notice the Contractor fails to remedy such conditions within five(5)days to the satisfaction of the Airport, the Airport may exercise its option in writing to terminate the Contract without further notice to the Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 10 of 32 Contractor and order the Contractor to stop providing services immediately and vacate the premises; and to cancel ordered products with no expense to the Airport. 22.2 Contractor files a voluntary petition in bankruptcy, including a reorganization plan, makes a general or other assignment for the benefit of creditors, is adjudicated as bankrupt or if a receiver is appointed for the benefit of creditors, is adjudicated as bankrupt or if a receiver is appointed for the property or affairs of Contractor and such receivership is not vacated within thirty (30) days after the appointment of such receiver. 22.3 Contractor's failure to provide services according to the specifications contained herein. 22.4 Contractor's failure to keep, perform, or observe any other term or condition of this Contract. 22.5 Contractor's performance of the Contract is unreasonably delayed. 22.6 The Airport reserves the right to terminate this Contract if the services provided under this Contract do not meet or exceed existing industry standards. The Airport reserves the right to make the final determination as to the quality of services. 22.7 Termination for Convenience The Airport may terminate this Contract in whole or in part at any time by providing written notice to the Contractor. Such action may be without cause and without prejudice to any other right or remedy of Airport. Upon receipt of a written notice of termination, except as explicitly directed by the Airport, the Contractor shall immediately proceed with the following obligations regardless of any delay in determining or adjusting amounts due under this clause: 1. Contractor must immediately discontinue work as specified in the written notice. 2. Terminate all subcontracts to the extent they relate to the work terminated under the notice. 3. Discontinue orders for materials and services except as directed by the written notice. 4. Deliver to the Airport all fabricated and partially fabricated parts, completed and partially completed work, supplies, equipment and materials acquired prior to termination of the work and as directed in the written notice. 5. Complete performance of the work not terminated by the notice. 6. Take action as directed by the owner to protect and preserve property and work related to this Contract that Airport will take possession. Airport agrees to pay Contractor for: a) completed and acceptable work executed in accordance with the Contract documents prior to the effective date of termination; b) documented expenses sustained prior to the effective date of termination in performing work and furnishing labor, materials, or equipment as required by the Contract documents in connection with uncompleted work; c) reasonable and substantiated claims, costs and damages incurred in settlement of terminated contracts with Subcontractors and Suppliers; and d) reasonable and substantiated expenses to the Contractor directly attributable to Airport's termination action Airport will not pay Contractor for loss of anticipated profits or revenue or other economic loss arising out of or resulting from the Airport's termination action. The rights and remedies this clause provides are in addition to any other rights and remedies provided by law or under this Contract. ARTICLE 23 INDEMNIFICATION AND HOLD HARMLESS Contractor agrees to indemnify and hold harmless the Augusta Aviation Commission, Augusta, GA and their members, officers, elected and appointed officials, agents, servants, employees and successors in office, as set forth in the Augusta-Richmond County Code, and particularly Article 1, Chapter 3, Division 1, Section 1-3-8.5, Indemnity and Insurance, as the same may be amended from time to time, and described herein, from any and all claims including reasonable attorney's fees and expenses of litigation Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 11 of 32 incurred by the Augusta GA and the Augusta Aviation Commission, in connection therewith related to or arising out of any damage or injury to property or persons, occurring or allegedly occurring in, on or about Airport property which are in any way related to or arising out of any failure of Contractor to perform its obligations hereunder. Contractor further agrees that the foregoing Contract to indemnify and hold harmless applies to any claims for damage or injury to any individuals employed or retained by Contractor in connection with any changes, additions, alterations, modifications and/or improvements made to the premises, and hereby releases the Augusta, GA and the Augusta Aviation Commission, from liability in connection with any such claims. In the event of a conflict between the provisions of the Augusta- Richmond County Code and this Contract, the broader requirement shall govern. ARTICLE 24 AIRPORT SECURITY REQUIREMENTS/SPECIAL SECURITY IDENTIFICATION DISPLAY AREA(SIDA)BADGES 24. Contractor's employees may be required to operate in the Airport's secure areas. Contractor shall be required to obtain the Airport's Security Identification Display Area(SIDA) badges for any employee working in the secured area. Contractor shall comply, at its own expense, with the Transportation Security Authority (TSA) and the Airport's security requirements for the Airport's SIDA including, but not limited to employee training and badging. Contractor shall cooperate with the TSA and the Airport on all security matters and shall promptly comply with any Project security arrangements established by the Airport. Compliance with such security requirements shall not relieve Contractor of its responsibility for maintaining proper security for the above-noted items, nor shall it be construed as limiting in any manner Contractor's obligation with respect to all applicable federal, state and local laws and regulations and its duty to undertake reasonable action to establish and maintain secure conditions at and around the Premises and throughout the Airport. All employees shall be properly badged and comply with all Airport safety and security rules. 24.1 To qualify for the badge, individual must be fingerprinted and have a background investigation completed. In addition, the Airport will conduct a background inquiry and require finger printing of all individuals who will be working on the secured side of the Airport screening point. This may also include collection of appropriate criminal history information, contractual and business associations and practices, employment histories, reputation in the business community and credit reports for the Contractor, as well as, its employees. 24.2 Contractor consents to such an inquiry and agrees to make available to the Airport such books and records the Airport deems necessary to conduct the review. 24.3 Contractor shall pay all costs associated with providing SIDA badges. ARTICLE 25 HAZARDOUS MATERIALS Contractor shall not cause or permit any Hazardous Material to be brought, kept or used in or about the Airport by Contractor, its agents, employees, subcontractors, or invitees. Without limiting the foregoing, if the presence of any Hazardous Material in the Airport caused or permitted by Contractor results in any contamination of the Airport, Contractor shall promptly take all actions at its sole expense as are necessary to return the Airport to the conditions existing prior to the introduction of such Hazardous Material to the Airport; provided that Airport's approval of such actions, and the corrective actions to be used by Contractor in connection therewith,shall first be obtained. The term "Hazardous Material" means any hazardous or toxic substance, material, or waste, which is or becomes regulated by any local governmental authority or the United States Government. The term "Hazardous Material" includes, without limitation, any material or substance which is (i) defined as a "hazardous waste", "extremely hazardous waste", or "restricted hazardous waste" or similar term under any laws now or hereafter enacted by the United States or the State of Georgia or any political subdivision thereof, or (ii) designated a "hazardous substance" pursuant to the Federal Water Pollution Control Act, 33 U.S.C. § 1317, or(iii)defined as a "hazardous waste" pursuant to the Federal Resource Conservation and Recovery Act, 42 U.S.C.§ 6901 et seq., or (iv) defined as a "hazardous substance" pursuant to the Comprehensive Environmental Response, Compensation and Liability Act,42 U.S.C. §9601 et seq. Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 12 of 32 ARTICLE 26 PROHIBITION OF SEGREGATED FACILITIES The Contractor agrees that it does not and will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not and will not permit its employees to perform their services at any location under its control where segregated facilities are maintained. The Contractor agrees that a breach of this clause is a violation of the Equal Opportunity clause in this Contract. (a) "Segregated facilities," as used in this clause, means any waiting rooms, work areas, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees, that are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, sex, or national origin because of written or oral policies or employee custom. The term does not include separate or single-user rest rooms or necessary dressing or sleeping areas provided to assure privacy between the sexes. (b) The Contractor shall include this clause in every subcontract and purchase order that is subject to the Equal Opportunity clause of this Contract. ARTICLE 27 TEMPORARY SUSPENSION OR DELAY OF PERFORMANCE OF CONTRACT To the extent that it does not alter the scope of this Contract, the Airport may unilaterally order a temporary stopping of the work or delaying of the work to be performed by Consultant under this Contract. ARTICLE 28. GOODS, PRODUCTS AND MATERIALS 28.1 The Contractor shall furnish goods, products, materials, equipment and systems which: 28.2 Comply with this Contract for; 28.3 Conform to applicable regulations, specifications, descriptions, instructions, data and samples; 28.4 Are new and without damage; 28.5 Are of quality, strength, durability, capacity or appearance equal to or higher than that required by the Contract Documents; 28.6 Are free from defects; and 28.7 Are beyond and in addition to those required by manufacturers'or suppliers'specifications where such additional items are required by the Contract Documents. 28.8 All goods, products, materials, equipment and systems named or described in the Contract Documents, and all others furnished as equal thereto shall, unless specifically stated otherwise, be furnished, used, installed, employed and protected in strict compliance with the specifications, recommendations and instructions of the manufacturer or supplier, unless such specifications, recommendations or instructions deviate from applicable FAA advisory circulars or the Contract Documents, in which case the Contractor shall so inform the City and shall proceed as directed by the City. The Contractor shall coordinate all subcontracts to verify compatibility of goods, products, materials, equipment and systems, and the validity of all warranties and guarantees, required by the Contract Documents. ARTICLE 29 WARRANTIES AND CORRECTION OF WORK 29.1 The Contractor shall guarantee all Work to have been accomplished in conformance with this Contract. Neither the final certificate of payment nor any provision of the Contract, nor partial or entire occupancy or use of the Work by the Airport, shall constitute an acceptance of any part of the Work not done in accordance with the Contract, or relieve the Contractor of liability for incomplete or faulty materials or workmanship. The Contractor shall promptly remedy any omission or defect in the Work and pay for any damage to other improvements or facilities resulting from such omission or defect which shall appear within a period of one year from the date of final acceptance, unless a longer period is elsewhere specified. In the event that the Contractor should fail to make repairs, adjustments, or other remedy that Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 13 of 32 may be made necessary by such defects, the Airport may do so and charge the Contractor the cost thereby incurred. The Contractor shall also provide a ten-year(10) manufacturer's warranty on the metal roofing coating system that meets GAF Diamond Pledge warranty specifications. 29.2 The Contractor warrants to the Airport that materials and equipment furnished under the Contract will be of good quality and new unless otherwise required or permitted by the Contract, that the Work will be free from defects not inherent in the quality required or permitted, and that the Work will conform to the requirements of the Contract. Work not conforming to these requirements, including substitutions not properly approved and authorized, is considered defective. The Airport, in its sole discretion, may exclude from the Contractor's warranty, remedies for damage or defect which the Airport determines were caused by abuse, modifications not executed by the Contractor, improper or insufficient maintenance, improper operation, or normal wear and tear and normal usage. If required by the Airport, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. All warranties and guaranties shall extend for the greatest of one year commencing on the dates of Substantial Completion of the Project or such longer period of time as is required by the Contract. The one-year period shall be extended with respect to portions of the Work first performed after Substantial Completion for a period of one year after the actual performance of the Work. If any defect or deviation should exist, develop, be discovered or appear within such one-year period, the Contractor, at its sole cost and expense and immediately upon demand, shall fully and completely repair, correct, and eliminate such defect. The foregoing warranties and guarantees are cumulative of and in addition to, and not restrictive of or in lieu of, any and all other warranties and guarantees provided for or required by law. No one or more of the warranties contained herein shall be deemed to alter or limit any other. 29.3 The obligation of this Section shall survive acceptance of the Work and termination of the Contract. All manufacturer warranties and guarantees shall be delivered to the City prior to Substantial Completion and such delivery shall be a condition precedent to the issuance of the Certificate of Substantial Completion. Before Final Payment the Contractor shall assign and transfer to the.City all guarantees warranties and agreements from all Contractors, Subcontractors, vendors, Suppliers, or manufacturers regarding their performance quality of workmanship or quality of materials supplied in connection with the Work. The Contractor represents and warrants that all such guarantees, warranties and agreements will be freely assignable to the City, and that upon Final Completion of the Work, all such guarantees, warranties and agreements shall be in place and enforceable by the City in accordance with their terms. ARTICLE 30 MISCELLANEOUS PROVISIONS 30.1 JUDICIAL INTERPRETATION. Should any provision of this Contract require judicial interpretation, it is agreed that the court interpreting or construing the same shall not apply a presumption that the terms hereof shall be more strictly construed against one party by reason of the rule of construction that a document is to be construed more strictly against the party who itself or through its agent prepared same, it being agreed that the agents of all parties have participated in the preparation hereof and all parties have had an adequate opportunity to consult with legal counsel. 30.2 GOVERNING LAW; JURISDICTION AND VENUE; ATTORNEYS' FEES. This Contract shall be governed by, and construed and enforced in accordance with, the laws of the State of Georgia (without regard to the conflicts or choice of law principles thereof). The parties irrevocably consent to the jurisdiction of the State of Georgia, and agree that the Superior Court of Richmond County, Georgia, shall be an appropriate and convenient place of venue to resolve any dispute with respect to this Contract. In the event either party commences any proceeding against the other party with respect to this Contract, the parties agree that neither party shall be entitled to recover attorneys'fees except as otherwise specifically provided for by law. 30.3 COMMERCIAL ACTIVITY: Neither Contractor nor its employees may establish any commercial activity or issue concessions or permits of any kind to third parties for establishing activities at the Airport. Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 14 of 32 30.4 CONTINGENT FEES. Contractor warrants that it has not employed or retained any company or person, other than a bona fide employee working for Contractor, to solicit or secure this Contract; and that Contractor has not paid or agreed to pay any company, association, corporation, firm or person, other than a bona fide employee working for Contractor, any fee, commission, percentage, gift or any other consideration contingent upon or resulting from the award or making of this Contract. For the breach or violation of this warranty and upon a finding after notice and hearing, City may terminate the Contract and, at its discretion, may deduct from the Contract Sum, or otherwise recover the full amount of any such fee, commission, percentage, gift or consideration. 30.5 WAIVER. The failure of Airport to seek redress for any violation of or to insist upon the strict performance of, any term of this Contract will not prevent a subsequent violation of this Contract from being actionable by Airport. The provision in this Contract of any particular remedy will not preclude Airport from any other remedy. 30.6 FORCE MAJEURE. Neither party hereto shall be considered in default in the performance of its obligations hereunder to the extent that the performance of any such obligation, except the payment of money, is prevented or delayed by any cause, existing or future, which is beyond the reasonable control of the affected party, or by a strike, lockout or other labor difficulty, the settlement of which shall be within the sole discretion of the party involved. Each party hereto shall give notice promptly to the other of the nature and extent of any Force Majeure claimed to delay, hinder or prevent performance of the services under this Contract. In the event either party is prevented or delayed in the performance of this obligation by reason of such Force Majeure, there shall be an equitable adjustment of the schedule. Contractor will not be liable for failure to perform or for delay in performance as a result of Force Majeure, including the following: (a) Any cause beyond its reasonable control; (b) Any act of God; (c) Inclement weather; (d) Earthquake; (e) Fire; (f) Explosion; (g) Flood; (h) Strike or other labor dispute; (i) Any shortage or disruption of or inability to obtain labor, material, manufacturing facilities, power, fuel or transportation from unusual sources, or any other transportation facility; (j) • Delay or failure to act of any governmental or military authority; (k) Any war, hostility or invasion; (I) Any embargo, sabotage, civil disturbance, riot or insurrection; (m) Any legal proceedings; or (n) Failure to act by Contractor's suppliers due to any cause which Contractor is not responsible, in whole or in part. 30. 7 PERMITS. Contractor shall obtain and maintain at all times all necessary licenses, permits and certifications to perform the work described in the Contract. Contractor shall furnish copies of all licenses, permits, and certifications to the Airport. 30.8 WORK PERMITS REQUIRED. Contractor agrees and acknowledges that its employees and agent's employees, as well as any subcontractors or subcontractors' personnel, working on the Contract must be United States citizens, or must be lawfully admitted for residence and be permitted to work in the United States under the Immigration and Naturalization Act, 8 U.S.C. 1101, et seq. 30.9 COUNTERPARTS. This Contract may be executed in several counterparts, each of which shall be deemed an original, and all such counterparts together shall constitute one and the same Contract. 30.10 CAPTIONS.The section captions contained in this Contract are for convenience only and Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 15 of 32 do not in any way limit or amplify any term or provision hereof. The use of the terms "hereof," "hereunder" and "herein" shall refer to this Contract as a whole, inclusive of the Exhibits, except when noted otherwise. The use of the masculine or neuter genders herein shall include the masculine, feminine and neuter genders and the singular form shall include the plural when the context so requires. 30.11 ARTICLE FURTHER ACTS. Airport and Contractor each agrees to perform any additional acts, execute, and deliver any additional documents as may reasonably be necessary in order to carry out the provisions and effectuate the intent of this Contract. 30.12 USE OF AUGUSTA, GEORGIA LANDFILL. All contracts for Contractors performing demolition and/or construction projects for Augusta, Georgia shall contain a provision requiring that all debris, trash and rubble from the project be transported to and disposed of at the Augusta, Georgia Solid Waste Landfill in accordance with local and state regulations. The Contractor shall provide evidence of proper disposal through manifests, which shall include the types of material disposed of,the name and location of the disposal facility, date of disposal and all related fees. 30.13 PROHIBITION AGAINST CONTINGENT FEES. The Contractor by execution of this Contract warrants that it has not employed or retained any company or person, other than a bona fide employee working solely for it, to solicit or secure this Contract and that it has not paid or agreed to pay any person, company, corporation, individual, or firm, other than a bona fide employee working solely for it, any fees, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this Contract. 30.14 CONFLICT IN DOCUMENTS AND PRESENT DOCUMENTS. The Contractor shall in no case claim a waiver of any specification requirements on the basis of previous approval of material or workmanship on other jobs of like nature or on the basis of what might be considered "standard" for material or workmanship in any particular location. The Contract for this Project shall govern the Work. If any portion of the Contract shall be in conflict with any other portion, the various documents comprising the Contract shall govern in the following order of precedence: Contract, Change Orders or modifications issued after execution of the Contract; the General Requirements of the Contract; the Specifications; the Drawings; as between schedules and information given on the drawings, the schedules shall govern; as between figures given on Drawings and the scaled measurements, the figures shall govern; as between large-scale Drawings and small-scale Drawings, the larger scale shall govern; and detailed drawings shall govern over general drawings;the Bid Document Package. SIGNATURES ON NEXT PAGE Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 16 of 32 IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed by their appropriate officials, as of the date first written above. t AUGUSTA A Vi •MMISSION ALL SOUTH SIDING,WINDOW& ROOFING, CO. /Ai �r , A 7► BY: 'i r' ,, jr _ George R;' a - « an;IF Kevin i • ATTEST: .� _ - Crystal Johnson 4 . „,, . , ,64.Q.d. i. 1 , ,. Herbert Judon, Exec live D' ctor AUG GE RGIR 4011 /all Hardie Davis, Mayor fz3/1q Attest: ' /Ali t1? � ' R,Ajil f .It '$i Lena Bon ', CSO ,, o, ar`41; e a Reviewed By , �° 1 o s ��1. � / 9 . k. V s' 1 i`. Bid Item#18-261A I dustrial Elastomeric Metal Roof Coating System for Hangar One Page 17 of 32 ATTACHMENT A SCOPE OF WORK Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 18 of 32 SECTION 011000--DIVISION I GENERAL CONDITIONS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A_ General provisions of the Coauraet.Mauling General and Suppicautacary Conditions and other Division 01 Specification Sections,apply to this Sectiota. 1,v* SUlatMARY A. Simian Includes: I. Project intormation 2. Work coveted by Corinna Documents. 3. tion:by Owner. 4. Across to site. S. Coordination Wlth occupants. 6. Work restrictions. 7. Miscellaneous provisions 1,3 PROJECT INFORMATION Project Identification:Augusta Regional Airport Hangar One Industrial Elastomeric Metal Root Coating System: Project Lotaninn: 1510 Haangaar Road Augusta,GA 30906 Owner:Augusta Regional Airport Project Timeline:30 Calendar days from issuance otpaura:hase order Owner's Project and Consmiction Manager:Paul Strychara r Adrienne Ayers-Allen I. Notify Owner not 1.N.s Main 72luautb in*it iti.11 that will*OM C7wiaer's operations 1.4 WORK REST RlCTIOl S A. Work R.atri.t ioasi,C1etwsat:Comply with a'a a Frii1.ion).an a nsty M.n o o ttitivat. Pt 2 Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 19 of 32 1. Comply with limitations on use of phehelee streets and with other requirements of authorities having jurisdiction. B. Oft-Site Work Hours_Limit wort in the existing building to normal busin s working hours of 7:30 a.m. to 5 p.m..Monday through Friday..uaalesa otherwise indicated. 1. Weekend Hoots:Coordinate with O wtecr prim to eonaneneetm ttt. Z. Early Morning Hours:Coordinate with Owner prior to eorn+nett.-emeru:. 3. Hours for Utility Shutdowns.Coordinate wish Owner prior to commencement. C Painting Utility Interruptions:Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only alter providing temporary utility services *ording to requirements indicated: 1. Notify Owner.Comtruction Meer.not less than two days in advance of proposed utility interruptions. 2. Obtain Owner's written permission before proceeding with utility Intertmptiellts. D. !wiser.Vibration. and Odors.Coordinate operations that may rtsult in high levels of noise and vibration,odom or other disruption to Owner oecupancy with Owner. L Notify Owner not less than poo days in advance of proposed disruptive operations. 2. Obtain Owner's written permission before proceeding with disruptive operations. E. Nonsmoking Building:Smoking is oot permitted within the building or within 25 feet (st in) of entrances. operable windows, or outdoor-air intakes E. Cetrettolled Substances. Use of tobacco products and other controllers substances on Project site is not ppermineed. Ch. Employer liattifieation. Provide idetttificatioa tags for Contractor personnel working on Project site.Reevluire wartime!rpe!to tune identification tags at all tines. SECTION 013300-SUBMITTAL PROCEDURES PART 1-GENERAL 1.1 RELATED DOCUMENTS General provisions of the C:.ontraet, including Gunnel and Supp&;mehttary Conditions and other Division 01 Sporifreation Sections.apply to this Section pg 3 Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 20 of 32 a Manufacturer's ostalakg cuts. b. Manufacturer's pe duet spa,ditieations Standard Mot charts d At^3ilabilit?and delivery time information. LIST OF INCOMPLETE ITEMS(PUNCFHLIST) A. Organization of List: include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including.if necessary.areas disturbed by Contractor that are outside the limits of construction E_ Ogtantze list of spaces in sequential order,starting with exterior areas fust. '_. Organize items applying to each space by major element including, categories for ceiling,individual walls.floors,equipment,and budding systems. 3. Include the following information at the top of each page: a Propel name. b. Date c. Name of Contractor, d. Page number_ DIVISION 34 Coatings 34 01 Oa-GENERAL REQUIREMENTS t. SCOPE OF WORK Li rsstenor Metal Rascal RaatOnl.VaIrr°a oat ii S+.'apl, Repaired May MIS;Standing a(im reef panels an latter afffiee masa sat In scope.Hangar t Ltiesitilan 1.2 Prepare all surfaces about the hangar-curved roof by washing scraping any loose impediments per ms's trennunendas%ons.Install selected liquid spray applied water based system per manufacturers specs. 1.3 Cover any essential area's to prevent coating from adhering to that was not meant to be coated and to prevemt damage, 1.4 Measured Coverage Area 119,259 sq.ft. PB.4 Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 21 of 32 13 Apply GAF-Topcoat Membrane'Industrial Iiastomcxic iicptud water based spray applied Metal Roof Coating System or equsl- Color to be white.Contractor to provide system doeutnentation to owner prior for approval of use. 1.6 Roofing system selected must meet Energy Star rating along with ASTM standar&UL Class A fire rating,and Factory Mutual Class 1 rating. 1.7 Contractor to provide certification documentation from manufacturer stating contractor is authorized to install selected roofing system. 1.8 Contractor to follow manufacturer's recommendations on the application process concerning preparation,any needed base or primer coats,and the number of finish coats required Contractor will not vary from any manufacturers steps. 1.9 Contractor to leave any excess products with owner. 1.10 Contractor will provide owner with manufacturer's 10 yr.warranty upon finish.Include contractor's 1 yr. Labor warranty. 2.0 Contractor to provide and use all OSHA required fall protection devices when performing work on elevated surfaces. 2.1 See enclosed two pictures of the top inner portion of the roof surfaces.Lett and right side of buret roof can be seen clearly from ground level.Contractors will not be allowed to walk on roof. 2.2 Contractors responsibility Is to supply all needed labor,equipment,and materials to complete the jets.Provide any needed trash dumpster. pg.S Bid Item#18-261 A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 22 of 32 f r F+ K a1elrY'w,. 7 Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 23 of 32 si �"A x y ,.' rigtk ,,,: .§ � :� -1::,,,,, ',.',,,,'„,,, v \., _\ ' ,:,I.-.''''..,: ,.,, � r rd s1 r b 4 T Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 24 of 32 ATTACHMENT B REQUIRED SUBMITTALS Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 25 of 32 • # . • ' = • AomfifLath A2.2 Ast, Ctk.,t1,\I A/Art:222. g'2'2'!.i'S 92 Ili I l'-'11t2211..-'12 tii7+41:Pt .jrtffl D7.K.010F' 2.•FlItti A .`ttilif tat' N40- 77't"tvt • • • 1-14 101 n 1`.1 . lig • • c.tr 4! c„,„1,1„11-, -• KM Niaji 5f, ,b94 -•• 1.i*i Atkt bt-77,fe,et, kelk# 170 A A40,4 1 - •a t.)w le e VA*4 kti IF*My 7 vicd Andtzt StaiklALti UM mei U Rkt In k'Artil#4.11t' *t I , , h"F • ' 5 55 555 t 22. g Frf au,It A, . Fkrtitiattil tlitaltteltM . Mt. f.A.. teve. - It a'e .• t "'At Arlwarit C*. teld. #•*. *, ec *pi • . c.#5 un.55.4 ,55 55,4 u Ft I 77:,.k7rtk et! 17.Set."Mkt,-.att. t1ç, Al Prf'W!.<.c..kl. cmag .k3141.4 ziu4tErt....wurfrtk-us-. . " TIchrhfrikd Ct ti agil •AV, . .10• ;Kt k attu urorr 11.1f F t * .2 4, 3 f. e 5144 4145'k5-45"'555 5 kV:V*14N lie .fts t.a.#:Ft MX*,ittti t‘t-, !..4.14A6 p-7-74.7-.tat st r 511 ...vcattev, watvad'itilVAIII66.36,V 6.7 leg rkiikgkCP ` grPg,tufo 4.d tk pst,trt4i....etc!tt. 34-.F.kkper Flo.77 7.'7.4;00'131'6k ,k3 gk IFt..7 tet tt'et 5-5 t'-'51,15 5,54 Ps.6.rkgklk Fs'0.4t> crivi .4 s, eta:pt., koVE g 2,s, 11,AVM1 Z` tet,. er es retv.1.,11.Pslerart t-at- M &AL" st..,sisszsa. 2jf 444.643's..**to:act_ 0..10,-1 it. 1.4.*ev4.1•.' 2' • .2*A L•tet2.1., asrit**.A s*VivV*Itt.tea*.iri:Ve#14404 6 kV, 6,66,-,606 177,k pi, "f,p.3 16,oi 1,663 pp,,P3 664 631 636 **,3--al 1,4 14,,f .**4 kic.".kk ito.#177;#2:27iid 44 vs,F.,a, v.1 ee ' 221412!. NV" 161V hee: 11.sta 6s.....1.14-4...s•ItClatais-V,11,*Via atV s.' F#2.....fss... et% F A' ti,4*.a kfitRi t".rekk-, iftteitsC I ycr.36,3 6 3- kg,koar3v3 r.:36,1,6 6 6 3./I 51555-‘7,V1,I A -ekv-.1, rce 5_51,0,5 e*,I-to,e itve ral tq 0 CET..v../ IY1!rm.4-.4‘..t!err71.P,S,W. fox 49"Ril-55 A21A221 taAec &tee IA.::F ct-77.2.4. 711t.t. ,t1 tk.t A,t itv.4 et Ls1 Ira A I.4 /04552, ife.&kir-O....Xi l'et•al6A1.4,-4.• 'to aft.:5•,t&i. AkA 7.. k Av-Pr Cs,tr 436 ev.,*ea-7 te**-•• vvve....ee *vs I 4, I. s,s4 a. fAr tr r1 I !e5,55 22 EA 6 SP,g 1.‘31kk L I t ‘4,4'tv• Pena, - = tev 44' *Le evq•ct.****.ert et t I.te 14 Bid Item#18-26IA Industrial Elastomeric Metal Roof Coating System for Hangar One Page 26 of 32 Salad lay eUhrnlsedio 01 a Fermi,On resewndirro Toth Naha,ander proudly of per}aey.Orel to the best€It Its knothedge rid tellef: 1.tie c6ietivrelannes esti Mesh new.a Conk(of ordered M pt r* lith g ihe makes(etpared by be WO,end ?.Thal no employea of rhos Courtly,nor any member thereof roil are audit'Minor tr Ada! by this BUD ham e'y ptcabry interest In the business of Fra responding fine re his el+h-CCniuite^Itts)has 0uny Marton den world mad In bogy mannr or melee web leu prfom,tme boated 1e#e8 OD Sy submission of e prones,die Moudor(warm rerdeo penally cit prey .rryy Bal bihe best Of he kowlstye and t»at tae The Woes In the proprmei here bean arrived et independently edtlroul eearidmn.aero w4 ONSM PSSAbls•Cr suraemorrf,ter 1110 ,pteposk of matt%onnteeletne,es Sc any MPH=reladrrg Sc ankh rives tabh,any other vender or ea any 0erroalltcr. fb}Unless olhereane eegrdred by bak Ole:prime which hers bawl gonad In Sin pinpaeal 41w.Taal terawngIy boon disclosed by be ardor Ow b r pea-*q,draraly or ladlradey.b any ether raider or C9rrpeeIr• c}hb a Iver pt fess been MOS.or the to tirade,by die vendor to boats wry mien Dereak pariniosnl r or coaprabrr to aural or not to submit a pr oral IYar the purpose of rsdrinang oaepelfea9. Kut ay tared,or Holden cl Iiia paausin.be County Meal lora the r#11 In aoaeilate slot'leaded mewl or egnowmera Ween iii bNRy and A ib desehon is deduct bum the pries%or uthorwiue MEOW,Pie trot amend of such tee,otheeshelpn.pamemaga.0111.Payment or tpgrrriidwralferr. cafitiKaPLAISIMPLIMPIALMON ay mlecrt6irg be ender Fie eaderslgeed Ceedrnlor sanies d herr ane wltia®LGA 5 13-1Dw91,elokrg esrrafsue1y VW the rebrldud.in,or torporalbn Mohr Is mrdracee with Augusta,Georgia Bard of Cweenbeinnere has redelarid with and is tai piing ie a federal wet aulhadpatdan og em'piny di the dead*wined n of nodi rupee reOsn groCrne operated by the United Mara Departmatd.of How Swurey or ant o Aefent fedora(wort aulhorration preilrem cperated by the 19Yiad Slates Deperunent of ltenelarrd Setard@ to may n4eenullrr of emir kited employees psawore is the benI5rahoo Ombra and Control Arad 196@ secs),P,L 98,SCe1,le now.Beth a ib lb.wppeeabley prof eorre and deadiesn as6bIatrd in 9.C.O.A I31D4!, The undersigned byther ars Ittat,strodid a ernpkoy Or rsrasuct oath any ef+i h cwr�nae ra Nih the per dear pallcanrerce ae aardec puilma to tWr conbeal aidsAupiidu Geo/p1+Owed of CaNWIUNtiblek ewnaeaagr well aerate gar surer eutai ICaetcr(s1 ahatlr.miiraalon d eouplisrroe Nib e c.G.i4113,9-all MOO SubccuirmbrAffelevi1prouthod do Rub 30(0041,0B mr a subeiondEly radar lona.Corrbedtsr Wier Wrens le mairsoin reasrdn al bud'omaperpw and pravde a boar of each such v1edIm dfoo to the Aiquate,Vergie Board rel Ceneriesieners et are thee the s41 misroo}s relined to sedum each se Deer&Law requires pre w iqi ey'b Inva art E.Vre fylker Ideairleatlesm Number(Company IN eta or doer allay 1r 300. For additional abandon or to error your company.ries the 011e et Glenda website: E Aitrrity'User Identification Number(Company I.Q.) 5 �1 h iA [+a�fd, Yt1r i! N14,1:1P- e SLP f,:41ff+F d 1,110;f rItE Fie;molL_ '1 r 1rI Se-O°�h3Ea.L�321M'd'+te1r7 rte 4r 4`.1 GUcF -•rr.'i . CC'- ..1 F.:c•• ,f 65100."Y£r-,r•)4z,r. ,,f'.1'rrWf 4-4! The under signed further agrees to submit a notarized copy of Attachment B and arty required documentation noted es part of the Auguote, Georgia Board of COmmistsionn motions Which govern this process, In addition, the undersigned agrees to submit all required forms for any subcontractor(s) as requested and or required. I further understand that my submittal will be deemed flan-comp plant If any part of this process Is violated. Siding Dmpany f 9it&11 .1 44;7 /1 T of gent (Covitrreclor&igrlat ire) Monet Tills of Authorized Officer or Agent of Conp'actor _ Fre rte Printed Name of Authorized Offoer or Age-ht SU ;'C1t1BEDAHD RN5EFQIiE YE ON THIS RE DAY OF I .2OJ ALM NOTARY SIAL ~titalE:>ry Ru He j e� hr9y Currantission Eypvres: . t i 0 -* __ ,r' a[l e r i . ; .. rid €' -h . f t. t air-I/Ort OF Re•E'e hr- ire 761.0,tndusttel tastometk infra Noe'Coital*mom far hwrra Cry ll-Bid itur Forder:November 2,2118 a 11:p74 Pep ct 2t Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 27 of 32 ..--- • a yit; it 0 I A e..."' lystematio Alien Verification for Entitlements(MM)Program Affidavit Verifying Status for Augusta. Georgia Benefit Application By executing this affidavit under oath, as are applicant for an Augusta, Georgia Business License or Occupation Tax Certificate, Mono! License, Taxi Permit Contract or other public benefit as reference In 0,C.GA. Section 5646-1,I am staling Ito 10110102 wiLf7e,ct to my tid for Mitura%Georgia cent , or )5 -61111 1 Trui UStin 64., 1 ilsompai 0 - . ' ,.. PliiPfalag* *fidPfNiwnli CPOL4in3 SLiatern - 4qin diogt'Wine:4 0 e, pgrleffroyier Nano of Mint swum appirloo on avettaf indhilvat boahlest eimparelho, • ,or othiwptsgii*WWI I a)thith 3101,vi 4LOIMCLO i E° RD* C ISIIItitypr*Me of nen ik.tweaMon,proretatilm fr*NNW *Aid ' - am a citizen of the United States, OR 2) I ern a legal permanent resident 113 years of age or older. OR 3.) ,______. I ern an otherwise qualffied ellen RI§USC 1641)or nonimmigrant under the Federal Immigration and Nationality Act(8 USC 1101 et seq.)18 years of age or eider and lawfully present in tho United States, In reekleg dye stove reatesenterfon under oath,I understend that any person who knowingly and willfully makes a Woe,*MMus,or fraudulent statement or . ' - cellon In en elhtdavit shell be guilty of a siolshon of Code Sect 1S-1 o '0 idep •,,,,,,e. ''.d.of Georgie. ...., "" - 81. - - • Andyni Levin, lerneu Mused NSOIC .J MIni Resigned=Number ler Neu-Citimer SUBScryla ED AND SWORNArpRE ME ON TI-US THE 2,, ...DAY 0 2011$ j 1,14- P-thit- f Etirg)It414"1 ÷ to r P ti ic . , 1 I My Coominissitytapkta. 14Li le NOTARY SEAL Pra.241,4626 115456 Wm 516 nu Inthaltmi 6156165ttrk KEW Rate Ct51;514 6p.trei NI 51,51pf 055 65-052 D4555455.12555.5ber 2 MR f ues 5:n. Nell a la Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 28 of 32 a VORGI A EXCEPTION SHEET If the commodity (ins) andior services proposed in the response to this bid Is in anyway different from that contained in this bid, the bidder is responsible to clearly identity by specification section number.all such differences in the space provided below. Otherwise, it will be assumed that bidder(s)offer is in total compliance with all aspects of the bid. Below are the exceptions to the stated specifications: e Date , t $411194 f&V. RY,f111(0, pkany UkorieR, Title p1174,4j4 1;4 14 ' 1 Rev.711112511 Re Rid Mar All 163.1, riastlie Ifiereibneek Mte4 Peo,Coato-4 Sars!ttorigt.0,0? Ra-Rid FeRac Ncorardee, ?PB Page B 21 Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 29 of 32 U r . • 6 L A r 11.32.'tas(boy LoeaiV ndo3<Re„iiistratio®berm lei Matt ote.Gear&ec a'a dee use of IUtnl* Ores of goatee,mars end eorstrued n P''adit.-ts whenever pantie.naoludo.Deralto alio vlgaa.tmi sopporu de adwittahes of or axe onmpethlve;Owlet*OF ferdhllth eft tab Sectio stall be Int rprets:1 to mean flat Augtd 1aeaWia AdminMrW of P €prtrx-tl[Nark-ire+relent ted In in vial from seeleN iaemal bets or proposals iron usWde the Augusta merle: 401.0 Olt lhewoe MerdarPrefer enaepolicy shall Doh befooted tomeet:et ofteahmemeethousandddgrs 30bp)orfessend oat Olen the loseett toof nuatraos letle.1ttir;f0%GrSi¢006,rdaeuiwrblmd!1heWrestraanin®Ibkdrrn The twat oa At Wddetwit bo mewed to mete.the bee of the lowest nor:kcal tidder and,If metcidtl_the ltiwtsi Iptal gaatldd WI be muirded the eruct Please Meth &ReldiWiestempropttt't`s1fMeALt'iuSCgOA,COM Yea No 1. the had a heed oflke a Getattradtd peini h and hattrq a street address WOW)the itogephdt Iknks of Pkhmond C4utS ;Min Car at Wade i61 months Onntedlettiv peke to the Ittuenat d tete metemon for Ws or quotes by Aetg.em and yesX_Na t.lhahh i rt W inn%Vow*wenitired try the ASS=A,Wt.Cash teed vet the 3. Feepko*et least rase luemme employee.or low pert-tette employees whew peahen,odder*Le within tete gttttgreget t Wks aB lklanard tient%Gmor i a it nes Metiers has oe efre sees.the business that be sl teen Sty sweat G0%) parte by that or DOW Winn whose Wemify Whew It via*iter issayetf'l•AaId oh i¢leearsd ratnsy.Gwyn. t0.) wage,this=kin stay hr*treeted demean neat the&watt.linnet Adithatader or Catmints,'nav dedinete foliate the provisions of 4 t G tt'F4 3641-1 through 364145.rabbi Weiss s4+dridlt.&CA&3 31A1.2.1 Modes that at"GOO"Gine nei tutor"MIO(Antri06 nr ana•huraa'ed tam*Mars thiG0,0331 or mane.at difined therein.he Modell o a ills d before I<ting oat the canerma to tbe Matvest bidder When nothing In she renin shot 8tOstetreht0 to mRtd A/Pna.Google Annnnintlatarut Soaad td t'44►f M'Onrr'IN OrfrrtW fif rtr< prodded titheAUGUSTA-Ga.CODE retaken publksdtw tisisg bete*Yttirtg etwuln awtteectc Tana The 4eatl bole%et i WV huI*tr shei hint Iwo U)tetter Iran the date OE die Wifaeal W thitapirksAnA.Faboestrg tee now=date,a *ado k a.ietked a heal biddies.An Oak bkdirmert wheel a sue appal 1sen tar won es a head bidder tsar Rwueetnent&wax std elteggth sive k mews to Mitt foe rernikairens,eoa tabsad In mbiamyaph fel Igen grtteelp Selene)of teak stscidae Inrider to rico*■the Peidoanoeofnegglikloci WOW.Plow review the hies*WeIOW Pattonenv,... =,itt r..r E7tck ., eLASCaek I fl.+f1 Notary Pubic: t � 1Frltethfarw� 3/14-britt°134 -10.04/t Owner. _. , /'� -�.�..� . . � Ctrtertusantxpkea• 1, " �+ ` �! 9wnare Signature. NOTARY SEAL Re-glee hem 0)5?5th Industral lFntometh Motel Root Coag Sesfrm Iuf Hamm Qie nee-lid Duo f OW,km***T.2,71$fIt Il: F ns loge 10otla Bid Item#18-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 30 of 32 nos CERTIFICATE IS TO BE POSTED INA C1BFJCI PLACE TI! S FIEREIN DEED 2018 CERTIFICATEU MAILING MOMS INFORMATION ALL SOLJlH SONO$WINDOW CO 20S RUNNEL VEW RD NORTH AUGUSTA,SC 2Q641 *Tl11ai D1* BUI INESS L-103ENSE#.;i eC20 002227 ISSUE CM►TE~ {11d;1tt7$ CERVIFICATE'MST IN THE NAME on MJ.obUTh pm*** velum ccs • t ESSIGI SPECALTy CONThA SUISNOMI TYPE: CONTRACTOR ESEENEEE ICOATI0/t 621 Carnbrialp Rd,Awaits,Q+4 9 CERTIFICATE IH©U*R M$O Afl Ti* KEVIN 1WIN[Y Tos aceSPATIOPOIL TAX 4IRTEICATSIS VSLO O!O4;MOMS VITAXIONNO iOni/ a AM*001111114OT TO. f WOW PT OVISOIO.Tile PLAP6111 SA1100W LOPAI OrepART#IO'Ir k HAVV TME ROOSTT USPOIDASY CMllTIP CATSIF T1eElllllll's VIOLATS ANY LAW OR ORDO OOSOFTlle'k4NTW STATB.'TME woe OPMONK C t*I*ISTA,OKORcJ A. 6 Malek*bon,Demeter Pia Nowa and Dcyalogineol Papartnlalll Bid Item#18-26IA Industrial Elastomeric Metal Roof Coating System for Hangar One Page 31 of 32 ATTACHMENT C PRICE QUOTE BIDDER OFFER LUMP SUM 117TAL$ Lei-i 8i c' BID SUBMITTED St ODMPANT: I\\1_8MA, Sid i tr4 V1/4)Ali 24 4 ROO k ,,PY. j ADDRSS; - It' ').,14 etzt316 EnUt., CITY/STATE: N13 1111 ,- 11- -2 --- TELEPHONE: 845-bqq:1-13a0 FAX 0 -ficri - I EMAIL allUfh 4-i trrai 6ccencihin .,/ SIGNATURE // / By*ming this elocumentv the bidder Is stating 4/ he or the knot en employee of Auguste,Georgia- AUGUSTA RESERVES THE RIGHT TO REJECT ANY AND ML 4105. i • I.,, s t i. P. 1.,,,., 1, v, ..,,:l. C:4'. r.t. lit ed two C8 24.1.4 Nittitia Lit:tome*Meta'Rye Loans ),,tatrr It I kilter Om r";4 Dor 6 Airy Nottriber 2,MB D11:03m m Pair 20.at 20 Bid Item#1 8-261A Industrial Elastomeric Metal Roof Coating System for Hangar One Page 32 of 32