HomeMy WebLinkAbout2015-05-19-Meeting Minutes
Commission Meeting Agenda Commission Chamber - 5/19/2015
ATTENDANCE:
Present: Hons. Hardie Davis, Jr., Mayor; Lockett, Sias, M. Williams,
Fennoy, D. Williams and Davis, members of Augusta Richmond County
Commission.
Absent: Hons. Guilfoyle, Frantom, Hasan and Smith, members of Augusta
Richmond County Commission.
INVOCATION:
Rev. Dr. Mike Cash, Pastor, Trinity on the Hill United Methodist Church
PLEDGE OF ALLEGIANCE TO THE FLAG OF THE UNITED STATES OF AMERICA.
Five (5) minute time limit per delegation
DELEGATIONS
A. Mr. Lamar Hawkins
RE: Blockage of both entrances at the Richmond Summit Apartments.
Item
Action:
None
Lamar_Hawkins.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made
By
Seconded
By
Motion
Result
Presentation is made by Mr.
Hawkins.
B. Mr. Moses Todd
RE: Stormwater Fee
Item
Action:
None
Moses_Todd.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made
By
Seconded
By
Motion
Result
Presentation is made by Mr.
Todd.
CONSENT AGENDA
(Items 1-17)
PLANNING
1. Z-15-11 – A request for concurrence with the Augusta Georgia Planning
Commission to approve with the conditions listed below a petition by Gregory
Jones, on behalf of the Florence S. Waterman Trust, requesting a change of
zoning from Zone R-MH (Manufactured Home Residential) to Zone B-2
(General Business)affecting property containing approximately .72 acres and is
known as part of 2036 Gordon Highway. Part of Tax Map 069-0-008-00-
0. DISTRICT 5 1. Provide landscaping of individual planter boxes placed in
the front of the primary structure. 2. Parking lot and security lighting must be
directed away from the residential properties located to the south of the subject
property. 3. Maintain the existing fence that separates the property from the
nearby residential uses.
Item
Action:
Approved
Z-15-11.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes 6-
0.
Commissioner
Sammie Sias
Commissioner
William Lockett Passes
2. Z-15-13-SP – A request for concurrence with the Augusta Georgia Planning
Commission to approve with the conditions listed below a petition by Harper
Franklin Group LLC, on behalf of Michael Abbott, requesting a Special
Exception in a R-1C (One-family Residential) Zone to allow single family
attached townhomes developed per Section 11-2(a) at a density not to exceed
seven (7) units per acre in accordance with Section 13 of the Comprehensive
Zoning Ordinance for Augusta, Georgia affecting property containing
approximately 7.8 acres and is known as 4113 D Elders Drive. Part of Tax Map
066-4-008-00-0 DISTRICT 3 1. The final plan of the proposed development
Item
Action:
Approved
must be consistent to the concept plan and building elevations received on
4/06/15. 2. The building materials must be consistent with the materials list
provided by the petitioner. 3. A six foot solid fence must be constructed and
maintained along the property line adjacent to Elderberry Subdivision.
Z-15-13.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes 6-
0.
Commissioner
Marion Williams
Commissioner
Sammie Sias Passes
3. Z-15-16 – A request for concurrence with the Augusta Georgia Planning
Commission to approve with the conditions listed below a petition by John
Crowell, on behalf of Crowell & Co. Inc., requesting a change of zoning from
Zone A (Agriculture) to Zone R-1C (One-family Residential) on property
beginning at a point where Covington Court extended intersects Harper Franklin
Avenue. This property contains approximately 86.72 acres and is known as 4095
Harper Franklin Avenue and is proposed to be developed as Section 4 of
Granite Hill Subdivision. Tax Map 053-0-079-01-0 DISTRICT 3 1. A
secondary means of ingress/egress in the form of a stub or temporary street shall
be provided on the east side of the proposed development.
Item
Action:
Approved
Z-15-16.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes 6-
0.
Commissioner
Sammie Sias
Commissioner
Mary Davis Passes
4. ZA-R-237 - A request for concurrence with the Augusta Georgia Planning
Commission to approve a petition to amend the Comprehensive Zoning
Ordinance by adding a new Section 28-F (Personal Care Home); amending
Section 4-2 (Off-Street Parking and Loading) regarding parking requirements
Item
Action:
Disapproved
outside the Central Business District and; amending Section 26-1(h) – Special
Exceptions – Family Personal Care Homes.
ZA-R-237.pdf
ZA-R-237_AMENDMENT.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve.
Voting No:
Commissioner
Marion Williams.
Motion Fails 5-1.
Commissioner
Sammie Sias
Commissioner
William Lockett Fails
5. ZA-R-238 - A request for concurrence with the Augusta Georgia Planning
Commission to approve a petition to amend Section 2 – Definitions by adding
Crematoriums; Section 22-2(22) General Business – Permitted Uses and Section
26-1(s) - Special Exception – to include Crematoriums and required criteria.
Item
Action:
Approved
ZA-R-238_REPORT.pdf
ZA-R-238.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes 6-
0.
Commissioner
Sammie Sias
Commissioner
Mary Davis Passes
PUBLIC SERVICES
6. Motion to approve New Ownership Application: A. N. 15-22: A request by
Kim Sharpton for an on premise consumption Liquor, Beer, & Wine License to
be used in connection with FLO located at 879 Broad Street. There will be
Dance. District 1. Super District 9. (Approved by Public Services Committee
May 12, 2015)
Item
Action:
Approved
FLO.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes 6-
0.
Commissioner
Sammie Sias
Commissioner
Mary Davis Passes
7. Motion to approve New Ownership Application: A. N. 15-23: A request by
Brian Brittingham for an on premise consumption Liquor, Beer & Wine License
to be used in connection with The Central Smokehouse and Cantina located at
1855 Central Avenue. There will be Sunday Sales. District 1. Super District 9.
(Approved by Public Services Committee May 12, 2015)
Item
Action:
Approved
Central_Smokehouse.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes 6-
0.
Commissioner
Sammie Sias
Commissioner
Mary Davis Passes
8. Motion to approve tasking the Administrator with bringing back to the full
Commission a recommendation regarding the demolition status on the
Synagogue and Court of Ordinary Building on the Municipal Building
Campus with options for funding sources and developing an agreement with
Mr. Steinburg and his group for the implementation of plans for a
museum. (Approved by Public Services Committee May 12, 2015)
Item
Action:
Rescheduled
Historic_Preservation_Meeting_Minutes.pdf
2015-03_MB_Campus_Existing.pdf
2015-03_MB_Campus_Option_A.pdf
2015-03_MB_Campus_Option_B.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Defer
Motion to refer this
item back to
committee.
Motion Passes 6-0.
Commissioner
William Fennoy
Commissioner
William Lockett Passes
ADMINISTRATIVE SERVICES
9. Motion to approve tasking the Administrator and Interim Human Resources
Director to review existing grievance policies, investigate the procedures in
other municipalities and to bring back information at the next committee
meeting concerning the establishment of a grievance process for SES employees
for non-EEO related matters. (Approved by Administrative Services
Committee May 12, 2015)
Item
Action:
Approved
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes 6-
0.
Commissioner
Sammie Sias
Commissioner
Mary Davis Passes
PUBLIC SAFETY
10. Motion to approve expansion of Information Technology’s Hewlett Packard
Storage Area Network (SAN). (Approved by Public Safety Committee May
12, 2015)
Item
Action:
Approved
SAN_Quote.pdf
SAN_State_Contract.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve Motion to
approve.
Motion Passes 6-
Commissioner
Sammie Sias
Commissioner
Mary Davis Passes
0.
FINANCE
11. Motion to approve Supplement Agreement #1 to the FY 2015
Metropolitan Transportation Planning Services contract between Augusta,
Georgia and the Georgia Department of Transportation with a local match of
20% which will be 10% in-kind services and 10% cash in the amount of
$22,609.58. (Approved by Finance Committee May 12, 2015)
Item
Action:
Approved
FY_15_Supplemental_#1-_PL_Con_for_ARTS_MPO.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes 6-
0.
Commissioner
Sammie Sias
Commissioner
Mary Davis Passes
12. Motion to approve revisions to Vehicle Oversight Program. (Approved by
Finance Committee May 12, 2015)
Item
Action:
Approved
2015_VEHICLE_OVERSIGHT_PROGRAM_Revision_042415_blue_lined.docx
2009_VEHICLE_OVERSIGHT_PROGRAM_w_Acknowledge_Form_072409.doc
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes 6-
0.
Commissioner
Sammie Sias
Commissioner
Mary Davis Passes
ENGINEERING SERVICES
13. Motion to approve the Avrett Plumbing Company, Inc. in the amount of
$250,000.00 for the option year renewal of existing contract for Cleaning of
Sanitary Sewer Systems to be performed under Account Number
506043410-5223220. (Approved by Engineering Services Committee
May 12, 2015)
Item
Action:
Rescheduled
Backup_for_Extension_12-177.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Defer
Motion to refer this
item back to
committee.
Motion Passes 6-0.
Commissioner
William Fennoy
Commissioner
Sammie Sias Passes
14. Motion to approve the resolution authorizing the Environmental Services
Department (ESD) to apply for financial reimbursement from Georgia’s
Environmental Protection Division (EPD). (Approved by Engineering
Services Committee May 12, 2015)
Item
Action:
Approved
EPD_modelres_-_MJ_CA-Clean_Revised_Resolution_Law_Dept.docx
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes 6-
0.
Commissioner
Sammie Sias
Commissioner
Mary Davis Passes
PETITIONS AND COMMUNICATIONS
15. Motion to approve the minutes of the regular meeting of the Commission on
May 5, 2015 and the Special Called meeting on May 12, 2015.
Item
Action:
Approved
Regular_Commission_Meeting_May_5_2015.pdf
Called_Commission_Meeting_May_12_2015.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Motion to
Approve
approve.
Motion Passes 6-
0.
Commissioner
Sammie Sias
Commissioner
Mary Davis Passes
APPOINTMENT(S)
16. Motion to approve the appointment of Mr. John Kelly to the Augusta-
Richmond County Coliseum Authority to replace Mr. Harry Moore.
(Requested by Commissioner Smith)
Item
Action:
Disapproved
Talent_Bank_Application_John_Kelly_Jr..pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve.
Mr. D. Williams
abstains.
Voting No:
Commissioner
William Fennoy,
Commissioner
William Lockett.
Motion Fails 3-2 -1.
Commissioner
Marion
Williams
Commissioner
Mary Davis Fails
17. Motion to approve the appointment of Ms. Sheena Dorsey to the Animal
Control Board representing District 7. (Requested by Commissioner
Frantom)
Item
Action:
Approved
Talent_Bank_Application_-_Sheena_Dorsey.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes 6-
0.
Commissioner
Sammie Sias
Commissioner
Mary Davis Passes
****END CONSENT AGENDA****
AUGUSTA COMMISSION
5/19/2015
AUGUSTA COMMISSION
REGULAR AGENDA
5/19/2015
(Items 18-22)
PUBLIC SERVICES
18. Ordinance to Amend Augusta Code Title Seven Chapter Four Article Four
Section 7-4-28 relating to the Requirement of Conformance with Certificate
of Appropriateness; to repeal all Code Sections and Ordinances and parts of
Code Sections and Ordinances in conflict herewith; to provide an effective
date and for other purposes. (No recommendation from Public Services
Committee May 12, 2015)
Item
Action:
Rescheduled
2015-4-14_Ord_to_Amend_Historic_Preservaton_Requirements_o_Commission.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Defer
Motion to refer this
item back to
committee.
Motion Passes 6-0.
Commissioner
Sammie Sias
Commissioner
William Lockett Passes
ADMINISTRATIVE SERVICES
19. Discuss the authorization for compensation to the commissioner who serves as a
member on the Planning Commission Board. (Requested by Commissioner M.
Williams) (Tabled until this meeting by Administrative Services Committee
May 12, 2015)
Item
Action:
None
Board_Compensation_Schedule.pdf
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made
By
Seconded
By
Motion
Result
No action is taken on this item due
to the loss of a quorum.
20. Discuss the hiring/rehiring of an EEO Director. (Requested by Commissioner
M. Williams)
Item
Action:
None
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made
By
Seconded
By
Motion
Result
No action is taken on this item due
to the loss of a quorum.
ENGINEERING SERVICES
21. Approve proposed Amendment to Stormwater Ordinance.
Item
Action:
Rescheduled
Chapter_5_Augusta_Final_Draft_04282015.docx
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Defer
Motion to refer this
item back to the next
full Commission
meeting.
Voting No:
Commissioner
Marion Williams.
Motion Fails 5-1.
Commissioner
Sammie Sias
Commissioner
William
Lockett
Fails
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve
reconsidering this
item.
Motion Passes 6-0.
Commissioner
William Fennoy
Commissioner
William Lockett Passes
Motions
Upcoming Meetings
www.augustaga.gov
Motion
Type Motion Text Made By Seconded By Motion
Result
Defer
Motion to refer this
item back to
committee.
Motion Passes 6-0.
Commissioner
Marion
Williams
Commissioner
Mary Davis Passes
OTHER BUSINESS
22. Discuss the big screen monitors outside the Commission Chambers.
(Requested by Commissioner M. Williams)
Item
Action:
None
ItemApprovalSheet.html
Motions
Motion
Type Motion Text Made
By
Seconded
By
Motion
Result
No action is taken on this item due
to the loss of a quorum.
LEGAL MEETING
A. Pending and Potential Litigation.
B. Real Estate.
C. Personnel.
23. Motion to authorize execution by the Mayor of the affidavit of
compliance with Georgia's Open Meeting Act.
Item
Action:
None
Commission Meeting Agenda
5/19/2015 2:00 PM
Attendance 5/19/15
Department:
Caption:
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Commission Meeting Agenda
5/19/2015 2:00 PM
Invocation
Department:
Caption:Rev. Dr. Mike Cash, Pastor, Trinity on the Hill United Methodist
Church
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Commission Meeting Agenda
5/19/2015 2:00 PM
Lamar Hawkins
Department:Clerk of Commission
Caption:Mr. Lamar Hawkins
RE: Blockage of both entrances at the Richmond Summit
Apartments.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Commission Meeting Agenda
5/19/2015 2:00 PM
Moses Todd
Department:
Caption:Mr. Moses Todd
RE: Stormwater Fee
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
AUGUSTA-RICHMOND COUNTY PLANNING COMMISSION
REZONING STAFF REPORT
Case Numberz Z-15-ll
Hearing Date: Monday, April 612015
Report Prepared By: Paul DeCamp, Kevin Boyd and Bob Austin
Applicant: Gregory Jones
Property Owner: Florence S. Waterman Trust
Address of Property: 2036 Gordon Highway
Tax Parcet #: 069-0-008-00-0
Present Zoningz R-MH (Manufactured Home Residential)
Subdivision: N/A
Commission District: 5 (Bill Lockett)
Fort Gordon Notification Required: N/A
Request.' The applicant is requesting a change of zoning from
Home Residential) to Zone B-2 (General Business) to establish
lot.
Zone R-MH (Manufactured
an automobile vehicle sales
Request'.P.r,o,,p, ed Use /$otivity $pplic-hl+ O rdiucilie $Gc{io )
Rezone from R-MH to
B-2 Automobile vehicle sales lot Section 22-l (b)
Background:
This case involves 0.5 acres of a 4.38-acre tract, located approximately 820 feet east of the
Gordon Highway and Wylds Road intersection. A 31-foot wide improved private road bounds
the parcel to the west and provides secondary access to the site. The property contains a 695
square-foot mobile office building, billboard sign and parking, but is vacant at this time. The rear
of the parcel is entirely enclosed by a wooden and barbwire fence that measure slightly more
than 6 feet in height. The applicant said that the site was a used car lot many years ago, a use that
is not allowed under the current R-MH (Manufactured Home Residential) zone. This property
has been utilized for various businesses for many years.
A mix of zoning is present along this stretch of the Gordon Highway commercial corridor.
Primary land uses include auto sales, retail and manufactured housing in the R-l (One-Family
Residential), R-MH (Manufactured Home Residential), B-2 (General Business) and LI (Light
Industry) Zones. Some service businesses and warehouses are present further west of the site.
o Land Use and Zoning- The subject parcel is part of a 4.38-acre tract located on Gordon
Highway. The larger tract area contains several primary uses, both commercial and
residential in nature, including two vehicle sales lots, a tattoo parlor and mobile home
park. The site has a split-zone configuration of B-2 and MH that represents 2.26 acres
and2.l2 acres, respectively. The proposed zoning will reflect existing zoning patterns on
Gordon Highway.
o Utilities - There are three nearby sewer lines that run north, south and west of the site,
and a 12-inch water line located in the north right-of-way of Gordon Highway.
o Environmental - The parcel is entirely developed with a structure and surface parking
lot. Much of existing infrastructure to the site will be retained; the proposal only seeks to
make minor changes, including exterior painting of the building which will have a
minimum impact on the surrounding environment.
o Traffic and Circulation - The parcel has driveway access and an existing curb cut along
Gordon Highway. A 3l-foot wide private road, which extends further into the south
adjacent lot, provides secondary access to the site.
o Buffer and Landscaping - No substantial changes are being proposed to the exterior of
the building and existing infrastructure will largely remain in place. A six-foot tall
wooden and barbwire fence encloses the back portion of the property. Staff recommends
that planter boxes be placed near or along the front fagade of the primary structure to
soften the appearance of the site.
o Comprehensive Plan - The request is compatible with aspects of the current 2008
Comprehensive Plan. The Future Development Map envisions the area to remain a
commercial corridor and encourages opportunities for infill redevelopment along
principal arterial highways in the city. The plan also recommends the sufficient buffers
are established between non-residential uses and adjoining residential areas.
Project Analysis: The applicant is requesting to rezone the property from R-MH to B-2 to
establish an automobile vehicle sales lot. While the current R-MH zoning prohibits the use, a
dealership once operated on the lot. The applicant plans to utilize the existing infrastructure, and
make some minor improvements to the infrastructure. The applicant plans to retain the
commercial mobile offrce building and fence enclosure as part of the automobile sales use. The
applicant intends to have between 10-15 cars on the lot. The modular building is designed for
business use and is registered with the Department of Community Affairs (DCA). A building
permit will be required to construct the ADA ramp and landings.
Findings:
1.Staff finds that the request to rezone the property to B-2 is compatible with aspects of the
general area. The proposed zoning is more appropriate given that the site has direct
abutting access along a major thoroughfare and is similar to other land uses along the
street.
A cluster of auto dealerships along Gordon Highway, there are over 10 auto dealerships
within 3,200 feet of the site, to include two of the four existing primary uses located on
the tract.
Existing infrastructure on the parcel will undergo some improvements and be used as part
of the car sales business. The fence in the rear of the property will continue to screen
portions the site from nearby residential uses.
The request is compatible with aspects of the current 2008 Comprehensive Plan which
encourages opportunities for infill redevelopment along principal arterial highways in the
city.
Preliminary Staff Recommendation: The Staff recommends APPROVAL of this rezoning
petition with the following conditions:
1. Provide landscaping of individual planter boxes placed in the front of the primary
structure.
2. Parking lot and security lighting must be directed away from the residential properties
located to the south of the subject property.
3. Maintain the existing fence that separates the property from the nearby residential uses.
2.
J.
4.
Note: The information included in this staff report represents the best available information at
the time it is written, which is generally two weeks prior to the Planning Commission hearing at
which the zoning petition is to be heard. It represents an evaluation of the facts presented by the
applicant, research done by the staff, and consideration of the relevant factors in the
Comprehensive Zoning Ordinance of Augusta, Georgia. New facts may emerge after the staff
report is written and staff reserves the right to make an oral recommendation at the hearing based
on all the information available at that time.
RWA & PTD/KB
iErEeEs
,iEfigg;g
'iiiEiiig
o
a6 6
iFsgEo6rxoi,
: o !;OO ae;.sidP3 eE.3F
s EsggBEa
tIco!,oo(ofi,oN
E}ti!i
tr
.9o'o boE EE- r=5 E 5! rED N tr''= -g.=-= d 6S :E,A E ro S tUf;fi E H8 E
EEtEils I!;E!EEfg F
-eEEiIiEEE
iEgEiEEgE =#-- ;gf:igii >
BE3}i:EE
I{EEEE; O
g
6e -9i"EEEEe ou ot33;5"
gEi gH
3 8"',<S8trd
o6U)E, P,flE E g
:(I E OtrTt E 6 >
?Eg.E E EIEE€ E E
IEEg.g E
tii= i s:
E
f,o
ED
TE?3
-oo<
= at),? EDvcoEE EcrxC,(\a ul Ettr
$grrt N[!IIH
ocIEloIN
B
.9
EDc
r..aoxIU
c
.9oo >cnE E.=E---E _O,q 3 6'nv c, EcED N =-E- - l/ O
=i @ I EDE,A F roF.E+ E EE
ooTLo6c{
o
:; o
*FIgE
fo.!;oo dv;"u t rfP
$3Ees3 E"<S
EL-o-
, eli-.
$HsaaFEsFEg
FsH # E "iE ;s:
o.clclorN
tr
.9o.2 boE 3i=c rE.q P E,Q
=Yc,tEo
3; i sE ?-Eg E EE Eg IEJII !uutlH
Commission Meeting Agenda
5/19/2015 2:00 PM
Z-15-11
Department:Planning Commission
Caption: Z-15-11 – A request for concurrence with the Augusta Georgia
Planning Commission to approve with the conditions listed below a
petition by Gregory Jones, on behalf of the Florence S. Waterman
Trust, requesting a change of zoning from Zone R-MH
(Manufactured Home Residential) to Zone B-2 (General
Business)affecting property containing approximately .72 acres and
is known as part of 2036 Gordon Highway. Part of Tax Map 069-
0-008-00-0. DISTRICT 5 1. Provide landscaping of individual
planter boxes placed in the front of the primary structure.
2. Parking lot and security lighting must be directed away from the
residential properties located to the south of the subject property.
3. Maintain the existing fence that separates the property from the
nearby residential uses.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
AUGUSTA.RICHMOND COUNTY PLANNING COMMISSION
REZONING STAFF REPORT
Case Number: LL5-13-SP
Hearing Date: Monday, JN[.ay 412015
Report Prepared By: Paul DeCamp, Kevin Boyd and Bob Austin
Applicant: Harper Franklin Group, LLC
Property Owner: Michael Abbott
Address of Propertyz 4ll3 D Elders Drive
Tax Parcel#: 066-4-008-00-0 (part of)
P resent Zoningz R- I C (One-Family Res idential)
Commission District: 3 (Mary Davis)
Fort Gordon Notification Required: Yes
Request: The applicant is requesting a Special Exception in an R-lC (One-Family
Residential) Zone to allow single-family attached townhomes with a density not to exceed
seven (7) housing units per acre, per Section ll-2 (a) of the Comprehensive Zoning Ordinance
for Augusta, Georgia.
Background:
This case involves 7.8 acres of a 13.55-acre tract located south of the intersection Jimmie Dyess
Parkway and Harper Franklin Avenue. The oddly-shaped tract remains undeveloped and is
adjacent to the Elderberry residential subdivision. The property has split zoning, with I 1.55 acres
zoned R-lC (One-Family Residential) and 2.00 acres zoned B-2 (General Business).
Request Proposed Use IActivity Applicable Ordinance Section(s)
Special Exception in an
R-lC Zone
single-family attached
residential townhomes
Section ll-2 (a)
Section 13
The surrounding area includes a mix of zoning and land uses. To the north and south are tracts
zoned B-2 (General Business). Some of these tracts have commercial establishments, but the
majority is undeveloped. To the east are several single-family residential subdivisions zoned R-
lC (One-Family Residential). To the west, across Jimmie Dyess Parkway, is a 156-acre
undeveloped tract, the majority of which is zoned A (Agriculture).
Project Analysis: The applicant is requesting a Special Exception in an R-lC (One-Family
Residential) for 7.8 acres of the 13.55-acre lot. The updated concept plan for the project shows
that six (6) townhome buildings would be constructed on the property. Each townhome building
would contain four (4) housing units. Each townhouse lot would measure 26' x 100' or 2,600
square feet in area. These 24 units would represent the second phase of a two-phase townhouse
development. The first phase would involve the construction of another 44 townhomes on
property located immediately north of the subject tract. That property is appropriately zoned
within B-2 (General Business) Zorre.
Based on the proposed concept, each townhouse would be two-stories tall and have a front porch
an attached garage and a backyard. All of the townhomes would front a common roadway and
contain a20' x 20' parking pad between the building and road. Although a materials list was not
submitted with the application, the elevation drawing reflects a modern style building. The
exterior would have wood siding, with some stone accents on the front facade. Overflow parking
is included in the concept plan in an effort to discourage on-street parking.
o Land Use and Density of Development - The current zoning of R-lC (One-Family
Residential) limits land use to single-family detached residences on lots that are a minimum
60 feet wide and 6,000 square feet in area, or approximately seven (7) units per acre. The
requested Special Exception also permits up to seven (7) units per gross acre, but the
proposed townhouse development would be approximately three (3) units per acre.
o Environmental - The wooded tract slopes down from 370 feet above mean sea level (MSL)
in the northeast corner, to approximately 330 feet above MSL in the southeast corner. The
area where the townhomes are proposed is at an elevation of 340-350 feet above MSL. The
Augusta GIS online map indicates that more than half of the subject property has wetland
soils. The developer proposes to leave the area between the existing sewer line easement and
the proposed townhomes (units 61 - 68) as a natural buffer. The impact of the project on
these soils will have to be addressed with the U.S. Army Corps of Engineers.
The concept plan includes two stormwater management ponds and indicates that much of the
area covered by wetlands soils will be preserved, although there will be some disturbance to
the wetlands at the rear of the properties. The concept plan is subject to change at any time
until final submittal of the site plan.
Traffic and Circulation - The concept plan identifies a single point of access from the
proposed network of internal driveways which will extend from an adjacent lot north of the
property. Each of the three, in total, intemal driveways will measure roughly 20 feet wide
and provide access to and from Harper-Franklin Avenue. Though the property has around
670 feet of frontage along Jimmie Dyess Parkway, classified as a principal arterial, a direct
connection is unlikely given the area of wetlands that separates the proposed development
area from the highway. However, the applicant has expressed an interest in integrating the
major thoroughfare into future commercial development adjacent to the site. Access and
emergency ingress and egress will be addressed once final plans are submitted for internal
review, which will include coordination with Traffic Engineering and the Fire Department.
The 2013 GDOT traffic counts recorded 20,140 annual average daily trips for the section
along Jimmie Dyess Parkway between Belair Road and Harper Franklin Avenue to the south.
Buffer and Landscaping - The concept plan indicates that undeveloped wetlands would
serve as a buffer between the proposed development and nearby detached, single-family
residences. The concept plan includes two stormwater management ponds on the property to
ensure proper drainage. Issues such as drainage flow and buffers will be more closely
analyzed during the internal site review process. The proposed development will have to
comply with applicable provisions outlined in the Augusta Tree Ordinance.
o Comprehensive Plan - This area is envisioned as a "Subdivision Development Area" on the
Future Development Map of the 2008 Comprehensive Plan. Suburban Development areas are
defined, in part, as locations for new mixed-use and infill development in appropriate
locations to reduce automobile traffic, create pedestrian-friendly spaces and establish a sense
of place in suburban locations. The Comprehensive Plan also includes policies to protect
established residential areas and to protect environmentally sensitive areas.
Findings:
1. The proposed use and density of the development are generally compatible with the
adjacent land uses.
2. Vehicular traffic will be handled by new roadways internal to the development. The
internal roads will connect to Harper Franklin Avenue. There will be no road connection
to Elders Drive.
3. The topography of the tract, including the presence of wetlands wetland areas, makes the
site suitable for more compact development.
4. Development of the existing wetland a.reas may pose a threat to the environment, aspects
of the final submitted site plan should aralyze the impact that the proposed development
may have on stormwater management.
Preliminary Staff Recommendation: The Staff recommends APPROVAL of this rezoning
petition with the following conditions:
1. The final plan of the proposed development must be consistent to the concept plan and
building elevations received on 4106115.
2. The building materials must be consistent with the materials list provided by the
petitioner.
3. A six foot solid fence must be constructed and maintained along the property line
adjacent to Elderberry Subdivision.
Note: The information included in this staff report represents the best available information at
the time it is written, which is generally two weeks prior to the Planning Commission hearing at
which the zoning petition is to be heard. It represents an evaluation of the facts presented by the
applicant, research done by the staff, and consideration of the relevant factors in the
Comprehensive Zoning Ordinance of Augusta, Georgia. New facts may emerge after the staff
report is written and staff reserves the right to make an oral recommendation at the hearing based
on all the information available at that time.
KB&PTD&RWA/Kb
ool,!o
CO((t
IE;EiEt
,iEIiilig
3 J;E: E;!E
BiEEiiEEe=
EEBifi[E
!f Ei EEi
E
Hr a s
i*3*.uE r.Pgh ES-E'i5
d
=6t
o
Eol6
o
d
gopoE
LlJo(,
!t
ffi
tr
.9?,tr E6E OEE o*8o- P EH
=sg q iH scE rt :?i GEq E. 38. E
€,ol!oo(o
5o
FEEEl6:EE;do i gP
Eil5g
!i
o-
o
5i(0
d
g
cott
Bgrc
=EEdre'E;
.JoOgoE
t! i.'.lrcI<EcO
IHI
ot,c
-g.eUEDe'=il oi;N
osoo=rrt'OJH6oP@9E E;xo\tUl0/
ffillt
EEocD3
Eo+,
CLooxuJ
6Eo
CLa
E
-9oo LEOEo6o. P E9U?Rtr:o2 ^ atrE T H
f;i E E
Building Materials List
Harper Franklin Multi-Family Site
Rezoning FiIe #2.15-13-SP
Front - a combination ofbrick, stone & hardi board.
Right / Left Sides - hardi board
Rear - hardi board
Roof Materials - 30 year architectural shingles
Soffit & Facia - metal facia & vinyl soffit (same as all the houses in Edleberry neighborhood)
Garage Doors - metal stamped cuiage house with hardware
Windows - Vinyl single hung comparable to Edleberry neighborhood
Exterior Doors - combination of metal & fiberglass comparable to Edleberry neighborhood
!,, fi tr
Pnnted Name
Subscribed and affirmed before me in the county of Columbia, State of Georgia, this 6th day of
May 2015.
lI[rJArlL@RoEn JR
ilOTATYPUBI.JC*r^,ffiffiffiCffi,r*Dcsemberlg-2qLo
Commissior, E*pi.utiir--
Notary's Offi cial Signature
Commission Meeting Agenda
5/19/2015 2:00 PM
Z-15-13
Department:Planning Commission
Caption: Z-15-13-SP – A request for concurrence with the Augusta
Georgia Planning Commission to approve with the conditions
listed below a petition by Harper Franklin Group LLC, on behalf
of Michael Abbott, requesting a Special Exception in a R-1C
(One-family Residential) Zone to allow single family attached
townhomes developed per Section 11-2(a) at a density not to
exceed seven (7) units per acre in accordance with Section 13 of
the Comprehensive Zoning Ordinance for Augusta, Georgia
affecting property containing approximately 7.8 acres and is
known as 4113 D Elders Drive. Part of Tax Map 066-4-008-00-0
DISTRICT 3 1. The final plan of the proposed development
must be consistent to the concept plan and building elevations
received on 4/06/15. 2. The building materials must be consistent
with the materials list provided by the petitioner. 3. A six foot
solid fence must be constructed and maintained along the property
line adjacent to Elderberry Subdivision.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
AUGUSTA.RICHMOND COUNTY PLANNING COMMISSION
REZONING STAFF REPORT
Case Number: Ll5-16
Hearing Date: Monday, May 4,2015
Report Prepared By: Paul DeCamp, Kevin Boyd and Teri Turner
Applicant: John Crowell
Property Owner: Crowell & Co.r Inc.
Address of Property: 4095 Harper Franklin Avenue
Tax Parcel #: 053-0-079-01-0
Present Zoning: A (Agriculture)
Commission District: 3 (Mary Davis)
Fort Gordon Notification Required: Yes
Request: The applicant is requesting a change of zoning from Zone A (Agriculture) to
ZoneR-lC (One-Family Residential) to develop a residential subdivision.
Background:
The R-lC zone permits detached, single-family residential development at a density not to
exceed seven (7) units per gross acre. The plan submitted with the application subdivides the
86.72 acres into 222lots, thereby yielding a density of 2.58 units per acre. A few of the proposed
lots do not meet the lot size requirements for the R-lC zone. No building plans or elevations of
the proposed houses within the development have been provided with the submitted application,
but none are generally required with this type of application'
:Reqn-$Proposed- tlse'/. ,-!ffi Ap$UiabteOrdin*-nte jSectiou(b)
Rezone from A to R-lC To develop a residential
subdivision Section 11-1 (a)
Single-family detached residences are the predominant land use in the immediate area. The
vacant tracts to the east that are zoned A (Agriculture). This is an area in which residential
development has been occurring since the 1990s. Granite Hill, Elderberry and Breckenridge are
some of the subdivisions developed in this area.
The applicant is requesting to rezone the property from A (Agriculture) to R-1C (One-Family
Residential) in order to develop Section 4 of the Granite Hill residential subdivision. The
proposed zoning would match that of the other sections of Granite Hill, as well as the zoning of
Elderberry and Breckenridge.
o Land Use and Zoning- The site is 86.72 acres of vacant of land currently addressed as
4095 Harper Franklin Avenue. The site is bordered by three residential subdivisions on
the north and west, vacant land on the east, and a power line easement and CSX railroad
line to the south. Gordon Highway is located south of the railroad line. The developer
proposes detached, single-family residential development at a density not to exceed seven
(7) units per gross acre.
o Utitities - Presently, a 30-inch water line bisects the tract to the south and contains a fire
hydrant. The nearest sewer line is located roughly 155 feet north of the site along Harper
Franklin Avenue.
Environmental - At this time the site is undeveloped, though much of the wooded area
was cleared years ago by a previous owner as part of a mining operation. The site will
require grading to create the subdivision lots and access roads. Staff noted a large pond
located on a lot that is east and south of the site.
The site is roughly 1,670 feet away from the nearest identified FEMA flood zone (2011,
AE 100-yr flood) to the east, and 2,400 feet from the nearest identified FEMA flood zone
(2011, AE 100-yr flood), west of the site. Locally delineated wetland area, less than one
acre in size, is located at the south end of the property. A small part of the wetlands
extends into the backyards of lots 64, 65 and 66. Wetlands that measure less than an acre
are covered under the Nationwide Permit with notification to the U.S. Army Corps of
Engineers.
Traffic and Circulation - The concept plan indicates that a group of new roads will be
built as part of the subdivision. These will all be classified as local roads. One of the
roads will connect to Harper Franklin Avenue where it intersects Covington Court.
Harper Franklin Avenue provides access to Jimmie Dyess Parkway. There is concern
about there being only one road connection to the subdivision.
Buffer and Landscaping - Some of the mature trees on the site will be maintained to
provide separation from existing development. The rear yards of many of the subdivision
lots are expected to be enclosed with privacy fences. A separate l3-acre tract, owned by
another party and located southwest of the site, will serve as a natural buffer.
o Comprehensive Plan - The zoning request is compatible with the Future Development
Map and policies in the Comprehensive Plan. The Future Development Map targets the
area that the site is in for additional suburban development. The dominant characteristics
envisioned for the area include low and medium-density residential development
concentrated in areas where already established. The requested zoning also adheres to a
guiding land use policy to provide zoning for land suitable for new conventional single-
family residential development.
Project Analysis: The applicant is requesting to rezone the property from A (Agriculture) to R-
lC (One-Family Residential) to develop Section 4 of the Granite Hill subdivision. The proposed
subdivision is currently under Development Plan review and will consist of 8 new streets and
222 residential lots on more than 86 acres of land. The proposed zoning and land use are
compatible with the surroundingarea, and with policies in the Comprehensive Plan. Public water
and sewer service are available near the site.
Based on the submitted Development Plan, the lots appear to contain enough space for sufficient
off-street parking. Staff is concerned about the single access point proposed for the site, south of
the Harper Franklin Avenue and Covington Court intersection. The petitioner has been advised
to create at least one stub or temporary dead-end street on the east side of the subdivision in an
effort to provide additional access to the subdivision via the property to the east, in the event of
an emergency, once that property is developed. Any change of the overall layout is subject to
approval by the Planning Director. This secondary access point will become functional as the
adjacent parcel to the east fully develops. The petitioner must also ensure that all the lots
conform to the general development standards of the zoning district.
Findings:
1. Staff finds that the request to rezone the property to R-lC is compatible with the
surrounding area. Adjacent land to the west and north are zoned R-lC with lots of similar
size and roads of similar configuration.
2. The zoning request is compatible with the Future Development Map and policies in the
Comprehensive Plan. The Future Development Map targets the area that the site is in for
additional suburban development. The dominant characteristics envisioned for the area
include low and medium-density residential development concentrated in areas where
already established. The requested zoning also adheres to a guiding land use policy to
provide zoning for land suitable for new conventional single-family residential
development.
There are concems about the single access point proposed for the development, south of
the Harper Franklin Avenue and Covington Court intersection, considering the large
amount of lots being proposed.
Several lots being proposed do not conform to Section 405. B. of the Land Subdivision
Regulation for Augusta, GA, specifically, the provision that prohibits the depth of lots to
exceed two and one-half (2ll2) times its width.
Preliminary Staff Recommendation: The Staff recommends APPROVAL of this rezoning
petition with the following condition(s):
1. A secondary means of ingress/egress in the form of a stub or temporary street shall be
provided on the east side of the proposed development.
Note: The information included in this staff report represents the best available information at
the time it is written, which is generally two weeks prior to the Planning Commission hearing at
which the zoning petition is to be heard. It represents an evaluation of the facts presented by the
applicant, research done by the staff, and consideration of the relevant factors in the
Comprehensive Zoning Ordinance of Augusta, Georgia. New facts may emerge after the staff
r.po.t is written and staff reserves the right to make an oral recommendation at the hearing based
on all the information available at that time.
KB&PTD&TLTIKb
J.
4.
ooll
8o_
rEsEEEr
'i:iiEliEEigEiiiiE
EEEiIEAE
lf B; Eet
igtacOO ov--5dP
E EHgg8Ed
oicItr
,E
8.
6I
U)oos
FTht
o
.9 .EOEO =EDbFFA->rY.-LLTE Eb6 P E) =9s I EE i
Fr i gE f
6d,lr
E
q$)
tErEe€ir:EltEt
3 ilEi?E
,E!iEilEi iiE;EE!
E -:EE giit
,iliEEii
g
6a
3 F3Eo6rxo
f o-:;oog";.6 Igo 6F E
E EBgo-t
G
E(,E
=e=$BttrcoEgSSEE*
gggi:HaE
E,F.FEtrE=-iEE EBHEB6OO=zoJ!'
..oci!....2-N&&&&ddi=
o,
3.9o
d
.9SO=cto ?o aE o-! .=E E'= E 6E +6 = E-g,q rrl bN .e ; E
3e $ n$ gEeE E .,E[ i es f; qrrlr"i E n!ilIuItIl
o
o3
o
o*c0
=#"
ool!o
8.
Fresg 62:-t;,J
*E9E
Fu :*
o
c
EtoI'__*,G.a_odqE!€Y
' ##5HaE e & i : # r SeF€EEEdEE
EEIItgEa;<OOO=zgJr
ot,6otG'
ElcloIN
^oEAE€ O.,8 E g
=E lr t
sEBE3,8 # PPi s Eig e 6
o
.9 .Eo=O =EDL-
= (E=LL-E '16q ssEE.P- { Fe 5
EE st - j E EF[ g $E EI
..cici=....Z-N<&.&&0.6d JT
N[ilINTIIInffil
Commission Meeting Agenda
5/19/2015 2:00 PM
Z-15-16
Department:Planning Commission
Caption: Z-15-16 – A request for concurrence with the Augusta Georgia
Planning Commission to approve with the conditions listed below
a petition by John Crowell, on behalf of Crowell & Co. Inc.,
requesting a change of zoning from Zone A (Agriculture) to
Zone R-1C (One-family Residential) on property beginning at a
point where Covington Court extended intersects Harper Franklin
Avenue. This property contains approximately 86.72 acres and is
known as 4095 Harper Franklin Avenue and is proposed to be
developed as Section 4 of Granite Hill Subdivision. Tax Map 053-
0-079-01-0 DISTRICT 3 1. A secondary means of
ingress/egress in the form of a stub or temporary street shall
be provided on the east side of the proposed development.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
AUGUSTA.RICHMOND COT]NTY PLANNING COMMISSION
ZONING ORDINANCE AMENDMENT
STAF'F REPORT
Case Numberz #ZA-R-237
Hearing Date: Monday, March 212015
Report Prepared By: Paul DeCamp and Andrew Uhlir
Recommended Amendment:Amend the Comprehensive Zoning Ordinance by adding
Section 28-F (Personal Care Homes) and amending Section 4-2 (Oft Street Parking for All Areas
Except Central Business District (CBD) and Section 26-1(h) (Special Exception- Family
personal care home subject to the following criteria).
Background: The number of personal care homes in Augusta continues to grow, and with this
addition comes the increased need to ensure they are continually providing a high quality of life
for the residents and the surrounding community. The Georgia Department of Community
Health (DCH) facilitates the state licensing of these facilities, while local building, zoning, and
fire safety codes regulate additional standards, such as location and type of home, safety, and
property/building maintenance.
Although homes may undergo an initial inspection, DCH is limited in their resources to provide
periodic inspections to ensure compliance. Furthermore, DCH design requirements can be broad
and may not meet all of the needs of individual communities. Additional or more restrictive
requirements are allowable for local jurisdictions in order to ensure a high quality of living and
safety.
Justification: The intent of this amendment is to provide a way for Augusta to not only increase
the quality of life of residents through design requirements, but to also provide a way to ensure
personal care homes are continually in compliance past their initial inspection. The ordinance
focuses on ADA Standards of Accessible Design, living room, dining room, bathroom, and
bedroom spacing, privacy, and accessibility. Many of these design requirements are increased
clarification or additions to DCH requirements that are already in place. Furthermore, continued
compliance focuses on annual updates to business licensing as well as annual inspections.
ORDINANCE
An Ordinance to amend the Comprehensive Zoning Ordinance adopted by the
Augusta, Georgia Commission effective Septernber 16,lgg7 by adopting Section
28-F (Personal Care Homes)
THE AUGUSTA COMMISSION HEREBY ORDAINS:
SECTION I. That the Comprehensive Zoning Ordinance is amended by adopting
Section 28-F (Personal Care Homes) as shown below:
SECTION 2&F
PERSONAL CARE HOMES
28-F-1 PURPOSE This section is intended to an enhance the quality of living standards of
Personal Care Homes in order to protect the health, safety, and integrity of the residents. This
section includes regulatory requirements, home design standards, and parking requironents for
Personal Care Homes occupied by six or fewer unrelated individuals who reside there and
receive care. These include Family Persoaal Care Homes, both as a Permitted Use and as a
Special Exception granted per Section 26-l (h), as well as Special Use Permits granted for a
Personal Care Home per Section 8-3 (e). Other applicable requirements for Personal Care Homes
include: Georgia Departrnent of Community Health (DCH) requirements, Intemational Property
Maintenance Code, and Fire Code compliance.
28-A-2 DEFINITIONS As used in this Section of the ordinance, the following terms shall
have the meanings indicated:
"Personal Care Home" - shall mean a building occupied by the property owners, or by a
person or persons employed by the property owners, and also occupied by unrelated
individuals who reside there and receive care and/or supervision from the property
owners or persons in their ernployment. A personal care home shall provide care for
elderly and./or handicapped persons. Personal Care Homes shall be classified as: Family
Personal Care Homes, Group Personal Care Homes, and Congregate Personal Care
Homes.
"Personal Care Home Application" - The official application for a Personal Care Home,
attached to a Special Use Permit application, a Special Exception application, or a
permitted use zoning application.
28.A-3 GENERAL REQUIREMENTS
A. Regulatory Compliance:
Personal Care Homes shall comply with all applicable city zoning, building,
housing, and fire codes, and shall fully comply with the Georgia Department
of Community Health (DCH) Rules and Regulations for Personal Care Homes
(Section lll-8-62 of Georgia Code). Proof of compliance as a state registered
Personal Care Home through DCH shall be submitted with a Personal Care
Home Application.
A Personal Care Home Application must contain a scaled floor plan of the
entire residence, including the following details:
a. Bedroom, bathroom, and common room dimensions (must meet
standards set forth in Section 28-B Home Design Requirements).
b. Number ofpersons per bedroom.
c. Rooms labeled (i.e. bedroom, closet, bathroom, dining room, kitchen,
etc.).
d. Label area for use by residents and visitors which affords privacy (i.e.
an area where residents can meet alone with visitors).
The maximum number of residents allowed for the Personal Care Home is
dependent upon the specifications in the Home Design Requirements Section
below, as well as Department of Community Health (DCH) requirements. If
the maximum number of residents allowed is different between DCH
requirernents and Municipal Code requirements, the more stringent
regulations will apply.
Applicant shall provide evidence annually to the Augusta Planning and
Development Department that the facility continues to satisff the conditions
of approval set forth in this ordinance, as well as Department of Community
Health (DCH) requiranents. Evidence of compliance shall be submitted at
least thirty (30) days before the renewal of a business license. During this
time, the Augusta Planning and Development Department may inspect the
home to ensure compliance with both the city ordinance and the business
license requirements. Evidence submitted in the business license renewal
process shall include:
a. A copy of the most recent DCH inspection report and plan for
correction
1.
2.
4.
b. A copy of the most current and accurate licensed residential care
profile
Upon a Personal Care Home being approved, applicant shall make no
alterations or additions to the primary structure for the purpose of increasing
the number of individuals who reside there and receive care.
Any Special Exception or Special Use Permit issued pursuant to this Section
shall terminate if the structure is devoted to a use other than a Personal Care
Home.
If the structure fails to maintain compliance with all building, safety, health,
and zoning requirements, the Special Exception or Special Use Permit shall be
grounds for termination and the owner/operate shall thereafter be required to
discontinue the use of the premises as a Personal Care Home.
B. Home Design Requirements:
1. Common Areas
i. Homes serving a person dependent upon a wheelchair or scooter for mobility
must meet the 2010 ADA Standards for Accessible Design set forth by the
United States Department of Justice. ADA standard ramps within the front
yard must include a landscape buffer around the perimeter of the ramp for the
purpose of visual aesthetics.
ii. The home must have handrails, grab bars, doorways and corridors which
accommodate permiued mobility devices, such as walkers, motorized
scooters, wheel chairs and crutches or canes as the residents require for their
safety and allows the residents to move about the home freely. Homes serving
individuals in wheelchairs must have 60 inches by 60 inches of turning radius
in all areas meant to be accessible to thern, including but not limited to the
bedroom, kitchen, living room, entrances and exits, and at least one bathroom.
iii. The living room must be large enough to accommodate individuals without
overcrowding. Homes with three (3) to five (5) individuals who reside there
and receive care must provide at least 120 square feet of living room space.
Homes with six (6) individuals who reside there and receive care must provide
at least 150 square feet ofliving room space.
iv. The home must provide a comfortable dining area which is properly equipped
and adequate in size for the number of individuals who reside there and
receive care. The dining area shall be adequate to seat all individuals who
reside there and receive care at the same meal seating. Homes with three (3) to
five individuals who reside there and receive care must have at least 80 square
feet allocated for a dining room. Homes with six (6) individuals who reside
there and receive care must have at least 100 square feet allocated for a dining
room.
5.
6.
7.
v. The home must provide a fenced and accessible outdoor space for individuals
who reside there and receive care.
2. Bedrooms or Private Living Spaces
i. Bedrooms or private living spaces must have at least 100 square feet of usable
floor space per individual who resides there and receives care.
3. Bathroom Facilities
i. At least one (1) functional toilet and lavatory must be provided for each four
(4) occupants, and at least one bathing or showering facility must be provided
for each (6) occupants. Occupants include persons who reside there and
receive care, care providers, and other persons living in the home.
ii. A home serving a person dependent upon a wheelchair or scooter for mobility
must have at least one (1) bathroom that perrnits the person to use all
bathroom fixtures easily and independently where able. The bathroom must
meet the 2010 ADA Standards for Accessible Design set forth by the United
States Department of Justice.
Home Design Spacing Requirements Summary Table
*Includes persons who reside there and receive care, care providers, and other persons living
in the home.
Category Requirement
Living Room 3-5 persons who reside andreceive care : 120 square feet
6 persons who reside and receive care: 150 square feet
Dining Room 3-5 persons who reside and receive care: 80 square feet
6 persons who reside and receive care: 100 square feet
Bedroom or private living
spaces
Per person who resides and receives care : I 00 square feet
Functional toilet and lavatory Per4occupants*: l functionaltoilet
Showering facility Per 6 occupants* : I bathing or showering facility
4. Off-Street Parking
i. Homes must meet the requirernents for Off-Street Parking found in Section 4-
2 "Off-Street Parking Requirements for all Areas except Central Business
District (CBD)" of this ordinance. A summary of example required parking
spaces for Off-Street Parking is provided below.
-Street P,'able
Number of
Residents
Space
Allocated to
Residents
On-site
Provider
Visitor Total Required
Spaces
2 1 I I J
J I I 1 3
4 2 I 1 4
5 2 I I 4
6 2 I I 4
SECTION II. That the Comprehensive Zoning Ordinance is amended by adding to
Section 4 (Off-Street Parking and Loading) as shown below:
4-2 Off Street Parking Requirements for all Areas except Central Business District (CBD)
SECTION III. That the Comprehensive Zoning Ordinance is amended by adding to
Section 26-1 (Special Exceptions) as shown below:
(h) Family personal care home subject to the following criteria:
(3) Personal Care Homes with six (6) or less
individuals who reside there and receive care
One (l) space for each three (3) individuals
who reside there and receive care, one (1)
space for an on-site care provided, and one (1)
space for visitors
(4) A family personal care home must meet the requirements set forth in
Section 28-F Personal Care Homes of this ordinance.
SECTION IV. All Ordinances or parts of Ordinances in conflict with this Ordinance are hereby
repealed.
Duly adopted by the Augusta-Richmond County Commission this day of
2015.
MAYOR, AUGUSTA COMMISSION
AUGUSTA, GEORGIA
ATTEST:
LENA BONNER, CLERK
First Reading:
Second Reading:
Commission Meeting Agenda
5/19/2015 2:00 PM
ZA-R-237
Department:Planning Commission
Caption: ZA-R-237 - A request for concurrence with the Augusta Georgia
Planning Commission to approve a petition to amend the
Comprehensive Zoning Ordinance by adding a new Section 28-
F (Personal Care Home); amending Section 4-2 (Off-Street
Parking and Loading) regarding parking requirements outside the
Central Business District and; amending Section 26-1(h) – Special
Exceptions – Family Personal Care Homes.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
AUGUSTA-RICHMOND COUNTY PLANNING COMMISSION
ZONING ORDINANCE AMENDMENT
STAFF REPORT
Case Number: #ZA-R-238
Hearing Date: Monday, March 2,2015
Report Prepared By: Paul DeCamp and Kevin Boyd
Recommended Amendment: Amend Section 22-l (General Business - Permitted Uses) and
Section 26-l (Special Exception - Funeral Homes) of the Comprehensive Zoning Ordinance that
introduces new language that regulates the size and adds minimum distance requirements for
cremation facilities and related accessory uses. This amendment also proposes to limit the
number of single unit cremators for accessory cremation facilities.
Background: In recent months, citizens have been become increasingly concerned about the
close proximity of cremation facilities to residential areas. Due to the growth in popularity of
cremation, crematory services have expanded in the region. While cremation facilities may exist
as a stand-alone use, many operate in conjunction with, or accessory to, existing funeral home
establishments. Section 22-l of the Augusta Comprehensive Zoning Ordinance permits funeral
homes and cremations as an accessory use, in the B-2 (General Business) zone. Under Section
26-1, funeral homes may be considered for a Special Exception in zones deemed appropriate. A
Special Exception is similar to a rezoning, and requires a Planning Commission recommendation
and a final approval from the Augusta Commission. Current ordinance provisions do not regulate
cremation facilities.
Regulations on funeral homes and crematoriums are generally handled at the local or state level.
Most municipalities in Georgia rely on the state's licensing requirements to operate such
businesses and other regulations. The federal govemment itself does not impose any regulations.
Cremation facilities sometimes may present nuisances, such as unpleasant odors and loud noises.
Justification: This amendment adds new language for accessory crematory facilities and stand-
alone crematory facilities. The proposed sections will impose minimum distances and maximum
size requirements for said uses that, in effect, seek to reduce potential conflicts in land uses and
perceived nuisances between cremation facilities and nearby residential uses.
Note: The amendment proposes to add eight new provisions on cremation facilities in Section
22-l (General Business - Funeral Homes), and add subsections 5 - 9 in Section 26-l (Special
Exceptions - Funeral Homes). These provisions provide additional regulations on cremation
facilities.
ORDINANCE
An Ordinance to amend the Comprehensive Zoning Ordinance adopted by the
Augusta, Georgia Commission effective September 16, 1997 by amending
Section 2 (Definitions) by adding Crematorium, Section 22-l (General Business -
Permitted Uses) and Section 26-1 (Special Exceptions - Funeral Homes)
THE AUGUSTA COMMISSION HEREBY ORDAINS:
SECTION 1. That the Comprehensive Zorung Ordinance is amended by adding the
following language in Section 2 (Definitions):
"CREMATORIUM'or "CREMATION FACILITY" shall mean an establishment for
the incineration of animal or human corpses.
SECTION II. That the Comprehensive Zoning Ordinance is amended by adding the
following language in Section 22-l (General Business - Permitted Uses)
(22) Crematoriums - subject to the following restrictions and regulations.(a) Crematoriums are allowed as an accessory use wherein the funeral home is identified
as the primary use.(1) Accessory cremation facilities shall be located at least six hundred (600) feet
from contiguous properties zoned or developed for residential use.
(b) Cremation facilities that are considered o'stand-a1one" shall be located at least two
thousand five hundred (2,500) feet from contiguous properties zoned or developed
for residential use.
(c) Off-street parking shall conform to Section 4 of this Ordinance.(d) No crematory incinerator shall have a discharge of smoke that exceeds ten percent
(10%) ambient air.(e) The owner/operator shall record the hours of operation and total daily cremation rate
for the facility:
(l) Hours of operation shall not be greater than 6:00 A.M. to 9 P.M.
(2) Each human crematory operation shall record the daily cremation rate in bodies
per day.
(3) Each animal crematory operation shall record the daily cremation rate in
pounds per day.
(0 Records of the daily cremation rate and the facility's hours of operation shall be
maintained on site in written or electronic logs.
(g) Cremation facilities shall adhere to all applicable state permit and licensing
requirements.
SECTION III. That the Comprehensive Zoning Ordinance is amended by adding the
following language in Section 26-1 (Special Exception - Crematoriums)
(s) Crematoriums are subject to the following criteria:(1) Crematoriums are allowed as an accessory use wherein the funeral home is identified
as the primary use.
(a) Accessory cremation facilities shall be located at least six hundred (600) feet from
contiguous properties zoned or developed for residential use.(2) Cremation facilities that are considered "stand-alone" shall be located at least two
thousand five hundred (2,500) feet from contiguous properties zoned or developed for
residential use.(3) A tract upon which a stand-alone cremation facility is to be established shall have at
least one hundred (100) feet offrontage on a collector street or an arterial street and be
at least one acre in area.(4) Off-street parking shall conform to Section 4 of this Ordinance.(5) No crematory incinerator shall have a discharge of smoke that exceeds ten percent
O0%) ambient air.
(6) The owner/operator shall record the hours of operation and total daily cremation rate
for the facility:
(a) Hours of operation shall not be greater than 6:00 A.M. to 9 P.M.
(b) Each human crematory operation shall record the daily cremation rate in bodies
per day.
(c) Each animal crematory operation shall record the daily cremation rate in pounds
per day.(7) Records of the daily cremation rate and the facility's hours of operation shall be
maintained on site in written or electronic logs.
(8) A plan illustrating compliance with the above requirements shall be submitted to the
staff of the Augusta Planning and Development Department before the proposal is
placed on the agenda. The Planning Commission shall determine that all of the
foregoing requirements have been satisfied, and further, that the benefits of the
proposed funeral home are greater than any possible depreciating effects and damages
to neighboring properties.
(9) Cremation facilities shall adhere to all applicable state permit and licensing
requirements.
SECTION IV. All Ordinances or parts of Ordinances in conflict with this Ordinance are hereby
repealed.
Duly adopted by the Augusta-Richmond County Commission this day of
2015.
MAYOR, AUGUSTA COMMISSION
AUGUSTA, GEORGIA
ATTEST:
LENA BONNER, CLERK
First Reading:
Second Reading:
Commission Meeting Agenda
5/19/2015 2:00 PM
ZA-R-238
Department:Planning Commission
Caption: ZA-R-238 - A request for concurrence with the Augusta Georgia
Planning Commission to approve a petition to amend Section 2 –
Definitions by adding Crematoriums; Section 22-2(22) General
Business – Permitted Uses and Section 26-1(s) - Special
Exception – to include Crematoriums and required criteria.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
Commission Meeting Agenda
5/19/2015 2:00 PM
Alcohol Application
Department:Planning & Development
Caption:Motion to approve New Ownership Application: A. N. 15-22: A
request by Kim Sharpton for an on premise consumption Liquor,
Beer, & Wine License to be used in connection with FLO located
at 879 Broad Street. There will be Dance. District 1. Super
District 9. (Approved by Public Services Committee May 12,
2015)
Background:This is a New Ownership Application. Formerly in the name of
Anthony Evangelista,
Analysis:This applicant meets all of the requirements of the City of
Augusta's Alcohol Ordinance.
Financial Impact:The applicant will pay a fee of $4,486.00.
Alternatives:
Recommendation:The Planning & Development Department recommends approval.
The R.C.S.D. recommends approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Commission Meeting Agenda
5/19/2015 2:00 PM
Alcohol Application
Department:Planning & Development
Caption:Motion to approve New Ownership Application: A. N. 15-23: A
request by Brian Brittingham for an on premise consumption
Liquor, Beer & Wine License to be used in connection with The
Central Smokehouse and Cantina located at 1855 Central
Avenue. There will be Sunday Sales. District 1. Super District 9.
(Approved by Public Services Committee May 12, 2015)
Background:This is a New Ownership Application. Formerly in the name of
Andrew Crumrine.
Analysis:This applicant meets all of the requirements of the City of
Augusta's Alcohol Ordinance.
Financial Impact:The applicant will pay a fee of $5,610.00
Alternatives:
Recommendation:The Planning & Development Department recommends approval.
The R.C.S.D. recommends approval.
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Commission Meeting Agenda
5/19/2015 2:00 PM
Consider MB Campus Options
Department:Recreation Parks and Facilities - Facilities Management
Caption:Motion to approve tasking the Administrator with bringing back
to the full Commission a recommendation regarding the
demolition status on the Synagogue and Court of Ordinary
Building on the Municipal Building Campus with options for
funding sources and developing an agreement with Mr. Steinburg
and his group for the implementation of plans for a
museum. (Approved by Public Services Committee May 12,
2015)
Background:In December 2013 the Historic Preservation Commission (HPC)
approved demolition of the building which had housed the print
shop and some information Technology Department staff (the rear
portion of the Court of the Ordinary/Courthouse Annex), and the
building that the remainder of the IT staff currently uses (the
masonry structure with the metal building on top). The front
portion of the Courthouse Annex is roughly 82’ long by 30’ wide
and was constructed in the mid-1800s; HPC denied permission to
demolish this front section. (See HRC meeting minutes attached.)
The new IT building is nearing completion and staff will move in
beginning on or about April 30, 2015. The current IT location is
too close to the new building to conform to the requirements of
the current fire and life safety codes. Demolition of the IT
buildings is required in order to comply. Ideally, the demolition
would have been completed prior to the issuance of the Certificate
of Occupancy (CO) of the new IT facility. However, due to the
fact that we could not shut down IT operations until we had the
new facility ready, demolition prior to the move was not possible.
As it relates to the certificate of occupancy (CO) for the new
Information Technology (IT) building, the Planning &
Development Department will issue a temporary CO for what they
determine is a reasonable time period, not to exceed 90 days. A
final CO will be issued when all life safety and fire codes have
been satisfied. Turner Construction’s Guaranteed Maximum Price
(GMP) for the Municipal Building renovation includes $180,000
for demolition and removal of the current IT buildings in their
entirety. In order to salvage the area identified as historic (per the
decision of the HPC), it would be necessary to install bracing and
shoring to permit safe, selective demolition of a portion of the
Court of the Ordinary. The remaining structure would need to be
stabilized and secured as part of the work. These activities would
increase our demolition costs by $206,561. Other factors to
consider are that there is not a current identified use for the
structure that would remain, and Augusta would also need to
provide appropriate ongoing maintenance to prevent further
deterioration. (Please note that because Turner is now completing
their contract work, Heery has recommended that we deduct the
demolition from Turner’s contract and that Augusta contract
directly with vendor to secure demolition services. We anticipate
that the increased costs for the selective demolition will still be the
same if we contract directly with that vendor.) A closely related
issue is that once the Planning and Development Department
relocates to the Municipal Building, their current offices in the
former Synagogue will remain vacant. There is no identified
future use for this building. The Commission should consider the
long term intentions for this building, including demolition, as
they look at future development of the Municipal Building
Campus and the services provided to the community.
Analysis:Thoughtful planning today is essential to responsible use of
taxpayer resources, both financial and historical. The Municipal
Building campus is and will be for the foreseeable future, the
center of operations for the Augusta-Richmond County
Government. The block bordered by Greene Street, Telfair Street,
5th Street, and 6th Street should be sufficient to meet the needs of
our citizens for many years. However, Augusta needs to consider
planning for the future use of this confined site. Current issues
which deserve discussion and consideration include: insufficient
parking on the current campus, historic structures, and space for
departments not included in the scope of the current renovation
project (Those departments include Engineering, Juvenile Court,
Public Defender, and the Law Dept.) Other factors that need to be
taken into account when determining the path forward are: 1. We
don’t have precise estimates on the costs associated with making
either of the historic buildings usable. We do know that neither
meets current code and it would be a costly proposition to make
required code changes, should Augusta choose to renovate them
for future use. 2. The final CO for the new IT building is
dependent on demolition of the current IT buildings. 3. There are
costs associated with retaining any remaining portion of the Court
of the Ordinary and the former synagogue. The estimated average
annual maintenance and utility costs for these structures would be
$10,000. If the Commission determines they do not wish to
commit that level of financial resources to retain vacant structures,
they could be mothballed in accordance with the Augusta
Ordinance which gives Augusta 6 months to determine what to do
with these structures.
Financial Impact:Funding in the amount of $661,000 is available for demolition on
the MB Campus ($180,000 in the GMP contract, and $481,000 in
remaining project accounts). It is estimated that complete or
selective demolition of the 3 vacated buildings can be
accomplished within this budget. The current amount under
Turner’s contract reflects a $180,000 estimate for base demolition
of the two IT buildings. The additional cost to perform selective
demolition and stabilization of the Court of the Ordinary is
estimated at $206,561.00. We do not have a bid number on the
cost to demolish the former synagogue, but we believe the cost
would be in the range of $250,000 to $300,000 if it were bid as a
separate project, and less than that if it were added to a project
including the Court of the Ordinary and old IT building
demolition. In addition, should we decide not to move forward
with full demolition, we would incur the maintenance costs
described above.
Alternatives:1) The Augusta Commission can approve an increase in funding
of $206,561 and direct the contractor to proceed with selective
demolition immediately. That funding is available through savings
from changes in the scope of the Municipal Building Campus
project. The scope of the renovations to the buildings that house
the legal and engineering departments has been reduced. The total
campus project cost would not be increased. 2) The Augusta
Commission can determine that demolition of the vacated
structures is in the best interest of Augusta and direct the
Administrator to proceed with demolition procurement through
Turner's GMP contract. 3) The Augusta Commission can request
that the Historic Preservation Commission reconsider their denial
to demolish the entire Court of the Ordinary structure, and also
request to demolish the synagogue through the normal approval
process. The time required to go through the process for
reconsideration would likely delay demolition. 4) Determine
another path forward not detailed above, such as providing for an
exemption for municipal projects from Historic Preservation
codes.
Recommendation:Allocate the available funds to complete the demolition of the
three vacant structures, following applicable codes; Authorize the
extension of Turner Construction’s GMP contract through the 90-
day period of the TCO; and Authorize the Administrator to take
the necessary actions to complete these demolitions.
Funds are Available
in the Following
Accounts:
Funding in the amount of $661,000 is available for demolition on
the MB Campus ($180,000 in the GMP contract, and $481,000 in
remaining project accounts).
REVIEWED AND APPROVED BY:
ORDINANCE NO. __________________
AN ORDINANCE TO AMEND THE AUGUSTA, GA CODE TITLE SEVEN CHAPTER
FOUR ARTICLE FOUR SECTION 7-4-28 RELATING TO THE REQUIREMENT OF CONFORMANCE WITH CERTIFICATE OF APPROPRIATENESS; TO REPEAL ALL CODE SECTIONS AND ORDINANCES AND PARTS OF CODE SECTIONS AND ORDINANCES IN CONFLICT HEREWITH; TO PROVIDE AN EFFECTIVE DATE
AND FOR OTHER PURPOSES.
WHEREAS, Section 7-4-28(e) binds the Augusta Commission, its various departments,
authorities, commissions, committees, and boards to the provisions of Title Seven, Chapter four,
Article Four of the AUGUSTA, GA CODE; and
WHEREAS, it is the desire of the Commission adjust this binding language.
THE AUGUSTA, GEORGIA COMMISSION hereby ordains as follows:
SECTION 1. Augusta, GA Code Section 7-4-28, is hereby amended by striking this section in
its entirety as set forth in “Exhibit A” hereto. A new Code Section 7-4-28 is hereby inserted to replace the repealed Code Section as set forth in “Exhibit B” hereto.
SECTION 2. This ordinance shall become effective upon approval.
SECTION 3. All ordinances, parts of ordinances, policies, and procedures in conflict herewith are hereby repealed.
Adopted this ____ day of ___________, 2015.
______________________________
Hardie Davis, Jr.
As its Mayor
Attest:
________________________________
Lena J. Bonner, Clerk of Commission
1st Reading:______________________
2nd Reading:______________________
Exhibit A
STRIKE:
Sec. 7-4-28. Requirement of conformance with certificate of appropriateness.
(a) All work performed pursuant to an issued Certificate of Appropriateness shall conform to
the requirements of such certificate. In the event work is performed not in accordance with such
certificate, such work will constitute a violated of this Chapter and the Historic Preservation Commission shall issue a cease and desist order and all work shall cease.
(b) Where this ordinance would require the abstention of a Certificate of Appropriateness
and work upon a structure is undertaken without a Certificate of Appropriateness having been
obtained, such work will constitute a violated of this Chapter and the Historic Preservation Commission shall issue a cease and desist order and all work shall cease.
(c) Work which constitutes a violation of section 7-4-28(a) or (b) above or the failure to obey
a cease and desist order issued pursuant to this Chapter shall constitute a separate and continuing
violation of this Chapter.
(d) The Commission or the Historic Preservation Commission shall be authorized to instate
any appropriate action nor proceeding in any court of competent jurisdiction to prevent any
material change in the appearance of a designated historic property or property within a historic
district, not made in compliance with the provisions of this Chapter or to prevent any illegal act or conduct with respect to such historic property or historic district.
(e) The Commission, including its various departments, authorities, commissions,
committees and boards, shall be bound be the requirements of this article.
Exhibit B
REPLACE WITH:
Sec. 7-4-28. Requirement of conformance with certificate of appropriateness.
(a) All work performed pursuant to an issued Certificate of Appropriateness shall conform to
the requirements of such certificate. In the event work is performed not in accordance
with such certificate, such work will constitute a violated of this Chapter and the Historic Preservation Commission shall issue a cease and desist order and all work shall cease.
(b) Where this ordinance would require the abstention of a Certificate of Appropriateness
and work upon a structure is undertaken without a Certificate of Appropriateness having been
obtained, such work will constitute a violated of this Chapter and the Historic Preservation Commission shall issue a cease and desist order and all work shall cease.
(c) Work which constitutes a violation of section 7-4-28(a) or (b) above or the failure to obey
a cease and desist order issued pursuant to this Chapter shall constitute a separate and continuing
violation of this Chapter.
(d) The Augusta Commission or the Historic Preservation Commission shall be authorized to
instate any appropriate action nor proceeding in any court of competent jurisdiction to prevent
any material change in the appearance of a designated historic property or property within a
historic district, not made in compliance with the provisions of this Chapter or to prevent any illegal act or conduct with respect to such historic property or historic district.
(e) The Augusta Commission, including its various departments, authorities, commissions,
committees and boards, shall not be bound be the requirements of this article.
Redline
Sec. 7-4-28. Requirement of conformance with certificate of appropriateness.
(a) All work performed pursuant to an issued Certificate of Appropriateness shall conform to
the requirements of such certificate. In the event work is performed not in accordance
with such certificate, such work will constitute a violated of this Chapter and the Historic
Preservation Commission shall issue a cease and desist order and all work shall cease.
(b) Where this ordinance would require the abstention of a Certificate of Appropriateness
and work upon a structure is undertaken without a Certificate of Appropriateness having been
obtained, such work will constitute a violated of this Chapter and the Historic Preservation
Commission shall issue a cease and desist order and all work shall cease.
(c) Work which constitutes a violation of section 7-4-28(a) or (b) above or the failure to obey a cease and desist order issued pursuant to this Chapter shall constitute a separate and continuing
violation of this Chapter.
(d) The Augusta Commission or the Historic Preservation Commission shall be authorized to instate any appropriate action nor proceeding in any court of competent jurisdiction to prevent any material change in the appearance of a designated historic property or property within a
historic district, not made in compliance with the provisions of this Chapter or to prevent any
illegal act or conduct with respect to such historic property or historic district.
(e) The Augusta Commission, including its various departments, authorities, commissions, committees and boards, shall not be bound be the requirements of this article.
Commission Meeting Agenda
5/19/2015 2:00 PM
Ordinance to Amend Augsuta Code Title Seven Chapter Four Article Four Section 7-4-28 Relating to the
Requirement of Conformance with Certificate of Appropriateness
Department:Administrator
Caption:Ordinance to Amend Augusta Code Title Seven Chapter Four
Article Four Section 7-4-28 relating to the Requirement of
Conformance with Certificate of Appropriateness; to repeal all
Code Sections and Ordinances and parts of Code Sections and
Ordinances in conflict herewith; to provide an effective date and
for other purposes. (No recommendation from Public Services
Committee May 12, 2015)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
None
REVIEWED AND APPROVED BY:
Commission Meeting Agenda
5/19/2015 2:00 PM
Reorganization of the Law Department
Department:Clerk of Commission
Caption:Motion to approve tasking the Administrator and Interim Human
Resources Director to review existing grievance policies,
investigate the procedures in other municipalities and to bring
back information at the next committee meeting concerning the
establishment of a grievance process for SES employees for non-
EEO related matters. (Approved by Administrative Services
Committee May 12, 2015)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Commission Meeting Agenda
5/19/2015 2:00 PM
Compensation for Service on Planning Commission Board
Department:Clerk of Commission
Caption: Discuss the authorization for compensation to the commissioner
who serves as a member on the Planning Commission Board.
(Requested by Commissioner M. Williams) (Tabled until this
meeting by Administrative Services Committee May 12, 2015)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Commission Meeting Agenda
5/19/2015 2:00 PM
EEO Director
Department:
Caption:Discuss the hiring/rehiring of an EEO Director. (Requested by
Commissioner M. Williams)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Legal Quotation
In reply to your request:
Expires
1/31/201511/17/2014
Created
GDL-11973-01
Your HP Sales Contact:
Alexeia Pickett,
Phone:
Fax:
HP Quote #
Email:alexeia.l.pickett@hp.com
+1 800 2778988 ext. 7812903
Net 30 days, subject to credit approval
Payment Terms:
U.S. SLED Order Management,
Submit Purchase Order To:
1-800-825-2329
Phone:
Fax:
Email:VALOM-US-SLED@hp.com
To:Augusta, City of (inc)
530 GREENE ST RM 806
AUGUSTA, GA 30901-4451
Phone:
Fax:
Email:
Net Price
Hardware:
Software:
Support:
Grand Total:
Solution
131,487.16
47,076.45
58,905.78
0.00
3 weeks
250,000.00
Estimated Delivery Upon Order Entry:
Shipping and Handling: 0.00
Delivery Method:
Standard
Shipping & Handling and Special Handling Exempt
Delivery Duty Paid
Sub-Total: 250,000.00
Other:
12,530.61 Installation:
US$
US$
US$
US$
US$
US$
US$
US$
11/17/2014 2:32:24PMPrint Date:
Legal Quotation
Quote Number
GDL-11973-01
Page
2
No.Product DescriptionQty Extended
Item Net
Price
Delivery
Upon
Order
Entry
Estimated
0100 BW904A 6 days 1,272.52 1 HP 642 1075mm Shock Intelligent Rack
Opt. 001 6 days 170.88 1 HP Factory Express Base Racking Service
0200 E7X84A 3 weeks 29,852.91 1 HP 3PAR StoreServ 7440c 4N St Cent Base
Opt. 0D1 3 weeks 1 Factory integrated
0201 QR486A 3 weeks 6,878.52 4 HP 3PAR 7000 4-pt 8Gb/s FC Adapter
Opt. 0D1 3 weeks 4 Factory integrated
0202 C8R72A 7 days 12,958.12 28 HP M6710 600GB 6G SAS 10K 2.5in HDD
Opt. 0D1 7 days 28 Factory integrated
0203 QR498A 7 days 3,912.60 12 HP M6710 1TB 6G SAS 7.2K 2.5in HDD
Opt. 0D1 7 days 12 Factory integrated
0204 BD374A 5 days 853.36 1 HP 3PAR 7440c OS Suite Base LTU
Opt. 0D1 5 days 1 Factory integrated
0205 BD381A 5 days 13,957.60 80 HP 3PAR 7440c OS Suite Drive LTU
Opt. 0D1 5 days 80 Factory integrated
0206 BD404A 5 days 1,027.82 1 HP 3PAR 7440c Data Opt St v2 Base LTU
Opt. 0D1 5 days 1 Factory integrated
0207 BD405A 5 days 16,418.40 80 HP 3PAR 7440c Data Opt St v2 Drive LTU
Opt. 0D1 5 days 80 Factory integrated
0208 BD375A 5 days 3,036.14 1 HP 3PAR 7440c Reporting Suite LTU
Opt. 0D1 5 days 1 Factory integrated
0300 QR490A 3 weeks 4,291.56 2 HP M6710 2.5in 2U SAS Drive Enclosure
Opt. 0D1 3 weeks 2 Factory integrated
0301 C8R72A 7 days 12,958.12 28 HP M6710 600GB 6G SAS 10K 2.5in HDD
Opt. 0D1 7 days 28 Factory integrated
0302 QR498A 7 days 3,912.60 12 HP M6710 1TB 6G SAS 7.2K 2.5in HDD
Opt. 0D1 7 days 12 Factory integrated
0400 HA114A1 1 HP Installation and Startup Service
Opt. 5TS 2,576.95 1 HP Startup 3PAR 7400 4-Nd Strg Base SVC
Opt. 5TT 1,103.20 4 HP Startup 3PAR 7000 FC Adapter SVC
Opt. 5TV 736.50 2 HP Startup 3PAR 7000 2U SAS Enclosre SVC
0500 QR516B 8 days 1,802.59 1 HP 3PAR 7000 Service Processor
Opt. 0D1 8 days 1 Factory integrated
0600 TK808A 7 days 1.34 1 HP Rack Front Door Cover Kit
Opt. 0D1 7 days 1 Factory integrated
0700 QK734A 7 days 1,741.92 24 HP Premier Flex LC/LC OM4 2f 5m Cbl
Opt. 0D1 7 days 24 Factory integrated
HP Proprietary for Customer Use Only - Do Not Share
11/17/2014 2:32:24PMPrint Date:
Legal Quotation
Quote Number
GDL-11973-01
Page
3
No.Product DescriptionQty Extended
Item Net
Price
Delivery
Upon
Order
Entry
Estimated
0800 H5M58A 8 days 776.52 4 HP 4.9kVA 208V 20out NA/JP bPDU
Opt. 0D1 8 days 4 Factory integrated
0900 BW932A 6 days 151.80 1 HP 600mm Rack Stabilizer Kit
Opt. B01 6 days 1 Include with complete system
1000 BW906A 6 days 248.78 1 HP 42U 1075mm Side Panel Kit
Opt. 0D1 6 days 1 Factory integrated
1100 HA113A1 1 HP Installation Service
Opt. 5BY 404.86 1 Rack and Rack Options Installation
1200 BD362AAE 5 days 6.76 1 HP 3PAR StoreServ Mgmt/Core SW E-Media
1300 BD363AAE 5 days 6.76 1 HP 3PAR 7000/7450 OS Suite E-Media
1400 BD365AAE 5 days 2.37 1 HP 3PAR 7000 Service Proc SW E-Media
1500 BD373AAE 5 days 6.76 1 HP 3PAR Reporting Suite E-Media
1600 H8B35A3 1 HP 3Y 4 hour 24x7 Proactive Care ADV SVC
Opt. RZ5 266.92 1 HP 3PAR 7000 Service Processor Supp
Opt. RZ6 5,484.38 1 HP 3PAR 7450 OS Suite Base LTU Supp
Opt. RZJ 3,459.70 1 HP 3PAR 7450 Reporting Suite LTU Supp
Opt. S7Y 7,648.00 80 HP 3PAR 7450 OS Suite Drive LTU Supp
Opt. SDT 6,503.02 1 HP 3PAR 7450 DataOpt St v2 Base LTU Supp
Opt. SDU 9,045.60 80 HP 3PAR 7450 Data Opt St v2 Drv LTU Supp
Opt. TRJ 11,694.76 1 HP 3PAR StoreServ 7440c4NStrgbase HWSupp
Opt. WSF 4 HP 3PAR Internal Entitlement Purpose
Opt. WUS 4,728.64 56 HP 3PAR 7000 Drives under 1TB Support
Opt. WUT 2,515.68 24 HP 3PAR 7000 Drives over 1TB Support
Opt. WUW 670.68 2 HP 3PAR 7000 Drive Enclosure Support
Opt. WUX 991.96 4 HP 3PAR 7000 Adapter Support
1700 HA124A1 1 HP Technical Installation Startup SVC
Opt. 5TM 2,678.20 1 HP Startup 3PAR 7000 Reporting Ste SVC
Opt. 5UG 5,030.90 1 HP Startup 3PAR 7000 Data Opt Ste v2 SVC
1800 UW316AS 1 HP Proactive Select Service
1900 HK696A1 2 HP 1Y Proactive Select 10 Credit SVC
Opt. 2BT 2,949.98 2 HP Proactive Select Credit SVC
2000 U4VT2AS 10 HP PCA Proactive Credits Per Year SVC
Complex 1
2100 727021-B21 2 weeks 2,989.96 2 HP BL460c Gen9 10Gb/20Gb FLB CTO Blade
2101 779795-L21 8 days 9,514.04 2 HP BL460c Gen9 E5-2699v3 FIO Kit
2102 779795-B21 8 days 9,514.04 2 HP BL460c Gen9 E5-2699v3 Kit
HP Proprietary for Customer Use Only - Do Not Share
11/17/2014 2:32:24PMPrint Date:
Legal Quotation
Quote Number
GDL-11973-01
Page
4
No.Product DescriptionQty Extended
Item Net
Price
Delivery
Upon
Order
Entry
Estimated
Opt. 0D1 8 days 2 Factory integrated
2103 726722-B21 9 days 4,982.24 8 HP 32GB 4Rx4 PC4-2133P-L Kit
Opt. 0D1 9 days 8 Factory integrated
2104 759208-B21 8 days 1,400.00 4 HP 300GB 12G SAS 15K 2.5in SC ENT HDD
Opt. 0D1 8 days 4 Factory integrated
2105 700764-B21 8 days 240.00 2 HP FlexFabric 20Gb 2P 650FLB FIO Adptr
2106 761871-B21 8 days 877.42 2 HP Smart Array P244br/1G FIO Controller
2200 BD713AAE 5 days 11,760.48 4 VMw vSphere Ent 1P 3yr E-LTU
2300 H1K92A3 1 HP 3Y 4 hr 24x7 Proactive Care SVC
Opt. R5H 494.84 4 VMw vSphere Ent 1P 3yr SW
Opt. TT8 2,451.62 2 HP BL460c Gen9 Server Blade Support
Complex 1
2400 571956-B21 5 days 21,038.68 2 HP BLc VC FlexFabric 10Gb/24-port Opt
250,000.00 Grand Total:US$
HP Proprietary for Customer Use Only - Do Not Share
11/17/2014 2:32:24PMPrint Date:
Legal Quotation
Quote Number
GDL-11973-01
Page
5
Quote contains special discounts. Unless the customer has another valid agreement with HP, this quotation is governed by HP Customer Terms - Portfolio.
A copy of these terms can be found on-line at http://h20195.www2.hp.com/V2/GetPDF.aspx/4AA4-8516ENUS.pdf or a copy can be requested from your
Customer Service Representative.
For inquiries regarding this quote please contact: RFQ-US-SLED@hp.com
Upon issuing a Purchase Order to Hewlett-Packard please include the following:
Hewlett-Packard Company listed as the Vendor
Bill to & ship to addresses
PO# and valid HP quote number
HP Purchase Agreement #SWC90813-04
Contact name, phone number & e-Mail address
For electronic software include the end user e-Mail Address
Requested delivery date (per SLA requirements) and any special delivery requirements
Tax status
If support is ordered provide the end user’s name and phone number. For upgrades include the serial
number or the support identifier for contract entitlement
*Prices are exclusive of use, sales value added and other taxes. Should the item(s) being quoted herein be exempt from sales tax please include the
appropriate valid tax exemption certificate referencing Hewlett-Packard Company as the vendor.
*If quoted herein, Remarketed Products are fully remanufactured and carry new product warranty. Purchase is subject to inventory availability at receipt of
order. Inventory may not be reserved. HP reserves the right to substitute new components if appropriate, or to cancel orders by notifying the customer if
necessary components are unavailable.
*If quoted herein, HP Promotions must be ordered as quoted, no substitutions will be allowed. POs must be received on or prior to the expiration date of the
quote or special promotion whichever comes first.
*If quoted herein, HP Consignment/Demo equipment is currently at the location listed on this quote. Issuing a PO against this formal quotation will imply
acceptance and delivery of the Consignment/Demo inventory. The standard warranty applicable to new equipment will apply. Some demo equipment may
contain products that are remanufactured to be functionally equivalent to new.
Unless indicated differently this quote is subject to the terms and conditions as set forth in your purchase agreement SWC90813-04.
.
HP Proprietary for Customer Use Only - Do Not Share
11/17/2014 2:32:24PMPrint Date:
Statewide Contract Information Sheet
Statewide Contract
Number
SWC90813
Name of Contract Servers/Storage
Effective Date September 1, 2009
Contract Table of Contents
Suppliers Awarded
Contract Information: MANDATORY CONTRACT
Contract Information for Supplier Page Number
Dell 2
Hewlett Packard 4
IBM 7
Additional Contract Information
Quick Facts 8
Item Schedule 9
Revised 07/13/11 SPD-CP032
Vendor Information Sheet
Vendor Name: Dell
Contract Information
Statewide Contract
Number
SWC90813-01
Contract Name Servers/Storage
PeopleSoft Vendor
Number
0000015689
Location Code
001
Vendor Name & Address
Dell Marketing L.P.
One Dell Way, Round Rock, TX 78682
800.981.3355
Contract Administrator
Name: Lauren McCosham
Address: One Dell Way, MS RR8-07
Telephone: 512-723-1325 Fax: 512-283-9092
E-mail: lauren_mccosham@dell.com
Contract Details
1. Ordering
Information
Deven Richter
Phone: 800-981-3355, ext. 7289110
Email: deven_richter@dell.com
2. Remitting
Information PO BOX 534118
Atlanta, GA 30353-4118
3. Delivery Days
To be defined by authorized purchaser at the moment of the purchase.
4. Discounts Additional order-size discounts are available for the State of Georgia
Standard Configurations.
5. Payment Terms Net 30
6. Bid offer includes State and Local Government, Higher Education, K-12
7. Acceptable payment method
Purchasing Card may be used for purchases under this contract and any
cash discount will be applied the same as cash.
8. Escalation Plan for Customer Service
Quality Issues
1st Line Escalation Contact:
Travis Quigley,
Account Executive
Phone: 404-345-7622
Email: Travis_Quigley@Dell.com
2nd Line Escalation Contact:
Jeff Fleetwood, Regional
Sales Manager
Phone: 803-802-8809
Email: jeff_fleetwood@dell.com
3rd Line Escalation Contact:
John Mullen, Vice
President MPA Sales
Phone: 512-728-5920
Email: john_mullen@dell.com
RESELLERS AUTHORIZED TO ACCEPT PURCHASE ORDERS ON BEHALF OF DELL
Cambridge Computers Corporate Office
www.cambridgecomputer.com
Contact – Information and Quotes: Remit Address:
Joe Heitmeyer Cambridge Computers Corporate Office
Client Relationship Manager 271 Waverley Oaks Road #301
jheitmeyer@cambridgecomputer.com Waltam, MA 02452
Office: 770-973-9665
Cell: 770-329-1102
PO Instructions:
Cambridge Computers is authorized to accept
purchase orders on behalf of Dell for all items in this contract.
Vendor Information Sheet
Vendor Name: Hewlett Packard Contract Information
Statewide Contract Number SWC90813-04
Contract Name Servers/Storage
PeopleSoft Vendor Number 0000264929 Location Code 001
Vendor Name & Address
Hewlett-Packard Company
3000 Hanover St.
Palo Alto, CA 94304
Contract Administrator
Erin Tank
Contract Sales and Strategic Programs Telephone: 501-428-8287 / Fax: 866-220-7319
E-mail: erin.e.tank@hp.com
Contact Details
1. Ordering
Information
Bruce Glenn
Phone: 800-277-8988, Option 1, ext. 7713559
Email: bruce.glenn@hp.com
2. Remitting
Information
Hewlett-Packard Company
PO 101149
Atlanta, GA 30392-1149
3. Delivery Days To be defined by authorized purchaser at the moment of the purchase.
4. Discounts Additional order-size discounts are available for the State of Georgia Standard Configurations.
5. Payment Terms Net 30 Days
6. Bid Offer includes State and Local Government, Higher Education, K-12
7. Acceptable
payment method Vendor will accept the Purchasing Card for purchases under this
contract 8. Escalation Plan for
Customer Service Quality Issues
1st Line Escalation Lauren Cromwell
Phone: 888-277-8988
Opt. 1, Ext 7810544
Email:
bruce.glenn@hp.com
2nd Line Escalation Nelson Munn
Phone: 850-322-1535
Email:
nelson.munn@hp.com
3rdt Line Escalation Tom Coleman
Phone: 678-654-5750
Email: tom.coleman@hp.com
RESELLERS AUTHORIZED TO ACCEPT PURCHASE ORDERS ON BEHALF OF HP
Cnetics Technologies, LLC
FEID 58-2360346
www.cnetics.com
For Quotes Contact:
Remit Address:
Account Executive Bob Hannah Lisa Chambless Cnetics Technologies, LLC
770-864-7240 770-864-7232 7076 Peachtree Ind. Blvd. Suite 200
Fax: 770-409-3112 lchambless@cnetics.com Norcross, GA 30071
bhannah@cnetics.com
Reporting Contact:
Melanie Bellavich
770-864-7210
mbellavich@cnetics.com
MCPc, Inc.
FEID 32-0012228 http://www.mcpc.com/
For Quotes Contact: Remit Address:
Account Executive Scott Huse MCPc, Inc.
Lincoln L. Stupart 770-392-8901; ext. 5012 PO Box 643283
770-392-8901; ext. 5004 scott.huse@mcpc.com Pittsburgh, PA 15264-3283
770-633-3228 mobile
lincoln.stupart@mcpc.com
Reporting Contact:
Matthew Curtis
440-268-4394
matthew.curtis@mcpc.com
Systems Alliance, Inc.
FEID 52-1811163
www.systemsalliance.com For Quotes Contact: Remit Address:
Sr. Business Development Executive
Charlie Pierce
Cell: 706-248-9556
Charlie Pierce
Cell: 706-248-9556
Systems Alliance, Inc.
Executive Plaza III
Office: 410-343-7715 cpierce@systemsalliance.com 11350 McCormick Road, Suite 1203
Fax: 410-584-0594
cpierce@systemsalliance.com
Hunt Valley, MD 21031
Reporting Contact:
Kristi Peyton, Controller
410-343-7720
kpeyton@systemsalliance.com
CDW-Government LLC
FEID 36-4230110
https://www.cdwg.com/ For Quotes Contact: Remit Address:
Deputy Program Manager
John Johnsen
Office: 312-705-0909
John Johnsen
Phone: 312-705-0909
CDW-Government
LLC
Fax: 312-705-3709 jjohnsen@cdw.com 75 Remittance Dr. Suite 1515
jjohnsen@cdw.com Chicago, IL, 60675-1515
Reporting Contact:
John Johnsen
312-705-0909
jjohnsen@cdw.com
Vendor Information Sheet
Vendor Name: International Business Machines Corporation
Contract Information
Statewide Contract Number SWC90813-02
Contract Name Servers/Storage
PeopleSoft Vendor Number 0000004543 Location Code 001
Vendor Name & Address
International Business Machines Corporation
New Orchard Road
Armonk, NY 10504
Contract Administrator
Russell Boles
International Business Machines, Corp
Client Systems Manager - East Region, Public Sector 7100 Highlands Parkway, Smyrna GA 30082
770-863-1823, t/l 753 rusboles@us.ibm.com
Contact Details
1. Ordering Information Russell Boles
Phone: 770-863-1823, t/l 753 rusboles@us.ibm.com
2. Remitting Information
91222 Collections Center Dr
Chicago, IL 60693-1222
3. Delivery Days To be defined by authorized purchaser at the
moment of the purchase.
4. Discounts Additional order-size discounts are available for the State of Georgia Standard
Configurations.
5. Payment Terms Net 30 Days
6. Bid Offer includes State and Local Government, Higher Education, K-
12
7. Acceptable payment method Vendor will accept the Purchasing Card for
purchases under this contract. 8. Escalation Plan for Customer Service Quality Issues
Russell Boles Phone: 770-863-1823, t/l 753 Email: rusboles@us.ibm.com
Quick Facts: The contracts are administered by the Department of Administrative Services (DOAS). The contracts are a mandatory source to all eligible State entities and for the convenience of political
subdivisions.
Discounts were negotiated for the State of Georgia with Dell, HP, IBM, and Oracle for Configurations
and Family Suite of Products.
Additional order-size discounts are available for the State of Georgia.
Item Schedule
Dell Products and Pricing:
See Team Georgia Marketplace for State products and pricing or contact supplier directly.
HP Products and Pricing:
See Team Georgia Marketplace for State products and pricing or contact supplier directly.
IBM Products and Pricing:
See Team Georgia Marketplace for State products and pricing or contact supplier directly.
Oracle Products and Pricing:
Contact supplier directly for products and pricing.
Commission Meeting Agenda
5/19/2015 2:00 PM
Approve expansion of Information Technology’s Hewlett Packard Storage Area Network (SAN).
Department:Information Technology
Caption:Motion to approve expansion of Information Technology’s
Hewlett Packard Storage Area Network (SAN). (Approved by
Public Safety Committee May 12, 2015)
Background:This addition to Information Technology’s Storage Area Network
(SAN) increases the capacity of our current SAN base
configuration. This purchase will further migration of physical
servers to virtual servers and increase the storage capacity of the
environment. Virtualization increases the manageability and
redundancy of those resources and also reduces the likelihood of
downtime. This purchase will allow for future expansion at a
lower cost for a minimum of the next five (5) years. Vendor:
Hewlett Packard Purchase Information:This purchase will be
made based on the agreement between the State of Georgia and
Hewlett Packard. State Contract: SWC90813-04
Analysis:This expansion will increase Information Technology’s virtual
storage by 50TB. This additional space is needed for the storage
of mission critical data. It will provide storage that will be used to
continue the expansion of our virtual environment for the next five
(5) years. This is to expand Hewlett Packard hardware that is
already installed. This will provide increased compatibility with
existing systems.
Financial Impact:The total cost for this project is $250,000. Funds are available in
Information Technology’s approved capital budget.
Alternatives:N/A
Recommendation:Approve expansion of Information Technology’s Hewlett Packard
Storage Area Network (SAN).
Funds are Available
in the Following Funds are available in Information Technology’s approved capital
budget.
Accounts:
REVIEWED AND APPROVED BY:
METROPOLITAN TRANSPORTATION
PLANNING SERVICES CONTRACT
SUPPLEMENTAL AGREEMENT # 1
AUGUSTA PLANNING AND DEVELOPMENT DEPARTMENT
FHWA METROPOLITAN PLANNING PROGRAM
PLANNING (PL) FUNDS
FY 2015
PROJECT ACCOUNT NUMBER: PL000-0012-00-927
CATALOG OF FEDERAL DOMESTIC ASSISTANCE NUMBER 20.205
FEDERAL-AID PARTICIPATING PROJECT
PI Number 0012927-PLN
Federal Share 80% $460,476.65
Local Match Share 20% $115,119.16
Total Contract Cost $575,595.82
SUPPLEMENTAL AGREEMENT #1
between
DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
ONE GEORGIA CENTER
600 WEST PEACHTREE STREET
ATLANTA, GEORGIA
and
AUGUSTA PLANNING AND DEVELOPMENT DEPARTMENT
THIS AGREEMENT is made and entered into this ________ day of __________________, 2015, by and
between the DEPARTMENT OF TRANSPORTATION, an agency of the State of Georgia, hereinafter called the
"DEPARTMENT," and the, AUGUSTA PLANNING AND DEVELOPMENT DEPARTMENT organized and
existing under the laws of the State of Georgia, hereinafter called the "DESIGNATED AGENCY."
WHEREAS the DEPARTMENT and the DESIGNATED AGENCY desire to amend the Original
Agreement dated July 16, 2014, to increase federal amount of the Original Agreement, by adding the FY 2014 PL
Contract carry over federal money in the sum of One Hundred Eighty Thousand Eight Hundred Seventy Six Dollars
and Sixty Five cents ($180,876.65).
Now, THEREFORE it is agreed by the parties hereto that the Original Agreement dated July 16, 2014 is hereby
amended as follows:
1. By deleting ARTICLE VI, COMPENSATION, Section A, Total Cost, in its entirety and inserting in
lieu thereof the following Section A:
A. Total Cost
The total estimated allowable cost, as shown in Exhibit B, attached hereto and incorporated herein
by reference, for the completion of the PROJECT is Five Hundred Seventy Five Thousand Five Hundred
Ninety Five Dollars and Eighty Two Cents ($575,595.82). It is agreed that the amount which the
DEPARTMENT shall be obligated to pay is 80%, which represents the Federal Share, of the cost of the
PROJECT up to Four Hundred Sixty Thousand Four Seventy Six Dollars and Sixty Five Cents
($460,476.65). However, if the sum total of the allowable cost for the PROJECT should be less than the
estimated amount, then it is further agreed that the DEPARTMENT shall be obligated to pay the 80%
Federal Share Match of the allowable cost incurred. In no event shall the DEPARTMENT be obligated to
pay more than the $460,476.65 Federal Share. Also, it is agreed that the amount which the DESIGNATED
AGENCY shall be obligated to pay is 20%, which represents the Local Match, of the cost of the PROJECT
up to One Hundred Fifteen Thousand One Hundred Nineteen and Sixteen Cents ($115,119.16). However, if
the sum total of the allowable cost should be less than the total estimated allowable cost it is agreed that the
DESIGNATED AGENCY shall pay 20% of the allowable cost incurred. In no event shall the
DESIGNATED AGENCY’S Local Match of the Federal Share exceed $115,119.16.
2. By deleting Exhibit B. from the Original Agreement in its entirety and inserting in lieu thereof the
attached Exhibit B revised April 10, 2015:
COVENANTS AGAINST CONTINGENT FEES
SUPPLEMENTAL AGREEMENT
The DESIGNATED AGENCY shall comply with all relevant requirements of all Federal, State, and
Local laws. The DESIGNATED AGENCY warrants that it has not employed or retained any company or
person, other than a bona fide employee working solely for the DESIGNATED AGENCY, to solicit or secure
this SUPPLEMENTAL AGREEMENT and that it has not paid or agreed to pay any company or person, other
than a bona fide employee working solely for the DESIGNATED AGENCY, any fee commission, percentage,
brokerage fee, gifts or any consideration, contingent upon or resulting from the award or making of this
Supplemental Agreement. For breach or violation of this warranty, the DEPARTMENT shall have the right to
annul this Supplemental Agreement without liability or, in its discretion, to deduct from the Supplemental
Agreement price or consideration, or otherwise recover, the full amount of such fee, commission, percentage,
brokerage fee, gift or contingent fee.
Except as hereby modified, changed or amended, all other terms and conditions of the Agreement dated July 16,
2014 shall remain in full force and effect.
IN WITNESS WHEREOF, said parties have hereunto set their hands and affixed their seals the day and year above
first written.
DEPARTMENT OF TRANSPORTATION AUGUSTA, GEORGIA
(Continued)
Commissioner (SEAL)
Sworn and subscribed before me
this day of , 20 .
NOTARY PUBLIC
ATTEST:
Treasurer
AUGUSTA, GEORGIA
My Commission Expires:
(Notary Seal)
FEDERAL EMPLOYER
IDENTIFICATION NUMBER:
________________________________________
Mayor
Attest:______________________(seal)
This agreement approved by the Mayor and
Commission at a meeting held on the _______ day of _________, 20___.
I attest that the Corporate Seal attached to this
Document is in fact the seal of the Corporation
and that the Officer of this Corporation executing
this Document does in fact occupy the official
position indicated and is duly authorized to
execute such document on behalf of this
Corporation.
EXHIBIT B
BUDGET ESTIMATE
FISCAL YEAR 2015
Commission Meeting Agenda
5/19/2015 2:00 PM
FY 2015 Metropolitan Transportation Planning Services Contract, Supplemental Agreement
Department:Planning and Development
Caption:Motion to approve Supplement Agreement #1 to the FY 2015
Metropolitan Transportation Planning Services contract between
Augusta, Georgia and the Georgia Department of Transportation
with a local match of 20% which will be 10% in-kind services and
10% cash in the amount of $22,609.58. (Approved by Finance
Committee May 12, 2015)
Background:The Augusta Planning and Development Department (APDD) is
the metropolitan transportation planning staff of the Augusta
Regional Transportation Study serving as Metropolitan Planning
Organization (MPO) representing Richmond County, Georgia.
The APDD received approval from the Augusta Commission to
execute the FY 2015 Metropolitan Transportation Planning
Services Contract between Augusta Georgia and GDOT on June
9, 2014. These funds provide funding for administration, staff, and
office equipment to support the Augusta Regional Transportation
Study work tasks in the FY 2015 Unified Planning Work
Program.
Analysis:APDD did not expand all federal funds under this program in FY
2014, and subsequently requested GDOT to carryover funds to
support work tasks to conduct the 2040 Long Range
Transportation Plan. Without approval of this item, the Augusta
Planning Development Department will not receive additional
federal funds and cannot execute the aforementioned
Supplemental Agreement. These funds need to be expensed by
June 30, 2015.
Financial Impact:Local matching funds will be provided by the City of Augusta in
an 80/20 split including $180,876.65, 80% from the U.S.
Department of Transportation – Federal Highway Administration;
and $45,219.16, 20% local match from the city.
Alternatives:Approve or Deny the Supplemental Agreement
Recommendation:Approve Supplement Agreement #1 to the FY 2015 Metropolitan
Transportation Planning Services contract between Augusta,
Georgia and the Georgia Department of Transportation.
Funds are Available
in the Following
Accounts:
Org. Key #220016309
REVIEWED AND APPROVED BY:
FINANCE DEPARTMENT
RISK MANAGEMENT
FLEET MANAGEMENT
VEHICLE OVERSIGHT PROGRAM
Commission Approved 12/02/2008 / Revised 02/12/2015
PPPM Sections 1100.401 – 1100.405
1. PURPOSE: The Vehicle Oversight Program has numerous purposes:
· Provides management a tool to better utilize available resources.
· Provides management a tool to monitor employee productivity.
· Enhances the risk reduction program.
· Reinforces current vehicle utilization policy and encourages responsible driving behavior.
· Increases safety awareness.
· Enhances Augusta’s 311 program.
2. CONCEPT: Vehicles owned by the Augusta Commission will have Global Positioning Systems (GPS) installed with
monitoring capability at the respective department level. Central monitoring will be available through Risk
Management and Fleet Management as well. Installation on vehicles will be coordinated with Fleet Management.
3. APPLICABILITY: This program is applicable to departments and agencies subordinate to the Augusta
Commission. Vehicles assigned to Constitutional Officers or Elected Officials are not subject to this program at this
time; however, they may elect to participate in the program and units will be placed on their vehicles as they
become available.
4. RESPONSIBILITIES:
A. Administrator: Responsible for the overall supervision of the monitoring program.
B. Finance:
1. Risk Management: Provides for program implementation, information briefings to respective departments
and provides primary centralized monitoring of vehicles. Coordinates funding for program support,
continuity and sustainment.
2. Fleet Management: Assists Risk Management with program implementation and coordination. Provides
secondary centralized monitoring of vehicles. Responsible for coordinating the installation of systems on
vehicles as directed.
C. Departments: Provides departmental monitoring and operational supervision. All employees will be required
to sign a form that acknowledges they understand GPS devices will be used in vehicles/equipment owned by
the Augusta Commission and they are aware of potential consequences when abuse is discovered.
Departments should use the system to verify employee compliance with Augusta, GA Risk
Management Policies, the Fleet Management Policy, and Departmental Policies, i.e. the safe and
conscientious operation of motor vehicles to include speeds driven, idle time appropriateness, using
vehicle for business purposes only (personal use prohibited), etc.
5. CONSEQUENCES: Abuses will be governed by Augusta’s Progressive Discipline Policy, suggested
discipline for this program include (but are not limited to):
A. ND-18 - Violation of traffic laws while operating Augusta, Georgia vehicle, i.e. speeding, etc.
B. EV-1 1 - Fraud, waste, and/or abuse of Augusta, Georgia property or time.
C. EV-13 - Intentional destruction, theft (including stealing time) or unauthorized removal, possession or
use of Augusta, Georgia property, tools or equipment without consent.
6. REPORTING ACTIVITIES TO RISK MANAGEMENT/ADMINISTRATOR. For review by the Administrator,
departments will provide monthly reports to Risk Management showing the action taken for the violations
below. Reports containing this information will be required monthly unless otherwise directed by the
Administrator:
A. Heightened speeding violations must be reported to Risk Management. Any speed above the
posted speed limit is a violation of state and local laws and may subject the employee to tickets
FINANCE DEPARTMENT
RISK MANAGEMENT
FLEET MANAGEMENT
and fines through law enforcement as well as employee discipline. Speeding in excess of 9 miles
over the posted speed limit is considered a heightened speeding violation and will subject the
employee to Augusta’s Progressive Discipline Policy. Additionally, speeding in school zones is also
considered a heightened speeding violation regardless of the amount over the speed limit.
B. Improper personal use of an Augusta, GA vehicle must be reported to Risk Management. The use of
Augusta, GA owned vehicles for personal use is prohibited. However, if it is not advantageous to
Augusta, GA for the employee to return to pick up their own personal vehicle so they may take their
lunch break, they are allowed to use an Augusta. GA owned vehicle to patronize an eating
establishment that is in close proximity to their work site.
C. Unnecessary idle time of 15 minutes or more must be reported to Risk Management (departments may
establish a lower idle time but for reporting you will only need to report unnecessary idle time in excess
of 15 minutes).
7. FUNDING:
A. Initial Funding: to be provided by Risk Management and will include the purchase of system hardware,
activation and initial monthly/annual monthly fees.
B. Sustainment Funding: to be provided by Risk Management for the monthly service fees and other fees included
in the allocation process.
FINANCE DEPARTMENT
RISK MANAGEMENT
FLEET MANAGEMENT
EMPLOYEE ACKNOWLEDGEMENT
VEHICLE OVERSIGHT PROGRAM
2015
I, ________________________________________, understand that Augusta, GA equips
its fleet vehicles and equipment with Global Positioning System (GPS) devices.
I also understand that when operating a fleet vehicle or equipment owned by Augusta, GA
I am subject to observation through use of the GPS by my department, Risk Management
and/or Fleet Management. I understand that some of the capabilities of the GPS tracking
service provide tracking vehicle location and length of time at location, vehicle speed, and
vehicle idle time.
I understand that in addition to adhering to Motor Vehicle laws I am responsible for
adhering to policies of Augusta, GA which govern the use of its fleet vehicles and
equipment: Risk Management Safety Policy located in the Employee Handbook and the
Fleet Management Policy which can be obtained by contacting the Fleet Manager.
I understand that information gathered from observations of my driving and/or use of
equipment may be used as justification for disciplinary action consistent with the Augusta
Commission Progressive Discipline Policy.
Employee Signature
Date
01/15/09
Draft Revision 01/27/15
Draft resubmitted 04/09/15
Each employee of Augusta, GA, whether they operate a government owned vehicle or not, is required to read and sign this
acknowledgement.
Completed forms are to be returned to Risk Management. Risk Management will retain a copy and forward the original form
to Human Resources for inclusion in the employee’s personnel file.
FINANCE DEPARTMENT
RISK MANAGEMENT
FLEET MANAGEMENT
VEHICLE OVERSIGHT PROGRAM
Commission Approved 12/02/2008
1. PURPOSE: The Vehicle Oversight Program has numerous purposes:
· Provides management a tool to better utilize available resources.
· Provides management a tool to monitor employee productivity.
· Enhances the risk reduction program.
· Reinforces current vehicle utilization policy.
· Increases safety awareness.
· Enhances Augusta Cares program.
2. CONCEPT: Vehicles owned by the Augusta Commission will have Global Positioning Systems (GPS) installed with
monitoring capability at the respective department level. Central monitoring will be available through Risk
Management and Fleet Management as well. . Installation on vehicles will be coordinated with Fleet Management.
3. APPLICABILITY: This program is applicable to departments and agencies subordinate to the Augusta
Commission. Vehicles assigned to Constitutional Officers or Elected Officials are not subject to this program at this
time.
4. RESPONSIBILITIES:
A. Administrator: Overall responsible for the overall supervision of the monitoring program. .
B. Finance:
1. Risk Management: Provides for program implementation, information briefings to respective departments
and provides primary centralized monitoring of vehicles. Coordinates funding for program support,
continuity and sustainment.
2. Fleet Management: Assists Risk Management with program implementation and coordination. Provides
secondary centralized monitoring of vehicles. Responsible for coordinating the installation of systems on
vehicles as directed.
C. Departments: Provides departmental monitoring and operational supervision. All employees will be required
to sign a form that acknowledges they understand GPS devices will be used in vehicles/equipment owned by
the Augusta Commission and they are aware of potential consequences when abuse is discovered.
5. FUNDING:
A. Initial Funding: provided by Risk Management and will include the purchase of system hardware, activation
and monthly/annual monthly fees.
B. Sustainment Funding: provided by Risk Management for the monthly service fees and included in the
allocation process.
FINANCE DEPARTMENT
RISK MANAGEMENT
FLEET MANAGEMENT
EMPLOYEE ACKNOWLEDGEMENT
VEHICLE OVERSIGHT PROGRAM
I, ________________________________________, understand that Augusta, GA equips
its fleet vehicles and equipment with Global Positioning System (GPS) devices.
I also understand that when operating a fleet vehicle or equipment owned by Augusta, GA
I am subject to observation through use of the GPS by my department, Risk Management
and/or Fleet Management.
I understand that in addition to adhering to Motor Vehicle laws I am responsible for
adhering to policies of Augusta, GA which govern the use of its fleet vehicles and
equipment: Risk Management Safety Policy located in the Employee Handbook and the
Fleet Management Policy which can be obtained by contacting the Fleet Manager.
I understand that information gathered from observations of my driving and/or use of
equipment may be used as justification for disciplinary action consistent with the Augusta
Commission Progressive Discipline Policy.
Employee Signature
Date
01/15/09
Each employee of Augusta, GA, whether they operate a government owned vehicle or not, is required to read and sign this
acknowledgement.
Completed forms are to be returned to Risk Management. Risk Management will retain a copy and forward the original form
to Human Resources for inclusion in the employee’s personnel file.
Commission Meeting Agenda
5/19/2015 2:00 PM
Revisions to Vehicle Oversight Program
Department:Finance/Risk Management Division
Caption:Motion to approve revisions to Vehicle Oversight Program.
(Approved by Finance Committee May 12, 2015)
Background:Augusta uses GPS devices to monitor its fleet of vehicles. The
Risk Management Department has oversight of the program.
Individual departments montior their employees for any abuse.
Analysis:The Risk Management Department was tasked to bring to the
Administrator revisions to the existing policy that would more
clearly define the reporting process and to assure that the
Administrator received timely reports from the user departments.
Financial Impact:n/a
Alternatives:
Recommendation:accept the revisions
Funds are Available
in the Following
Accounts:
n/a
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Commission Meeting Agenda
5/19/2015 2:00 PM
Extend Existing Sanitary Systems Cleaning Contract
Department:Tom Wiedmeier, P.E., Director - Augusta Utilities Department
Caption:Motion to approve the Avrett Plumbing Company, Inc. in the
amount of $250,000.00 for the option year renewal of existing
contract for Cleaning of Sanitary Sewer Systems to be performed
under Account Number 506043410-5223220. (Approved by
Engineering Services Committee May 12, 2015)
Background:The Augusta Utilities Department has an existing contract (see
Bid # 12-177) with Avrett Plumbing Company to clean existing
sanitary sewer systems. As defined in the existing contract,
Augusta Utilities is requesting a change order to extend the
contract for one more year. This extension is necessary to continue
the cleaning of our 8 – 18 inch diameter sanitary sewer lines.
Analysis:Extension of the existing sanitary sewer cleaning contract will
continue to allow the contractor to mobilize in the right-of-way
and areas designated as “off-site” so that their equipment can be
set up to perform the cleaning process. This includes the
mobilization and demobilization of equipment for designated
multiple 15,000 linear foot modules of piping to be cleaned, as
well as smaller modules as needed. This is in addition to the actual
cleaning of the pipes per the cleaning specification in the contract.
Financial Impact:The Sanitary Sewer Systems Cleaning Project Funding is will be
funded from account 506043410-5223220
Alternatives:No alternative are recommended
Recommendation:Augusta Utilities recommends Commission approval for the one
year renewal of the existing Cleaning of Sanitary Systems
Cleaning Contract with Avrett Plumbing Company, Inc. for the
amount of $250,000.00
Funds are Available
in the Following Funds are available in the following account: 506043410-5223220
Accounts:
REVIEWED AND APPROVED BY:
RESOLUTIO
[Authorization to Make Application for Financial Assistance]
WHEREAS, Augusta, Georgia is a local government as defined in the Rules of the Georgia Department of
Natural Resources, Environmental Protection Division (hereinafter, “EPD Rules”), Rule number 391-3-19-
.09; and
WHEREAS, Augusta, Georgia is a county within the meaning of O.C.G.A. Section 12-8-95(b)(4) and EPD
Rule 391-3-19-.09; and
WHEREAS, the site more particularly described in Exhibit “A” attached hereto is a solid waste handling
facility as defined by EPD Rule 391-3-4-.10(67) (hereinafter, “the Site”), and has been placed on the
Hazardous Site Inventory pursuant to the Hazardous Site Response Act (O.C.G.A., Section 12-8-90 et
seq.); and
WHEREAS, the Director of the Georgia Department of Natural Resources, Environmental Protection
Division (“EPD”) has notified Augusta, Georgia in writing that it is a “responsible party” (as defined in
EPD Rule 391-3-19-.02(2)(s)) for the Site; and
WHEREAS, Augusta, Georgia has expended and anticipates expending certain costs associated with the
investigation, remediation, post-closure care and maintenance of the Site (hereinafter, “the Costs”); and
WHEREAS, the Costs (or a portion thereof) may be eligible for reimbursement to Augusta, Georgia by the
Director of EPD from the Hazardous Waste Trust Fund (pursuant to O.C.G.A. Section 12-8-90 et seq.,
EPD Rule 391-3-19-.09 and other pertinent law), provided said Costs (or portion thereof) are determined by
EPD to be “Eligible Costs” (as defined in EPD Rule 391-3-19-.09(4)(a)), and provided Augusta, Georgia
has met the “Eligibility Requirements” set forth in EPD Rule 391-3-19-.09(2); and
WHEREAS, the said “Eligibility Requirements” set forth in EPD Rule 391-3-19-.09(2) require, among
other things, that the following criteria be met in order for the Costs (or portion thereof) to be eligible for
reimbursement:
“ ... (e) the state or local government has adopted an authorizing resolution; and
(f ) the state or local government has submitted to the Director [of EPD] a completed
application for financial assistance on forms as provided by the Director...” ; and
WHEREAS, Augusta, Georgia desires to make application to EPD for reimbursement of the Costs (or a
portion thereof) on the form(s) provided by the Director of EPD (as completed and attached hereto as
Exhibit “B”), and to take any other action which may be necessary or appropriate to have the Costs (or
portion thereof) fully considered for such purposes; and
WHEREAS, in the event the attached applications are approved by EPD, Augusta, Georgia
desires to receive the sums approved by EPD as reimbursement of the
Costs (or a portion thereof), and to process, administratively handle and utilize said sums for such approved
purposes; and
WHEREAS, Augusta, Georgia is confident that it can otherwise satisfy the “Eligibility Requirements” set
forth in EPD Rule 391-3-19-.09(2);
NOW, THEREFORE, BE IT RESOLVED that the Mayor is hereby fully authorized to complete and
execute the application attached hereto as Exhibit “B” on behalf of Augusta, Georgia, and to submit same
to EPD for its consideration.
BE IT FURTHER RESOLVED that the Mayor is hereby authorized to take any and all other action,
without further approval or action of this Commission (including, but not limited to, executing
supplemental forms, application amendments, additional applications and the like, and providing additional
information or documentation), which may be necessary or appropriate in order for the Costs (or portion
thereof) to be fully considered by EPD for reimbursement from the Hazardous Waste Trust Fund in
accordance with the provisions of O.C.G.A. Section 12-8-90 et seq., EPD Rule 391-3-19-.09, and other
pertinent law.
THIS Day of , 2015.
Augusta, Georgia
By:___________________________
Hardie Davis, Jr., Mayor
By:___________________________
Lena J. Bonner, Clerk of Commission
EXHIBIT A
By virtue of a special warranty deed from Carl E. Sanders, dated November 7, 1984
and of record in the Office of the Clerk of Superior Court of Richmond County,
Georgia, in Realty Book 193, page 313 and by deed dated April 28, 1995 from C. H.
Wiggins, Sr., and of record in the Office of the Clerk of Superior Court of
Richmond County, Georgia, in Realty Book 489, Page 909.
LEGAL DESCRIPTION:
ALL THAT LOT or parcel of land, with improvements thereon, situate, lying and
being in the State of Georgia, County of Richmond, containing one thousand one
hundred eighty-one and twelve hundredths (1,181.12) acres, more or less, as being
more particularly described according to the plat prepared for Richmond County,
Georgia, dated November 5, 1984, made by Toole Surveying company, having been
recorded with the Office of the Clerk of Superior Court of Richmond County as
Exhibit A to a Warranty deed dated November 7, 1984, from Carl E. Sanders to
Richmond County, Georgia in Realty Book 193, Page 313: and made a part hereof
and referenced being made to said plat for a more accurate and complete
description as to the metes, bounds, courses, distances and location of said
property;
ALSO, ALL THAT TRACT or parcel of land, with any improvements thereon,
situate, lying and being in the 86th G.M.D., State of Georgia, County of Richmond,
containing 28.02 acres, as shown on a plat prepared by Steven H. Hardy,
Registered Land Surveyor, dated March 17, 1995, which plat has been recorded in
the Office of the Clerk of Superior Court of Richmond County, Georgia, Realty Reel
489, pages 907-908, reference being made to said plat for a more particular
description as to the metes, bounds and location of said property.
Less and Except Right of Way conveyed to Georgia Department of
Transportation filed of record in the aforesaid Clerk’s office in Realty Book 174,
2128.
Less and Except Right of Way conveyed to Southern Natural Gas Company filed
of record in the aforesaid Clerk’s office in Realty Book 34-D, page 30, et seq.
Less and Except Right of Way Deed to Georgia Department of Transportation
filed of record in the aforesaid Clerk’s office in Realty Book 1311, page 1915, et seq.
Less and Except Easement For Right of Way to Georgia Power Company by
Right of Way Deed filed of record in the aforesaid Clerk’s office in Realty Book 21-
B, page 310, et seq.
Less and Except Easement for Right of Way to Georgia Power Company filed of
record in the aforesaid Clerk’s office in Realty Book 33-L, page 279, et seq.
Less and Except Easement for Right of Way to Georgia Power Company filed of
record in the aforesaid Clerk’s office in Realty Book 28, page 252, et seq.
Less and Except Easement for Right of Way to Georgia Power Company filed of
record in the aforesaid Clerk’s office in Realty Book 29, page 1389, et seq.
Less and Except Right of Way Agreement to Southern Natural Gas Company
filed of record in the aforesaid Clerk’s office in Realty Book 19-J, page 74, et seq.
Less and Except Right of Way Agreement to Southern Natural Gas Company
filed of record in the aforesaid Clerk’s office in Realty Book 34-D, page 32, et seq.
Less and Except Right of Way Deed to Southern Natural Gas Company filed of
record in the aforesaid Clerk’s office in Realty Book 34-D, page 47, et seq.
All tracts, lots or parcel of land herein are conveyed subject to any easements and
all restrictions of record in the aforesaid Clerk’s office and to any Declaration of
Restrictions and Covenants filed of record.
That the above-captioned property is subject only to the following exceptions:
1. This property is exempt for the purpose of ad valorem taxes.
2. The exact location of boundary lines, unrecorded easements, possible
encroachments and other facts or conditions which would be disclosed by an
accurate survey and inspection of the property.
3. Easement to Georgia Power Company, recorded in said Clerk’s office in Realty
Reel 12, page 1396.
4. Easement to Southern Natural Gas Company filed of record in the aforesaid
Clerk’s office in Realty Book 19G, page 369, et seq.
5. Underground Easement to Georgia Power Company filed of record in the
aforesaid Clerk’s office in Realty Book 1173, page 167, et seq.
6. Easement to Georgia Power Company filed of record in the aforesaid Clerk’s
office in Realty Book 1195, Page 393, et seq.
7. Underground Easement to Georgia Power Company filed or record in the
aforesaid Clerk’s office in Realty Book 1264, Page 1297, et seq.
8. Easement to Jefferson County Electric Membership Corporation filed of record in
the aforesaid Clerk’s office in Realty Book 13-X, page 74, et seq.
9. Easement to Jefferson County Electric Membership Corporation filed of record in
the aforesaid Clerk’s office in Realty Book 13-X, page 65, et seq.
10. Easement to Southern Natural Gas Company filed of record in the aforesaid
Clerk’s office in Realty Book 20-U, Page 34.
11. Easement to Southern Natural Gas Company filed of record in the aforesaid
Clerk’s office in Realty Book 20-U, Page 37.
12. Possible liens of architects, laborers or materialmen for improvements of the
property, not filed for record at the effective date hereof, and rights, if any, of
persons who may be in possession under claims not appearing of record.
13. Matters which might affect the state of title, which may be of record but are not
indexed properly such that a reasonably prudent title search would have revealed
them to the record examiner.
Commission Meeting Agenda
5/19/2015 2:00 PM
Resolution authorizing to apply for financial reimbursement
Department:Environmental Services
Caption:Motion to approve the resolution authorizing the Environmental
Services Department (ESD) to apply for financial reimbursement
from Georgia’s Environmental Protection Division (EPD).
(Approved by Engineering Services Committee May 12, 2015)
Background:The State of Georgia created the Hazardous Waste Trust Fund
(Trust Fund) as part of the Georgia Hazardous Site Response Act
of 1992 to assist local governments with groundwater
investigation and remediation (“clean-up”) costs at solid waste
handling facilities. A facility must first be listed on the Hazardous
Site Inventory (HSI) to be eligible for reimbursement of
remediation costs. Listing on the HSI can occur after Georgia
Department of Natural Resources Environmental Protection
Division (EPD) identifies a groundwater quality exceedance above
a regulatory threshold through the permit required monitoring
program. The Deans Bridge Road Municipal Solid Waste
Landfill, Phase IIA/B was listed on the HSI by EPD in
2006. Since that listing, the Environmental Services Department
has expended efforts to investigate the extents of the issues as well
as implement actions to remediate the issues. These efforts have
been coordinated through the EPD as part of an Assessment
Monitoring Plan (AMP) and an Assessment of Corrective
Measures (ACM).
Analysis:After meeting the following requirements, Augusta is eligible for
reimbursement of qualifying groundwater investigation and clean-
up costs: (a) Site is a solid waste handling facility listed on the
Hazardous Site Inventory; (b) Director has notified the local
government in writing that they are the responsible party for the
site; (c) The local government has entered into a contract with
EPD which describes the financial assistance provided and the
activities for which the monies shall be used; (d) The local
government has accounting system in accordance with the
Governmental Accounting Standards Board; (e) The local
government has adopted an authorizing resolution; (f) The local
government has submitted to EPD a completed application for
financial assistance on forms as provided by the Director; and (g)
The local government has submitted to EPD a written statement of
the percentage of total costs associated with the actions described
in Rule 391-3-19-.09(4)(a) for which a state or local government
is liable; includes a description of how such percentage was
determined including the results of negotiations with any other
responsible parties for the site. Furthermore, the Trust Fund must
be replenished by the State each fiscal year and the unencumbered
balance must exceed $4.0 million for reimbursements to occur.
These conditions have recently been met and as such the
Environmental Services Department has commenced with the
reimbursement application process. Requirements (a), (b), and (d)
are complete and items (c), (f), and (g) will be provided in a
reimbursement application to be submitted to EPD upon
completion. In order to move forward with the process, the item
(e) authorizing resolution must now be completed. Up to $2
million in eligible investigation and clean-up costs may be
reimbursed by the State from the Trust Fund to the responsible
local government.
Financial Impact:At this time, ESD is finalizing the package to be submitted to the
EPD for consideration. ESD has no concise way of knowing what
EPD will approve for reimbursement or the amount of funds the
state has remaining in the HSI fund. Currently the department is
confident in saying it could be an amount up to $2 million dollars,
however, will most likely be a dollar amount less than that.
Alternatives:1. Do not apply for reimbursement
Recommendation:Approve the resolution authorizing the Environmental Services
Department (ESD) to apply for financial reimbursement from
Georgia’s Environmental Protection Division (EPD).
Funds are Available
in the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
1
ORDIACE O. ___________
A ORDIACE TO AMED THE AUGUSTA, GA CODE ARTICLE FIVE, CHAPTER OE,
RELATIG TO STORMWATER MAAGEMET TO EACT A STORMW ATER USER FEE; TO
MODIFY AD/OR ADD TO PARTS OF TITLE 5 (UILITIES) CH APTER 1 (STORMWATER
MAAGEMET) TO SUPPORT EACTMET AD ADMIISTRATIO OF THE
STORMWATER USER FEE; TO PROVIDE A EFFECTIVE DATE A D FOR OTHER
PURPOSES.
WHEREAS, the federal Clean Water Act, as amended by the Water Quality Act of 1987 (33 U.S.C. 1251 et
seq.), and rules promulgated by the United States Environmental Protection Agency pursuant to the act
emphasizes the role of local governments in developing, implementing, conducting and funding stormwater
programs which address water quality impacts of stormwater runoff and require such stormwater management
programs;
WHEREAS, stormwater management services and stormwater management systems and facilities will assist
Augusta in meeting the regulatory obligations imposed by its national pollutant discharge elimination system
(NPDES) permits by reducing pollution and helping in the protection of water quality within Augusta;
WHEREAS, Augusta is authorized by the state constitution, including, without limitation, Article IX, Section
II, Paragraphs I(a) and III(a)(6) thereof and state law to provide stormwater management services, systems
and facilities, which services, systems and facilities contribute to the protection and preservation of the public
health, safety and welfare, and protection of the natural resources of Augusta;
WHEREAS, stormwater management services, systems and facilities will assist Augusta in protecting the
public health, safety and welfare and the environment; and provision of stormwater management services,
systems and facilities and regulation of the use thereof renders and/or results in service to individual parcels,
parcel owners, citizens and residents of Augusta and to all parcels, parcel owners, citizens and residents of
Augusta and Richmond County concurrently and the environment in a variety of ways; and while specific
service and facility demands may differ from area to area at any given point in time, a stormwater
management service area encompassing all lands and water bodies within Augusta and Richmond County is
consistent with the present and future needs of the community;
WHEREAS, Augusta, GA presently owns and operates stormwater management systems and facilities which
have been developed over many years; and the future usefulness of the existing stormwater management
systems and facilities owned and operated by Augusta, and of additions and improvements thereto, rests on
the ability of Augusta to effectively manage, protect, control, regulate, use, and enhance stormwater
management systems and facilities in Augusta in concert with the management of other public utilities in
Augusta; and in order to do so, Augusta must have adequate and stable funding for its stormwater
management program's operating needs and capital program;
WHEREAS, Augusta has undertaken a comprehensive review by staff and professional consultants of the
need for, management of, and funding for, a stormwater user fee; and Augusta staff reports and the
professional engineering analysis submitted to Augusta properly assess and define the stormwater
management problems, needs, goals, program priorities and funding opportunities of Augusta;
WHEREAS, based on the foregoing, the Augusta, Georgia Commission recommends amending Article Five,
Chapter One, of the AUGUSTA, GA. CODE.
THE AUGUSTA, GEORGIA BOARD OF COMMISSIOERS ordains as follows:
SECTIO 1. Various sections of AUGUSTA CODE TITLE 5 UTILITIES, ARTICLE 1 STORMWATER
MANAGEMENT are hereby amended as set forth in “Exhibit A” hereto.
SECTIO 2. T his ordinance shall become effective upon its adoption in accordance with applicable laws.
SECTIO 3. All ordinances or parts of ordinances in conflict herewith are hereby repealed.
2
Adopted this _____ day of , 2015.
___________________________
Hardie, Davis, Jr.
As its Mayor
Attest:
______________________________
Lena J. Bonner, Clerk of Commission
Seal:
CERTIFICATIO
The undersigned Clerk of Commission, Lena J. Bonner, hereby certifies that the foregoing Ordinance
was duly adopted by the Augusta, Georgia Commission on_________________, 2015 and that such
Ordinance has not been modified or rescinded as of the date hereof and the undersigned further certifies that
attached hereto is a true copy of the Ordinance which was approved and adopted in the foregoing meeting(s).
______________________________
Lena J. Bonner, Clerk of Commission
Published in the Augusta Chronicle.
Date:
First Reading
Second Reading
3
Exhibit A
TITLE 5
UTILITIES
CHAPTER 1
STORM WATER MAAGEMET
§ 5-1-1. GEERALLY.
This Chapter shall be known as the Storm Water Management Ordinance of
Augusta, Georgia.
§ 5-1-2. FIDIGS.
(a) Authority to collect, treat, and manage storm water is found in Art. IX, Sec. II, Par. 3
of the 1983 Constitution of the State of Georgia, and more expressly at O.C.G.A. §36-82-61, wherein
this local government is given the power to own, operate and maintain systems, works,
instrumentalities, and facilities used or useful in connection with the collection, storage, treatment,
and disposal of storm water.
(b) Uncontrolled storm water drainage/discharge may have a significant, adverse impact
on natural resources and the health, safety, and welfare of the citizens of Augusta, Georgia. Surface
water runoff can carry pollutants and nutrients into receiving waters.
(c) Uncontrolled storm water drainage can increase the incidence of flooding and the level of
floods which occur, endangering roads, other public and private property and human life.
(d) Altered land surfaces can change the rate and volume of runoff.
(e) Adverse water quality and quantity consequences described above could result in
substantial economic losses. Potential losses include, but are not limited to, increased water treatment
costs, as well as state and federal fines associated with water quality violations.
(f) The Federal Water Pollution Control Act of 1972, as amended, commonly referred to as the
Clean Water Act, 33 U.S.C 1251 et seq.; the Georgia Water Quality Control Act, O.C.G.A. §12-5-20, et seq.,
and regulations promulgated pursuant thereto place increase emphasis on the role of local government in
developing, implementing conducting, and funding storm water management programs which address water
quality impacts of storm water runoff.
(g) Many future problems can be avoided through property storm water management.
(h) Every parcel of real property, both public and private, either uses or benefits from
the maintenance of Augusta, Georgia storm water system.
(i) Current and anticipated growth will contribute to and increase the need for improvement
and maintenance of the storm water system. The continued economic development depends upon effective
solutions to the existing and continuing storm water problems and preservation of the quality of waters in
the lakes, streams, and rivers.
§ 5-1-3. OBJECTIVE
4
The objectives of this chapter include the following:
(a) To protect, maintain, and enhance the public health, safety, and general welfare. This
objective will be achieved by providing for regulation and management of Augusta, Georgia storm water
system, including public and private facilities in Augusta, Georgia
(b) To comply with State Department of Natural Resources and Federal Environmental
protection Agency storm water regulations developed pursuant to the Federal Clean Water Act.
These requirements include:
(1) Control of the contribution of pollutants to the municipal storm sewer system by
storm water discharges;
(2) Prohibition of illicit connections to municipal separate storm sewers;
(3) Control of discharge to municipal separate storm sewers of spills, dumping or
disposal of materials other than storm water; and
(4) Control, through intergovernmental agreements, of contribution of pollutants
from one municipal system to another.
(5) Control of Post-development storm water management through a regulatory
program of inspection, monitoring and enforcement of private facilities and implementation of best
management practices and policies and procedures promoting the use of Green Infrastructure and Low
Impact Development techniques.
§ 5-1-4 DEFIITIOS.
(a) For the purposes of this chapter, unless specifically defined below, words or phrases shall
be interpreted so as to give them the meaning they have in common usage and to give this chapter its most
effective application. Words in the singular shall include the plural, and words in the plural shall include
the singular. Words used in the present tense shall include the future tense. The word shall connote
mandatory and not discretionary; the word may is permissive.
(b) Unless otherwise specified, or it is apparent from the context, definitions herein will be
the same as those in other Augusta, Georgia Ordinances and as used elsewhere this code.
(1) Accidental discharge. A discharge prohibited by this chapter into the municipal
storm sewer system which occurs by chance and without planning or consideration prior to occurrence.
(2) Appeals authority. The Augusta Commission, one of whose purpose is to review
appeals to this chapter and render decisions and variances.
(3) Best Management Practices (BMPs). A wide range of management procedures,
control measures, activities, and prohibitions on practices which control the quality and/or quantity of storm
water runoff and which are compatible with the planned land use.
(4) Clean Water Act. The Federal Water Pollution Control Act, as amended (33
U.S.C. 1251 et seq.).
(5) Cooling water. Water used exclusively as a cooling medium in an appliance,
device or apparatus.
5
(6) Conveyance. Storm water features designed for the movement of storm water
through the drainage system, such as concrete or metal pipes, ditches, depressions, or swales
(7) Credit. A conditional reduction in the amount of a storm water service
charge to an individual property based on the provision and continuing presence of an effectively
maintained and operational on-site storm water system or facility or the provision of a service or
activity by property owner, tenant, and/or occupant, which system, facility, service, or activity reduces
the storm water utility's cost of providing storm water services and facilities.
(8) Department. The Department of Engineering responsible for all storm water
management activities and implementation of the provisions of this chapter.
(9) Developed land. Property altered from its natural state by construction or
installation of more than 400 square feet of impervious surfaces as defined in this chapter.
(10) Development means:
a. The division of a lot, tract or parcel of land into two (2) or more lots,
plots, sites, tracts, parcels or other divisions by plat or deed;
b. The construction, installation, or alteration of a structure, impervious
surface, or drainage facility;
c. Clearing, scraping, grubbing, or otherwise significantly disturbing
the soil, vegetation, mud, sand or rock or a site; or
d. Adding, removing, exposing, excavating, leveling, grading, digging,
burrowing, dumping, piling, dredging or otherwise disturbing the soil, vegetation, mud, sand or rock of
a site.
(11) Detached dwelling unit. Developed land containing one dwelling or
residential structure which is not attached to another dwelling and which contains one or more
bedrooms, with a bathroom and kitchen facilities designed for occupancy by one family. It shall also
include developed land containing two (duplex) or three (triplex) attached residential dwelling units
located on one or more parcels of land and shall be treated as detached dwelling units for the purposes
of fee calculations. Detached dwelling units may include houses, manufactured homes, and mobile
homes located on one or more individual lots or parcels of land. Developed land may be classified as a
detached dwelling unit despite the presence of incidental structures associated with residential uses
such as garages, carports, or small storage buildings.
(12) DIRECTOR. Either the director of Department of Engineering or any duly
authorized representatives of the DIRECTOR.
(13) Easement. A right in land, less than fee simple title, for the specific use or
limitation of use of the land, or described portion thereof, by one not its owner. The use or limitation
of use for which the easement is given is normally subservient to the primary use of the land.
Easements may be of limited duration or given in perpetuity.
(14) Equivalent Residential Unit (ERU). The typical representative impervious
coverage of detached dwelling unit properties in Augusta, Georgia as determined by the DIRECTOR,
and shall be used as the basis for determining storm water service charges to detached dwelling unit
properties or classes of detached dwelling unit properties and other properties. Two thousand two
hundred (2,200) square feet of impervious area shall be one equivalent residential unit.
(15) Governing body. The Augusta Commission.
6
(16) Illicit connection. A connection to a municipal separate storm system which
results in a discharge that is not composed entirely of storm water runoff, except discharges pursuant to
a NPDES permit (other than the NPDES permit for discharge from the municipal separate storm sewer).
(17) Impervious surface. Developed areas of land that prevent or significantly
impede the infiltration of storm water into the soil. Typical impervious surface areas include, but are
not limited to: roofs; sidewalks; walkways; patios; swimming pools; private driveways and roads;
parking lots; access extensions; alleys and other paved, engineered, compacted or traveled gravel
surfaces containing materials that prevent or significantly impede the natural infiltration of storm water
into the soil.
(18) Maintenance. Any action necessary to preserve storm water management
facilities to function as designed, in order to serve the intended purposes set forth in this chapter and
to prevent structural failure of such facilities.
(19) Multiple dwelling unit residential properties. Developed land whereon four
or more attached residential dwelling units are located and shall include, but not limited to, apartment
houses, condominiums, town homes, attached single-family homes, boarding houses, group homes,
hotels and motels, retirement centers and other structures in which four or more family groups
commonly and normally reside or could reside. In the application of storm water service charge rates,
multiple dwelling unit properties shall be treated as other developed lands except that individually
owned units located on individually owned parcels shall be treated as detached dwelling units.
(20) Municipal Separate Storm Sewer System or MS4. A conveyance or system of
conveyances including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches,
manmade channels or storm drains, owned or operated by Augusta, Georgia or other public body, designed
or used for collecting or conveying storm water runoff and is not a combined sewer or part of a Publicly
Owned Treatment Works.
(21) National Pollutant Discharge Elimination System (NPDES). A regulatory
mechanism established by the U.S. Environmental Protection Agency pursuant to the Water Quality
Act and the Clean Water Act with permit application requirements as set forth in 55FR47990 as
implemented by the Georgia Environmental Protection Division of the Department of Natural
Resources in accordance with the State Water Quality Control Act, O.C.G.A § 12-5-21.
(22) Other developed land. All developed lands not classified as detached dwelling
units, including but not limited to, quadraplexes and larger multiple dwelling unit residential properties,
manufactured home and mobile home parks, commercial and office buildings, public buildings and
structures, industrial and manufacturing buildings, storage buildings and storage areas covered with
impervious surfaces, parking lots, parks, recreation properties, churches, public and private schools and
universities, research stations, hospitals and convalescent centers, airports, agricultural uses covered by
impervious surfaces, water reservoirs, and water and wastewater treatment plants that have four hundred
(400) square feet or more of impervious area. Incidental structures that are associated with farming
(agricultural) activities such as barns, machinery sheds, and small storage buildings are considered 400
square feet or less under this chapter.
(23) Person. Any and all persons, natural or artificial and includes any individual, firm,
corporation, government agency, business, estate, trust, partnership, association, two (2) or more persons
having a joint or common interest, or any other legal entity.
(24) Pollutant. Means dredge spoil, solid waste, incinerator, filter backwash, sewage,
garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials (except
those regulated under the Atomic Energy Act of 1954, as amended), heat, wrecked or discarded
equipment, rock, sand, cellar dirt and industrial municipal and agricultural waste discharged into water.
(25) Pollution. The contamination or other alteration of any water’s physical,
chemical or biological properties, including change in temperature, taste, color turbidity, or odor of such
7
waters or the discharge of any liquid, gaseous, solid, radioactive, or other substance into any such waters
as will or is likely to create a nuisance or render such waters harmful, detrimental or injurious to the
public health, safety or welfare or to domestic, commercial, industrial, agricultural, recreational, or other
legitimate beneficial uses, or to livestock, wild animals, birds, fish or other aquatic life.
(26) Procedure. A procedure adopted by the utility, by and through the director of
engineering, to implement a regulation or regulations adopted under this chapter, or to carry out other
responsibilities as may be required by the code or other codes, ordinances or resolutions of Augusta,
Georgia.
(27) Redevelopment. A change to previously existing, improved property, including
but not limited to the demolition or building of structures, filling, grading, paving, or excavating, but
excluding ordinary maintenance activities, remodeling of buildings on the existing footprint, resurfacing
of paved areas and exterior changes or improvements that involves the creation, addition or replacement of
5,000 square feet or less of impervious cover and do not materially increase or concentrate storm water
runoff or cause additional nonpoint source pollution.
(28) Regulation. Any regulation, rule or requirement prepared by the Department
of Engineering and adopted by Augusta, Georgia pursuant to the requirements of this chapter.
(29) Sanitary sewer system. The complete sanitary sewer system of the county
which discharges sewage directly or indirectly into the sewage treatment plant, including sanitary sewer
pipelines, manholes and flushing inlets and appurtenances to the foregoing, excluding sewage treatment
facilities.
(30) Service area. All land within the legal limits of Augusta-Richmond County.
(31) Service charge. The storm water management service charge or charges
applicable to a parcel of developed land, which charge shall be reflective of the Augusta, Georgia
storm water utility's cost of providing storm water management services and facilities. Service charges
will be based on measured or estimated impervious area on each parcel of developed land. Impervious
area measurements may be updated using more recent or more accurate information from time to time
by Augusta, Georgia. The use of impervious area as a service charge rate parameter shall not preclude
the use of other parameters, or of grouping of properties having similar characteristics through the use
of ranges or rounding up or down to a consistent numerical interval, or the use of flat-rate charges for
one or more classes of similarly-situated properties whose impact on the storm water utility's cost of
providing storm water management services and facilities is relatively consistent. Storm water service
charges may also include special charges to individual customers for services or facilities related to
storm water management, including but not limited to charges for development plan review, inspection
or development projects and on-site storm water control systems, and enhanced levels of storm water
services above those normally provided by Augusta, GA.
(32) Site. Any lot, plot, parcel or tract of land.
(33) Storm water management. The collection, conveyance, storage, treatment and
disposal of storm water runoff in a manner to meet the objectives of this chapter and which shall include
a system of vegetative or structural measures, or both, that control the increased volume and rate of
storm water runoff and water quality impacts caused by manmade changes to the land.
(34) Storm water management facilities. Constructed or natural components of a
storm water drainage system, designed to perform a particular function, or multiple functions, including,
but not limited to, pipes, swales, ditches, culverts, street gutters, detention basins, retention basins,
constructed wetlands, infiltration devices, catch basins, oil/water separators, sediment basins, natural
systems and modular pavements.
8
(35) Storm water management Program (SWMP). means the Storm Water Management
Program required to be developed and implemented under the terms and conditions of Augusta, Georgia
National Pollution Discharge Elimination System Municipal Separate Storm Sewer System (MS4) permit
and refers to a comprehensive program to manage the quantity and quality of storm water discharged from
Augusta’s MS4.
(36) Storm water runoff. The direct response of a land surface to precipitation and
includes the surface and subsurface runoff that enters a ditch, stream, storm drain or other concentrated
flow during and following the precipitation.
(37) Variance. The modification of the minimum storm water management
requirements for specific circumstances where strict adherence of the requirements would result in
unnecessary hardship and not fulfill the intent of this chapter.
(38) Water quality. Those characteristics of storm water runoff that relate to the
physical, chemical, biological, or radiological integrity of water.
(39) Water quantity. Those characteristics of storm water runoff that relate to the
rate and volume of the storm water runoff.
§ 5-1-5. SCOPE OF RESPOSIBILITY .
(a) The provisions of this chapter shall apply throughout Augusta, Georgia.
(b) The director of the Department of Engineering shall be responsible for the coordination and
enforcement of the provisions of this chapter.
(c) The Department of Engineering shall be responsible for the conservation, management,
maintenance, extension, and improvement of the Augusta, Georgia storm water system, including
activities necessary to control storm water runoff and activities necessary to carry out storm water
management programs included in Augusta, Georgia
NPDES storm water permit.
(d) The application of this chapter and the provisions expressed herein shall be the minimum
storm water management requirements and shall not be deemed a limitation or repeal of any other powers
granted by State statute.
§ 5-1-6. POWERS OF THE DEPARTMET OF EGIEERIG .
(a) The Department of Engineering shall have the power to administer and enforce all
regulations and procedures adopted to implement this chapter, including the right to maintain an action or
procedure in any court of competent jurisdiction to compel compliance with or to restrain any violation of
this chapter.
(b) The Department of Engineering shall:
(1) Administer, coordinate and oversee acquisition, design, construction, and
operation and maintenance of municipal storm water facilities and conveyances.
(2) Establish or oversee establishment of development standards and guidelines for
controlling storm water runoff operated;
(3) Determine the manner in which storm water facilities should be operated;
9
(4) Inspect private systems which discharge to the Augusta, Georgia storm water
system;
(5) Advise the Augusta Commission and other
Augusta departments on issues related to storm water;
(6) Protect facilities and properties controlled by the Department of
Engineering and prescribe how they are used by others;
(7) Require new, increased, or significantly changed storm water contributions
to comply with the terms of this chapter.
(8) Develop programs or procedures to control the discharge of pollutants
into the municipal storm sewer system; and
(9) Adopt and implement the storm water management program for
Augusta, Georgia.
(10) Adopt and implement the calculation and collection of storm water service charges
for Augusta, Georgia.
§ 5-1-7 STORM WATER RUOFF QUATITY AD QUALITY COTROLS .
(a) Water quantity and quality controls will be provided as a part of all new development
and redevelopment pursuant to the provisions of the Augusta, Georgia Soil Erosion, Sedimentation and
Pollution Control Ordinance (Title 7, Chapter 3), Planning and Zoning Ordinance (Title 8), Water and
Wastewater Ordinance (Title 5, Chapter 2) and Subdivision of Land Ordinance (Title 8, Chapter 3), and
regulations adopted pursuant to those ordinance and Augusta Storm Water Management Program
(SWMP).
(b) Augusta, Georgia may allow storm water runoff that otherwise is of unacceptable quantity
or which would be discharged in volumes or at rates in excess of those otherwise allowed by its code and
regulations to be discharged into drainage facilities off-site of the development, provided the following
conditions are met:
(1) It is not practicable to completely manage runoff on-site in a manner that
meets the design and performance standards found in the code and regulations.
(2) Off-site drainage facilities and channels leading to them are designed,
constructed and maintained in accordance with requirements of those code and regulations; and,
§ 5-1-8 PROHIBITIO .
(a) It is unlawful for any person to throw, drain, run, or otherwise discharge to any component
of the municipal separate storm water system or to cause, permit or suffer to be thrown, drained, run, or
allow to seep or otherwise discharge into such system all matter of any nature excepting only such storm or
surface water runoff as herein authorized.
(b) The DIRECTOR may require controls for or exempt from the above prohibition
provision the following, provided he/she determines they are not a significant source of pollutant(s)
as defined in the Federal Water Pollution Control Act of 1972, as amended, commonly referred to as
the Clean Water Act, 33 U.S.C 1251 et seq.; the Georgia Water Quality Control Act, O.C.G.A. §12-
5-20, et seq., and regulations promulgated pursuant thereto place increase emphasis on the role of
local government in developing, implementing conducting, and funding storm water management
programs which address water quality impacts of storm water runoff:
10
(1) Unpolluted industrial cooling water, but only under the authorization and
direction of the director and appropriate NPDES permit. (Per State requirements, the discharge should not
raise the temperature of the receiving stream more than five (5) degrees after the discharge has thoroughly
mixed with receiving waters. In secondary trout streams, there shall be no elevation in temperature
exceeding two (2) degrees above the natural stream temperature).
(2) Water line flushing performed by a government agency, diverted stream flows,
rising ground waters, and unpolluted ground water infiltration.
(3) Unpolluted pumped ground water.
(4) Discharges from potable water sources, foundation drains, air conditioning
condensation, irrigation water springs, water from crawl space pumps, footing drains, lawn watering,
individual residential car washing, flows from riparian habitats and wetlands, and street wash water.
(5) Discharges or flows from firefighting.
(6) Other unpolluted water.
(c) In the event of an accidental discharge or an unavoidable spill to the municipal storm sewer
system of any material or substance other than storm water runoff, the person concerned shall inform
Augusta, Georgia 911 and EMA Center immediately and within twenty-four (24) hours the Department of
Engineering of the nature, quantity and time of occurrence of the discharge. The person concerned shall
take immediate steps to contain the waste, treat the waste or other actions to minimize effects of the
discharge on the municipal system and receiving streams. The person shall also take immediate steps to
ensure no recurrence of the discharge.
§ 5-1-9 ILLICIT COECTIOS
(a) It is unlawful for any person, to connect any pipe, open channel, or any other conveyance
system that discharges anything except storm water or unpolluted water which is approved by the
DIRECTOR, based on the exemptions listed in § 5-1-8(b), to Augusta-Richmond County’s storm water
system.
(b) Improper connections in violation of the Code must be disconnected and redirected, if
necessary, to the Augusta, Georgia sanitary sewer system upon approval by the director of the Water and
Sewer Department.
§ 5-1-10 MAITEACE AD ISPECTIO.
(a) Any storm water management facility or BMP which services a single lot or commercial
and industrial development shall be privately owned and maintained. The owner shall maintain a
perpetual, nonexclusive easement which allows for access for maintenance.
(b) All other storm water management control facilities and BMPs shall be publicly owned
and/or maintained only if accepted for maintenance by Augusta, Georgia.
(c) The DIRECTOR may require dedication of privately owned storm water facilities
which discharge to the storm water system to Augusta, Georgia.
(d) The department of engineering director shall determine inspection schedules
necessary to enforce the provisions of this chapter.
11
(e) The DIRECTOR, bearing proper credentials and identification shall be permitted
to enter, without hindrance, all properties for regular inspections, periodic investigations,
observation, measurement, enforcement, sampling and testing, in accordance with provisions of
this chapter. The DIRECTOR shall duly notify the owner of said property or the representative
on site, except in the case of an emergency.
(f) The DIRECTOR bearing proper credentials and identification, shall be permitted to
enter, without hindrance, all properties for which Augusta, Georgia holds a negotiated easement for
repairs, maintenance and other purposes related to any portion of the storm water management facilities
lying within said easement. The DIRECTOR shall duly notify the owner of said property or the
representative on site, except in the case of an emergency.
(g) Measurements, tests and analyses performed by the Department of Engineering or
required of any discharger to the municipal system shall be in accordance with 40 CFR Part 136, unless
another method is approved by the DIRECTOR.
(h) If, after inspection, the condition of a facility presents any immediate danger to the
public health, safety or general welfare because of unsafe conditions or improper maintenance,
Augusta, Georgia may take action as may be necessary to protect the public and make the facility safe
and shall be compensated by the responsible party for the cost of such effort.
(i) Inspection reports shall be maintained in a permanent file located at the Department of
Engineering office for a period of three (3) years. All such records shall be open to the public.
§ 5-1-11 VARIACES FOR REQUIREMETS.
(a) The DIRECTOR may grant a variance from requirements of this chapter if exceptional
circumstances applicable to a site exist such that strict adherence to the provisions of this chapter will result
in unnecessary hardship and will not fulfill the intent of this chapter.
(b) A written request for a variance shall be required and shall state the specific variance
sought and the reasons, with supporting data, a variance should be, granted. The request shall include
all information necessary to evaluate the proposed variance including any potential impact to
surrounding properties.
(c) The DIRECTOR will conduct a review of the request for a variance and respond in
writing within thirty (30) working days of receiving the request.
§ 5-1-12 ESTABLISHMENT OF STORM WATER UTILITY ENTERPRISE FUND.
There is established a storm water utility enterprise fund in Augusta, GA, together with budgeting
and accounting systems, for the purpose of dedicating and protecting all funding including, but not limited to,
rentals, rates, charges, fees and licenses, as may be established and charged by the Augusta Commission from
time to time, and other funds that may be transferred or allocated for storm water management related
purposes. All storm water management related revenues and receipts shall be placed in the storm water utility
enterprise fund, and such revenues and receipts shall be used to pay for the expenses and capital investments
of the storm water management program; provided, however, that other revenues, receipts and resources not
accounted for in the storm water utility enterprise fund may be applied to storm water management services,
systems and facilities as deemed appropriate by the Augusta Commission.
§ 5-1-13 STORM WATER SERVICE CHARGES.
In order to fully recover the cost of providing storm water services and facilities while fairly and reasonably
apportioning the cost among developed properties throughout the service area, the following storm water rates
shall apply:
12
(a) Detached dwellings units. Two classes of detached dwelling units shall be billed, based on
the representative amount of impervious area on the individual properties. The class of smaller detached
dwelling units shall include all such properties having less than four thousand four hundred (4,400) square
feet of impervious area, which shall be charged the rate applicable to one (1.0) equivalent residential unit as
established, or as amended by ordinance in the future. The class of larger detached dwelling units shall
include all detached dwelling unit properties having greater than or equal to four thousand four hundred
(4,400) square feet of impervious area, which shall be charged the rate applicable to two (2.0) equivalent
residential units as established, or as amended by ordinance in the future.
(b) Other developed lands. All developed lands not classified as detached dwelling units shall
be billed for one equivalent residential unit (ERU) for each two thousand two hundred (2,200) square feet of
impervious surface. Increments above an even number of equivalent residential units shall be rounded to the
nearest whole number of equivalent residential units.
(c) The minimum service charge for developed land shall be the charge applicable to one (1.0)
equivalent residential unit.
(d) Storm water service charge rate per equivalent residential unit (ERU) or increment thereof.
The storm water service charge per equivalent residential unit on the effective date of storm water service
charges shall be six dollars and forty cents ($6.40) per month.
§ 5-1-14 DETERMINATION AND MODIFICATION OF STORM WATER SERVICE CHARGES.
Storm water service charges may be determined and modified from time to time by the Augusta, Georgia
Commission so that the total revenue generated by said charges and any other sources of revenue that will be
made available to the storm water utility will be sufficient to meet the cost of services and facilities, including
but not limited to compliance cost, the payment of debt service and related costs on revenue bonds or loan
obligations incurred for construction and improvements to the storm water system.
§ 5-1-15 EFFECTIVE DATE OF STORM WATER SERVICE CHARGES.
Storm water service charges shall accrue beginning July 1, 2015 and shall be billed monthly thereafter to
customers, except as specific exemptions and credits may apply.
§ 5-1-16 DISPOSITION OF SERVICE CHARGES AND FEES.
Storm water utility service charge and fee revenues shall be assigned and dedicated solely to the storm water
management enterprise fund in Augusta, GA, which shall be and remain separate from other funds, and shall
be used only to fund identified storm water management program activities. The service charges and fees
paid to and collected by virtue of the provision of this chapter shall not be used for general or other
governmental or proprietary purposes of Augusta, GA, except to pay for costs incurred by Augusta, GA in
rendering services associated with the storm water management and administration.
§ 5-1-17 EXEMPTIONS AND CREDITS APPLICABLE TO STORM WATER SERVICE CHARGES.
Except as provided in this Section, no public or private property shall be exempt from storm water utility
service charges or receive a credit or offset against such service charges. No exception, credit, offset, or other
reduction in storm water service charges shall be granted based on the age, tax, income or economic status,
race, or religion of the customer, or other condition unrelated to the Department of Engineering’s cost of
providing storm water services and facilities. Credits shall be defined and made available on the basis of the
ability of a site to reduce its impact on the storm water system. Credits shall be available only to “other
developed lands” as defined herein.
(a) Land not containing more than four hundred (400) square feet of impervious area shall be
exempt from storm water service charges.
13
(b) Railroad tracks shall be exempt from storm water service charges. However, railroad
stations, maintenance buildings, or other developed land used for railroad purposes shall not be exempt from
storm water service charges.
(c) Public and private roadways, including the portion of private driveways greater than two
hundred (200) linear feet, shall be exempt from storm water service charges.
(d) Ft Gordon, Georgia including contiguous properties owned or operated as part of Fort
operations shall be exempt from the storm water service charge. No storm water services shall be provided by
Augusta, Georgia to the properties so exempt. If services are provided to the properties so exempt the
DIRECTOR is authorized to calculate the proportion of the storm water service charge commensurate with
the level and type of services provided by Augusta, Georgia to be charged all, or a portion of, Fort Gordon.
Such charges shall be calculated by the DIRECTOR and changed from time to time as overall rates or
services are modified.
(e) Hephzibah and Blythe, Georgia shall be charged a storm water service charge
commensurate with the level and type of services provided by Augusta, Georgia. Such charges shall be
calculated by the DIRECTOR and changed from time to time as overall rates or services are modified.
(f) The storm water service charge credit shall be determined based on the technical
requirements and standards contained in the Augusta, Georgia Storm Water Credit Manual. The storm water
service charge credit may be up to sixty five (65) percent of the service charge applicable to a property, and
shall be proportional to the extent that on-site systems, facilities, services, and activities provided, operated,
and maintained by the property owner, tenant, and/or occupant reduce or mitigate the storm water utility's cost
of providing services and facilities. The director of the Department of Engineering shall make a final
determination of credit eligibility.
(g) Credits for on-site storm water systems shall be generally proportional and related to the
affect that such systems have on the: pollution runoff, channel eroding force, and peak rate of runoff from the
site. . The Augusta Georgia Storm Water Credit Manual shall be prepared by the Department of Engineering
specifying the design and performance standards, or sources of such standards, of on-site systems, facilities,
activities, or services which qualify for application of a service charge credit, and how such credits shall be
calculated and applied for.
(h) In the first year of the storm water utility, property owners, tenants, and/or occupants
seeking service charge credits must apply for storm water service charge credits through completion and
submittal to the DIRECTOR of a storm water service charge credit application prior to one calendar year from
the effective date of storm water charges. Approved applications shall receive a storm water credit retroactive
to the effective date of storm water charges.
(i) After one calendar year from the effective date of storm water charges credits will be
granted upon receipt of a timely, completed application, the DIRECTOR shall review the application and
make a determination as to whether the applicable criteria for a credit has been met. All decisions regarding
the approval or disapproval of a storm water credit shall be made within forty-five (45) days of the date the
completed application was accepted by Augusta, GA.
(j) Any credit allowed against the service charge is conditioned on continuing compliance with
Augusta, GA's design and performance standards in effect at the time of the facility’s construction and any
required reporting as required in the Augusta Georgia Storm Water Credit Manual. Augusta, GA may revoke
any credit at any time for non-compliance with this section.
(k) Continuing compliance with Augusta, GA's design and performance standards may be
verified by Augusta, GA Engineering personnel inspection of the systems or facilities upon which the credit is
based. Those systems or facilities determined to no longer comply with Augusta, GA’s design and
performance standards shall be noted to the property owner, tenant, and/or occupant in writing and sixty (60)
days given to remedy the problem. If the deficiencies found in the systems or facilities are not corrected, the
property owner, tenant, and/or occupant shall be subject to revocation of all, or a portion of, storm water
service charge credits based on Augusta, GA inspectors' estimate of capacity reduction for a period of not less
14
than one (1) year. The DIRECTOR reserves the right to correct deficiencies using Augusta, GA resources and
charge the property owner, tenant, and/or occupant the cost of deficiency correction.
§ 5-1-18 STORM WATER SERVICE CHARGE BILLING, DELINQUENCIES, AND COLLECTIONS.
The storm water service charge may be billed and collected separately or along with other rates, fees or
charges as deemed most effective and efficient by the Augusta, GA Commission. All policies of that billing
mechanism shall generally be followed.
(a) A storm water service fee charge shall be declared delinquent if not paid within sixty (60)
days of the date of billing. Unpaid storm water service fees shall be collected using the methods of the billing
mechanism chosen or by filing suit to collect on an unpaid account and by using all methods allowed by
Georgia law to collect on any judgment obtained thereby.
(b) A storm water service fee bill may be sent through the United States mail or by alternative
means notifying the customer of the amount of the bill, the date the payment is due, and the date when past
due. Failure to receive a bill is not justification for non-payment. Regardless of the party to whom the bill is
initially directed, the owner of each parcel of developed land shall be ultimately obligated to pay such fee.
(c) If a customer is underbilled or if no bill is correctly sent for developed land, Augusta,
Georgia may backbill for a period of up to three years, but shall not assess penalties for any delinquency due
to the failure to send a bill, incorrect address, or an under billing.
§ 5-1-19 APPEALS.
(a) Any person aggrieved by a decision of the DIRECTOR relating to the storm water utility
fee (including any decision with reference to the granting or denial of a variance from the terms of this
chapter and storm water service fee decisions) must make a written request for reconsideration by the
DIRECTOR within ten (10) days of the issuance of said decision by the DIRECTOR. A request for
reconsideration shall state the specific reasons why the decision of the DIRECTOR is alleged to be in error.
(b) The DIRECTOR may reverse his/her decision giving written reason for reversal. In the
event the DIRECTOR does not reverse his/her decision, the DIRECTOR shall prepare and send to the
appellant a written response to said request for reconsideration within thirty (30) days of receipt of the
request for reconsideration.
(c) If the appellant is dissatisfied with the decision of the DIRECTOR, he/she can appeal said
decision to the Augusta, Georgia Commission in accordance with this code section and the Augusta,
Georgia Rules of Procedure. A written notice of appeal shall be provided to the DIRECTOR and to the
Augusta Georgia Clerk of Commission within thirty (30) days of appellant’s receipt of the DIRECTOR’s
final decision and shall be captioned as follows: “Appeal of Engineering Department director decision
relating to Storm Water” and shall contain the following information: appellant’s name, a brief description
of the storm water issue decided by the DIRECTOR, a copy of the DIRECTOR’s final decision and the
relief sought by appellant.
(d) Engineering Services Committee hearing procedures and effect of failure to appear at
hearing. Appeals appearing on the Engineering Services Committee shall be treated as any other
Committee agenda item, except that the appellant, or his or her representative, shall have the right to
address the Committee and to present evidence in support of the protest for a maximum of ten (10) minutes.
The DIRECTOR, or his or her representative, shall also have the opportunity to present evidence relating to
the appeal for a maximum of ten (10) minutes. The Chairman of the Engineering Services Committee may
grant additional time equally to each party at his or her discretion.
15
(e) After considering the evidence presented, the Engineering Services Committee shall make
a recommendation to grant or deny the protest, or to send the item to the full Augusta, Georgia Commission
without recommendation. Regardless of the action taken by the Committee, the protest shall be forwarded
to the full Commission agenda for a final decision. The Clerk of Commission shall make an audio
recording of the appeal hearing and shall make such recording available to Commissioners within two (2)
business days following the hearing.
(f) Procedure to Speak to Full Commission Regarding Appeal.
An appellant seeking to speak to the full Commission regarding his or her protest must submit a
request in writing, including his/her address and the name of the procurement being protested, no later than
5:00 p.m. on the Wednesday preceding the next regularly scheduled Commission meeting that follows the
Administrative Services Committee protest hearing. Such request shall be provided to the Clerk of
Commission with a copy to be provided to the Procurement director. When the protest is heard by the
Commission, the appellant and the Procurement director shall each have five (5) minutes to summarize the
arguments and evidence presented to the Administrative Services Committee. The Commission will not
hold a new hearing and will not accept new evidence. If the appellant has not made a timely request to
address the full Commission, the Commission may, at its discretion, dispose of the agenda item via the
Consent Agenda.
(g) Effect of Failure to Appear at Hearing. Failure on the part of the appellant to appear
before either the Engineering Services Committee or the full Augusta, Georgia Commission is considered
an abandonment of their right to appeal and a failure on the part of the appellant to exhaust administrative
remedies. The DIRECTOR’s decision is considered final and the award shall proceed accordingly.
However, the Chairman of the Engineering Services Committee or the Mayor, may, at his or her discretion,
grant the appellant one continuance to the next regularly scheduled Committee or Commission Meeting.
Such continuance may only be granted during the Committee or Commission meeting and shall be recorded
on the minutes of such meeting.
(h) If the appellant is dissatisfied with the Commission’s decision, he/she can appeal said
decision to the Superior Court of Richmond County within thirty (30) days of the date of that decision.
Said appeal shall consist of a review of the record in the appeal process.
§ 5-1-20 COOPERATIO WITH OTHER GOVERMETS.
Augusta, Georgia may enter into agreements with the State of Georgia or with other local
governments to carry out the purpose of this chapter. These agreements may include, but are not limited
to enforcement of provisions, resolution of disputes, cooperative monitoring, and cooperative
management of storm water system and management programs.
§ 5-1-21 PROPERTY OWER LIABILITY; SUPPLEMETAL CHA RGES.
Any person in violation of any portion of this chapter shall be responsible for all costs of
Augusta, GA associated with the violation, including, but not limited to, containment of spills, cleanup,
personal injury, wrongful death, damage or destruction of property, or other related expenses.
Collection, and enforcement provision of this section is in addition to collection methods provided in
Section 5-1-18 above Augusta, Georgia Code.
§ 5-1-22 EFORCEMET; PEALTIES.
(a) This chapter shall be enforced by the office of the director of engineering. Citations for
violation may be issued by inspectors from the Department of Engineering or Planning & Development
Department. Citations shall specify the factual basis of violation(s), cite the specific statutory or code
provision involved, and the Court and date and time to which returnable.
16
(b) Any person, cited for violating this chapter shall upon conviction be subject to the penalties
provided in § 1-6-1 to include a fine not exceeding one thousand dollars or by imprisonment not
exceeding sixty (60) days, either or both, in the discretion of the judge of the court having
jurisdiction. Each day any violation of any provision of this Code or of any such ordinance or rule,
regulation or order shall constitute a separate offence. Violation of this chapter may also constitute
state or federal laws violation and conviction of this chapter does not prohibit prosecution under
state and federal laws.
(c) In addition, Augusta, Georgia may institute appropriate action or proceedings at law or in
equity for the enforcement of this chapter or to correct violations of this chapter. Any court of competent
jurisdiction may have the right to issue restraining orders, temporary or permanent injunctions, and other
appropriate forms of remedy or relief. Each day of noncompliance is considered a separate offense.
Nothing herein contained shall prevent Augusta, Georgia from taking such other lawful action as is
necessary to prevent or remedy any violation, including application for injunctive relief.
§ 5-1-23 SEVERABILITY.
If any term, requirement or provision of this chapter or the application thereof to any person or
circumstance shall, to any extent, be invalid or unenforceable, the remainder of this chapter or the
application of such terms, requirements and provisions to person or circumstances other than those to
which it is held invalid or unenforceable, shall not be affected thereby and each term, requirement or
provision of this chapter shall be valid and be enforced to the fullest extent permitted by law.
§ 5-1-24 PRIOR ICOSISTET ORDIACES .
Any Code provisions, uncodified ordinances, or parts thereof adopted prior to the date of adoption
of this chapter are hereby repealed.
Commission Meeting Agenda
5/19/2015 2:00 PM
Amendment to Stormwater Ordinance
Department:Abie L. Ladson - Director
Caption:Approve proposed Amendment to Stormwater Ordinance.
Background:N/A
Analysis:N/A
Financial Impact:N/A
Alternatives:
Recommendation:Approve ordiance
Funds are Available
in the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Commission Meeting Agenda
5/19/2015 2:00 PM
Minutes
Department:
Caption:Motion to approve the minutes of the regular meeting of the
Commission on May 5, 2015 and the Special Called meeting on
May 12, 2015.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Commission Meeting Agenda
5/19/2015 2:00 PM
Appointment District 10
Department:Clerk of Commission
Caption:Motion to approve the appointment of Mr. John Kelly to the
Augusta-Richmond County Coliseum Authority to replace Mr.
Harry Moore. (Requested by Commissioner Smith)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Commission Meeting Agenda
5/19/2015 2:00 PM
Appointment District 7
Department:Clerk of Commission
Caption:Motion to approve the appointment of Ms. Sheena Dorsey to the
Animal Control Board representing District 7. (Requested by
Commissioner Frantom)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Commission Meeting Agenda
5/19/2015 2:00 PM
Big Screen Monitors
Department:
Caption:Discuss the big screen monitors outside the Commission
Chambers. (Requested by Commissioner M. Williams)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Commission Meeting Agenda
5/19/2015 2:00 PM
Affidavit
Department:Clerk of Commission
Caption:Motion to authorize execution by the Mayor of the affidavit of
compliance with Georgia's Open Meeting Act.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY: