HomeMy WebLinkAbout2022-08-30-Meeting Minutes Engineering Services Committee Meeting Commission Chamber - 8/30/2022
ATTENDANCE:
Present: Hons. Garrett, Chairman; Hasan, Vice Chairman; Johnson and McKnight, members. Absent: Hon. Hardie
Davis, Jr., Mayor.
ENGINEERING SERVICES
1. Update on Bussey Road. (Requested by Commissioner Ben Hasan) Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve receiving this
item as information.
Motion Passes 4-0.
Commissioner Jordan
Johnson
Commissioner Ben
Hasan Passes
2. Mr. Randy Sasser regarding excessive traffic volume and speed on Pleasant Home Road.Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to approve receiving this
item as information.
Motion Passes 4-0.
Commissioner Jordan
Johnson
Commissioner Ben
Hasan Passes
3. Discuss Hornsby Subdivision Improvements led by Cherry Ave Revitalization Enterprise for street sign
toppers. (Requested by Commissioner Jordan Johnson)
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to delete this item
from the agenda.
Motion Passes 4-0.
Commissioner Ben
Hasan
Commissioner Catherine
Smith-McKnight Passes
4. Motion to approve the minutes of the Engineering Services Committee held on August 9, 2022.Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve Motion to
approve.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight
Passes
Motion Passes
4-0.
5. Approve to Supplement Construction (SA3) to Superior Construction Company Southeast, LLC in the
amount of $286,327.80 for Transportation Investment Act (TIA) Project, 5th Street Bridge over
Savannah River Repair and Restoration Projects as requested by Augusta Engineering . Bid 19-291
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
6. Motion to authorize condemnation to acquire title of a portion of property for temporary easement
(Parcel 059-2-821-00-0) 808 Perry Court.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
7. Motion to authorize condemnation to acquire title of a portion of property for temporary easement (Parcel
059-2-834-00-0) 1244 James Brown Boulevard.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
8. Motion to authorize condemnation to acquire title of a portion of property for temporary easement
(Parcel 059-2-837-00-0) 836 Spruce Street.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
9. Motion to authorize condemnation to acquire title of a portion of property for temporary easement
(Parcel 059-2-832-00-0) 1308 James Brown Boulevard.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
10. Motion to authorize condemnation to acquire title of a portion of property for right of way and temporary
easement (Parcel 059-2-319-00-0) 858 Laney Walker Boulevard.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
11. Motion to approve and adopt proposed Ordinance changes to the Augusta, Georgia Code, 3-5-1 and 3-5-
86 to modify requirements for personal transportation vehicles (PTV).
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to forward this item to the full
Commission without recommendation.
Motion Passes 4-0.
Commissioner
Jordan Johnson
Commissioner
Ben Hasan Passes
12. Motion to approve Bid Award Item 22-209 Landscaping and Lawn Maintenance for Water Treatment
Plants
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
13. Motion to approve Supplemental Agreement one (SA1) for Blue Ridge Services Professional Services
Contract in amount of $82,002.73 for Solid Waste Intake Operations Supporting Services for Deans
Bridge Road Landfill. Emergency Procurement. Requested by AE&ESD
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve Motion to
approve.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight
Passes
Motion Passes
4-0.
14. Motion to approve a cost sharing agreement between Augusta Utilities Department and JEN-PCS, LLC
for the up-sizing of gravity sanitary sewer main from 8” pipe to 12” pipe in the amount of $71,684.43.
Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable
{mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-
noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-
margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in;
line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri",sans-serif; mso-
ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-
theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;}
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
15. Motion to approve Supplemental Agreement Three for Infrastructure Systems Management, LLC (ISM)
in the amount of $351,502.50 for Deans Bridge Road Landfill Phase 3 Site Improvements & stabilization
and Erosion Management services. RFP 19-241 / Requested by AE&ESD
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
16. Motion to approve funding for Design Consultant Services Supplemental Agreement #4 to Benesch
(formerly WR Toole Engineers) in the amount of $33,160 for the East Augusta Roadway & Drainage
Improvement Project-Brunswick Ave. & Azalea Street Phase Construction Phase Services (CEI).
Requested by the Augusta Engineering. RFQ 06-202
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
17. Motion to approve and authorize Augusta Engineering (AE&ESD) to submit, accept and receive
Georgia Department of Transpiration (GDOT) Financial Assistance from GDOT FY2023 Local
Maintenance and Improvement Grant (FY2023 LMIG) for Road Improvements & maintenance projects
(Listed under Financial Impact Section). requested by AE&ESD.
Item
Action:
Approved
Motions
Motion
Type
Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Jordan
Johnson
Commissioner Catherine Smith-
McKnight Passes
18. Motion to approve Georgia Power Easements at Augusta Owned Parcels – Savannah Rapids Pavilion.
Also authorize Augusta, GA’s Mayor to sign all documentation. This approval is contingent upon receipt
of letter agreement from Georgia Power. Requested by the Augusta Engineering.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
19. Motion to approve award of Bid to Yancy Brothers in the amount of $1,477,101.00 for Landfill
Compactor Purchase. Bid 22-190 / Requested by AE&ESD
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve,
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
20. Motion to approve and Authorize the Engineering & Environmental Services Department (AE&ESD) to
Accept and Receive Federal Financial Assistance through Section 319(h) Nonpoint Source Implication
Grant Program for Phase 2 Biota improvement in Urban Stream. Also grant authorization permitting
Augusta, GA’s Mayor to sign all documentation requested by AE&ESD.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
21. Motion to approve the installation of three (3) speed humps along Gardner Street between Johns Road
and Milledge Road per Augusta Speed humps adopted Policy. Also approve construction funds in
amount of $12,000. Requested by Engineering Normal 0 false false false EN-US X-NONE
X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-
rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-
parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-pagination:widow-orphan;
font-size:10.0pt; font-family:"Times New Roman",serif;}
Item
Action:
Approved
Motions
Motion
Type
Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
22. Motion to approve a $282,775.00 urgent replacement by Hembree Contracting, Inc of the inoperative
CNG dispensers located at 3035 Tobacco Road. Requested by Engineering
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
23. Motion to approve funding for on-call professional engineering services for traffic signal analysis,
design, and permitting at Gordon Hwy and Haynes Station Drive in the amount of $142,400.00 to
Infrastructure Systems Management, LLC (ISM) per RFP 19-241. Requested by Engineering
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner Ben
Hasan
Commissioner Catherine Smith-
McKnight Passes
www.augustaga.gov
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Bussey Road
Department:Augusta Commission
Presenter:Commissioner Ben Hasan
Caption:Update on Bussey Road. (Requested by Commissioner Ben Hasan)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available in
the Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Randy Sasser traffic volume Pleasant Home Road
Department:
Presenter:Mr. Randy Sasser
Caption: Mr. Randy Sasser regarding excessive traffic volume and speed on
Pleasant Home Road.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available in
the Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Discuss Hornsby Subdivision Improvements led by Cherry Ave Revitalization Enterprise
Department:
Presenter:Commissioner Jordan Johnson and Cherry Ave Rehab Enterprise LLC
Caption:Discuss Hornsby Subdivision Improvements led by Cherry Ave
Revitalization Enterprise for street sign toppers. (Requested by
Commissioner Jordan Johnson)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available in
the Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Minutes
Department:
Presenter:
Caption:Motion to approve the minutes of the Engineering Services Committee
held on August 9, 2022.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available in
the Following
Accounts:
REVIEWED AND APPROVED BY:
5TH STREET BRIDGE REHABILITATION OVER SAVANNAH RIVER
CITY OF AUGUSTA
RGBW CHANGE ORDER - 24 FIXTURES
BID DATE: JULY 26, 2022 R. J. HAYNIE & ASSOCIATES, INC.
COMPLETION DATE: TBD
LINE NO.ITEM NO.DESCRIPTION UNIT QUANTITY UNIT PRICE EXTENDED PRICE
CABLE, TP XHHW, AWG NO 4 LF 1250.00 4.25$ 5,312.50$
RGBW40K FIXTURE EA 24.00 6,275.00$ 150,600.00$
CBX BOX EA 6.00 2,985.00$ 17,910.00$
65 FT SNOOPER TRUCK RENTAL LS 1.00 68,100.00$ 68,100.00$
1/2 IN PVC COATED LIQUID TIGHT CONDUIT LF 175.00 17.00$ 2,975.00$
4 X 4 X 4 JUNCTION BOX EA 4.00 393.00$ 1,572.00$
60 X 25 X 18 PADLOCKABLE 3R CABINET W/ BACK PANEL EA 2.00 4,633.40$ 9,266.80$
DMX CABLE LF 1250.00 3.65$ 4,562.50$
BID TOTAL:260,298.80$
**5 year Cloud service is included.
**Bid is valid for 30 days.
R. J. Haynie & Associates, Inc.
Jeff Haynie
404-361-0672 (office)
404-366-9750 (fax)
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project is authorized to CPB#371-041110-T15041217. This request is to Supplement
Construction Three to Superior Construction Company Southeast, LLC in the amount
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
TIA Design 992,200$
TIA Construction 8,000,000$
LMIG FUNDS 1,000,000$
TIA Discretionary 1,658,202$
LMIG FY2021FUNDS 550,000$
SPLOST VI 260,299$
12,460,701$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Honorable Hardie Davis, Mayor
CAPITAL PROJECT BUDGET
CPB#371-041110-T15041217
5th Street Bridge over the Savannah River (Bridge Repair and Restoration)
Bid 19-291
of $260,299 for Transportation Investment Act (TIA) project subject to bonds as
requested by AED. Funding is available in SPLOST VI Funds
8/18/2022
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
CPB#371-041110-T15041217
5th Street Bridge over the Savannah River (Bridge Repair and Restoration)
Bid 19-291
CPB AMOUNT CPB New
SOURCE OF FUNDS CPB Addition CPB
TIA Project
371-041110/5212115-T15041217 ($200,920)($200,920)
TIA Project
371-041110/5212115-T15041217 ($791,280)($791,280)
TIA Project
371-041110-T15041217 ($8,000,000)($8,000,000)
GDOT LMIG Funds ($1,000,000)($1,000,000)
TIA Discretionary ($1,658,202)($1,658,202)
GDOT LMIG 2021 ($550,000)($550,000)
SPLOST VI $0 ($260,299)($260,299)
TOTAL SOURCES:($12,200,402)($260,299)($12,460,701)
USE OF FUNDS
ENGINEERING
371-041110-5414210/T15041217 $992,200 $992,200
TIA Project
371-041110-5414110-T15041217 $8,000,000 $8,000,000
GDOT LMIG Funds
371-041110-5414110 $1,000,000 $1,000,000
TIA Discretionary
235-041110-5414110 $1,658,202 $1,658,202
GDOT LMIG 2021 $550,000
SPLOST VI Funds
328-041110-219828922 $0 $260,299 $260,299
TOTAL USES:$12,200,402 $260,299 $12,460,701
8/18/2022
Engineering Services Committee Meeting
8/30/2022 1:15 PM
5th Street Over the Savannah River –Bridge Repair and Restoration Project TIA Project#RC07-001217/PI#0011418
Bid #19-291 File Reference: 2022– 014(T)
Department:Engineering
Presenter:
Caption:Approve to Supplement Construction (SA3) to Superior Construction
Company Southeast, LLC in the amount of $286,327.80 for
Transportation Investment Act (TIA) Project, 5th Street Bridge over
Savannah River Repair and Restoration Projects as requested by Augusta
Engineering . Bid 19-291
Background:Currently, Superior Construction Company Southeast, LLC is under
contract with Augusta, GA for Transportation Investment Act (TIA)
Project, 5th Street Bridge over Savannah River (Bridge Repair and
Restoration) Improvements Project. The Augusta Commission awarded
this contract on December 17, 2019. Bridge rehabilitation work is
complete and at the deck. Safety and recreation features construction is in
progress and near completion. Bridge’s intended use is a Public Linear
Park. Project improvements include various Linear Park features including
multiple shade structures and lighting. Bridge underdeck lighting is
interchangeable color lighting with presently only one central shade
structure equipped with similar lighting fixture.
Analysis:Superior Construction Company Southeast, LLC is currently under
contract with Augusta, GA/Augusta Engineering for 5th Street Bridge over
Savannah River (Bridge Repair and Restoration)) Improvements work.
Bridge Improvements work is progressing and project is near completion.
Bridge lighting was commission and tested on June 15, 2022. It was noted
that interchangeable color lighting feature is also needed at other shade
structures. These shade structure presently does not have RGBW fixture.
Work covered under this supplement is adding such fixtures.
Financial Impact:Funds in the amount of $286,328 available in Engineering SPLOST VI -
Street Lighting for covering construction cost.
Alternatives:1) Do not approve and find alternative to complete shade structures needed
lighting improvements.
Recommendation:Approve to Supplement Construction (SA3) to Superior Construction
Company Southeast, LLC in the amount of $286,328 for Transportation
Investment Act (TIA) Project, 5th Street Bridge over Savannah River
Repair and Restoration Projects as requested by Augusta Engineering. Bid
19-291
Funds are Available in
the Following
Accounts:
($286,328) 328-041110-5312310 / 219828922-5312310 (SPLOST VI)
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
AGENDA ITEM ______________
EDITION ______________
DATE: August 8, 2022
TO: The Honorable Hardie Davis, Mayor
Members of the Augusta Commission/Members of the Engineering Services
Committee
FROM: Daniel W. Hamilton through Wayne Brown, General Counsel
SUBJECT: Acquisition of a temporary construction easement to Richmond County, Georgia
from Alfredie Dixon and Joan R. Dixon.
CAPTION: Motion to authorize condemnation to acquire title of a portion of
property for temporary easement (Parcel 059-2-821-00-0) 808
Perry Court.
BACKGROUND: The City has been unable to reach an agreement with the property
owners and therefore seeks to acquire title through condemnation.
In order to proceed and avoid further project delays, it is
necessary to condemn a portion of subject property. The required
property consists of 609 square feet of temporary easement. The
appraised value is $500.00.
ANALYSIS: Condemnation is necessary in order to acquire the required
property.
FINANCIAL IMPACT: The necessary costs will be covered under the project budget.
ALTERNATIVES: Deny condemnation.
RECOMMENDATION: Approve condemnation.
AGENDA DATE: August 30, 2022.
DEPARTMENT FUNDS ARE AVAILABLE IN THE
DIRECTOR:_________________________ FOLLOWING ACCOUNTS:
G/L 272-075511
ADMINISTRATOR:____________________
FINANCE:__________________________
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Acquisition of a temporary construction easement to Richmond County, Georgia from Alfredie Dixon and Joan R.
Dixon 808 Perry Ct.
Department:Engineering
Presenter:Law
Caption:Motion to authorize condemnation to acquire title of a portion of property
for temporary easement (Parcel 059-2-821-00-0) 808 Perry Court.
Background:The City has been unable to reach an agreement with the property owners
and therefore seeks to acquire title through condemnation. In order to
proceed and avoid further project delays, it is necessary to condemn a
portion of subject property. The required property consists of 609 square
feet of temporary easement. The appraised value is $500.00.
Analysis:Condemnation is necessary in order to acquire the required property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available in
the Following
Accounts:
FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L
272-07-5511/5212115
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
AGENDA ITEM ______________
EDITION ______________
DATE: August 8, 2022
TO: The Honorable Hardie Davis, Mayor
Members of the Augusta Commission/Members of the Engineering Services
Committee
FROM: Daniel W. Hamilton through Wayne Brown, General Counsel
SUBJECT: Acquisition of a temporary construction easement to Richmond County, Georgia
from Bernice O. Dixon (deceased).
CAPTION: Motion to authorize condemnation to acquire title of a portion of
property for temporary easement (Parcel 059-2-834-00-0) 1244
James Brown Boulevard.
BACKGROUND: The City cannot determine clear title due to the owner being
deceased. Therefore the City seeks to acquire title through
condemnation. In order to proceed and avoid further project
delays, it is necessary to condemn a portion of subject property.
The required property consists of 375 square feet of temporary
easement. The appraised value is $500.00.
ANALYSIS: Condemnation is necessary in order to acquire the required
property.
FINANCIAL IMPACT: The necessary costs will be covered under the project budget.
ALTERNATIVES: Deny condemnation.
RECOMMENDATION: Approve condemnation.
AGENDA DATE: August 30, 2022.
DEPARTMENT FUNDS ARE AVAILABLE IN THE
DIRECTOR:_________________________ FOLLOWING ACCOUNTS:
G/L 272-075511
ADMINISTRATOR:____________________
FINANCE:__________________________
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Acquisition of a temporary construction easement to Richmond County, Georgia from Bernice O. Dixon (deceased).
1244 James Brown Blvd.
Department:Engineering
Presenter:Law
Caption:Motion to authorize condemnation to acquire title of a portion of property
for temporary easement (Parcel 059-2-834-00-0) 1244 James Brown
Boulevard.
Background:The City cannot determine clear title due to the owner being deceased.
Therefore the City seeks to acquire title through condemnation. In order to
proceed and avoid further project delays, it is necessary to condemn a
portion of subject property. The required property consists of 375 square
feet of temporary easement. The appraised value is $500.00.
Analysis:Condemnation is necessary in order to acquire the required property.
Financial Impact:The necessary costs will be covered under the project budget
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available in
the Following
Accounts:
FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L
272-07-5511/5212115
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
AGENDA ITEM ______________ EDITION ______________ DATE: August 8, 2022
TO: The Honorable Hardie Davis, Mayor Members of the Augusta Commission/Members of the Engineering Services Committee FROM: Daniel W. Hamilton through Wayne Brown, General Counsel SUBJECT: Acquisition of a temporary construction easement to Richmond County, Georgia from Emma Brassfield (deceased). CAPTION: Motion to authorize condemnation to acquire title of a portion of property for temporary easement (Parcel 059-2-837-00-0) 836 Spruce Street.
BACKGROUND: The City cannot determine clear title due to the owner being deceased. Therefore the City seeks to acquire title through
condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 446 square feet of temporary
easement. The appraised value is $500.00. ANALYSIS: Condemnation is necessary in order to acquire the required property. FINANCIAL IMPACT: The necessary costs will be covered under the project budget. ALTERNATIVES: Deny condemnation. RECOMMENDATION: Approve condemnation.
AGENDA DATE: August 30, 2022.
DEPARTMENT FUNDS ARE AVAILABLE IN THE DIRECTOR:_________________________ FOLLOWING ACCOUNTS: G/L 272-075511
ADMINISTRATOR:____________________ FINANCE:__________________________
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Acquisition of a temporary construction easement to Richmond County, Georgia from Emma Brassfield (deceased)
836 Spruce Street.
Department:Engineering
Presenter:Law
Caption:Motion to authorize condemnation to acquire title of a portion of property
for temporary easement (Parcel 059-2-837-00-0) 836 Spruce Street.
Background:The City cannot determine clear title due to the owner being deceased.
Therefore the City seeks to acquire title through condemnation. In order to
proceed and avoid further project delays, it is necessary to condemn a
portion of subject property. The required property consists of 446 square
feet of temporary easement. The appraised value is $500.00.
Analysis:Condemnation is necessary in order to acquire the required property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available in
the Following
Accounts:
FOLLOWING ACCOUNTS: G/L 272-07-5511/5212115
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
AGENDA ITEM ______________
EDITION ______________
DATE: August 8, 2022
TO: The Honorable Hardie Davis, Mayor
Members of the Augusta Commission/Members of the Engineering Services
Committee
FROM: Daniel W. Hamilton through Wayne Brown, General Counsel
SUBJECT: Acquisition of a temporary construction easement to Richmond County, Georgia
from Mary A. Dejesus (deceased).
CAPTION: Motion to authorize condemnation to acquire title of a portion of
property for temporary easement (Parcel 059-2-832-00-0) 1308
James Brown Boulevard.
BACKGROUND: The City cannot determine clear title due to the owner being
deceased. Therefore the City seeks to acquire title through
condemnation. In order to proceed and avoid further project
delays, it is necessary to condemn a portion of subject property.
The required property consists of 375 square feet of temporary
easement. The appraised value is $500.00.
ANALYSIS: Condemnation is necessary in order to acquire the required
property.
FINANCIAL IMPACT: The necessary costs will be covered under the project budget.
ALTERNATIVES: Deny condemnation.
RECOMMENDATION: Approve condemnation.
AGENDA DATE: August 30, 2022.
DEPARTMENT FUNDS ARE AVAILABLE IN THE
DIRECTOR:_________________________ FOLLOWING ACCOUNTS:
G/L 272-075511
ADMINISTRATOR:____________________
FINANCE:__________________________
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Acquisition of a temporary construction easement to Richmond County, Georgia from Mary A. Dejesus (deceased).
1308 James Brown Blvd.
Department:Engineering
Presenter:Law
Caption:Motion to authorize condemnation to acquire title of a portion of property
for temporary easement (Parcel 059-2-832-00-0) 1308 James Brown
Boulevard.
Background:The City cannot determine clear title due to the owner being deceased.
Therefore the City seeks to acquire title through condemnation. In order to
proceed and avoid further project delays, it is necessary to condemn a
portion of subject property. The required property consists of 375 square
feet of temporary easement. The appraised value is $500.00.
Analysis:Condemnation is necessary in order to acquire the required property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available in
the Following
Accounts:
FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L
272-07-5511/5212115
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
AGENDA ITEM ______________ EDITION ______________ DATE: August 8, 2022
TO: The Honorable Hardie Davis, Mayor Members of the Augusta Commission/Members of the Engineering Services Committee FROM: Daniel W. Hamilton through Wayne Brown, General Counsel SUBJECT: Acquisition of right of way and temporary construction easement to Richmond County, Georgia from Marietta Scott Reid (deceased), Aline Walker, Marcus Reid Anthony, and Katrina Nicole Reid. CAPTION: Motion to authorize condemnation to acquire title of a portion of property for right of way and temporary easement (Parcel 059-2-
319-00-0) 858 Laney Walker Boulevard. BACKGROUND: The City cannot determine clear title due to one of the owners
being deceased. Also, the City has been unable to reach an agreement with some of the property owners. Therefore the City seeks to acquire title through condemnation. In order to proceed
and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 312 square feet of right of way and 264 square feet of temporary easement. The appraised value is $3,000.00. ANALYSIS: Condemnation is necessary in order to acquire the required property. FINANCIAL IMPACT: The necessary costs will be covered under the project budget. ALTERNATIVES: Deny condemnation.
RECOMMENDATION: Approve condemnation. AGENDA DATE: August 30, 2022.
DEPARTMENT FUNDS ARE AVAILABLE IN THE DIRECTOR:_________________________ FOLLOWING ACCOUNTS: G/L 272-075511 ADMINISTRATOR:____________________ FINANCE:__________________________
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Acquisition of right of way and temporary construction easement to Richmond County, Georgia from Marietta Scott
Reid (deceased), Aline Walker, Marcus Reid Anthony, and Katrina Nicole Reid. 858 Laney Walker Boulevard.
Department:Engineering
Presenter:Law
Caption:Motion to authorize condemnation to acquire title of a portion of property
for right of way and temporary easement (Parcel 059-2-319-00-0) 858
Laney Walker Boulevard.
Background:The City cannot determine clear title due to one of the owners being
deceased. Also, the City has been unable to reach an agreement with some
of the property owners. Therefore the City seeks to acquire title through
condemnation. In order to proceed and avoid further project delays, it is
necessary to condemn a portion of subject property. The required property
consists of 312 square feet of right of way and 264 square feet of
temporary easement. The appraised value is $3,000.00.
Analysis:Condemnation is necessary in order to acquire the required property.
Financial Impact:The necessary costs will be covered under the project budget.
Alternatives:Deny condemnation.
Recommendation:Approve condemnation.
Funds are Available in
the Following
Accounts:
FOLLOWING ACCOUNTS: G/L 272-07-5511/5212115
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Approve and Adopt Revised Ordinance Regarding RTV Ordinance Revisions
Department:Engineering
Presenter:
Caption:Motion to approve and adopt proposed Ordinance changes to the Augusta,
Georgia Code, 3-5-1 and 3-5-86 to modify requirements for personal
transportation vehicles (PTV).
Background:Currently, the PTV ordinance and all associated conditions were adopted
in 2018 by the Augusta Commission. A downtown business would like to
modify the Ordinance to allow the use of a larger PTV vehicle.
Analysis:The ordinance modifications involve increasing the allowable weight of a
Commercial PTV to 3,000 pounds and increasing the number of
passengers up to 20 people.
Financial Impact:None
Alternatives:Do not approve changes to Augusta, Georgia Code 3-5-1 and 3-5-86.
Recommendation:Approve proposed revisions to Augusta, Georgia Code 3-5-1 and 3-5-86 to
allow for Commercial PTV changes.
Funds are Available in
the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Invitation to Bid
Sealed bids will be received at this office until Monday, May 9, 2022 @ 11:00 a.m. via ZOOM Meeting ID: 883 5667 1071;
Passcode: 527197 for furnishing:
Bid Item #22-209 Landscaping and Lawn Maintenance for Water Treatment Plant for Augusta, GA – Utilities
Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid
documents may be obtained at the offices of Augusta, GA Procurement Department, 535 Telfair Street – Suite 605,
Augusta, GA 30901 (706-821-2422).
Please contact Stephen Orton at 706-836-7283 for Optional Site-Visit on April 18, 2022.
All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov
to the office of the Procurement Department by Wednesday, April 20, 2022 @ 5:00 P.M. No bid will be accepted by fax
or email, all must be received by mail or hand delivered.
No bids may be withdrawn for a period of ninety (90) days after bids have been opened, pending the execution of contract
with the successful bidder.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include
specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions,
applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to,
the number of copies needed, the timing of the submission, the required financial data, and any other requirements
designated by the Procurement Department are considered material conditions of the bid which are not waiveable or
modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted
through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the
Augusta, Georgia Commission. Please mark BID number on the outside of the envelope.
The local bidder preference program is applicable to this project. To be approved as a local bidder and receive bid
preference an eligible bidder must submit a completed and signed written application to become a local bidder at least
thirty (30) days prior to the date bids are received on an eligible local project. An eligible bidder who fails to submit an
application for approval as a local bidder at least thirty (30) days prior to the date bids are received on an eligible local
project, and who otherwise meets the requirements for approval as a local bidder, will not be qualified for a bid
preference on such eligible local project.
GEORGIA E-Verify and Public Contracts: The Georgia E-Verify law requires contractors and all sub-contractors on Georgia
public contract (contracts with a government agency) for the physical performance of services over $2,499 in value to
enroll in E-Verify, regardless of the number of employees. They may be exempt from this requirement if they have no
employees and do not plan to hire employees for the purpose of completing any part of the public contract. Certain
professions are also exempt. All requests for proposals issued by a city must include the contractor affidavit as part of the
requirement for their bid to be considered.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement
Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of
receiving incomplete or inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
No bid will be accepted by fax or email, all must be received by mail or hand delivered.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle March 24, 31, 2022 and April 7, 14, 2022
Metro Courier March 24, 2022
OFFICIAL
VENDORS
Jacobs Land Management
733 Scott Nixon Memorial
Dr.
Augusta, GA 30907
HB Landscaping and Lawn
Care LLC
663 Blanchard Rd.
Evans, GA 30809
Yellowstone Landscape
702 McKnight Industrial
Blvd
Martinez, GA 30907
LEP Contracting LLC
2917 Foxhall Circle
Augusta, GA 30907
Pond Maintenance of
Augusta LLC
3707 Colbert St.
Augusta, GA 30906
Anything Outdoors
4160 Iron Horse Dr.
Augusta, GA 30907
Attachment B YES YES YES YES YES
E-Verify Number 417873 1419481 648975 1512510 67036
SAVE Form YES YES YES YES YES
Area 1 $255.00 $416.00 $450.00 $1,000.00 $600.00
Area 2 $220.00 $566.00 $1,000.00 $850.00 $600.00
Area 3 $295.00 $566.00 $815.00 $850.00 $600.00
Area 4 $435.00 $566.00 $750.00 $850.00 $1,200.00
Area 5 $285.00 $366.00 $950.00 $850.00 $600.00
Highland Plant
Total Monthly Fee $1,490.00 $2,480.00 $3,965.00 $4,400.00 $3,600.00
Area 1 $485.00 $460.00 $1,150.00 $734.00 $2,000.00
Area 2 $175.00 $260.00 $350.00 $1,000.00 $500.00
Area 3 $190.00 $260.00 $450.00 $734.00 $500.00
Area 4 $475.00 $560.00 $1,380.00 $734.00 $2,000.00
Hicks Plant Total
Monthly Fee $1,325.00 $1,540.00 $3,330.00 $3,202.00 $5,000.00
Area 1 $255.00 $437.00 $450.00 $1,045.00 $690.00
Area 2 $220.00 $594.00 $1,000.00 $886.00 $690.00
Area 3 $295.00 $594.00 $815.00 $886.00 $690.00
Area 4 $435.00 $594.00 $750.00 $886.00 $1,380.00
Area 5 $285.00 $385.00 $950.00 $886.00 $690.00
Highland Plant
Total Monthly Fee $1,490.00 $2,604.00 $3,965.00 $4,589.00 $4,140.00
Area 1 $485.00 $483.00 $1,150.00 $759.00 $2,300.00
Area 2 $175.00 $273.00 $350.00 $1,045.00 $575.00
Area 3 $190.00 $273.00 $450.00 $759.00 $575.00
Area 4 $475.00 $588.00 $1,380.00 $759.00 $2,300.00
Hicks Plant Total
Monthly Fee $1,325.00 $1,617.00 $3,330.00 $3,322.00 $5,750.00
Bid Form: Landscaping Services Fee for the One (1) One Year Extension Options
Bid Form: Landscaping Services
LATE SUBMITTAL
Total Number Specifications Mailed Out: 22
Total Number Specifications Download (Demandstar): 11
Total Electronic Notifications (Demandstar): 281
Total Georgia Procurement Registry: 1918
Total packages submitted: 6
Total Non-Compliant: 1
Bid Opening Bid Item #22-209 Landscaping and Lawn
Maintenance for Water Treatment Plant
for Augusta, Georgia- Utilities Department
Bid Due: Mon May 9, 2022 @ 11:00 a.m.
Page 1 of 1
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Award Bid Item 22-209 Landscaping and Lawn Maintenance for Water Treatment Plants
Department:Utilities
Presenter:Wes Byne
Caption:Motion to approve Bid Award Item 22-209 Landscaping and Lawn
Maintenance for Water Treatment Plants
Background:The Utilities Department has worked with the Augusta Procurement
Department to solicit bids for landscaping and lawn maintenance services
at our two largest drinking water treatment facilities. The bid solicitation
requested a monthly cost for one year with an option for a second year.
The solicitation resulted in five bids from qualified vendors.
Analysis:Our review of the bids received determined that the best bid was submitted
by Jacobs Land Management at a maximum cost of $2,815.00 per month
for both facilities. They also propose to maintain that pricing if Augusta
exercises the option for a second year. The total annual maximum cost for
this service would be $33,780.00.
Financial Impact:$33.780.00 from budgeted funds.
Alternatives:Perform this work with our staff and equipment which would cost more
than the proposed maximum cost. Not Recommended.
Recommendation:Award Bid Item 22-209 to Jacobs Land Management at an annual cost of
$33.780.00.
Funds are Available in
the Following
Accounts:
506043520-5222410 for Highland Avenue Facility 506043540-5222410
for N Max Hicks Facility
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Hameed Malik, Ph.D., P.E.
Director Engineering
Augusta Engineering Department
452 Walker St., Suite 110, Augusta, Georgia 30901
August 4, 2022
Dr. Malik,
Blue Ridge Services Montana, Inc. has prepared the following summary of tasks that we have been asked to perform
that are outside of our original scope of services.
Summary of additional tasks performed through August 4, 2022
• Landfill Compactor Recommendations
o Correspondence and review of landfill compactor bid specs, research, and provide correspondence
with findings and recommendations.
▪ Task Total $780.00
• Stormwater flap design (for submittal to the State)
o Includes, project management, internal and external correspondence, calculations, development of
drawings, and pro-rated onsite recognizance and observation for onsite visit.
▪ Task Total $17,446.48
• Modified Fill Sequence Plans (for submittal to the State)
o In our proposal and cost estimate we had allocated $23,765.00 to create one fill sequence plan concept.
Once learning of the need to incorporate the rain flap design into the fill sequence plans and maximize
the timeframe within the available lined area, we were asked to develop and submit another fill
sequence plan.
o Includes, project management, internal and external correspondence, meetings, calculations and the
development, printing and shipment of fill sequence drawings which were provided for staff review
and submittal to the State
▪ Task Total $20,416.25
• CORE Data Collection and Review
o We did not receive the requested CORE questionnaire and associated data in our initial requests and
spent a significant amount of effort re-requesting, summarizing, and reconfiguring the outstanding
information and data.
▪ Task Total $5,265.00
• Total of additional tasks performed through August 4, 2022, $43,907.73
Summary of estimated additional tasks moving forward
• Further modifications to Fill Sequence plans and Stormwater flap design
o Pending feedback from the State, we will require additional budget to perform any modifications to
the fill sequence plans and stormwater flap designs that were submitted. We will also require
additional budget to provide greater operational detail within each phase of the fill sequence plans.
This detail could include optimized wet-weather access roads and tipping areas for operations staff
to follow. This additional detail within the plans will require updated aerial topography (performed
by others).
o Includes, project management, internal and external correspondence, meetings, calculations and the
development, printing, and shipment of more detailed fill sequence drawings.
▪ Task Total $15,600
• Additional onsite training and support
o We were asked to provide three additional onsite training and support sessions for onsite
management, supervision, and operations staff. This would extend our existing monthly onsite
training and support sessions through the end of 2022. This training and support would continue to
reinforce the wide variety of optimizations, planning components and safety enhancements we have
introduced throughout the course of the project.
o Includes labor, materials and travel related expenses to provide 3 separate-three day onsite training
sessions.
▪ Task Total $36,535
• Total of additional tasks moving forward, $38,095
In our original scope of services, we had allocated $26,265.00 to develop the Airspace Management Plan (AMP). Per
your request, we have focused our efforts toward developing the fill sequence plans and have not utilized any of our
original budget to develop the longer-term Airspace Management Plan (AMP). Now that our team has reviewed the
base grades provided by SCS it is clear they have not been updated to account for the as-built conditions of the lined
slope. Prior to doing any AMP work SCS would need to update the design base grades and final grades to ensure that
any long-term sequencing iterations are accurate. With this in mind, we recommend standing down on the AMP task,
and reallocating the $26,265.00 of this original budget toward the tasks outlined within this document.
We respectfully request that the $26,265.00 AMP budget be reallocated to partially cover the additional tasks outlined
in this document. This reallocation of budget would result in an additional budget request of $55,737.73 to cover the
tasks performed through August 4, 2022, and the estimated additional tasks moving forward.
Please let me know if you have any questions or would like to discuss any of the above in more detail. We look
forward to your timely response.
Respectfully,
Jason Todaro
Solid Waste Operations Consultant III.
(SA02 – For changes greater than $25,000) August 2022
ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
Augusta Richmond County Project Number(s): 541-044210 – 5212115
Supplemental Agreement Number: 1
Purchase Order Number: P423293
WHEREAS, We, Blue Ridge Services, Inc., entered into a contract with Augusta-Richmond County on
December 23, 2021, for the Deans Bridge Road Solid Waste Facility for the Waste Management
Operations-Operational Regulatory Deficiencies and Violations Operation Improvements Project
referenced 541-044210-5212115 and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered
by the scope of the original contract, we desire to submit the following Supplemental Agreement
to-wit:
Deans Bridge Road LF- Comprehensive Operational Review
and Operation Supporting Services-Supplemental Work
It is agreed that as a result of the above described modifications the contract amount is increased
by $82,002.73 from $158,104.00 to a new total of $240,106.73. Any modifications to submittal
dates shall be as identified in the attached proposal. This agreement in no way modifies or changes
the original contract of which it becomes a part, except as specifically stated herein.
NOW, THEREFORE, We, Blue Ridge Services, Inc, Consultant, hereby agree to said Supplemental
Agreement consisting of the above-mentioned item, and agree that this Supplemental Agreement
is hereby made a part of the original contract to be performed under the specifications thereof, and
that the original contract is in full force and effect, except insofar as it might be modified by this
Supplemental Agreement.
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY Blue Ridge Services, Inc
AUGUSTA, GEORGIA
Honorable Hardie Davis, Mayor
Approved Date: Approved: Date:
[ATTACHED CORPORATE SEAL]
ATTEST: ATTEST:
Title:
Title:
(SA02 – For changes greater than $25,000) August 2022
ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
Augusta Richmond County Project Number(s): 541-044210 – 5212115
Supplemental Agreement Number: 1
Purchase Order Number: P423293
WHEREAS, We, Blue Ridge Services, Inc., entered into a contract with Augusta-Richmond County on
December 23, 2021, for the Deans Bridge Road Solid Waste Facility for the Waste Management
Operations-Operational Regulatory Deficiencies and Violations Operation Improvements Project
referenced 541-044210-5212115 and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered
by the scope of the original contract, we desire to submit the following Supplemental Agreement
to-wit:
Deans Bridge Road LF- Comprehensive Operational Review
and Operation Supporting Services-Supplemental Work
It is agreed that as a result of the above described modifications the contract amount is increased
by $82,002.73 from $158,104.00 to a new total of $240,106.73. Any modifications to submittal
dates shall be as identified in the attached proposal. This agreement in no way modifies or changes
the original contract of which it becomes a part, except as specifically stated herein.
NOW, THEREFORE, We, Blue Ridge Services, Inc, Consultant, hereby agree to said Supplemental
Agreement consisting of the above-mentioned item, and agree that this Supplemental Agreement
is hereby made a part of the original contract to be performed under the specifications thereof, and
that the original contract is in full force and effect, except insofar as it might be modified by this
Supplemental Agreement.
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY Blue Ridge Services, Inc
AUGUSTA, GEORGIA
Honorable Hardie Davis, Mayor
Approved Date: Approved: Date:
[ATTACHED CORPORATE SEAL]
ATTEST: ATTEST:
Title:
Title:
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Blue Ridge Services, Inc. Professional Services Contract - SA1 Deans Bridge Road Landfill Comprehensive
Operational Review and Operation Supporting Services-Supplemental Work File Reference: 22 – 014(L)
Department:Engineering
Presenter:
Caption:Motion to approve Supplemental Agreement one (SA1) for Blue Ridge
Services Professional Services Contract in amount of $82,002.73 for Solid
Waste Intake Operations Supporting Services for Deans Bridge Road
Landfill. Emergency Procurement. Requested by AE&ESD
Background:For an extended time, Augusta Deans Bridge Road Landfill (Facility) has
been experiencing solid waste management operational challenges and
issues. To bring the Facility back in compliance per NOV cited schedule
and getting possible response time extension, there was an emergency
need to i) conduct a comprehensive solid waste management operational
review, ii) develop fill sequence plan, iii) develop waste management
standard operating procedures, and iv) conduct the Facility waste
management employees’ hands-on on-site training. Aforementioned
activities are very specialized services and Blue Ridge is the national
leader of such professional services firm. Blue Ridge professional Services
are acquired under Emergency Procurement option in December 2021.
Analysis:Blue Ridge professional Services are acquired under Emergency
Procurement option in December 2021. Since then, Blue Ridge conducted
Deans Bridge Road Landfill (DBRLF) operational review, developed
waste fill sequences plan, initiated operators onsite training and provided
several associated services. Supplemental Services needs arise due to GA
EPD information request concerning fill sequences, active phase
stormwater management and requiring supplemental analysis &
submittals. Also, initiation of operators onsite training revealed that
additional onsite training and support is warranted to ensure waste fill
sequence plan is implemented as developed and operators have
comprehensive understanding of such plan.
Financial Impact:Funds in amount of $82,002.73 are available in Solid Waste Operational
Funds (541-044210-52-12115).
Alternatives:No alternate proposed
Recommendation:Approve Supplemental Agreement One (SA1) for Blue Ridge Services
Professional Services Contract in amount of $82,002.73 for Solid Waste
Intake Operations Supporting Services for Deans Bridge Road Landfill.
Emergency Procurement. Requested by AE&ESD
Funds are Available in
the Following
Accounts:
($82,002.73) - 541-044210-5212115 - Solid Waste Operational Funds
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
STATE OF GEORGIA)
COUNTY OF RICHMOND) COST SHARING AGREEMENT
THIS Agreement, made the ____ day of _____________, 2022, by and between
JEN-PCS, LLC, a Georgia limited liability corporation, hereinafter referred to as “JEN-
PCS”, and AUGUSTA, GEORGIA, a political subdivision of the State of Georgia, by and
through its Utilities Department, hereinafter referred to as “AUGUSTA”:
WITNESSETH
WHEREAS JEN-PCS owns certain property (hereinafter referred to as the
“PROPERTY”) described as:
ALL that tract or parcel of land, with improvements thereon, situate, lying and being in the State
of Georgia, Counties of Richmond and Columbia, being known as “Parcel “B” 612,069 sq. ft.
14.05 acres” as shown on a plat prepared for MCK&D, LLC by James G. Swift & Associates
under date of August 13, 2020, a copy of which is recorded in the Office of the Clerk of Superior
Court of Richmond County, Georgia in Plat Book 14, Page 193, and in the Office of the Clerk of
Superior Court of Columbia County, Georgia in Plat Book E2020, Page 228; reference is hereby
made to said plat for a more complete and accurate description as to the metes, bounds and
location of said property.
WHEREAS JEN-PCS wishes to develop the PROPERTY and wishes to
construct a sanitary sewer extension (hereinafter referred to as the “EXTENSION) and
to connect into the public sanitary sewer system (hereinafter referred to as the
“SEWER”) of AUGUSTA; and
WHEREAS a connection point to said SEWER is not readily available to the
PROPERTY; and
WHEREAS, AUGUSTA has requested the Developer construct a 12-inch
sanitary sewer main rather than an 8-inch sanitary sewer main, which is the minimum
size required to meet the JEN-PCS’ needs; and
WHEREAS, JEN-PCS’ engineer has demonstrated that a 12-inch sanitary sewer
main is not required to meet the needs of the development, however, it has been
determined by AUGUSTA that a 12-inch main is needed to meet the needs of
AUGUSTA in this area and will benefit this development and surrounding area; and
WHEREAS, JEN-PCS has contracted with a professional engineer to prepare the
design plans, contract documents and detailed specifications for the design of the 12-
inch sanitary sewer main, as well as cost estimates for the construction; and
WHEREAS, the plans have been reviewed by AUGUSTA, and AUGUSTA
concurs with the JEN-PCS’ cost estimates.
NOW THEREFORE, JEN-PCS and AUGUSTA hereby enter into the following
agreement:
A. PROJECT SCOPE AND ESTIMATED COST:
The project consists of increasing 3,691.59 linear feet of eight inch (8”) PVC
pipeline to twelve-inch (12”) PVC pipeline, which JEN-PCS agrees to construct as
shown on Exhibit A.
AUGUSTA agrees to pay the difference in costs that are a direct result of the
increase in size from an 8-inch PVC pipeline to a 12-inch PVC pipeline, of the
EXTENSION. The estimated cost to AUGUSTA, for this increase to the EXTENSION, is
$71,684.43 as shown on Exhibit B.
B. STIPULATIONS:
All parties understand and agree that:
1. JEN-PCS shall conduct a competitive bid, for the construction of said
EXTENSION, which shall adhere to the guidelines of the Augusta-Richmond County
Procurement Department.
2. The above stated estimated costs include any and all costs associated with
this project, including, but not limited to surveying, engineering, plats, clearing and
grubbing, construction, materials, acquisition and restoration.
3. The EXTENSION shall be constructed consistent with the applicable AUD
(Augusta Utilities Department), Georgia Plumbing codes and any other standards,
regulations and requirements pertinent to water pipelines.
4. The EXTENSION must pass all required and recommended testing. AUD
may, but is not obligated to, monitor the construction of the EXTENSION.
5. If the EXTENSION passes all required testing, it shall be dedicated to
AUGUSTA, at no further cost, whatsoever.
6. Any and all estimated cost overruns must have prior written approval of
AUGUSTA, through its Utilities Department (AUD).
7. If it is discovered that any easements will be needed, in conjunction with this
EXTENSION, said easements shall be obtained by JEN-PCS and donated/dedicated to
AUGUSTA.
C. DEDICATION OF PIPELINES AND EASEMENT(S):
As stated in B.4 and B.6 above, any and all easements obtained by any party
and used for the EXTENSION shall be donated, and the pipelines dedicated, to
AUGUSTA. This donation and dedication will be done upon the final approval and
acceptance of the EXTENSION by AUD. The documents for the donation and
dedication will be prepared by AUD and presented to JEN-PCS, for execution.
It is explicitly understood, and agreed, by all parties, that upon the donation and
dedication of the EXTENSION, any rights, or permissions, given to any party other than
AUGUSTA will cease to exist, and that no connections, or any other act that would
cause any party, other than AUGUSTA, to access the EXTENSION, shall be prohibited
unless permitted, in writing, by AUGUSTA.
D. PAYMENT:
Upon the completion of said EXTENSION, AUD will perform a final inspection to
determine that the EXTENSION has been constructed to all applicable Standards,
Specifications and Codes, and that said EXTENSION has passed all required and
recommended testing. If AUD determines that said EXTENSION is acceptable to
AUGUSTA, a final inspection report will be forwarded to JEN-PCS and JEN-PCS will
send an itemized invoice to AUD. Payment to JEN-PCS will be made within thirty (30)
days of the receipt of the itemized invoice by AUD.
For payment to be made to JEN-PCS, JEN-PCS must provide AUD with its e-
verify number, and any other information AUD may request, in order to process said
payment.
The terms “JEN-PCS” and "AUGUSTA" as used herein shall be deemed to mean
their respective heirs, successors and assigns, and this Agreement shall inure to the benefit of
and be binding upon JEN-PCS and AUGUSTA and their respective heirs, successors and
assigns.
IN WITNESS WHEREOF, the parties hereto have hereunto set their hands and their
seals on the day and year above first written.
Signed, sealed and delivered in the presence of:
JEN-PCS, LLC.
_________________________________ By: ___________________________________
WITNESS
_________________________________ As Its: ________________________
NOTARY PUBLIC
________ County, __________
My Commission Expires: _______________
AUGUSTA, GEORGIA
_________________________________ By: ______________________________________
WITNESS Hardie Davis, Jr.
As Its: ____Mayor_____
_________________________________
NOTARY PUBLIC
_____________ County, State of ___________
My Commission Expires: _____________
Attest:
[NOTARY SEAL] By: ______________________________
As Its: ________________________________
(SEAL)
EXHIBIT B
Up Charge/Unit Quantity Unit Total Up Charge
8" to 12" PVC Upsize charge $11.18 3,691.59 LF $41,271.98
8"X6" to 12"X6" Service Tee $185.60 47.00 EACH $8,723.20
Rock For Bedding ‐ Additional Rock Per LF $4.25 3,691.59 LF $15,689.26
Manhole ‐ 8" coring and boots upsized to 12" $200.00 30.00 EACH $6,000.00
$71,684.43Upsize Cost Share Total
Captains Corner Sewer Oversize Cost to Augusta
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Cost Share Agreement for Sanitary Sewer Upsizing from 8” to 12” diameter pipe through segments of the Captain’s
Corner Subdivision with JEN-PCS, LLC. And Augusta Utilities Department.
Department:Augusta Utilities Department
Presenter:Wes Byne
Caption:Motion to approve a cost sharing agreement between Augusta Utilities
Department and JEN-PCS, LLC for the up-sizing of gravity sanitary sewer
main from 8” pipe to 12” pipe in the amount of $71,684.43. Normal 0 false
false false EN-US X-NONE X-NONE /* Style Definitions */
table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-
rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-
style-priority:99; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt;
mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-
bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-
pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri",sans-
serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin;
mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-
bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;}
Background:JEN-PCS, LLC developed a large tract of land for the purpose of a new
subdivision in the western portion of the county. Due to the development
and the location of the development Augusta Utilities can benefit by
increasing pipe size whereby the system will be better equip to handle not
only the sanitary sewer of this development but future developments by
increasing the pipe size to allow greater capacity. Normal 0 false false
false EN-US X-NONE X-NONE /* Style Definitions */
table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-
rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-
style-priority:99; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt;
mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-
bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-
pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri",sans-
serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin;
mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-
bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;}
Analysis:Augusta Utilities Department agrees that the 3,691 linear feet of sanitary
sewer main cost difference between an 8” sewer main and 12” sewer main
fee of $71,684.43 is fair and reasonable.
Financial Impact:Funding in the amount of $71,684.43 is available from accounts:
507043420-5425210/ 82200070-5425210
Alternatives:No alternatives are recommended.
Recommendation:Augusta Utilities Department recommends the Commission approve the
Cost Share Agreement between JEN-PCS, LLC and Augusta in the
amount of $71,684.43 for the up-sizing of sanitary sewer from 8” to 12”
diameter pipe in the Captain’s Corner Subdivision.
Funds are Available in
the Following
Accounts:
Funds are available in the following accounts: 507043420-5425210/
82200070-5425210
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Alfred Benesch & Company
1005 Broad Street, Suite 200
Augusta, GA 30901
www.benesch.com
P 706-722-4114
F 706-722-6219
October 13, 2020
Augusta Engineering Department
Attention: Anthony Taylor
452 Walker St., Suite 110
Augusta, Georgia 30901
Reference: East Augusta Phase III Engineering and Construction Support
Proposal for Engineering and Construction Support Services (BEN #P2119053)
Dear Mr. Taylor:
Benesch appreciates this opportunity to present a request for supplement fees to provide professional
engineering services during the pre-construction and construction phase of the East Augusta Phase III -
Brunswick Avenue and Azealia Street Drainage Improvements project.
As discussed in our conversation on September 29th, 2020, we were requested to provide engineering services
through construction of the East Augusta Phase III project as we did during the East Augusta Phase VIII- Marion
Homes Drainage Improvement project.
The following briefly outlines our scope of services to provide field engineering and construction support
services associated for the East Augusta Phase III – Brunswick Ave. & Azealia Street Drainage Improvements
Project. A man hour sheet is also attached.
Construction Support Services
Pre-Construction
· Review material submittals for compliance with design standards.
Field Engineering
· Through construction of the Brunswick Ave. & Azealia Street Project we will respond to requests for
information, identify potential conflicts, and address any outstanding project items. Additionally, as
requested, we will provide field engineering services to address conflict resolution and design
modifications. Time commitments for construction support services are based upon the following:
o 45 weekly construction meetings and miscellaneous inspections
o Project Manager (2 hrs. / week)
o Construction Inspector (4 hrs. / week)
Erosion Control Measures Inspections
· Complete inspections of the erosion control measures per the NPDES permit requirements.
o Inspection of final stabilization of permanent grassing.
Time Frame & Schedule
We understand that the East Augusta Phase III project is scheduled to go to bid this fall. We will be available to
provide construction support services upon notice to proceed with the awarded contractor and be available
throughout closeout of the project.
Completion of Services & Additional Services
We respectfully propose to work on an hourly rate basis against the following not to exceed fee lump sum. The
lump sum fees are proposed given the assumed scope of work and professional time commitments noted
above. We will not provide services exceeding this amount without written authorization from the Augusta
Engineering Department. Monthly invoices will include a detailed breakdown of all time dedicated to the
project.
· Total Engineering and Construction Support Services $ 33,160.00
The proposed scope of work excludes the following services. Should these or other professional services be
required, Benesch will respectfully provide a supplemental proposal based on a mutually established scope of
work.
· Environmental Site Assessments / Environmental Permitting (NEPA, etc.)
· NPDES Stormwater Sampling and Testing
· Construction Materials Testing
Again, thank you for this opportunity to submit a request for supplemental fees. Should you have any questions,
please do not hesitate to contact our office.
Sincerely,
Alfred Benesch & Company
Victor Conover, P.E., C.F.M.
Project Manager
Attachments: Man-hour/Fee Estimate (1 Pages)
10/13/2020
Augusta, Georgia
Augusta Engineering Department
East Augusta Phase III Engineering and Construction Support
P2019015
Item/ Task Description
Pr
i
n
c
i
p
a
l
-
I
n
-
C
h
a
r
g
e
Sr
.
P
r
o
j
e
c
t
M
a
n
a
g
e
r
Pr
o
j
e
c
t
M
a
n
a
g
e
r
Se
n
i
o
r
D
e
s
i
g
n
e
r
De
s
i
g
n
e
r
CA
D
D
e
s
i
g
n
e
r
Ad
m
i
n
To
t
a
l
Engineering and Construction Support
Construction Services
Material Submittal Review 4 8 12
Construction Support - Conflict Design Management (Assume 45 Weeks)90 180 270
Final Stabilization Inspection 8 8
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total 0 0 102 0 188 0 0 290
Personnel Est. Hours Rate/Hour Cost ($) Totals
Division Manager 0 $235.00 $0.00
Sr. Project Manager 0 $195.00 $0.00
Project Manager 102 $150.00 $15,300.00
Senior Designer 0 $105.00 $0.00
Designer 188 $95.00 $17,860.00
CAD Designer 0 $75.00 $0.00
Admin 0 $55.00 $0.00
Total per Rate Schedule $33,160.00 $33,160.00
Subconsultant Costs Number Rate Est. Cost ($)
Total Subconsultant Costs $0.00
Total Proposed Fees $33,160.00
Date:
Project Location:
Benesch Proposal #:
Owner:
Project Name:
AUGUSTA-RICHMOND COUNTY
AUGUSTA ENGINEERING AND ENVIRONMENTAL SERVICES DEPARTMENT
SUPPLEMENTAL AGREEMENT
(SA04 – For changes greater than $25,000) August 2022
WHEREAS, We, Alfred Benesch & Company (formerly W. R. Toole Engineers), entered into a contract
with Augusta-Richmond County on March 17, 2009, for Engineering Design Services for East Augusta
Roadway & Drainage Improvement Project, File Reference No. 09-014 (A), and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the
scope of the original contract, we desire to submit the following Supplemental Agreement to-wit:
East Augusta Phase III Engineering and Construction Support Services
It is agreed that as a result of the above described modification the contract amount is increased by
$33,160.00 from $1,115,707.00 to a new total of $1,148,867.00.
Any modifications to submittal dates shall be as identified in the attached proposal. This agreement in no
way modifies or changes the original contract of which it becomes a part, except as specifically stated
herein.
NOW, THEREFORE, We, Alfred Benesch & Company (formerly W. R. Toole Engineers), hereby agree to
said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this
Supplemental Agreement is hereby made a part of the original contract to be performed under the
specifications thereof, and that the original contract is in full force and effect, except insofar as it might
be modified by this Supplemental Agreement.
This _________ day of _____________, 2022.
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY ALFRED BENESCH & COMPANY (formerly
AUGUSTA, GEORGIA W. R. TOOLE ENGINEERS, INC.),
Mayor Hardie Davis, Jr.
Approved: Date Approved: Date
[ATTACHED CORPORATE SEAL]
ATTEST: ATTEST:
Title: ____________________________ Title: ____________________________
Augusta Richmond County Project Number(s): 581-044320-5211120
Supplemental Agreement Number: 4
Purchase Order Number: P163878
Engineering Services Committee Meeting
8/30/2022 1:15 PM
East Augusta Roadway and Drainage Improvements - SA#4 - Brunswick Ave. & Azalea Street Phase CEI Services
RFQ 06-202 File Reference: 22-014(A)
Department:Engineering
Presenter:
Caption:Motion to approve funding for Design Consultant Services Supplemental
Agreement #4 to Benesch (formerly WR Toole Engineers) in the amount
of $33,160 for the East Augusta Roadway & Drainage Improvement
Project-Brunswick Ave. & Azalea Street Phase Construction Phase
Services (CEI). Requested by the Augusta Engineering. RFQ 06-202
Background:On March 17, 2009, Augusta Commission approved award of design
phases of the project to WR Toole Engineers (presently Benesch). On
November 16, 2021, Augusta Commission funding for the East Augusta
Street and Drainage Improvements Project- Brunswick Ave. & Azalea
Street Phase (Phase III) and awarded contract to Reeves Construction.
Construction Phase of roadway and drainage improvements require design
related coordination with utilities, resolution of constructability conflicts,
review of contractor construction documents submittals, and request for
field information (CEI) that warrants design engineer services
Analysis:In 2009, commission approved award of design phases of the project to
Benesch. The project is now under construction. This supplemental
agreement covers services during construction phase for contractor request
for field information, utility conflicts assessment & resolution, field
engineering, and attending construction progress meetings.
Financial Impact:Funds in amount of $33,160 are available in Stormwater Utility funds.
Alternatives:Do not approve and find alternative to perform CEI services.
Recommendation:Approve funding for Design Consultant Services Supplemental Agreement
to Benesch (formerly WR Toole Engineers) in the amount of $33,160 for
the East Augusta Roadway & Drainage Improvement Project-Brunswick
Ave. & Azalea Street Phase Construction Phase Services (CEI). Requested
by the Augusta Engineering. RFQ 06-202.
Funds are Available in
the Following
Accounts:
($33,160) 581-044320-5211120 - Stormwater Utility Funds
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Revised 07/01/2022
GEORGIA DEPARTMENT OF TRANSPORTATION LOCAL MAINTENANCE & IMPROVEMENT
GRANT (LMIG) APPLICATION FOR FISCAL YEAR 2023
TYPE OR PRINT LEGIBLY. ALL SECTIONS MUST BE COMPLETED.
LOCAL GOVERNMENT AFFIDAVIT AND CERTIFICATION
I, _________________________________________(Name), the_______________________________________(Title), on behalf of
__________________________________________________(Local Government), who being duly sworn do swear that the
information given herein is true to the best of his/her knowledge and belief. Local Government swears and certifies that it has
read and understands the LMIG General Guidelines and Rules and that it has complied with and will comply with the same.
Local government further swears and certifies that it has read and understands the regulations for the Georgia Planning Act of
1989 (O.C.G.A. § 45-12-200, et seq.), Service Delivery Strategy Act (O.C.G.A. § 36-70-20, et seq.), and the Local Government Budgets
and Audits Act (O.C.G.A. 36-81-7 et seq.) and will comply in full with said provisions. Local government further swears and certifies
that the roads or sections of roads described and shown on the local government’s Project List are dedicated public roads and are
part of the Public Road System in said county/city. Local government further swears and certifies that it complied with federal
and/or state environmental protection laws and at the completion of the project(s), it met the match requirements as stated in the
Transportation Investment ACT (TIA).
Further, the local government shall be responsible for any claim, damage, loss or expense that is attributable to negligent acts, errors,
or omissions related to the designs, drawings, specifications, work and other services furnished by or on behalf of the local
government pursuant to this Application (“Loss”). To the extent provided by law, the local government further agrees to hold harmless
and indemnify the DEPARTMENT and the State of Georgia from all suits or claims that may arise from said Loss.
If the local government fails to comply with these General Guidelines and Rules, or fails to comply with its Application and Certification,
or fails to cooperate with the auditor(s) or fails to maintain and retain sufficient records, the DEPARTMENT may, at its discretion,
prohibit the local government from participating in the LMIG program in the future and may pursue any available legal remedy to
obtain reimbursement of the LMIG funds. Furthermore, if in the estimation of the DEPARTMENT, a roadway or bridge shows evidence
of failure(s) due to poor workmanship, the use of substandard materials, or the failure to follow the required design and
construction guidelines as set forth herein, the Department may pursue any available legal remedy to obtain reimbursement of the
allocated LMIG funds or prohibit local government from participating in the LMIG program until such time as corrections are made
to address the deficiencies or reimbursement is made. All projects identified on the Project list shall be constructed in accordance
with the Department’s Standard Specifications of Transportation Systems (Current Edition), Supplemental Specifications (Current
Edition), and Special Provisions.
Local Government: ______________________________
E-Verify Number
____________________________ (Signature) Sworn to and subscribed before me,
____________________________ (Print) This _____ day of_________, 20____.
Mayor / Commission Chairperson In the presence of:
____________________________ (Date)
NOTARY PUBLIC
LOCAL GOVERNMENT SEAL:______________________________
My Commission Expires:
NOTARY PUBLIC SEAL:
September 6, 2022
Bill Wright, GDOT State Aid Administrator
GDOT - One Georgia Center
600 W. Peachtree St., NW, 17th Floor
Atlanta, GA 30308
Subject: FY 2023 State Local Maintenance and Improvement
Grant (LMIG) Application
File Reference: 22-014(A)
Dear Mr. Wright:
Please find enclosed Augusta, GA Local Maintenance and Improvements Grant (LMIG)
Application for FY 2023.
Contact information for questions concerning this submittal is listed below:
Hameed Malik, Ph.D., PE, Director
Augusta, GA Engineering & Environmental Services Department
452 Walker St., Suite 110, Augusta, GA 30901
Telephone: (706) 796-5040
Fax: (706) 796-5045
E-mail: hmalik@augustaga.gov
Sincerely,
Hardie Davis, Jr.
Mayor
Enclosure: LMIG Application
cc: Matthew Sammons, GDOT District 2 State Aid Coordinator
Takiyah Douse, Interim Administrator
Hameed Malik, Ph.D., PE, Director - Engineering
Lewis Avery, CPA, Assistant Director Finance and Administration, AED
Timothy E. Schroer, CPA, Assistant Director – Finance
File
Engineering Services Committee Meeting
8/30/2022 1:15 PM
GDOT FY2023 Local Maintenance and Improvement Grant (LMIG) Project Number: N/A File Reference: 22-014
(A)
Department:Engineering
Presenter:
Caption:Motion to approve and authorize Augusta Engineering (AE&ESD) to
submit, accept and receive Georgia Department of Transpiration (GDOT)
Financial Assistance from GDOT FY2023 Local Maintenance and
Improvement Grant (FY2023 LMIG) for Road Improvements &
maintenance projects (Listed under Financial Impact Section). requested
by AE&ESD.
Background:GDOT restructured its State Aid Program and named it as “Local
Maintenance and Improvement Grant (LMIG).” LMIG is a formula-based
grant from GDOT that is funded through the motor fuel tax. Grant funds
are typically used to supplement local projects for road improvements and
road resurfacing efforts based on priority. Augusta is eligible to receive
approximately $2.35 million through GDOT FY2023 LMIG Program.
Analysis:GDOT LMIG financial assistance is critical for completing AED projects
such as roadway improvements and maintenance construction projects.
This financial assistance is available on a yearly basis. In addition to this
yearly assistance, GDOT also provides LMIG funds to AED on as
requested basis depending on LMIG additional funds availability on the
state level, demonstrated need and local project connectivity to state road
system.
Financial Impact:Augusta, GA AED will receive $2,349,652.43 in GDOT FY23LMIG. A
local funding match of 10% is required. FY23LMIG partially funded AED
proposed projects are: i) McNutt Dirt Road Paving; and iii) Resurfacing of
Hephzibah-McBean Road (Hwy 56 to Hwy 25). Additional road
resurfacing may be added if there is saving in contracted work for listed
improvements or additional funding from other sources available.
Alternatives:2). Do not approve and loose FY2023 LMIG Funds that are designated for
Augusta, Georgia.
Recommendation:Approve and authorize Augusta Engineering Department (AED) to submit,
accept and receive Georgia Department of Transpiration (GDOT)
Financial Assistance from GDOT FY2022 Local Maintenance and
Improvement Grant (FY2022 LMIG) for Road & Drainage Improvements
& maintenance projects (Listed under Financial Impact Section) as
requested by AED.
Funds are Available in
the Following
Accounts:
($234,965) local funding match of 10% to be funded through SPLOST 7 &
SPLOST 8 as follows: ($117,482 – SPLOST 7 – 329041110-221829914 /
$117,483 SPLOST 8 – 330-041120-222830908)
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
June 27, 2022
AUGUSTA-RICHMOND COUNTY, GEORGIA
535 Telfair St.
Augusta, GA 30901
Enclosed is the easement (the “Easement”) that GEORGIA POWER COMPANY (“GPC”) needs to acquire along
property owned by AUGUSTA-RICHMOND COUNTY, GEORGIA (the “Owner”) located in the 125th GMD of
Columbia County, Georgia, as more particularly identified on Exhibit “A” attached to the Easement (the “Easement
Area”), in connection with the SAVANNAH RAPIDS PAV., MARTINEZ (COLUMBIA COUNTY) - DISTRIBUTION
LINE project.
Upon written request from the Owner, the Company agrees to relocate its facilities to a mutually agreeable location on
another portion of the Property of the Owner, so long as (i) the Owner executes a new easement agreement in connection
with the establishment of such new easement area, the form of which easement shall be substantially in the form of this
instrument, (ii) the Lessee (Columbia County) pays any and all costs associated with said relocation and any future
relocations requested by Columbia County prior to the commencement of the same, and (iii) such relocation(s) does not
cause service hardship (defined as a situation that would make the equipment inaccessible, or dangerous for company or
contractor personnel to access) for the Company as jointly agreed upon by the Owner and the Company. The Owner
acknowledges and agrees that the Company shall not be required to pay any additional compensation for execution by the
Owner of the new easement described in the preceding sentence. Upon completion of the relocation of the facilities as
contemplated herein, the Company agrees to quitclaim the abandoned portion of the Easement Area to the Owner.
The relocation rights described herein shall automatically expire and terminate the first time the Owner transfers the
Property encumbered by the Easement Area contemplated herein, or any portion thereof, to a new, non-governmental
property owner.
This letter is to be presented and surrendered to GPC when exercising this relocation request.
Please return the signed, witnessed, and notarized Easement to me at the following address:
Georgia Power Company
Attn: David Bragg, Land Dept.
1122 Grimm Ave.
Millen, Georgia 30442
I will continue to be available to answer any questions you may have concerning the Easement or the construction of the
distribution lines described therein. If you have questions, please call me at 706-360-8695.
Sincerely,
David Bragg
Land Acquisition Agent
Georgia Power Company
Authorized:
____________________________________
Zachary Bartlett
Project Engineer – Georgia Power Company
____________________________________
Scott Johnson
Manager – Columbia County
Combination Easement (LIMS 2) 2017.08.15 Page 1 of 3
After recording, return to: Georgia Power Company
Attn: Land Acquisition (Recording) 241 Ralph McGill Blvd NE Bin 10151 Atlanta, GA 30308-3374
PROJECT 2021120133 LETTER FILE DEED FILE MAP FILE
ACCOUNT NUMBER 10575689-GPC9596-VBS-15
NAME OF LINE/PROJECT: SAVANNAH RAPIDS PAV., MARTINEZ (COLUMBIA COUNTY) - DISTRIBUTION LINE
PARCEL NUMBER 001
STATE OF GEORGIA
COLUMBIA COUNTY
E A S E M E N T
For and in consideration of the sum of Ten and No/100 Dollars ($10.00) and other good and valuable consideration, in hand paid by GEORGIA POWER COMPANY, a Georgia corporation (the “Company”), the receipt and sufficiency of which are hereby acknowledged, AUGUSTA-RICHMOND COUNTY, GEORGIA (the “CITY”, which term shall include heirs, successors and/or assigns), whose mailing Address is 535 Telfair St., Augusta, GA 30901, does hereby grant and convey to the Company, its successors and assigns, the non-exclusive right, privilege and easement to go in, upon, along, across, under and through the Property (as defined below) for the purposes described herein. The “Property” is defined as that certain tract of land owned by the
Undersigned at 3300 EVANS TO LOCKS RD, MARTINEZ, GA 30907 (Tax Parcel ID No.
084 005) in the 125 GMD (Georgia Militia District) of Columbia County, Georgia.
The “Easement Area” is defined as any portion of the Property located (a) within fifteen (15) feet of the centerline of the overhead distribution line(s)
as installed in the approximate location(s) shown on “Exhibit A” attached hereto and made a part hereof, (b) within ten (10) feet of the centerline of the
underground distribution line(s) as installed in the approximate location(s) shown on “Exhibit A,” and (c) within ten (10) feet from each side of any related
above-ground equipment and facilities, including without limitation cubicles, transformers and service pedestals, as installed in the approximate location(s) shown in “Exhibit A.” Collectively aforementioned (a), (b), and (c) called “Facilities.”
The rights granted herein include and embrace the right of the Company to construct, operate, maintain, repair, renew and rebuild continuously upon and
PARCEL 001 NAME OF LINE/PROJECT: SAVANNAH RAPIDS PAV., MARTINEZ (COLUMBIA COUNTY) - DISTRIBUTION LINE
Combination Easement (LIMS 2) 2017.08.15 Page 2 of 3
under the Easement Area its lines for transmitting electric current with poles, wires, transformers, service pedestals, anchors, guy wires and other necessary apparatus, fixtures, and appliances; the right to attach communication facilities and related apparatus, fixtures, and appliances to said poles; the right to stretch communication or other lines within the Easement Area; the right to permit the attachment of the cables, lines, wires, apparatus, fixtures,
and appliances of any other company or person to said poles for electrical, communication or other purposes; the right to assign this Easement in whole or in part; the right at all times to enter upon the Easement Area for the purpose of inspecting said lines and/or making repairs, renewals, alterations and extensions thereon, thereunder, thereto or therefrom; the right to cut, trim, remove, clear and keep clear of said overhead or underground lines, transformers, fixtures, and appliances all trees and other obstructions that may in the opinion
of the Company now or hereafter in any way interfere or be likely to interfere with the proper maintenance and operation of said overhead or underground lines, transformers, fixtures, and appliances; the right of ingress and egress over the Property to and from the Easement Area; and the right to install and maintain electrical and communication lines and facilities to existing and future structure(s) within the Easement Area under the easement terms provided herein. Any timber cut on the Easement Area by or for the Company shall remain the
property of the owner of said timber.
The CITY does not convey any land, but merely grants the non-exclusive rights, privileges and easements hereinbefore set out. The Company and the Undersigned agree that the rights granted in this
Combination Easement expressly are and shall remain subject to and limited by
the terms and conditions in the letter agreement dated June 27, 2022 from
Georgia Power Company to Augusta-Richmond County, Georgia and said letter
agreement is not merged into, extinguished by, or otherwise limited in any way
by the undersigned’s grant herein.
Neither the Owner nor the Company shall be liable for or bound by any
statement, agreement or understanding not herein expressed.
[Signature(s) on Following Page(s)]
PARCEL 001 NAME OF LINE/PROJECT: SAVANNAH RAPIDS PAV., MARTINEZ (COLUMBIA COUNTY) - DISTRIBUTION LINE
Combination Easement (LIMS 2) 2017.08.15 Page 3 of 3
IN WITNESS WHEREOF, the Undersigned has/have hereunto set his/her/their
hand(s) and seal(s), this day of , .
Signed, sealed and delivered in the presence of:
Witness
Notary Public
AUGUSTA-RICHMOND COUNTY
By: (SEAL) Name: HARDIE DAVIS, JR. Title: MAYOR Attest: (SEAL) Name: Title:
[CORPORATE SEAL]
Underground (LIMS 2) 2017.08.17 Page 1 of 3
After recording, return to: Georgia Power Company
Attn: Land Acquisition (Recording) 241 Ralph McGill Blvd NE Bin 10151 Atlanta, GA 30308-3374
PROJECT 2021120133 LETTER FILE DEED FILE MAP FILE
ACCOUNT NUMBER 10575689-GPC9596-VBS-15
NAME OF LINE/PROJECT: SAVANNAH RAPIDS PAV., MARTINEZ (COLUMBIA COUNTY) - DISTRIBUTION LINE
PARCEL NUMBER 002
STATE OF GEORGIA
COLUMBIA COUNTY
U N D E R G R O U N D E A S E M E N T
For and in consideration of the sum of Ten and No/100 Dollars ($10.00) and other good and valuable consideration, in hand paid by GEORGIA POWER COMPANY, a Georgia corporation (the “Company”), the receipt and sufficiency of which are hereby acknowledged, AUGUSTA-RICHMOND COUNTY, GEORGIA (the “CITY”, which term shall include heirs, successors and/or assigns), whose mailing Address is 535 Telfair St., Augusta, GA 30901, does hereby grant and convey to the Company, its successors and assigns, the non-exclusive right, privilege and easement to go in, upon, along, across, under and through the Property (as defined below) for the purposes described herein. The “Property” is defined as that certain tract of land owned by the
Undersigned at 0 EVANS TO LOCKS RD, MARTINEZ, GA 30907 (Tax Parcel ID No. 084
043) in the 125 GMD (Georgia Militia District) of Columbia County, Georgia.
The “Easement Area” is defined as any portion of the Property located (a)
within ten (10) feet of the centerline of the underground distribution line(s)
as installed in the approximate location(s)shown on “Exhibit A” attached hereto
and made a part hereof, and (b) within ten (10) feet from each side of any
related above-ground equipment and facilities, including without limitations
cubicles, transformers and service pedestals, as installed in the approximate
location(s) shown in “Exhibit A”. Collectively aforementioned (a), (b), and (c)
called “Facilities.”
The rights granted herein include and embrace the right of the Company to
construct, operate, maintain, repair, renew and rebuild continuously upon and
under the Easement Area its lines for transmitting electric current with wires,
PARCEL 002 NAME OF LINE/PROJECT: SAVANNAH RAPIDS PAV., MARTINEZ (COLUMBIA COUNTY) - DISTRIBUTION LINE
Underground (LIMS 2) 2017.08.17 Page 2 of 3
transformers, service pedestals, manholes, conduits, cables and other necessary
apparatus, fixtures and appliances; the right to stretch communication or other
lines of any other company or person under the Easement Area; the right to
assign this Underground Easement in whole or in part; the right at all times to
enter upon the Easement Area for the purpose of inspecting said lines and/or
making repairs, renewals, alterations and extensions thereon, thereunder, thereto or therefrom; the right to cut, trim, remove, clear and keep clear of
said underground lines, transformers, fixtures, and appliances all trees and
other obstructions that may in the opinion of the Company now or hereafter in
any way interfere or be likely to interfere with the proper maintenance and
operation of said underground lines, transformers, fixtures, and appliances;
the right of ingress and egress over the Property to and from the Easement Area;
and the right to install and maintain electrical and communication lines and
facilities to existing and future structure(s) within the Easement Area under
the easement terms provided herein. Any timber cut on the Easement Area by or
for the Company shall remain the property of the owner of said timber.
The CITY does not convey any land, but merely grants the non-exclusive
rights, privileges and easements hereinbefore set out.
The Company and the Undersigned agree that the rights granted in this
Combination Easement expressly are and shall remain subject to and limited by
the terms and conditions in the letter agreement dated June 27, 2022 from
Georgia Power Company to Augusta-Richmond County, Georgia and said letter
agreement is not merged into, extinguished by, or otherwise limited in any way
by the undersigned’s grant herein.
Neither the Owner nor the Company shall be liable for or bound by any
statement, agreement or understanding not herein expressed.
[Signature(s) on Following Page(s)]
PARCEL 002 NAME OF LINE/PROJECT: SAVANNAH RAPIDS PAV., MARTINEZ (COLUMBIA COUNTY) - DISTRIBUTION LINE
Underground (LIMS 2) 2017.08.17 Page 3 of 3
IN WITNESS WHEREOF, the Undersigned has/have hereunto set his/her/their
hand(s) and seal(s), this day of , .
Signed, sealed and delivered in the presence of:
Witness
Notary Public
AUGUSTA-RICHMOND COUNTY, GEORGIA
By: (SEAL) Name: HARDIE DAVIS, JR. Title: MAYOR Attest: (SEAL) Name: Title:
[CORPORATE SEAL]
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Georgia Power Easements Request Augusta Parcels- Savannah Rapids Pavilion File Reference: 22-014(A)
Department:Engineering
Presenter:
Caption:Motion to approve Georgia Power Easements at Augusta Owned Parcels –
Savannah Rapids Pavilion. Also authorize Augusta, GA’s Mayor to sign
all documentation. This approval is contingent upon receipt of letter
agreement from Georgia Power. Requested by the Augusta Engineering.
Background:Augusta, Georgia owns property located on Evans to Locks Road, which is
leased to Columbia County, and on which the Savannah Rapids is located.
The parking lot at this property has recently been enlarged and Georgia
Power is requesting two new easements for extending its service across
this parking lot area.
Analysis:The easements are for Georgia Power to run electricity (distribution lines)
to a building located near the reconstructed parking lot and lighting.
Financial Impact:N/A
Alternatives:Do not approve.
Recommendation:Approve Georgia Power Easements at Augusta Owned Parcels – Savannah
Rapids Pavilion. Also authorize Augusta, GA’s Mayor to sign all
documentation. This approval is contingent upon receipt of letter
agreement from Georgia Power. Requested by the Augusta Engineering.
Funds are Available in
the Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
OFFICIAL
/ 17.";'.~ Bid Opening -Bid Item #22-190 Landfill Compactor
for Augusta, GA -Environmental Services Department
Bid Due: Thursday, March 31, 2022 @ 11:00 a.m.
Total Number Specifications Mailed Out: 16
Total Number Specifications Download (Demandstar): 6
Total Electronic Notifications (Demandstar): 81
Georgia Procurement Registry: 257
Total packages submitted: 3
Total Non-Compliant: O
C&C Manufacturing LLC Yancey Brothers Flint Equipment Company
VENDORS 15075 Aljon Ave 4165 Mike Padgett Hwy 1900 William Few Parkway
Ottumwa, IA 52501 Augusta, GA 30906 Grovetown, GA 30813
Attachment B Yes Yes Yes
E-Verify Number 1452339 146813 344722
SAVE Form Yes Yes Yes
BIDDER OFFER
YEAR 2022 2022 2022
MAKE Al-Jon Caterpillar Tana
MODEL ADV600 836K 520
BID PRICE $1,349 ,000.00 $1,477,101.00 $1,440,145.00
APPROXIMATE Nov-Dec 2022 360 Days 60-120 Days DELIVERY TIME
Page 1of 1
Invitation to Bid
Sealed bids will be received at this office until Thursday, March 31, 2022 @ 11:00 a.m. via ZOOM Meeting ID: 876 7089
9656; Passcode: 706285 for furnishing:
Bid Item #22-190 Landfill Compactor for Augusta, GA – Environmental Service Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
535 Telfair Street - Room 605
Augusta, Georgia 30901
Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid
documents may Documents may be examined during regular business hours at the offices of Augusta, GA Procurement
Department (706-821-2422).
All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to
the office of the Procurement Department by Friday, March 18, 2022 @ 5:00 P.M. No bid will be accepted by fax or email,
all must be received by mail or hand delivered.
No bids may be withdrawn for a period of ninety (90) days after bids have been opened, pending the execution of contract with
the successful bidder.
Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include
specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable
to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of
copies needed, the timing of the submission, the required financial data, and any other requirements designated by the
Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the
Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement
Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission.
Please mark BID number on the outside of the envelope.
GEORGIA E-Verify and Public Contracts: The Georgia E-Verify law requires contractors and all sub-contractors on Georgia public
contract (contracts with a government agency) for the physical performance of services over $2,499 in value to enroll in E-Verify,
regardless of the number of employees. They may be exempt from this requirement if they have no employees and do not plan
to hire employees for the purpose of completing any part of the public contract. Certain professions are also exempt. All requests
for proposals issued by a city must include the contractor affidavit as part of the requirement for their bid to be considered.
Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department
is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete
or inaccurate information upon which to base his qualifications.
Correspondence must be submitted via mail, fax or email as follows:
Augusta Procurement Department
Attn: Geri A. Sams, Director of Procurement
535 Telfair Street, Room 605
Augusta, GA 30901
Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov
No bid will be accepted by fax, all must be received by mail or hand delivered.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle February 24, 2022 and March 3, 10, 17, 2022
Metro Courier February 24, 2022
OFFICIAL
VENDORS
C&C Manufacturing LLC
15075 Aljon Ave
Ottumwa, IA 52501
Yancey Brothers
4165 Mike Padgett Hwy
Augusta, GA 30906
Flint Equipment Company
1900 William Few Parkway
Grovetown, GA 30813
Attachment B Yes Yes Yes
E-Verify Number 1452339 146813 344722
SAVE Form Yes Yes Yes
YEAR 2022 2022 2022
MAKE Al-Jon Caterpillar Tana
MODEL ADV600 836K 520
BID PRICE $1,349,000.00 $1,477,101.00 $1,440,145.00
APPROXIMATE
DELIVERY TIME Nov-Dec 2022 360 Days 60-120 Days
Total Number Specifications Mailed Out: 16
Total Number Specifications Download (Demandstar): 6
Total Electronic Notifications (Demandstar): 81
Georgia Procurement Registry: 257
Total packages submitted: 3
Total Non-Compliant: 0
Bid Opening - Bid Item #22-190 Landfill Compactor
for Augusta, GA -Environmental Services Department
Bid Due: Thursday, March 31, 2022 @ 11:00 a.m.
BIDDER OFFER
Page 1 of 1
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Landfill Compactor Purchase Bid 22-190
Department:Engineering
Presenter:
Caption:Motion to approve award of Bid to Yancy Brothers in the amount of
$1,477,101.00 for Landfill Compactor Purchase. Bid 22-190 / Requested
by AE&ESD
Background:One of the regulatory permit requirements of Deans Bridge Road l Landfill
(DBRLF) operations is proper placement and compaction of the garbage.
The equipment used to achieve this is a landfill compactor, and is vital to
the safe and compliant operation of the landfill. DBRLF operations is a
daily eleven-hour waste intake operation and current equipment is aging
and frequently down for maintenance. In this period of time, parts for the
machines are very difficult to locate and have a high lead-time. Also,
current supply chain delays and skilled labor shortages are causing delayed
repairs. Without the operating compactors, the landfill operations
compliance becomes difficult.
Analysis:Bids were received on March 31, 2022 with Yancey Brothers being the
qualified responsible bidder. There were three responsive bidders to Bid
Item 22-190. These firms are C&C Manufacturing LLC, Yancey Brothers,
and Flint Equipment Company. Upon careful considerations and analysis
of submitted equipment specific information and associated exceptions, it
is determined that Yancy Brothers submitted the most qualified
responsible bid. It is the recommendation of the Engineering &
Environmental Services Department to award this project to Yancy
Brothers.
Financial Impact:Funds in amount of $1,477,101.00 are available in Environmental Services
Operation FY2022 budget (541044210/5422510).
Alternatives:Cancel Bid and find alternate options for purchasing this equipment.
Recommendation:Approve award of Bid to Yancy Brothers in the amount of $1,477,101.00
for Landfill Compactor Purchase. Bid 22-190 / Requested by AE&ESD.
Funds are Available in
the Following
Accounts:
($1,477,101) - 541044210-5422510 Sold Waste Funds
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Dr. Hameed Malik, Ph.D., P.E.
Director of Engineering
Augusta Engineering Department
Engineering Administration
452 Walker Street, Suite 110
Augusta, Georgia 30901
RE: Contract Offer for Section 319(h) FY21 Grant - Element 12
Augusta, Georgia (Augusta-Richmond County)
“Phase 2 Biota Improvement in an Urban Stream through Aquatic Habitat Restoration”
Dear Dr. Malik:
Attached to this email is an electronic file of a new contract with Augusta, Georgia
(Augusta-Richmond County) for the “Phase 2 Biota Improvement in an Urban Stream through
Aquatic Habitat Restoration” project.
Please arrange for Mayor Hardie Davis, Jr. to use the SignNow feature in this email
(check Junk or Spam folders) to sign and date the contract on the signature page. Also, please
confirm the conditions (Yes/No) that apply in the Highly Compensated Officers section of the
FFATA Work Sheet. In addition, the E-Verify Contractor Affidavit must be notarized as well as
signed, dated, and returned via email before the contract can be fully executed. Once signed and
dated, all documents will be returned via SignNow to GAEPD and the attention of your grant
administrator, Mary E Gazaway, Nonpoint Source Program Grants Unit.
After insertion of electronic signature and date by my office, we will email you an
electronic file of the fully executed contract. If you have any questions or concerns regarding the
process or the contract, please contact Ms. Gazaway at mary.gazaway@dnr.ga.gov or 470-524-
0556.
Regards,
Richard E. Dunn
Director
RED:meg
Richard E. Dunn, Director
EPD Director’s Office
2 Martin Luther King, Jr. Drive
Suite 1456, East Tower
Atlanta, Georgia 30334
404-656-4713 August 12, 2022
Page 1 of 11
STATE OF GEORGIA
COUNTY OF FULTON
CONTRACT BETWEEN
THE GEORGIA ENVIRONMENTAL PROTECTION DIVISION (EPD)
AND
AUGUSTA, GEORGIA (AUGUSTA–RICHMOND COUNTY)
FOR
PHASE 2 BIOTA IMPROVEMENT IN AN URBAN STREAM THROUGH
AQUATIC HABITAT RESTORATION
This contract (“Contract”) is made and entered into as of the date of the last signature hereunder
(hereinafter called “Effective Date”), by and between the Georgia Environmental Protection Division;
(hereinafter called “Division”), and Augusta, Georgia (Augusta-Richmond County) (hereinafter called
“Contractor”). The persons executing this Contract on behalf of the Contractor have authority to bind the
Contractor to the terms of this Contract. The Director of the Division is authorized by law to execute this
Contract.
WHEREAS, the Division desires to engage the Contractor to render certain services hereafter described in
connection with an undertaking (hereinafter referred to as the “Project”) which will be financed through
grants authorized under Section 319 of the Federal Water Pollution Control Act Amendments of l987 and
administered by the Division; and
WHEREAS, Contractor desires to perform such services for the Project.
NOW, THEREFORE, in consideration of the valuable and mutual benefits flowing to each party as
described below, the parties hereto mutually agree as follows:
1. Employment of Contractor. The Division hereby agrees to engage the Contractor and the
Contractor hereby agrees to perform these services hereinafter as set forth in fulfillment of
this Contract.
2. Scope of Work. In performance of the Project, the Contractor shall conduct the work
described in the Scope of Work identified in the attached Appendix A, hereby made a part
of this Contract by reference.
3. Term; Time of Performance. The term (“Term”) of this Contract shall commence upon
the Effective Date and shall terminate upon the earlier of: i) the completion of the tasks
identified in Appendix A: Scope of Work; or ii) June 30, 2024 (hereinafter referred to as
“Termination Date”), unless sooner terminated by the Division or renewed by the Division
in accordance with the provisions of this Contract. The services of the Contractor are to
commence as soon as practicable after the Effective Date and shall be undertaken in
accordance with the timeline for completion of tasks included in the attached Appendix B:
Project Schedule, hereby made a part of this Contract by reference.
Page 2 of 11
4. Compensation. Division agrees to pay Contractor compensation for the services performed
under this Contract not to exceed One Hundred Seventeen Thousand Fifty-Eight dollars,
$117,058.00. Said compensation shall be paid in accordance with the budget described in
the Scope of Work. Any changes to the amount of compensation to be provided by the
Division to Contractor shall be made in a writing executed in accordance with the terms of
Paragraph 23.
5. In Kind Match. The Contractor will contribute a minimum of the equivalent of 40% of the
total project cost, in services or cash contributions, toward the performance of services
described in Appendix A: Scope of Work.
6. Method of Payment. Division will pay Contractor for work performed under this Contract
not to exceed the compensation described in Paragraph 4, and in accordance with the terms
described in this Paragraph:
a. Payment will only be made for the services described in Appendix A: Scope of
Work; and
b. Contractor shall be paid quarterly. No later than the 15th day of the month
following close of the immediately preceding quarter, Contractor shall submit to the
Division contact specified in Paragraph 36 an invoice for services rendered in that
immediate preceding quarter, accompanied by a progress report describing the services
performed and identifying the related items or tasks in the Scope of Work, specifying
that the services have been performed in accordance with this Contract, and
accompanied by any documentation, outputs, deliverables, or close-out reports; and
c. The Contractor shall certify in writing the accuracy of each invoice. All invoices
from the Contractor should show detailed line items referencing the costs of labor,
materials, property, equipment, installation, services, incidentals, etc. All invoices
should be signed and dated by authorized personnel as evidence of review and
approval prior to submission to the Division for reimbursement; and
d. The Division will review and approve or deny invoices within 30 days of receipt.
Payment shall be made upon determination by the Division that Scope of Work items
required by the Contract, including deliverables and reporting requirements of various
categories and kinds of information for the period, are sufficient. Any invoice not
approved by the Division shall not be paid; and
e. Payment of the final 10 percent (%) shall not be due and payable until all Scope of
Work items are completed and the Division has accepted and approved the final
products, reports, and invoices.
7. Credit. Notwithstanding any other provision of this Contract, the Contractor acknowledges
that the Division, as an agency of the State of Georgia, is prohibited from pledging the
State’s credit.
8. Funding. The Contractor acknowledges that this Contract is funded with a grant from the
U.S. Environmental Protection Agency (“USEPA”). In the event that the Division
determines that the source of payment no longer exists or is insufficient with respect to the
Services, the Division shall terminate this Contract in accordance with the provisions of
Paragraph 13.
a. In the event of such termination, the Division shall remain obligated to pay for
Services performed and accepted by the Division prior to such termination. All
finished or unfinished documents, data, studies, surveys, drawings, maps, models,
Page 3 of 11
photographs, and reports prepared by the Contractor under this Contract shall become
the property of the Division. Any use of incomplete documents shall be at the sole risk
of the Division. The determination of the Division of the events stated above shall be
conclusive.
b. The Division shall provide notice in writing to Contractor as soon as practicable after
the Division determines that the source of payment no longer exists or is insufficient
with respect to the services.
9. Fair Share. This Contract is being funded with a grant from the USEPA. It is the policy of
the USEPA to ensure to the fullest extent possible that at least a negotiated “Fair Share”
percentage of federal funds awarded to prime and subcontractors in support of USEPA
programs be made available to Disadvantaged Business Enterprises (“DBE”).
a. The Contractor agrees to ensure to the fullest extent possible that at least 4% Minority
Business Enterprises (MBE) and 4% Women Business Enterprises (WBE) of federal
funds for contracts or subcontracts for supplies, construction, equipment or services are
made available to organizations owned or controlled by socially and economically
disadvantaged individuals, women and historically black colleges and universities.
b. The Contractor agrees to include in its bid documents this 4% “Fair Share” percentage.
c. To evaluate compliance with the “Fair Share” policy, the Contractor agrees to comply
with the following six affirmative steps as appropriate:
i. Including qualified minority and women businesses on solicitation lists;
ii. Assuring that minority and women’s businesses are solicited whenever they are
potential sources;
iii. Dividing total requirements, when economically feasible, into small tasks or
quantities to permit maximum participation of minority and women’s
businesses;
iv. Establishing delivery schedules, where the requirements of the work permit,
which will encourage the participation by minority and women’s businesses;
v. Using the services and assistance of the U.S. Small Business Administration
and the Office of Minority Business Enterprise of the U.S. Department of
Commerce;
vi. Requiring each party to a subagreement to take the affirmative steps outlined in
paragraphs (i) through (ii) of this section.
d. The Contractor must submit to the Division a certification that the six steps have been
followed, along with documentation of the six steps that is sufficiently detailed to
allow for satisfactory review and should document the efforts of solicitation taken such
as; the name and address of MBE’s/WBE’s solicited, if advertised in newspaper show
proof and indicate name of paper.
e. The Contractor is required to submit semiannual reports of total Contract expenditures
to the Division, which includes a separate total for MBE/WBE utilization.
10. Taxes. The State is exempt from Federal Excise Taxes, and no payment will be made for
any taxes levied on Contractor’s employee’s wages. The Division is exempt from State and
Local Sales and Use Taxes on the services. Tax Exemption Certificates will be furnished
upon request. Contractor or an authorized subcontractor shall provide the Division with a
sworn verification regarding the filing of unemployment taxes or persons assigned by
Page 4 of 11
Contractor to perform Services, which verification is incorporated herein by reference.
11. Certification Regarding Sales and Use Tax. By executing the Contract, the Contractor
certifies it is either (a) registered with the State Department of Revenue, collects, and remits
State sales and use taxes as required by Georgia law, including Chapter 8 of Title 48 of the
Georgia Code; or (b) not a “retailer” as defined in O.C.G.A. Section 48-8-2. The Contractor
also acknowledges that the Division may declare the Contract void if the above certification
is false. The Contractor also understands that fraudulent certification may result in the
Division or its representative filing for damages for breach of contract.
12. Termination of Contract for Cause. If, through any cause other than force majeure, the
Contractor shall fail to fulfill in a timely and proper manner its obligations under this
Contract, or if the Contractor shall violate any of the covenants, agreements, or stipulations
of this Contract, the Division shall thereupon have the right to terminate this Contract by
giving written notice to the Contractor of such termination and specifying the effective date
thereof, at least fifteen (15) days before the effective date of such termination.
a. In that event, all finished or unfinished documents, data, studies, surveys, drawings,
maps, models, photographs, and reports prepared by the Contractor under this Contract
shall become the property of the Division, and the Contractor shall be entitled to
receive just and equitable compensation for any satisfactory work completed on such
documents and other materials in which funds were accrued or encumbered up to the
actual date of termination.
b. Notwithstanding the above, the Contractor shall not be relieved of liability to the
Division for damages sustained by the Division by virtue of any breach of this Contract
by the Contractor, and the Division may withhold any payments to the Contractor for
the purpose of setoff until such time as the exact amount of damages due the Division
from the Contractor is determined.
13. Termination of Contract for Convenience. The Division may terminate this Contract at
any time for good reason by giving at least thirty (30) days written notice to the Contractor
of such termination and specifying the effective date.
a. In that event, all finished or unfinished documents, data, studies, surveys, drawings,
maps, models, photographs, and reports prepared by the Contractor under this Contract
shall become the property of the Division, and the Contractor shall be entitled to
receive just and equitable compensation for any satisfactory work completed on such
documents and other materials in which funds were accrued or encumbered up to the
actual date of termination.
b. If this Contract is terminated as provided herein, the Contractor will be paid an amount
which bears the same ratio to the total compensation as the services actually performed
bear to the total services of the Contractor covered by this Contract, less payments of
compensation previously made.
14. Release of Materials Pursuant to the Georgia Open Records Act. All products, reports,
information, data, etc., given to, derived from, prepared by, or assembled by the Contractor
(the “Materials”) in the performance of this Contract shall be governed by the Georgia Open
Records Act. Unless otherwise required by applicable law, the Contractor shall not release
or deliver any Materials to the general public or to local officials pursuant to a written or oral
request under the Georgia Open Records Act. Division expressly acknowledges and agrees
that Contractor is an “agency” as defined in O.C.G.A. § 50-18-70 and is consequently
subject to the Georgia Open Records Act. Contractor shall inform the Division in writing if
Page 5 of 11
it receives any requests for the Materials pursuant to the Georgia Open Records Act.
15. Assignability. Contractor shall not transfer or assign all or any of its right, title or interest in
this Contract or delegate any of its duties or obligations hereunder without the prior written
consent of the Division. The Division may transfer or assign all or any of its right, title or
interest in this agreement to another agency or authority of the State of Georgia without
written notice to Contractor.
16. Interest of Contract. The Contractor covenants that it presently has no interest and shall
not acquire any interest, direct or indirect, which would conflict in any manner or degree
with the performance required under the Contract. It is specifically agreed and understood
that for the purposes of this Contract, the Contractor shall be an independent contractor and
nothing in this Contract shall be construed as creating a joint venture, partnership or
employment relationship between the parties.
17. Copyrights. No reports, maps, or other documents produced or derived in whole or in part
under this Contract shall be the subject of an application for copyright by or on behalf of the
Contractor. Any such reports, maps and other documents shall constitute a “work made for
hire” pursuant to the U.S. Copyright Act of 1976, as amended, and Contractor agrees that the
Division is the original and sole owner of all rights, including without limitation copyright,
in and to such reports, maps and other documents. If for any reason such reports, maps, and
other documents are found not to be “works made for hire,” then Contractor hereby assigns
to the Division all right, title and interest in and to such reports, maps and other documents
without further consideration of any kind. Contractor agrees to execute all further
documents and to take all further steps deemed advisable by the Division to secure and
protect the Division’s rights as stated herein.
18. Documents. Provided that Contractor has been paid for the Services, the Division shall have
the right to use the documents, maps, photographs, drawings and other materials (including
but not limited to models, software or other digital work products) resulting from Contractor
efforts on this Contract. Contractor acknowledges that, in accordance with the Contract, the
Division is the original and sole owner of all rights in and to such documents, maps,
photographs, drawings and other such materials including but not limited to models,
software or other digital work products. Division acknowledges that the reuse of any such
materials by Division on any extension of this project or any other project shall, with the
exception of the obligations of Contractor, be at Division’s sole risk unless otherwise agreed
to in writing by all parties. Contractor shall have the right to retain copies of all such
materials.
19. Identification of Documents and Projects. All construction or demonstration projects,
reports, maps, signage, and other documents completed as a part of this Contract, other than
documents exclusively for internal use within the Division, shall give the Contractor
recognition and carry the following notation on a conspicuous sign or the front cover or a
title page (or in the case of maps, in the same block as the legend):
“The preparation of this (report, map, document, project, etc.) was financed in part
through a grant from the U.S. Environmental Protection Agency under the
Provisions of Section 319(h) of the Federal Water Pollution Control Act, as
amended.”
and give credit to the Environmental Protection Division of the Department of Natural
Resources, State of Georgia together with the month and year of completion.
20. Intellectual Property. The Contractor agrees it will not use the name or any intellectual
Page 6 of 11
property, including but not limited to, the Division’s trademarks or logos in any manner,
including commercial advertising or as a business reference, without the express prior
written consent of the Division.
21. Personnel. The Contractor represents that it has, or will secure, all personnel required in
performing the Services under this Contract. Such personnel shall not be employees of or
have any contractual relationship with the Division.
a. All the Services required hereunder will be performed by the Contractor or under its
supervision, and all the personnel engaged in the work shall be fully qualified and shall
be authorized under state and local law to perform such services.
b. None of the work or Services covered by this Contract shall be subcontracted without
the prior written approval of the Division contact specified in Paragraph 36.
c. The Division, or its authorized representatives, shall have the right to enter into the
premises of Contractor and/or all subcontractors, or any places where duties under this
Contract are being performed, to inspect, monitor, or otherwise evaluate the
performance under this Agreement.
22. Right to Audit and Access to Records. The Contractor shall maintain books, records and
documents in accordance with generally accepted accounting principles and procedures and
which sufficiently and properly document and calculate all charges billed to the Division
throughout the term of the Contract for a period of at least five (5) years following the date
of final payment or completion of any required audit, whichever is later. Records to be
maintained include both financial records and service records. The Contractor shall permit
the Auditor of the State of Georgia or any authorized representative of the State, and where
federal funds are involved, the Comptroller General of the United States, or any other
authorized representative of the United States government, to access and examine, audit,
excerpt and transcribe any directly pertinent books, documents, papers, electronic or
optically stored and created records or other records of the Contractor relating to orders,
invoices or payments or any other documentation or materials pertaining to the Contract,
wherever such records may be located during normal business hours. The Contractor shall
not impose a charge for audit or examination of the Contractor’s books and records. If an
audit discloses incorrect billings or improprieties, the Division reserves the right to charge
the Contractor for the cost of the audit and appropriate reimbursement. Evidence of criminal
conduct will be turned over to the proper authorities.
23. Entire Agreement; Modification. This Contract represents the sole and complete
understanding of the terms of the Contract between the parties hereto with respect to the
subject matter contained herein and supersedes all prior agreements and understandings, oral
or written, with respect thereto. No modification or amendment to this Contract will be
binding on either party hereto unless such modification or amendment is reduced to a writing
executed by both parties. Any changes in the scope and/or duration of this Contract shall be
mutually agreed upon by and between the Division and the Contractor in a writing executed
in accordance with this Paragraph.
24. Warranty. The Contractor warrants to the Division that the Services will be performed in a
workmanlike manner, consistent with that level of care and skill ordinarily exercised by
other providers of similar services and with sound principles commonly used by similar
professionals under similar circumstances at the time the Services are provided and further
warrants that the work will be performed as intended and described in the Scope of Work.
a. Contractor warrants that he has not employed or retained any company or person, other
Page 7 of 11
than a bona fide employee working solely for him, to solicit or secure this Contract and
that he has not paid or agreed to pay any person, company, corporation, individual, or
firm, other than a bona fide employee working solely for him, any fee, commission,
percentage, gift, or other consideration contingent upon or resulting from the award or
the making of this Contract.
25. Indirect Damages. Each party hereby waives its rights to recover from the other party any
consequential, indirect, or incidental damages (including but not limited to, loss of use,
income, profits, financing, or reputation), arising out of, or relating to, this agreement of the
performance of the services or both.
26. Use of Third Party Data. The Division has requested that the Contractor obtain certain
facts, information, data, assumptions, opinions and representations (collectively, “Items”)
from third parties as part of its scope of services. The Division understands and agrees that
(i) the products of its services that the Contractor provides (collectively, “Products”) may be
based in part or in whole on Items that have not been verified by the Contractor, (ii) the
Contractor has no obligation or duty to verify the accuracy or completeness of the Items and
(iii) the Contractor makes no representation(s) or warranty(ies), express or implied, with
respect to the Items or the Products (other than the Products were prepared in accordance
with the standard of care to which the contractor is subject, as set forth elsewhere in this
contract), all of which representation(s) and warranty(ies) are hereby disclaimed, including,
without limitation, the warranties of merchantability and fitness for a particular purpose.
The Division hereby releases the Contractor from any and all claims, damages, losses,
expenses and liabilities of every kind and nature whatsoever, including reasonable attorneys’
fees and defense costs, arising out of the use of Items by the Contractor in performing its
services under this contract, including, without limitation, the preparation and delivery of the
Products to the Division.
27. Compliance with the Georgia Security and Immigration Compliance Act. Contractor
Certifies that it will comply with O.C.G.A. § 13-10-91 relating to the verification of the
status of newly hired employees as incorporated herein by reference.
28. Federally-Mandated Certifications and Disclosures.
a. Lobbying
i. Disclosure Regarding Lobbying: Contractor hereby warrants as a condition of
this Contract that if it is an organization described in Section 501(c)(4) of the
Internal Revenue Code of 1986, it will not engage in lobbying activities
prohibited by the Lobbying Disclosure Act of 1985.
ii. Certification Regarding Lobbying: Contractor certifies to the best of its
knowledge and belief that:
1. No Federal appropriated funds have been paid in full or will be paid, by
or on behalf of Contractor, to any person for influencing or attempting
to influence an officer or employee of a Member of Congress in
connection with the awarding of any Federal contract, the making of
any Federal grant, the making of any Federal loan, the entering into of
any cooperative agreement, and the extension, continuation, renewal,
amendment, or modification of any Federal contract, grant, loan, or
cooperative agreement.
2. If any funds other than Federal appropriated funds have been paid or
will be paid to any person for influencing or attempting to influence an
Page 8 of 11
officer or employee of any agency, a Member of Congress, an officer or
employee of Congress, or an employee of a Member of Congress in
connection with this contract, then Contractor shall fully disclose same
to the Division, and shall complete and submit Standard Form-LLL,
“Disclosure Form to Report Lobbying”, in accordance with its
instructions.
b. Drug Free Work Place: Contractor certifies that, in accordance with the provisions of
O.C.G.A. § 50-24-1, et seq., a drug-free workplace will be provided to Contractor’s
employees during the performance of this contract; and it will secure from any
subcontractor hired to work in a drug-free workplace the following written
certification: “As part of any subcontracting agreement (Subcontractor’s Name),
certifies to Contractor that a drug-free workplace will be provided for the
subcontractor’s employees during the performance of this Contract pursuant to
paragraph 7 of subsection (b) of Code 50-24-3.”
c. Debarment, Suspension, and Other Responsibility Matters:
i. The Contractor certifies that it and its principles:
1. Are not presently debarred, suspended, proposed for debarment, and
declared ineligible or voluntarily excluded from covered transactions by
any Federal department or agency.
2. Have not, within a three-year period preceding this contract, been
convicted of or had a civil judgment rendered against them for
commission of fraud or a criminal offense in connection with obtaining,
attempting to obtain, or performing a public transaction or contract
under a public transaction; violation of Federal or State antitrust
statutes; or commission of embezzlement, theft, forgery, bribery,
falsification or destruction of records, making false statements, or
receiving stolen property.
3. Are not presently indicted for or otherwise criminally or civilly charged
by a government entity with commission of any of the above offenses.
4. Have not within a three-year period preceding this contract had one or
more public transactions terminated for cause or default.
ii. Where the Contractor is unable to certify to any of the statements in this
certification, such Contractor shall attach an explanation to this contract.
d. Equal Employment Opportunity: The Contractor will not discriminate against any
employee for employment because of race, color, religion, sex or national origin. The
Contractor will comply with all sections of Executive Order 11246 - Equal
Employment Opportunity.
e. Audit Requirement: A non-Federal entity that expends $750,000 or more during the
non-Federal entity’s fiscal year in Federal awards must have a single or program-
specific audit conducted for that year in accordance with the provisions of Subpart F,
Part 200, Chapter II of Subtitle A, Title 2, Code of Federal Regulations.
29. General Federal Grant Conditions. All covenants, agreements and stipulations in Part 200
Chapter II of Subtitle A, Title 2, Code of Federal Regulations, are incorporated herein by
reference. The parties acknowledge those general grant conditions and intend that all those
covenants, agreements, and stipulations between the U.S. Environmental Protection Agency
Page 9 of 11
and the Division, with the exception of the provision for compliance with the Davis-Bacon
Act, are applicable to and enforceable against the Contractor. Allowable costs will be
determined in accordance with the cost principles in the hereto referenced Code of Federal
Regulations.
a. The Contractor will assure the continued proper operation and maintenance of all
nonpoint source management practices that have been implemented for projects funded
under this agreement. Such practices shall be operated and maintained for the expected
lifespan of the specific practice and in accordance with commonly accepted standards.
The Contractor shall include a provision in every applicable sub-agreement (contract)
awarded under this grant requiring that the management practices for the project be
properly operated and maintained.
b. The Contractor agrees to ensure that all necessary permits (such as Clean Water Act §
404) are obtained prior to implementation of any grant funded activity that may fall
under applicable federal, state or local laws. The Contractor project implementation
plan must identify permits that may be needed to complete activities identified in
Appendix A: Scope of Work. The Contractor must keep documentation regarding
necessary permits in the project file.
30. Israel. The Contractor certifies that the Contractor is not currently engaged in, and agrees
for the duration of this Contract not to engage in, a boycott of Israel, as defined in O.C.G.A.
§ 50-5-85.
31. Applicable Law. The parties agree that this agreement and all rights, privileges and
responsibilities shall be interpreted and construed according to the laws of the State of
Georgia.
32. No Waiver. The failure of the Division at any time to require performance by the
Contractor of any provision hereof, shall in no way affect the right of the Division thereafter
to enforce that same provision or any part of the Contract, nor shall the failure of the
Division to enforce any breach of any provision hereof be taken or held to be a waiver of
such provision, or as a waiver, modification or rescission of the Contract itself.
33. Counterparts; Electronic Signature. This Contract may be executed in two (2)
counterparts each of which is deemed an original of equal dignity with the other and which
is deemed on and the same instrument as the other. The Division and Contractor agree that
any electronic signatures on this Contract hereto constitute original, valid signatures
pursuant to the Uniform Electronic Transactions Act, O.C.G.A. § 10-1-21 et seq.
34. Severability. If any one or more of the provisions of this Contract are for any reason be
held by any court of competent jurisdiction to be invalid, illegal or unenforceable in any
respect, such invalidity, illegality or unenforceability will not affect any other provision, and
this Contract will be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein.
35. Notice. All notices, correspondence requests, demands, waives and other communications
required or permitted to be given under this Contract shall be made in writing and shall be
deemed to have been duly given if delivered by U.S. Mail, postage paid, sent by nationally
recognized overnight courier, or by electronic-mail to the contacts as follows:
Page 10 of 11
If to the Division:
Mary E Gazaway
Grant Administrator
Georgia EPD Watershed Protection Branch
Nonpoint Source Pollution Program Grants Unit
Suite 1462 East Tower
2 Martin Luther King, Jr. Drive
Atlanta, Georgia 30334
470-524-0556 (Zoom phone)
mary.gazaway@dnr.ga.gov
If to Contractor:
Hameed Malik, Ph.D., P.E.
Director of Engineering
Augusta Engineering Department
Engineering Administration
452 Walker Street, Suite 110
Augusta, GA 30901
(706) 796-5040
hmalik@augustaga.gov
Page 11 of 11
IN WITNESS WHEREOF the Division and the Contractor have executed this Contract on the day and
year below written.
The Environmental Protection Division of
the Department of Natural Resources,
State of Georgia
Augusta. Georgia (Augusta-Richmond
County)
Richard E. Dunn
Director
Date:
Hardie Davis, Jr.
Mayor
Date:
APPENDIX A
Scope of Work
Section 319(h) FY2021 Grant – Element12
1. Project Title: Phase 2 - Biota Improvement in an Urban Stream through Aquatic Habitat
Restoration
2. Lead Organization: Augusta, GA (AKA Augusta-Richmond County)
535 Telfair Street, Building 4000
Augusta, GA 30901
(706) 796-5040
(706)796-5045
Primary Contact: Hameed Malik, Ph.D., P.E.
Director of Engineering
Augusta Engineering Department
Engineering Administration
452 Walker Street, Suite 110
Augusta, GA 30901
(706) 796-5040
(706) 796-5045
hmalik@augustaga.gov
Project Start Date: August 2022
Project End Date: June 30, 2024
Federal Amount Requested: $117,058
Match Amount to be Contributed: $111,815
Total Project Amount: $228,873
3. Project Goals:
Phase 2 of this project continues to implement a 2018 Nine-Element Watershed Management
Plan (WMP) for the Augusta Canal (HUC-12 #030601060601)/Butler Creek (HUC-12
#030601060602)/Beaverdam Ditch (HUC-12 #030601060607) Watersheds in the Savannah
River Basin by addressing Bio F and Bio M water quality impairments in an 8-mile portion of
Rocky Creek (HUC-12 030601060607) in Augusta-Richmond County, Georgia. Project goals
are to increase a fish Index of Biotic Integrity (IBI) to >16 (Very Poor) and a macroinvertebrate
Multi-Metric Index (MMI) in a 100-point scale to >5 (Very Poor). Restoration of biological
health may also decrease fecal coliform concentrations based on a well-supported scientific food
web theory. These efforts will be documented through pre- and post-BMP monitoring using
GAEPD/GADNR standard protocols for sampling fish and macroinvertebrates in streams.
Habitat will be restored by directly adding Best Management Practices (BMPs) to the stream to
encourage a more natural riffle-pool geomorphology over time and support habitat diversity.
Phase 2 - Aquatic Habitat Restoration Augusta-Richmond County
Section 319(h) FY2021 Project 2
The project supports sections of Georgia’s Statewide NPS Management Plan (2014): 319
Grants, Key Stakeholders, Funding, page 92; Water Quality Monitoring, Program Issues, Short
Term Goal 1.1 page 64; Water Quality Monitoring, Program Issues, page 79; 319 Program, Short
Term Goal 8.1, page 97; Water Quality Monitoring, Short Term Goal 2.4, Page 85; Urban, Short
Term Goal 4.2, Page 105; and 319 Grants, Long Term Goal 13, Page 99.
4. Project Background:
Due to delays caused by the COVID-19 pandemic, project activities will be achieved in two
phases. Contracted under a Section 319(h) FY2016 grant, Phase 1 resulted in the completion of
the following Project Activities and Tasks plus quarterly, annual, and close-out reporting:
Project Activity: Reach out to representatives & convene 3 meetings of Watershed
Partnership developed throughout the previous TMDL planning process
Task 1: Introduce project to appropriate watershed partners
Task 2: Convene 3 meetings to solicit input, encourage support, and publicize project
Project Activity: Survey and qualify assessment of existing habitat.
Task 3: Survey of existing habitat in 8-mile reach of Rocky Creek
Task 4: Pre-BMP installation assessment of macroinvertebrate and fish communities
in observed habitats
Project Activity: Install BMPs from available options as determined by the assessment
Task 5: Survey of selected reach
Task 6: Engineering Design of Structures
Phase 2 will continue the project based on Project Activities and Tasks listed in 5. Project
Activities below. The BMP installation targets a minimum of 0.25 stream miles (1320 linear
feet) along the 6-mile “Headwaters to SR56” reach, with a spacing of approximately one feature
every 50-200 ft. Point Bar Formation/Stabilization Structure; Pipe Refugia; Widener/Woody
Habitat/Low flow Concentrator; Pool Enhancer; and Cross-Channel Rock Vane BMPs have been
evaluated and chosen based on in-stream assessment, project cost, ability to install, and six
research/restoration priorities developed by the project team.
A 2016 Total Maximum Daily Load (TMDL) evaluated both a 6-mile segment (Headwaters
to SR 56, formerly Headwaters to Phinizy Ditch) and a 2-mile reach (SR 56 to below New
Savannah Road) of Rocky Creek in Augusta as Very Poor for diversity in fish and
macroinvertebrate community populations. The TMDL does not call for further reduction in
sediment loading from external sources into Rocky Creek:
https://epd.georgia.gov/sites/epd.georgia.gov/files/related_files/site_page/Savannah%20Biota%2
0Impacted%20TMDL%20Report%20%5B2016%5D.pdf
Reduction of sediment will be pursued as an ancillary benefit of habitat BMPs and may
improve biotic health further. Therefore, the BMPs selected for this project are intended to
stabilize the creek bed and banks so they provide long term habitat as opposed to unconsolidated
stream bed and bank sediments.
Phase 2 - Aquatic Habitat Restoration Augusta-Richmond County
Section 319(h) FY2021 Project 3
A fecal coliform bacteria TMDL developed in 2000 for the 2-mile segment of Rocky Creek
established an 80% load reduction to achieve state water quality standards:
https://epd.georgia.gov/sites/epd.georgia.gov/files/related_files/site_page/EPA_Rocky_Creek_Fe
cal_TMDL.pdf
By improving the fish and macroinvertebrate communities, this project will upgrade the
overall food web, and help to create an environment that is less hospitable for fecal bacteria.
5. Project Activities:
Project Activity: Install BMPs from available options as determined by the assessment
Task 1: Install and provide for operations and maintenance of structures that create
in-stream habitat for biota including fish and macroinvertebrates over a wide range
of the food web and varying depth in the water column.
Deliverables: Installation of structural practices; Records of BMP inspections and
maintenance kept and made available for review beyond the term of this contract.
Measures of Success: Completion of structural practice installations; BMPs
operated and maintained for expected lifespan and in accordance with commonly
accepted standards to ensure proper functioning of system as designed.
Project Activity: Targeted monitoring to track post-BMP water quality trends
including improvement towards achieving stated goals
Task 2: Post-BMP sampling assessment of macroinvertebrates and fish above, in,
and below the BMP installations, including the historic GAEPD monitoring sites,
using GAEPD (2007)/GADNR(2005) protocols
Deliverables:
• Finalized QA/QC Water Quality Monitoring Plan for macroinvertebrate &
fish assessments
• Post-BMP metrics for stream showing value of BMP compared to areas of
stream without habitat restoration
Measures of Success:
• Finalized QA/QC Water quality Monitoring Plan approved by GAEPD
• Data showing an IBI >16 in fish and an MMI >5 in macroinvertebrate
biometric values
Project Activity: Publicize study results to scientific and general audience
Task 3: Develop a Case Study paper to summarize the project and publicize
through project partner websites and social media outlets
Deliverables:
• Completed paper and
• Presentation made accessible to general public
Phase 2 - Aquatic Habitat Restoration Augusta-Richmond County
Section 319(h) FY2021 Project 4
• Access to presentation through social media
Measures of Success: Documented views of presentation on social media outlets
Task 4: Develop a Case Study paper to summarize the project and present to
scientific community at regional water conference
Deliverables:
• Completed paper and
• Presentation at Georgia Water Resources Conference or similar
conference
Measures of Success: Acceptance of talk and paper at conference
Project Activity: Reporting Requirements
Task 5: Submit Quarterly Reports, including WBE/MBE reports and invoices, by
the 15th of January, April, July, and October of each year during the grant period.
Deliverables: Quarterly deliverables, monitoring data reports, invoices and
supporting documentation reporting progress on project and using template
provided by GAEPD.
Measures of Success: Quarterly deliverables, monitoring data reports, invoices
and supporting documentation reviewed and approved by GAEPD.
Task 6: Participate in project review meetings with GAEPD based on the following
schedule: Six months and twelve months after the project start date, then annually
through the project term.
Deliverables: Attendance at meetings and verbal or written responses to GAEPD.
Measures of Success: Full participation at all project review meetings.
.
Task 7: Submit Final Invoice and Closeout Report to GAEPD for review.
Deliverables: Final Invoice and Closeout Report
Measures of Success: Final Invoice and Closeout Report reviewed and approved
by GAEPD.
6. Roles and Responsibilities of Participating Organizations:
Organization Name Specific Responsibilities
City of Augusta
• Account for 40% of total project costs in matching funds or
in-kind services
• Pay funds to appropriate contractor(s) and vendor(s)
• Request reimbursements from GAEPD on a quarterly basis
• Track the progress of project activities completed, grant
funds expended, and match values provided in accordance
with the drawdown & implementation schedule
Phase 2 - Aquatic Habitat Restoration Augusta-Richmond County
Section 319(h) FY2021 Project 5
• Complete and submit quarterly progress reports and
invoices to GAEPD by January 15th, April 15th, July 15th,
and October 15th of each project year
• Participate in project review meetings with GAEPD each
project year
• Complete & submit close-out report at conclusion of project
GAEPD
• Provide 60% of total project costs
• Review and approve project deliverables
• Participate in meetings, as appropriate
• Review and assist as needed with 319(h) Grant protocols
• Provide project oversight and contract management
• Provide monitoring guidance and training
Phinizy Center for Water
Sciences
• Contract with City of Augusta to perform the following:
• Sample, identify, and enumerate aquatic insect and fish
species
• Assist in report writing
• Assist in BMP construction
• Subcontract for the following services under an existing
subagreement and with a previously approved professional:
o Install and maintain rain gauges and water level loggers
o Develop rating curves
o Assist in report writing
7. Project Location:
Rocky Creek runs through and lies entirely within Richmond County. It is a tributary to the
Savannah River.
a) Project Area Description and Map:
Phase 2 - Aquatic Habitat Restoration Augusta-Richmond County
Section 319(h) FY2021 Project 6
Figure 1. Location of Rocky Creek in the Augusta-Richmond County Area
Figure 2. Rocky Creek Watershed including impaired reaches and proposed restoration
area (Red-Fecal Coliform Impaired Reach, Orange-Macroinvertebrate Impaired Reach,
Blue-Proposed Target Area)
Phase 2 - Aquatic Habitat Restoration Augusta-Richmond County
Section 319(h) FY2021 Project 7
Figure 3. Aerial photo of the extent of proposed restoration area with Milledgeville Road
bordering upstream on the left and Wheeless Road bordering downstream on the right
b) Project Area Size (Acres): 8,107 acres
c) County or Counties: Richmond
d) Land Uses within the Watershed(s) or Project Area (Percentages):
Agricultural 6%
Commercial Forestry 0%
Urban/Residential 78%
Mining/Extraction 1%
Forest/Natural Areas 13%
Water/Wetlands 2%
TOTAL 100%
Data Source & Date: Draft Total Maximum Daily Load Evaluation for Seven Stream
Segments in the Savannah River Basin for Sediment, 2015
e) Hydrologic Unit Code(s), Watershed Name(s) and Priority Watershed(s):
HUC-10: #0306010606 Name: Rocky Creek Priority: NA
8. Nonpoint Source Pollution Impairments and Healthy Waters:
a) Section 305(b)/303(d) List of Waters:
Water Body Segment Name
(Segment Length (Miles) or
Embayment Acreage)
County Location(s)
Criterion
Violated or
Water Quality
Concern (Healthy
Water)
Listing
Status
Category
4a, 5 or 1
Rocky Creek (2 miles) Richmond Bio M, Bio F,
Fecal Coliform
4a
Rocky Creek (6 miles) Richmond Bio M, Bio F 4a
b) Secondary Pollutant(s):
In addition to the impairments already listed, there is evidence that sediment from the
stream itself could be contributing to sediment load in the stream. Significant gully and
Phase 2 - Aquatic Habitat Restoration Augusta-Richmond County
Section 319(h) FY2021 Project 8
channel erosion can be observed in the channel as well as a great deal of bed movement.
Higher flows cause significant movement of bed features.
9. Monitoring:
DRAFT QA/QC Water Quality Monitoring Plan as Attachment (listed in Section 11.)
GADNR, 2005-Standard operating procedures for conducting biomonitoring on fish
communities in wadeable streams in Georgia at http://www.georgiawildlife.com/node/913
GAEPD, 2007-Macroinvertebrate Biological Assessment of Wadeable Streams in Georgia;
Standard Operating Procedures at http://epd.georgia.gov/macroinvertebrate-bioassessment-
standard-operating-procedures-sop-and-metric-spreadsheets
GAEPD is working on revising the multi metric index (MMI) used to assess the health of
macroinvertebrate communities. See current assessment guidelines below.
http://epd.georgia.gov/sites/epd.georgia.gov/files/related_files/site_page/Guidelines%20for%2
0Listing%20and%20Delisting%20of%20Biological%20Data_Feb2016_Version1_2_Revised_
August%202016.pdf
Phase 2 - Aquatic Habitat Restoration Augusta-Richmond County
Section 319(h) FY2021 Project 9
10. Project Budget:
Item
Item Class Category
319(h)
Grant Funds
(60% Maximum)
Non-Federal
Matching Funds
(40% Minimum)
Total
A
Personnel:
One (1) AED Director – approximately 0.007 FTE
($170,000/year) for 2 years
Description of Duties: City Project Management, Project
oversight, BMP decisions
2,380 2,380
One (1) Stormwater Serv. Mgr. - approximately 0.15 FTE
($122,000/year) for 2 years
Description of Duties: Project Management, Project
oversight, Fieldwork, BMP decisions
36,600 36,600
One (1) Engineering Mgr. - approximately 0.01 FTE
($109,900/year) for 2 years
Description of Duties: Engineering Design, Permitting,
Project Management, BMP decisions
2,198 2,198
One (1) Stormwater Coordinator - approximately 0.01
FTE ($60,672/year) for 2 years
Description of Duties: Engineering Design, Permitting,
Project Management, BMP decisions
1,213 1,213
One (1) Staff Engineer - approximately 0.01 FTE
($79,000/year) for 2 years
Description of Duties: Engineering Design, Permitting,
Project Management, BMP decisions
1,580 1,580
One (1) AED Assist. Director – approximately 0.01 FTE
($101,000/year) for 2 years
Description of Duties: City Project Management, Project
oversight, BMP decisions
2,020 2,020
One (1) Asset Manager - approximately 0.01 FTE
($106,000/year) for 2 years
Description of Duties: GIS, Survey, BMP decisions
1,908 1,908
One (1) GIS analyst - approximately 0.01 FTE
($48,847/year) for 2 years
Description of Duties: GIS, Survey, BMP decisions
977 977
One (1) GIS analyst - approximately 0.01 FTE
($58,532/year) for 2 years
Description of Duties: GIS, Survey, BMP decisions
1,171 1,171
Sub Total: 0 50,047 50,047
B Fringe Benefits: Included in Item A @ a rate of 30% 0 0
Sub Total: 0 0 0
C
Travel:
Staff Position:
Purpose of Travel:
833 Miles x Mileage Rate ($.545 mile)
0 0
Sub Total: 0 0 0
D
Equipment:
Equipment:
Purpose/Use:
Sub Total: 0 0 0
E
Supplies:
Supplies:
Purpose/Use:
Sub Total: 0 0 0
Phase 2 - Aquatic Habitat Restoration Augusta-Richmond County
Section 319(h) FY2021 Project 10
Item
Item Class Category
319(h)
Grant Funds
(60% Maximum)
Non-Federal
Matching Funds
(40% Minimum)
Total
CONTRACTUAL: PHINIZY CENTER (NGO)
Up to four (4) Aquatic Ecologists – approximately 0.125
FTE ($35,000/year) for 2 years = $35,000
Description of Duties: Assisting with BMP sites survey,
aquatic sampling and subcontracting the following for
BMP construction:
• One (1) Project Engineer- approximately 0.25 FTE
($80,000/year) for 2 years = $40,000
Description of Duties: BMP selection and engineering,
assist with survey, report writing and project management
• One (1) Construction Contractor - TBD = $103,826
Description of Duties: Install BMPs
117,058 61,768 178,826
Sub Total: 117,058 61,768 178,826
G
Construction:
(Does not apply to GAEPD Section 319(h) Grants)
N/A
N/A
N/A
H
Other:
Sub Total
I
Total Direct Charges:
(Sum of A-H) 117,058 111,815 228,873
J
Indirect Charges:
(0% Eligible for Reimbursement with Federal Dollars) N/A Up to 100%
K
Total:
(Sum of I and J) 117,058 111,815 228,873
Narrative Justification for Item Class Categories:
Personnel (A): Personnel in this item class category are all Augusta-Richmond County
employees within the Augusta Engineering Department (AED) and are all contributing time as
Non-Federal matching contributions to the project. Since this project includes stream restoration
efforts that have potential impacts on in-stream flows within one of the Richmond County
streams, the AED will treat this as a submitted county construction project which will go through
our plan review and permitting processes. In addition, this project requires more specialized
elements that include engineering, buffer assessments and permitting, BMP installation and
monitoring, aquatic ecology, project management, and water quality assessments. All necessary
personnel to perform those necessary duties are included in this grant.
• AED Director: approximately (0.007 FTE @ $170,000/year) will have project oversight
duties, will be involved in planning, and will participate in draft and final report reviews.
• AED Stormwater Services Manager: approximately (0.15 FTE @ $122,000/year), will
oversee, manage and coordinate project, provide aquatic ecology and water quality
technical advice, input on BMP decisions, and organize and participate in fieldwork.
• AED Engineering Manager: approximately (0.01 FTE @ $109,900/year), will provide
plan review oversight, engineering design support, permit writing support, input on BMP
decisions and monitoring, and project management support.
• AED Stormwater Coordinator: approximately (0.01 FTE @ $60,672/yr) will have BMP
design input, fieldwork and project management responsibilities.
• AED Staff Engineer: approximately (0.01 FTE @ $79,000/yr) will have BMP design
input, engineering design support, fieldwork and project management responsibilities.
Phase 2 - Aquatic Habitat Restoration Augusta-Richmond County
Section 319(h) FY2021 Project 11
• AED Assistant Director-Maintenance: approximately (0.01 FTE @ $101,000/yr) will
have project management, project oversight, and site maintenance responsibilities.
• AED Asset Manager: approximately (0.01 FTE @ $106,000/yr) will have GIS, survey,
and BMP design input.
• AED GIS analyst: approximately (0.01 FTE @ $48,847/yr) will have GIS, survey, and
BMP design input.
• AED GIS analyst: approximately (0.01 FTE @ $58,532/yr) will have GIS, survey, and
BMP design input.
Fringe Benefits (B): Fringe amounts are included in the Personnel Line Item and are not broken
out in this Line Item. Fringe Benefits rate for AED employees is 30% and are included in
Personnel Line Item.
Supplies (E): Supplies have been reallocated to Contractual expenses
Contractual (F): Phinizy Center for Water Sciences will be the Contractual Manager for the
project and will make use of an existing subcontract and approved professional relationship as
well as subcontract with qualified companies, consultants, and institutions to outsource
monitoring, engineering and construction services. See below Justification for scope of services.
• Phinizy Center for Water Sciences: Phinizy Center (0.125 FTE @$35,000/year) includes
at a maximum four (4) staff members experienced in aquatic ecology and geomorphology
in urban streams. Personnel qualified for this function include aquatic ecologists,
researchers, and other specialists to perform post-BMP implementation surveys,
geomorphic characterizations, hydrologic analyses, and report writing. The team will also
be involved in taking advantage of an existing subagreement and a previously approved
professional relationship to outsource aquatic monitoring services. In addition, Phinizy
Center will outsource for microelectronics, survey assistance, and report writing, where
needed and subcontract the following for BMP construction:
• One (1) Project Engineer - approximately 0.25 FTE ($80,000/year) for 2 years = $40,000
for BMP selection and engineering, assist with survey, report writing and project
management.
• One (1) Construction Contractor - TBD = $103,826 to install BMPs.
Phase 2 of this project will install Bioengineering BMPs within Rocky Creek to increase
available habitat for aquatic insect and fish populations. Most supplies have already been
acquired in Phase 1. However, the budgets for BMP installation in this Line Item may include
additional items for construction and live plants.
Planting
• Live Stakes: ($1-$4 each) assuming a minimum of 12 groups of 50 at $4 each = $2,400
• Herbaceous Plugs = $3,000
Additional Items
• Temporary Construction Entrances (2) = $4,000
Phase 2 - Aquatic Habitat Restoration Augusta-Richmond County
Section 319(h) FY2021 Project 12
11. Project Attachment(s):
Link: 2018 Nine-Element Watershed Management Plan for the Augusta Canal (HUC-12
#030601060601) / Butler Creek (HUC-12 #030601060602) / Beaverdam Ditch
(HUC-12 #030601060607) Watersheds in Savannah River Basin
https://epd.georgia.gov/document/document/augustacanalbutlercreekbeaverdamdi
tchwmp0306010606y2018pdf/download
Attachment 1: Post-BMP QA/QC Water Quality Monitoring Plan
Initial Final
Grant Drawdown Amount $117,058 $0
Percent Federal Remaining 100% 0%
Match Amount $0 $111,815
Percent Match Accrued 0% 100%
Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24
Milestones/Tasks
Color KEY
Deliverable to EPD
Data Produced
Information Conveyed
Design/Construction
$25,000 $15,607 $13,000 $10,000 $6,345 $11,706
Appendix B: Project Schedule - Phase 2 Biota Improvement in an Urban Stream through Aquatic Habitat Restoration
1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 5th Quarter 6th Quarter 7th Quarter 8th Quarter
91%70%48%35%24%15%
$10,400 $25,000
10%0%
90%
$10,400 $25,000 $25,000 $15,607 $10,700 $8,000
32%54%
Task 7: Submit Final Close-Out Report
Task 2: Carry out post BMP sampling for fish and macros
Task 4: Develop a case study paper or presentation for the
project ands submit/present at water conference
Task 3: Develop a case study paper or presentation for the
project and publish to partner websites/social media
Task 6: Participate in project review meetings with GAEPD
Execute Contract
Task 1: Implement and install BMPs
Task 5: Submit Quarterly Invoices & Status Reports
100%
$5,926 $11,182
9%68%78%85%
Contractor Affidavit under O.C.G.A. § 13-10-91(b)(l)
The undersigned contractor ("Contractor") executes this Affidavit to comply with O.C.G.A § 13-10-91
related to any contract to which Contractor is a party that is subject to O.C.G.A. § 13-10-91 and hereby
verifies its compliance with O.C.G.A. § 13-10-91, attesting as follows:
a) The Contractor has registered with, is authorized to use and uses the federal work
authorization program commonly known as E-Verify, or any subsequent replacement
program;
b) The Contractor will continue to use the federal work authorization program throughout
the contract period, including any renewal or extension thereof;
c) The Contractor will notify the public employer in the event the Contractor ceases to
utilize the federal work authorization program during the contract period, including
renewals or extensions thereof;
d) The Contractor understands that ceasing to utilize the federal work authorization
program constitutes a material breach of Contract;
e) The Contractor will contract for the performance of services in satisfaction of such
contract only with subcontractors who present an affidavit to the Contractor with the
information required by O.C.G.A. § 13-10-91(a), (b), and (c);
f) The Contractor acknowledges and agrees that this Affidavit shall be incorporated into
any contract(s) subject to the provisions of O.C.G.A. § 13-10- 91 for the project listed
below to which Contractor is a party after the date hereof without further action or
consent by Contractor; and
g) Contractor acknowledges its responsibility to submit copies of any affidavits, drivers'
licenses, and identification cards required pursuant to O.C.G.A. § 13-10-91 to the public
employer within five business days of receipt.
__ 46923_________________ _____July 9, 2007__________________
Federal Work Authorization User Identification Number Date of Authorization
Augusta, Georgia Phase 2 Biota Improvement in Urban Stream through Aquatic Habitat Restoration _
Name of Contractor Name of Project
_Georgia DNR EPD ___
Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on _________, _____, 20_____ in _______________ (city), __________ (state).
_____________________________________________
Signature of Authorized Officer or Agent
_____________________________________________
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE _______ DAY OF _____________, 20______.
__________________________________________________
NOTARY PUBLIC
My Commission Expires: _____________________________
BRIAN KEMP MARK WILLIAMS
GOVERNOR COMMISSIONER
2 MARTIN LUTHER KING, JR. DRIVE, S.E., SUITE 1252 EAST | ATLANTA, GEORGIA 30334-9000
404.656.3500 | FAX 404.656.0770 | WWW.GADNR.ORG
Dear Sub-Awardee,
In 2006, the Federal Funding Accountability and Transparency Act (FFATA) was signed into law. This legislation requires
information disclosure concerning entities receiving Federal financial assistance through Federal grants. As a result, our
organization is required to report on each of the grants that we award (i.e., subawards, subcontracts). By answering the
questions below, your organization will provide us the data needed to meet FFATA reporting requirements. This form is
to be returned within 15 days of the contract signature date. Please don’t hesitate to contact us if your organization
has difficulty completing the questionnaire. Please contact:
Name: Denise Bowen Telephone Number: 404-463-2881
To be completed by Organization Receiving the Award
Subawardee Doing Business as Name: Augusta, Georgia (Augusta-Richmond County) DUNS #: 07-3438418
Address: City: 530 Greene Street, Augusta State GA Zip code 30901 + 4
Primary Place of Grant Performance: City: Augusta State GA Zip code 30901 + 4
Highly Compensated Officers: Please list below your top 5 compensated officers if all three of the following conditions apply:
Yes No
Your organization received 80% or more of its annual gross revenues from federal contracts, subcontracts, loans, grants,
subgrants and cooperative agreements in the preceding fiscal year.
Your organization received $25,000,000 or more in annual gross revenue from federal contracts, subcontracts, loans,
grants, subgrants and cooperative agreements in the preceding fiscal year.
The public does not have access to information about the compensation of the senior executives through periodic reports
filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 USC 78m(a), 78o(d)) or section 6104 of the
Internal Revenue Code of 1986.
Officer 1 Name: Compensation: $
Officer 2 Name: Compensation: $
Officer 3 Name: Compensation: $
Officer 4 Name: Compensation: $
Officer 5 Name: Compensation: $
To be completed by Awarding Agency: Georgia Department of Natural Resources Division: Environmental Protection
Federal Funding Agency Name: U.S. Environmental Protection Agency (U.S. EPA)
Federal Award Number (case, space and character sensitive): C9994458-??-0
Federal Funding Agency Code (4 digits): 6800
Catalog of Federal Domestic Assistance Number (CFDA): 66.460
Prime Recipient DUNS number (9 digits): 146985544
Prime Recipient City and State: Georgia
Program Source (Treasury Account Symbol – TAS for contracts): 68-0102
Activity Code (10 NAICS, NTEE-NTPC code): 924110
Subaward Amount: $? Subaward Date: ? Subaward Number: ?_________
Subaward Project Title (Description): Phase 2 Biota Improvement in an Urban Stream through Aquatic Habitat
Restoration
Targeted Monitoring Plan under 319(h) Grant
for a portion of the
Rocky Creek Watershed
Augusta-Richmond County, Georgia
Submitted by Phinizy Center for Water Sciences
1858 Lock and Dam Road, Augusta, GA, 30906
November, 2016
1
2
Contents
1. Watershed Description and Reason for Monitoring ............................................................................. 3
a. Size (HUC/acres/square miles) of watershed delineation or drainage area to be studied .............. 3
b. Name(s) of stream segment(s) and location descriptions ................................................................ 3
c. General watershed conditions and land use / coverage .................................................................. 3
d. Water quality impairments ............................................................................................................... 3
e. Jurisdictions impacting watershed .................................................................................................... 3
f. Reason(s) for monitoring .................................................................................................................. 4
2. Pollutants or Indicators to be Monitored ............................................................................................. 4
a. Indicators to be Monitored ............................................................................................................... 4
b. Installed BMPs ................................................................................................................................... 4
3. Monitoring Locations ............................................................................................................................ 5
a. Site Selection ..................................................................................................................................... 5
4. Quality Assurance/Quality Control ....................................................................................................... 6
a. Field staff ........................................................................................................................................... 6
b. Methodology and materials .............................................................................................................. 6
5. Training ................................................................................................................................................. 6
a. Names and affiliation of GAEPD staff trainers .................................................................................. 6
b. Names and affiliations of field personnel being trained ................................................................... 6
c. Titles and dates of training workshops ............................................................................................. 6
d. Description of the training sessions .................................................................................................. 6
6. Monitoring Schedule ............................................................................................................................. 7
a. General Schedule .............................................................................................................................. 7
3
1. Watershed Description and Reason for Monitoring
a. Size (HUC/acres/square miles) of watershed delineation or
drainage area to be studied
i. HUC12 - 030601060607
ii. 8107 acres
iii. 12.7 square miles
b. Name(s) of stream segment(s) and location descriptions
i. The impaired reach is 2 miles of Rocky Creek from SR 56 to New Savannah Road
for Fecal Coliform and Biota (Bio F and Bio M) and 6 miles of Rocky Creek from
SR 56 to the Headwaters for just Biota (Bio F and Bio M).
ii. The HUC12 subwatershed is entirely contained within Richmond County.
iii. Targeted sampling will take place in the impaired section and upstream to the
headwaters. The main focus of sampling will be within and downstream of the
BMP
c. General watershed conditions and land use / coverage
i. The area to be monitored is highly urbanized with the following land use
percentages. A large percentage of the development is mature with older
structures and infrastructure. There are large natural areas, especially near the
stream. The overall condition of the watershed is highly impacted by
urbanization.
1. Agricultural 6%
2. Commercial Forestry 0%
3. Urban/Residential 78%
4. Mining/Extraction 1%
5. Forest/Natural Areas 13%
6. Water/Wetlands 2%
7. TOTAL 100%
d. Water quality impairments
i. This monitoring plan addresses the impairment of 8 miles of Rocky Creek for
Biota Impairment (Bio F and Bio M) based on not supporting the criteria
associated with its designated use of fishing
ii. This impairment is described in the following document:
1. 2016 Total Maximum Daily Load Evaluation for Seven Stream Segments
in the Savannah River Basin for Sediment
e. Jurisdictions impacting watershed
i. Augusta-Richmond County Consolidated Government
4
f. Reason(s) for monitoring
i. The primary reason for monitoring is to verify the efficacy of the management
practices to be installed in the overall project
ii. A secondary reason for monitoring is to assess the ability to delist the stream
after BMP implementation
2. Pollutants or Indicators to be Monitored
a. Indicators to be Monitored
i. Turbidity or Total Suspended Solids (TSS)
ii. Stream Stage/discharge
iii. Temperature/Conductivity
iv. Visual Assessment of Stream Conditions
v. Macroinvertebrates
vi. Fish Community
b. Installed BMPs
i. This project will install a series of instream aquatic habitat restoration practices
to overcome historic sedimentation and loss of habitat. These are described
more fully in the proposal document.
5
3. Monitoring Locations
Table 1. Description of 7 monitoring sites
Sample Location # Latitude (N) Longitude (W) Description
1
Milledgeville Road
33°26'53.22” 82° 3'14.74” Just above BMP
2
Wheeless Road
33°26'50.31" 82° 2'46.75" Within BMP
3
Dean’s Bridge Road
33°26'17.30" 82° 1'31.85" Below BMP
a. Site Selection
i. Site selection was based on the ability to monitor the impact of the BMP on the
noted impairments. It is also based on the ability to assess the post BMP
condition of the impairments in the impaired reaches.
Figure 1. Map of target monitoring area including historic monitoring sites (pins), impaired biota reach
(orange), and BMP installation reach (blue).
6
4. Quality Assurance/Quality Control
a. Field staff
i. Damon Mullis and Matt Erickson– Phinizy Center
ii. Augusta-Richmond County Technician
iii. Additional Adopt-A-Stream Volunteers
b. Methodology and materials
i. Standard operating procedures (SOP) will comply with EPD Surface Water
Sampling (EPD-WPMP-2), the Georgia Adopt-A-Stream AAS Biological and
Chemical Manual, and GAEPD/GADNR standard protocols for sampling fish
(GADNR, 2005-Standard operating procedures for conducting biomonitoring on
fish communities in wadeable streams in Georgia) and macroinvertebrates
(GAEPD, 2007-Macroinvertebrate biological assessment of wadeable streams in
Georgia; standard operating procedures)
ii. Only trained personnel will be allowed to collect or process samples.
5. Training
a. Names and affiliation of GAEPD staff trainers
i. Training will be performed by Ruth Mead, a Certified Adopt-A-Stream Trainer
who is the Senior Education Specialist at Phinizy Center.
ii. GAEPD/GADNR training will be conducted through the annual workshop offered
by GADNR
b. Names and affiliations of field personnel being trained
i. Phinizy and Augusta Engineering staff as well as additional Adopt-A-Stream
Volunteers
c. Titles and dates of training workshops
i. GA Adopt-A-Stream Biological and GAEPD/GADNR training will take place on a
date TBD in 2017 for training in the assessment of Bio M and Bio F.
d. Description of the training sessions
i. Sessions will follow the GA Adopt-A-Stream manuals for training in the
designated areas
ii. GADNR training of aquatic insect methodologies is offered once per year
7
6. Monitoring Schedule
a. General Schedule
i. Sampling for fish and aquatic insects will be conducted before, during, and after
BMP installation in order to assess BMP effectiveness. All sampling will be
conducted, at a minimum, during Georgia’s Index Period which is mid-
September through February. Sampling will be conducted, at a minimum, of
one time at each of the three proposed sites (upstream, within, and
downstream of BMP installation) during the mid-September through February
time period, during the pre-BMP, ongoing-BMP, and post-BMP installation
phases. That is, at a minimum, of 3 sites (upstream, within, and downstream),
during each of the 3 phases (pre-BMP, ongoing-BMP, and post-BMP
installation).
ii. All sampling will be conducted according to the GAEPD protocols identified in
Section 4.b.
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Section 319(h) FY21 Grant-Element 12 Phase 2 Biota Implementation in an Urban Stream through Aquatic Habitat
Restoration File Reference: 22 – 014(A)
Department:Engineering
Presenter:
Caption:Motion to approve and Authorize the Engineering & Environmental
Services Department (AE&ESD) to Accept and Receive Federal Financial
Assistance through Section 319(h) Nonpoint Source Implication Grant
Program for Phase 2 Biota improvement in Urban Stream. Also grant
authorization permitting Augusta, GA’s Mayor to sign all documentation
requested by AE&ESD.
Background:The Clean Water Act Section 319(h) Water Quality grant funds support
activities to identify and implement projects for reduction of prioritized
risks and concerns in the community such as source assessment and
control of pollutant of interest load within state listed impaired water
bodies. During 2016, Augusta Engineering Department in partnering with
Phinizy Center for Water Sciences (PCWS) received two (2) separate
Section 319(h) grant federal funds for various activities associated with
surface water quality improvement program. Biota grant targeted activities
include restoring healthy macroinvertebrate and fish through instream
aquatic habitat restoration practices. As a team, AED and PCWS staff
worked to install and manage various management features. Phase 2 will
continue the project.
Analysis:On March 7, 2017 Augusta Commission authorized acceptance of Phase
one of this grant (Section 319(h) FY2016). Phase 2 is continuity of
inprogress activities and completion of certain tasks that delayed due to
Covid-19 pandemic. Phase 2 will continue the project based on Project
Activities. The BMP installation targets a minimum of 0.25 stream miles
(1320 linear feet) along the 6-mile “Headwaters to SR56” reach, with a
spacing of approximately one feature every 50-200 ft. Point Bar
Formation/Stabilization Structure; Pipe Refugia; Widener/Woody
Habitat/Low flow Concentrator; Pool Enhancer; and Cross-Channel Rock
Vane BMPs have been evaluated and chosen based on in-stream
assessment, project cost, ability to install, and six research/restoration
priorities developed by the project team.
Financial Impact:By accepting this grant, AED will receive $117,058 in federal funds. AED
will provide $50,047 matching non-federal funds i) in-kind, and ii)
$61,768 from its stormwater services contractual program.
Alternatives:1). Do not approve and identify alternate mechanism for assessment &
restoration of impaired waterbodies.
Recommendation:Approve and Authorize the Engineering & Environmental Services
Department (AE&ESD) to Accept and Receive Federal Financial
Assistance through Section 319(h) Nonpoint Source Implication Grant
Program for Phase 2 Biota improvement in Urban Stream. Also grant
authorization permitting Augusta, GA’s Mayor to sign all documentation.
requested by AE&ESD.
Funds are Available in
the Following
Accounts:
($117,058) $50,047 in-kind & $61,768 - 581-044320-5211120 Stormwater
Utility Funds
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Speed Hump Request for Gardner Street
Department:Engineering
Presenter:
Caption:Motion to approve the installation of three (3) speed humps along Gardner
Street between Johns Road and Milledge Road per Augusta Speed humps
adopted Policy. Also approve construction funds in amount of $12,000.
Requested by Engineering Normal 0 false false false EN-US X-NONE
X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-
name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-
size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:"";
mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-
pagination:widow-orphan; font-size:10.0pt; font-family:"Times New
Roman",serif;}
Background:The residents of this area requested to go through the speed hump process.
The speed survey showed that the majority of the vehicles traveling along
this street were going 10 mph over the posted speed limit. Approximately
65% (11 of 17) of the property owners adjacent to Gardner Street signed
the required petition. The Augusta Engineering Department will install
three (3) speed humps along Gardner Street per policy standards. Normal
0 false false false EN-US X-NONE X-NONE /* Style Definitions */
table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-
rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-
style-priority:99; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt;
mso-para-margin:0in; mso-pagination:widow-orphan; font-size:10.0pt;
font-family:"Times New Roman",serif;}
Analysis:Based on the current cost of materials and labor, the cost to install one
standard speed hump is $4,000. Per the adopted speed hump policy, three
(3) speed humps will be installed to calm traffic and reduce the overall
vehicle speeds.
Financial Impact:Adequate funds are available, and expenditures of this amount will leave
enough funding in this account for other traffic calming projects
throughout the year.
Alternatives:Do not approve
Recommendation:Approve the installation of three (3) speed humps along Gardner Street
between Johns Road and Milledge Road per Augusta Speed humps
adopted Policy. Also approve construction funds in amount of $12,000.
Requested by Engineering.
Funds are Available in
the Following
Accounts:
Traffic Funds ($12,000.00) 101041710-5319160
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
June 17, 2022
Proposal for: Atlanta Gas Light
Location: City of Augusta CNG Station
3035 Tobacco Rd.
Hephzibah,GA 30185
Hembree Contracting, Inc. recommends the following to update this existing CNG site with a new fuel
management terminal:
To allow more efficient fueling
• Remove existing dispensers 1&2 and replace with new dispensers
• Reuse one 1” gas line at each dispenser cap off other two at both ends
• Re-program priority panel to use only high pressure
• Convert storage vessels to all high pressure
• Replace with new provided dispensers
To provide effective card reading
• Add fuel management terminals next to each dispenser
• Run two conduits from each dispenser to respective fuel management terminal
• Use existing 120v circuit for blower interconnect for power to fuel management terminals
• Use existing Cat5e cable from dispenser to communication panel
• Run four #14’s from fuel management terminal to dispenser for authorize signal
Project Cost: $282,775
Please let me know if you have questions or need more information.
Wes Hembree
(770) 294-6997
wes@hembreecontracting.com
Hembree Contracting, Inc.
208 Main Street / PO Box 384
Bremen, GA 30110
www.hembreecontracting.com
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Tobacco Road Compressed Natural Gas (CNG) Fueling Station Dispensers Replacement
Department:Engineering
Presenter:
Caption:Motion to approve a $282,775.00 urgent replacement by Hembree
Contracting, Inc of the inoperative CNG dispensers located at 3035
Tobacco Road. Requested by Engineering
Background:The Tobacco Road and Scott Nixon Memorial Drive CNG stations are a
major agreement component of Augusta’s Solid Waste & Recyclables
Collection Services contract with its haulers. During the past two years,
Tobacco Road CNG station has been plagued with equipment failures that
has repeatedly caused lengthy dispensers’ downtime. The downtimes are
due mainly to hard-to-find outdated electronics and mechanical
parts. These outages deny the haulers the agreed to service of providing
them reliable CNG dispensing support within a reasonable distance. When
you add the haulers’ additional operating cost to Tobacco Road station’s
outages for minor maintenance adjustments or needing to engage the
system resets the economic impact supporting replacing the dispensers
goes even higher.
Analysis:The number of equipment components failure and repair service calls have
increased, and the intervals between repair service requests has decreased
for the Tobacco Road CNG station. Along with the increase in service
calls is an increase in the cost for maintaining the station. Whenever the
Tobacco Road station is out of service, it is a twenty (20) mile round trip
drive from there to the Scott Nixon station. The refueling drive causes
collection delays for the haulers and an excessive nonproductive use of
fuel. Depending on their daily route some of the hauler’s vehicles must
refuel two times a day at the Tobacco Road station.
Financial Impact:Funds in the amount of $282,775 is available in Environmental Services
Account 541 044210 5422510
Alternatives:Do not approve and risk not providing reliable CNG dispensing support
within a reasonable distance.
Recommendation:Approve a $282,775.00 urgent replacement by Hembree Contracting, Inc
of the inoperative CNG dispensers located at 3035 Tobacco Road.
($282,775) 541-5319130 – Landfill Operations Fund 541 044210 5422510
Funds are Available in
the Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
8/30/2022 1:15 PM
Utilize On-Call Professional Services for Traffic Signal Permitting and Design at Gordon Hwy and Haynes Station
Dr. RFP 19-241
Department:Engineering
Presenter:
Caption:Motion to approve funding for on-call professional engineering services
for traffic signal analysis, design, and permitting at Gordon Hwy and
Haynes Station Drive in the amount of $142,400.00 to Infrastructure
Systems Management, LLC (ISM) per RFP 19-241. Requested by
Engineering
Background:The areas surrounding the intersection of Gordon Hwy and Haynes Station
Drive have grown substantially in recent years resulting in traffic issues
from both an operational and safety standpoint. The Augusta Engineering
and Environmental Services Department would like to pursue upgrading
this intersection to address the current traffic needs by the installation of a
traffic signal through the Georgia Department of Transportation (GDOT).
Analysis:This on-call contract will consist of several tasks including data collection,
existing condition analysis, future year analysis, signal warrant analysis,
GDOT ICE analysis, signal design, and permitting. Because Gordon Hwy
is a state route, GDOT’s policies and standards must be maintained
throughout the process. The analysis, design, and permitting phases will be
completed in accordance with GDOT’s various manuals and policies.
Financial Impact:Funds are available in the amount of $142,400.00 in the Traffic Mitigation
Traffic Signal Imp/Gordon Hwy account.
Alternatives:Do not approve and find alternate process for completing signal design.
Recommendation:Approve contract award to ISM for on-call services in the amount of
$142,400.00 for the analysis, design, and permitting of a traffic signal at
Gordon Hwy and Haynes Station Drive.
Funds are Available in
the Following
Accounts:
($142,400.00) 160041710-5212115 – Traffic Mitigation Fund
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission