HomeMy WebLinkAbout2021-08-11 Meeting Minutes Engineering Services Committee Meeting Commission Chamber - 8/11/2021
ATTENDANCE:
Present: Hons. Hardie Davis, Jr., Mayor; Garrett, Chairman; Hasan,
Vice Chairman; Johnson and McKnight, members.
ENGINEERING SERVICES
1. Presentation by Mr. Woodrow Fryer regarding inadequate trash service and
untimely supplies delivered.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made
By
Seconded
By
Motion
Result
It was the consensus of the
committee that this item be received
as information without objection.
2. Storm Water flooding at Fountainhead West Condominiums. Item
Action:
Approved
Motions
Motion
Type Motion Text Made
By
Seconded
By
Motion
Result
It was the consensus of the
committee that this item be received
as information without objection.
3. Approve Supplement funding (SA1) for Engineering Phase of Design
Consultant Contract to Clark Patterson Lee (CPL) in the amount of
$60,320.77 for the 6th Street Improvements as requested by AED. RFP 18-
279.
Item
Action:
Approved
Motions
Motion
Type
Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Jordan Johnson
Commissioner
Brandon Garrett Passes
4. Approve Task Order Three funding for Drainage System Assessment,
Verification and Drainage Improvements Engineering Services Agreement to
Constantine Engineering (Constantine) in the amount of $226,000.00 for
Overton Road Drainage Subbasin as requested by the AED. RFQ 19-148.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Jordan Johnson
Commissioner
Brandon Garrett Passes
5. Approve Supplement funding (SA1) for Final Engineering Phase of Design
Consultant Contract to Civil Services, Inc. in the amount of $113,987.12 for
Highland Avenue Bridge over CSX Railroad (Bridge Repair and Restoration)
as requested by AED. RFQ 19-242.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Jordan Johnson
Commissioner
Brandon Garrett Passes
6. Discuss what needs to be done to get our city-owned properties such as
medians, parks, public buildings, Riverwalk, and entry ways maintained to
highest standard. (Requested by Commissioner Brandon Garrett)
Item
Action:
None
Motions
Motion
Type Motion Text Made
By
Seconded
By
Motion
Result
It was the consensus of the
committee to receive this item as
information without objection.
7. Motion to approve the minutes of the Engineering Services Committee held
on July 27, 2021.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Jordan Johnson
Commissioner
Brandon Garrett Passes
www.augustaga.gov
Engineering Services Committee Meeting
8/11/2021 1:20 PM
Attendance 8/10/21
Department:
Presenter:
Caption:
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
AGENDA ITEM REQUEST FORM
Commission meetings: First and third Tuesdays of each month - 2:00 p.m.
Committee meetings: Second and last Tuesdays of each month - 1:00 p.m.
Commission/Committee: (Please check one and insert meeting date)
Commission Date of Meeting
Public Safety Committee Date of Meeting
Public Services Committee Date of Meeting
Administrative Services Committee Date of Meeting
Engineering Services Committee Date of Meeting
Finance Committee Date of Meeting
Contact Information for Individual/Presenter Making the Request:
Name: lr)ood Fr
Address:
Telephone Number:
Fax Number:
E-Mail Address:
Caption/Topic of Discussion to be placed on the Agenda:
^d
Please send this request form to the following address:
Ms. Lena J. Bonner
Clerk of Commission
Suite 220 Municipal Building
535 Telfair Street
Augusta, GA 30901
Telephone Number: 706-821-1820
Fax Number: 706-821-1838
E-Mail Address: nmorawski@augustaga.gov
Requests may be faxed, e-mailed or delivered in person and must be received in the Clerk's
Office no later than 9:00 a.m. on the Thursday preceding the Commission and Committee
meetings of the following week. A five-minute time limit will be allowed for presentations.
Engineering Services Committee Meeting
8/11/2021 1:20 PM
Woodrow Fryer
Department:
Presenter:
Caption:Presentation by Mr. Woodrow Fryer regarding inadequate trash
service and untimely supplies delivered.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
8/11/2021 1:20 PM
FOUNTAINHEAD WEST CONDOMINIUMS
Department:
Presenter:FOUNTAINHEAD WEST CONDOMINIUMS ASSOCIATION
Caption:Storm Water flooding at Fountainhead West Condominiums.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
3011 Sutton Gate Dr.
Suite 130
Suwanee, GA 30024
770.831.9000 TEL
CPLTeam.com
July 15st, 2021
Dr. Hameed Malik, P.E.
Engineering Department, City of Augusta
452 Walker Street, Suite 110
Augusta, GA 30901
VIA EMAIL
RE: RCO7-001220 (GDOT P.I. #:0011421) 6th Street from Taylor Street to Reynolds Street
Supplemental #1: Additional Design and Coordination for On-Street Parking between
Telfair Street and Ellis Street
Dear Dr. Malik:
CPL Architects, Engineers, Landscape Architect, and Surveyor, D.P.C. (CPL) has agreed
to design revisions and construction plan additions outside the original scope of work for
the above referenced project. These changes were discussed and agreed upon by
representatives of both the City of Augusta and CPL during an on-site meeting on June
24th, 2021. A summary of these changes can be found in the minutes from that meeting.
Below is a description of the additional scope and fee for your review and approval.
Design
While coordinating with the city and utility companies, it was determined that on-street
parking that was originally removed in the approved concept report would be retained as
part of the 6th Street project. The parallel parking will be incorporated on both sides of 6th
Street from Telfair Street to Greene Street and Greene Street to Ellis Street; bulb outs will
be incorporated to maintain consistency and will use a 5’ sidewalk with 2’ buffers. In
addition to the roadway cross-sectional changes, it was requested that lighting be placed
on the backside of the sidewalk that will require relocating the sidewalk to avoid
purchasing right-of-way. These changes from approximately STA 115+00 (Telfair St) to
approximately STA 124+50 (Ellis St) will require additional redesign and analysis to
prevent ponding and ensure adequate drainage of the additional impervious surfaces.
Additional Fee
The CPL design team will perform the above referenced work accordingly with the
following fee being requested:
• Total Additional Hours: 566 hours
• Total Additional Fee: $60,320.77
*Please see the attached Itemized Breakdown per GDOT Cost Proposal
6th Street Supplemental #1
July 15th, 2021
Page 2 of 2
Schedule Revision
In addition to the fee revision, the CPL design team is requesting an additional 7 weeks
in the project schedule to perform the necessary design rework, quality assurance, and
quality control tasks to successfully delivery a quality project.
TERMS AND CONDITIONS:
This agreement shall be administered in accordance with the Terms and Conditions listed
in the existing contract signed April 2nd, 2019.
This document together with the exhibits and/or appendices identified herein constitutes
the entire understanding between the City of Augusta and CPL with respect to the work
to be performed by CPL for the benefit of the City of Augusta and may only be modified
in writing signed by both parties. Please sign and return the enclosed copy of this letter
if this document satisfactorily sets forth the understanding of the arrangement between
the City of Augusta and CPL. Receipt of the signed agreement will serve as our notice
to proceed. This Contract will be open for acceptance for sixty days from the date of this
letter.
We look forward to working with you on this project.
Sincerely,
CPL ARCHITECTURE ENGINEERING & PLANNING
Kevin J. McOmber, PE
Senior Vice President
cc: file
Accepted this __________________ day of _______________, 2021.
By: __________________________________ Title: ___________________________
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project is authorized to CPB#371-041110-T15041220 to approve
supplement funding for Engineering Design Phase to Clark Patterson Lee
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
TIA Design 228,350$
TIA FUNDS 24,975$
TIA FUNDS 150,000$
TIA FUNDS 60,320$
463,645$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Honorable Hardie Davis, Mayor
CAPITAL PROJECT BUDGET
CPB#371-041110-T15041220
6th Street Improvements
(RFP #18-279)
in the amount of $60,320.77 for the 6th Street Improvements project.
Funding is available in the TIA project budget:
7/30/2021
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
CPB#371-041110-T15041220
6th Street Improvements
(RFP #18-279)
CPB AMOUNT CPB New
SOURCE OF FUNDS CPB ADDITION CPB
TIA Project
371-041110/5212115-T15041220 ($403,325) ($403,325)
TIA FUNDS
371-041110/5212115-T15041220 $0 ($60,320) ($60,320)
TOTAL SOURCES: ($403,325)($60,320)($463,645)
USE OF FUNDS
ENGINEERING
371-041110-5212115/T15041220 $403,325 $403,325
TIA FUNDS
371-041110-5212115/T15041220 $0 $60,320 $60,320
TOTAL USES: $403,325 $60,320 $463,645
7/30/2021
(SA1 – For changes greater than $25,000) July 2021
ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
Augusta Richmond County Project Number(s): 371-041110-T15041220
GDOT Number (s):
RC07-001220
PI 0011421
Supplemental Agreement Number: 1
Purchase Order Number: 19ENG744
WHEREAS, We, Clark Patterson Lee (CPL), Consultant, entered into a contract with Augusta-
Richmond County on April 2, 2019 for engineering design services associated with the improvements
to 6th Street Improvements. Project RC07-001220, PI 0011421, and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered
by the scope of the original contract, we desire to submit the following Supplemental Agreement
to-wit:
Additional Design and Coordination for On-Street Parking between Telfair Street and Ellis Street
It is agreed that as a result of the above described modifications the contract amount is increased
by $60,320.77 from $228,325.00 to a new total of $288,645.77.
Any modifications to submittal dates shall be as identified in the attached proposal. This agreement
in no way modifies or changes the original contract of which it becomes a part, except as specifically
stated herein.
NOW, THEREFORE, We, Clark Patterson Lee (CPL) Consultant, hereby agree to said Supplemental
Agreement consisting of the above mentioned item, and agree that this Supplemental Agreement
is hereby made a part of the original contract to be performed under the specifications thereof, and
that the original contract is in full force and effect, except insofar as it might be modified by this
Supplemental Agreement.
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY Clark Patterson Lee (CPL).
AUGUSTA, GEORGIA
Hardie Davis, Mayor
Approved Date: Approved: Date:
[ATTACHED CORPORATE SEAL]
ATTEST: ATTEST:
Title:
Title:
Engineering Services Committee Meeting
8/11/2021 1:20 PM
6th Street Improvements Project
Department:Engineering Dept.
Presenter:Hammed Malik
Caption:Approve Supplement funding (SA1) for Engineering Phase of
Design Consultant Contract to Clark Patterson Lee (CPL) in the
amount of $60,320.77 for the 6th Street Improvements as
requested by AED. RFP 18-279.
Background:The 6th Street Improvements is a project from the “Approved
Investment List” of TIA that was approved by voters of the
CSRA in July 31, 2012 referendum. The 6th Street is a Band 2
project. The project improvements consist of improving roadway
safety by resurfacing, reconstructing the existing curb and gutter,
replacing sidewalks and improving the storm water system. The
project will improve pedestrian safety at intersections with new
high visibility crosswalks and organize the existing parallel
parking. On April 2, 2019, commission approved the award of
Engineering Design Phase Services to CPL. Design tasks are in
progress.
Analysis:Project is under design. On April 2, 2019 Augusta Commission
approved funding for concept and design phases tasks. Review
of preliminary design warranted design modification to
accommodate utilities installation and maximize street parking.
Supplemental Funds are needed to complete these tasks.
Financial Impact:Funds are available in Project TIA funds.
Alternatives:No Alternative proposed.
Recommendation:Approve Supplement funding (SA1) for Engineering Phase of
Design Consultant Contract to Clark Patterson Lee (CPL) in the
amount of $60,320.77 for the 6th Street Improvements as
requested by AED. RFP 18-279.
Funds are
Available in the
Following
Accounts:
($60,320.77) 371-041110-52.12115 / T15041220-52.12115 TIA
Funds
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
July 15, 2021
Hameed Malik, PhD, PE, Director
Augusta Engineering Department
452 Walker St
Augusta, GA 30901
RE: Morningside Drive/Overton Road Stormwater Infrastructure
Improvements
Dear Dr. Malik:
Constantine is pleased to submit this Task Order proposal for professional
engineering services to assist Augusta Engineering Department with preliminary
design, final design, permitting, easement acquisition, bidding, and construction
administration services for the Morningside Drive and Overton Road
Infrastructure improvements at the Augusta Country Club.
Based on our stormwater analysis, discussions with you and our field verification
efforts we understand that the project will consist of approximately 1,700 linear
feet of 72-inch storm sewer, interconnections of various sizes with existing
stormwater infrastructure on the Augusta Country Club, and related
appurtenances. Based on our understanding of the project we estimate the
construction cost to be approximately $1.9M.
We appreciate this opportunity of responding to your needs and look forward to
continuing our professional partnership with Augusta Engineering Department.
If you have any questions regarding the Task Order, please do not hesitate to give
me a call on my cell phone at 864-884-4497.
Sincerely,
Jeffrey L. Duplantis, MS, PE, PMP
Senior Project Controls Manager
CONSTANTINE ENGINEERING
608 Broad St
Suite 2
Augusta, GA 30901
706.664.0664
www.tcgeng.com
CONSTANTINE ENGINEERING
608 BROAD STREET, SUITE 2
AUGUSTA GA, 30901
PH: 706-664-0664
WWW.TCGENG.COM
Constantine Task Order Proposal Morningside Drive/Overton Road Drainage System Improvements 1
TASK ORDER
THIS TASK ORDER IS ISSUED PURSUANT TO THE AGREEMENT FOR CONSULTING ENGINEERING SERVICES
BETWEEN THE CITY OF AUGUSTA ENGINEERING DEPARTMENT AND CONSTANTINE ENGINEERING, WHICH
IS INCORPORATED HEREIN BY THIS REFERENCE, WITH RESPECT TO
SCOPE OF SERVICES
FOR PROFESSIONAL ENGINEERING SERVICES FOR THE MORNINGSIDE
DRIVE AND OVERTON ROAD DRAINAGE SYSTEM STORMWATER
INFRASTRUCTURE IMPROVEMENTS PROJECT
A. PURPOSE:
The purpose of this Scope of Services is to authorize and direct CONSULTANT (Constantine Engineering) to
provide professional services relating to the design of the proposed stormwater infrastructure improvements for
the Morningside Drive and Overton Road drainage systems as outlined in our Technical Memorandum titled
“Stormwater Capacity Analysis at Overton Road”.
B. SCOPE OF SERVICES
The scope of services for this project includes the following:
Task 1 - Preliminary Design
Preliminary Design will include services related to establishing the storm sewer route, storm sewer interconnection
requirements, preparation of a preliminary cost estimate, and development of a technical memorandum. The
following services are included:
a. Conduct a kickoff meeting and a review meeting; with preparation of meeting minutes for each meeting.
b. Perform a detailed review of available reports, studies, and other pertinent information.
c. Perform a field recon for storm sewer routing. Identify topographic ground elevations, existing utility
locations, and other physical feature information for design purposes.
d. Perform Subsurface Utility Exploration to identify existing utility conflicts.
e. Perform Gardner Street Hydrology Evaluation.
f. Establish final design criteria.
g. Research available adjacent property information and other relevant data. Confirm storm sewer routing.
Consideration will be given to available easements, rock, utility conflicts, permitting difficulty, and other
pertinent factors. Rights-of-way and potential easement requirements will be identified for the proposed
route.
h. Prepare preliminary schematics of the proposed route and right-of-way exhibits.
i. Prepare preliminary hydraulic calculations for the storm sewer.
CONSTANTINE ENGINEERING
608 BROAD STREET, SUITE 2
AUGUSTA GA, 30901
PH: 706-664-0664
WWW.TCGENG.COM
Constantine Task Order Proposal Morningside Drive/Overton Road Drainage System Improvements 2
j. Prepare a preliminary opinion of probable project costs and update the schedule with project milestones
and target dates.
k. Prepare a technical memorandum summarizing our findings, conclusions, and recommendations with
suitable exhibits.
l. Monitor project progress and budget, facilitate QA/QC of work products, communicate with AED Project
Manager, and provide project updates.
Task 2 - Final Design
Design and Engineering Services will include services related to preparing construction drawings and technical
specifications setting forth the size and character of the project as well as the requirements for its installation. The
following services are included:
a. Conduct a kick-off meeting to further define the project and two (60% and 90%) design review/progress
meetings.
b. Coordinate surveying of the proposed storm sewer route including obtaining topographic information,
locating property boundaries, existing rights-of-way, and locating existing above ground and underground
utilities.
c. Coordinate Subsurface Utility Exploration to determine existing utility conflicts.
d. Coordinate a geotechnical investigation of the proposed storm sewer route to obtain information regarding
the potential to encounter rock.
e. Select final design criteria and materials.
f. Prepare construction drawings and technical specifications.
g. Perform QA/QC of the construction drawings and technical specifications by Senior Engineer not
involved in the project.
h. Update the preliminary opinion of probable cost and preliminary schedule at 60% design, 90% design,
and upon completion of final design.
Task 3 - Easement Assistance
Easement Assistance will include preparation of up to ten (10) right-of-way exhibits.
Task 4 – Bidding Assistance
Bidding Services will include developing a bid form and related bid documents as requested, assisting
Owner in obtaining bids, conducting a Prebid meeting with AED staff, addressing technical questions
raised by prospective bidders and suppliers, issuance of all instructions and addenda, and
recommendation of contract award. Owner will assemble and distribute bidding documents to
contractors and will assemble contract documents for execution.
CONSTANTINE ENGINEERING
608 BROAD STREET, SUITE 2
AUGUSTA GA, 30901
PH: 706-664-0664
WWW.TCGENG.COM
Constantine Task Order Proposal Morningside Drive/Overton Road Drainage System Improvements 3
Task 5 – Permitting Services
Permitting Services will include advising AED on what permits may be required for the project, preparation of a
Notice of Intent to obtain a Stormwater Permit from Georgia EPD, preparation of a “GAEPD Construction Permit”
application package for submittal and assisting with obtaining said permit, preparation of highway encroachment
permit applications, and coordinating wetlands delineation and preparation of a wetlands permit application for
the Army Corps of Engineers.
Task 6 – Construction Administration Services
Construction Administration Services can be negotiated at a later date.
C. COMPENSATION
For the services rendered by our principals and employees assigned to this effort, we propose a lump sum fee of
two hundred twenty-six thousand dollars ($226,000) including reimbursable expenses. Please see our fee estimate
breakdown in Table 1 below.
We have also attached an Opinion of Probable Cost for the project based on our current knowledge and
understanding. The estimate includes construction costs with contingencies, engineering fees, construction
services fees and estimated costs for technical, right-of-way and land acquisition, and administrative/legal
services.
We would anticipate that surveying, subsurface utility exploration, wetlands permitting, and construction material
testing services may be needed during the project. These are services we do not customarily provide and therefore
are not included in this proposal. Our suggested budgets for these services fall under Technical Services and
Permitting included in the project cost opinion attached. We will, during the design phase, advise you as to the
need for these services.
Professional fees and reimbursable expenses will be invoiced monthly based upon actual work performed and
expenses incurred. Payments will be considered due upon receipt of invoices.
TABLE 1
LUMP SUM FEE ESTIMATE
Description Fee Estimate
Preliminary Engineering $55,000
Final Design $140,000
Easement Assistance $5,000
Permitting $15,000
Bidding $8,000
Expenses $3,000
TOTAL ESTIMATED FEE $226,000
CONSTANTINE ENGINEERING
608 BROAD STREET, SUITE 2
AUGUSTA GA, 30901
PH: 706-664-0664
WWW.TCGENG.COM
Constantine Task Order Proposal Morningside Drive/Overton Road Drainage System Improvements 4
D. SCHEDULE
We expect to start the Preliminary Design phase promptly after receipt of your acceptance of this proposal and
will endeavor to complete both preliminary and final design phases within 9 months. If this proposal meets with
your approval, please sign the enclosed copy of this letter in the space provided below and return for our records.
E. AUTHORIZED REPRESENTATIVES
The authorized representatives designated below are authorized to act with respect to this Task Order.
Communication between the parties shall be through the Authorized Representatives:
For CLIENT
For CONSULTANT
Name: Dr. Hameed Malik, PhD, PE
Director
Name: Jeffrey L. Duplantis, MS, P.E., PMP
Sr. Project Controls Manager
Address: Augusta Engineering Department
452 Walker Street
Augusta GA 30901
Address: 608 Broad Street, Suite 2
Augusta GA, 30901
Telephone: 706-796-5040 Telephone: 706-664-0664
Augusta-Richmond County, Georgia
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
144,180$
36,860$
Special 1% Sales Tax, Phase VI 42,120$
25,000$
Stormwater Utility Program 226,000$
474,160$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
CPB#581-044320-5211120
Honorable Hardie Davis, Jr., Mayor
CAPITAL PROJECT BUDGET
STORMWATER UTILITY Program (Constantine)
RFQ 19-148
Stormwater Utility Program
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia
that the following Capital Project Budget is hereby adopted:
Section 1: This project is authorized to CPB# 581-044320-5211120 Supplemental Agreement Number Three to
Constantine Engineering in the amount of $226,000 for the Stormwater Utility Fee Implementation Project.
This request is for Task Order Three Storm System Inventory, Basin Analysis and Data Review. Funding
is available through Stormwater Utility Program.
Stormwater Utility Program
Stormwater Utility Program
SUPPLEMENTAL AGREEMENT NUMBER THREE
1 of 2 7.15.2021
Augusta-Richmond County, Georgia CPB#581-044320-5211120
CAPITAL PROJECT BUDGET
CPB AMOUNT ADDITION NEW
SOURCE OF FUNDS CPB REQUEST CPB
Stormwater Utility
581-044320-5211120 ($144,180)($144,180)
SPLOST, PHASE VI
328-041110-211828702 ($36,860)($36,860)
SPLOST, PHASE VI
328-041110-211828501 ($42,120)($42,120)
Stormwater Utility
581-044320-5211120 ($25,000)($226,000)($251,000)
TOTAL SOURCES:($248,160)($226,000)($474,160)
USE OF FUNDS
ENGINEERING
328-041110-5212115-211828702 $36,860 $36,860
ENGINEERING
328-041110-5212115-211828501 $42,120 $42,120
Engineering
581-044320-5211120 $169,180 $226,000 $395,180
TOTAL USES:$248,160 $226,000 $474,160
2 of 2 7.15.2021
Engineering Services Committee Meeting
8/11/2021 1:20 PM
Engineering Services for Drainage Study, Stormwater System Assessment and Drainage Improvement
Projects – RFQ 19-148 Constantine Engineering – Task Order Three
Department:Engineering
Presenter:
Caption:Approve Task Order Three funding for Drainage System
Assessment, Verification and Drainage Improvements
Engineering Services Agreement to Constantine Engineering
(Constantine) in the amount of $226,000.00 for Overton Road
Drainage Subbasin as requested by the AED. RFQ 19-148.
Background:Stormwater conveyance concerns are wide spread and
particularly in older developed ares. The objective of Drainage
Improvements projects in the area experiencing localized
flooding is to provide infrastructure improvements that mitigate
the flooding conditions in these areas. The overall need for this
project is to upgrade the infrastructure system within the
designated area including roadway improvements, resurfacing,
or both, adding of curbs, gutters, sidewalks, and drainage
improvements. On May 7, 2019 Commission approved award
of Engineering Services for Drainage Study, Stormwater
System Assessment and Drainage Improvement Projects
Engineering Services Agreement to four qualified firms
including Constantine. Work is released as Phased Task Order.
Assessment and concept is completed and project is ready for
design phase.
Analysis:Drainage at and around Overton Road was assessed under Task
Order one. Generated information was used to develop drainage
system possible layout alternatives (Task Order 2). Task Order 3
is for Design phase services. Services are provided by
Constantine.
Financial Impact:Stormwater Services Program Funds.
Alternatives:1). Do not approve and find alternative to address county-wide
storm conveyance system improvements needs.
Recommendation:Approve Task Order Three funding for Drainage System
Assessment, Verification and Drainage Improvements
Engineering Services Agreement to Constantine Engineering
(Constantine) in the amount of $226,000.00 for Overton Road
Drainage Subbasin as requested by the AED. RFQ 19-148.
Funds are
Available in the
Following
Accounts:
581-044320-5211120 - Stormwater Services Program Funds
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby adopted:
Section 1: This project is set up and authorized to CPB#371-041110
to approve supplemental funding and award Preliminary Engineering Phase of Design Consultant Contract
in the amount of $113,987.12 to Civil Services, Inc. for the Highland Avenue Bridge Repair
and Restoration over CSX Rainroad Funding is in the project TIA funds.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
TIA Discretionary 19,390$
TIA Funds 201,294$
TIA Funds Supplement 113,987$
334,671$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
CPB#371-041110
Honorable Hardie Davis, Jr., Mayor
CAPITAL PROJECT BUDGET
Highland Avenue over CSX Railroad-Bridge Repair and Restoration
1 of 4 8/2/2021
Augusta-Richmond County, Georgia CPB#371-041110
CAPITAL PROJECT BUDGET
Highland Avenue over CSX Railroad-Bridge Repair and Restoration
CPB AMOUNT CPB NEW
SOURCE OF FUNDS CPB ADDITION CPB
TIA DISCRETIONARY (19,390)$ -$ (19,390)$
235-041110-5212115
TIA FUNDS (201,294)$ (113,987)$ (315,281)$
371-041110-5212115
T20040118-5212115
-$
-$
TOTAL SOURCES:(220,684)$ (113,987)$ (334,671)$
USE OF FUNDS
TIA DISCRETIONARY
235-041110-5212115 19,390$ -$ 19,390$
TIA FUNDS 201,294$ 113,987$ 315,281$
371-041110-5212115
T20040118-5212115 -$
TOTAL USES:220,684$ 113,987$ 334,671$
2 of 4 8/2/2021
to approve supplemental funding and award Preliminary Engineering Phase of Design Consultant Contract
3 of 4 8/2/2021
4 of 4 8/2/2021
Georgia Department of Transportation
COST PROPOSAL
Proj. No.:RFQ 19-242 Project:Design and Engineering Services for Highland Ave. Bridge Repair and Restoration over CSX Railroad - Task Order 2
PI No.:000000 County:Richmond Master Contract:contract number
Prime:Civil Services, Inc.Contract Type:Cost Plus Fixed Fee Contract Expiration:
Date:15-Jul-2021 Fixed Fee %:10%Task Order No:2
Cost Summary
By Phase / Discipline / Firm ˅ Formula Pulls Firm Name from each Discipline Tab
Total Fee Civil Services,
Inc.
Civil Services,
Inc.
Sub Firm Name
1
Civil Services,
Inc.
Sub Firm Name
2
Sub Firm Name
3
Sub Firm Name
3
Sub Firm Name
4
Sub Firm Name
5
Sub Firm Name
6
Enter discipline
provided by firm >>Project
Management
Roadway
Design
Design Support Bridge Design Traffic
Operations
Environmental Environmental Survey Aerial
Mapping
Utilities
Investigation
(SUE)
Totals 113,987.12$ 20,204.08$ 21,197.33$ -$ 72,585.71$ -$ -$ -$ -$ -$ -$
1 Concept Development -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
2 Database Preparation -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
3 Environmental Document -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
4 Preliminary Plans -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
5 Right of Way Plans -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
6 Final Plans 113,987.12$ 20,204.08$ 21,197.33$ -$ 72,585.71$ -$ -$ -$ -$ -$
7 Construction Services -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
8 Special Studies -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
9 Public Involvement -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Fixed Fee 10,351.55$ 1,834.80$ 1,925.00$ -$ 6,591.75$ -$ -$ -$ -$ -$
Tab Name>>PM1 Rd1 DS1 Br1 Trf1 Env1 Env2 Srv1 Map1 SUE1
DBE (Yes or No)Yes Yes No Yes No No No No No No
DBE Participation 113,987.12$ 20,204.08$ 21,197.33$ -$ 72,585.71$ -$ -$ -$ -$ -$ -$
DBE %100.0%17.7%18.6%63.7%
Contract DBE Goal %0.0%
1-Jan-2000
Phase Phase Description
Include a column for each discipline tab included in the proposal.
Ensure formulas link to the corresponding discipline tab.
7/30/2021 12:19 PM
CSI_Highland Ave Cost Proposal_Phase 2 Cost Summary Page 1 of 2
Georgia Department of Transportation
COST PROPOSAL
Proj. No.:RFQ 19-242 Project:Design and Engineering Services for Highland Ave. Bridge Repair and Restoration over CSX Railroad - Task Order 2
PI No.:000000 County:Richmond Master Contract:contract number
Prime:Civil Services, Inc.Contract Type:Cost Plus Fixed Fee Contract Expiration:
Date:15-Jul-2021 Fixed Fee %:10%Task Order No:2
1-Jan-2000
Civil Services,
Inc.
Civil Services,
Inc.
Sub Firm Name
1
Civil Services,
Inc.
Sub Firm Name
2
Sub Firm Name
3
Sub Firm Name
3
Sub Firm Name
4
Sub Firm Name
5
Sub Firm Name
6
Project
Management
Roadway
Design
Design Support Bridge Design Traffic
Operations
Environmental Environmental Survey Aerial
Mapping
Utilities
Investigation
(SUE)
Totals 746 88 144 - 514 - - - - - -
1 Concept Development - - - - - - - - - -
2 Database Preparation - - - - - - - - - -
3 Environmental Document - - - - - - - - - -
4 Preliminary Plans - - - - - - - - - -
5 Right of Way Plans - - - - - - - - - -
6 Final Plans 746 88 144 - 514 - - - - -
7 Construction Services - - - - - - - - - -
8 Special Studies - - - - - - - - - -
9 Public Involvement - - - - - - - - - -
By Phase / Firm
Phase Phase Description Total Hours
Hours Summary
7/30/2021 12:19 PM
CSI_Highland Ave Cost Proposal_Phase 2 Cost Summary Page 2 of 2
(SA1 – For changes greater than $25,000) July 2021
ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
Augusta Richmond County Project Number(s): 371-041110-T20040118
GDOT Number (s):
RC07-000118
PI 0011390
Supplemental Agreement Number: 1
Purchase Order Number: 20ENG839
WHEREAS, We, Civil Services, Inc., Consultant, entered into a contract with Augusta-Richmond
County on December 3, 2019 for engineering design services associated with the improvements to
Highland Avenue over CSX Railroad-Bridge Repair & Restoration Project RC07-000118, PI 0011390,
and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered
by the scope of the original contract, we desire to submit the following Supplemental Agreement
to-wit:
For the design and engineering services for concept development, preliminary plans, and ROW
plans and special studies
It is agreed that as a result of the above described modifications the contract amount is increased
by $113,987.12 from $220,684.00 to a new total of $334,671.12.
Any modifications to submittal dates shall be as identified in the attached proposal. This agreement
in no way modifies or changes the original contract of which it becomes a part, except as specifically
stated herein.
NOW, THEREFORE, We, Civil Services, Inc., Consultants, hereby agree to said Supplemental
Agreement consisting of the above mentioned item, and agree that this Supplemental Agreement
is hereby made a part of the original contract to be performed under the specifications thereof, and
that the original contract is in full force and effect, except insofar as it might be modified by this
Supplemental Agreement.
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY Civil Services, Inc.
AUGUSTA, GEORGIA
Hardie Davis, Mayor
Approved Date: Approved: Date:
[ATTACHED CORPORATE SEAL]
ATTEST: ATTEST:
Title:
Title:
Engineering Services Committee Meeting
8/11/2021 1:20 PM
Highland Avenue over CSX Railroad-Bridge Repair and Restoration Design and Engineering Services
TIA Project RC07-000118/PI#0011390 RFQ Item#19-242
Department:Engineering
Presenter:
Caption:Approve Supplement funding (SA1) for Final Engineering Phase
of Design Consultant Contract to Civil Services, Inc. in the
amount of $113,987.12 for Highland Avenue Bridge over CSX
Railroad (Bridge Repair and Restoration) as requested by AED.
RFQ 19-242.
Background:The Highland Avenue Bridge over CSX Railroad (Bridge Repair
and Restoration) is a project from the "Approved Investment
List" of TIA that was approved by voters of the CSRA in July
31, 2012 referendum. The Highland Avenue Bridge is a Band 3
project. Augusta Commission approved existing condition
assessment funding on December 3, 2019. Existing condition
assessment is completed and accordingly Civil Services, INC.
(CSI) has prepared bridge repair/restoration scope and fee to
commence engineering design phase.
Analysis:Project is under design. AED adopted a phased design approach
and on December 3, 2019 Augusta Commission approved
funding for bridge condition assessment and concept phase
initial tasks. Bridge structure condition assessment and concept
tasks are complete and now there is need of completing final
design & construction plans. Supplemental Funds are needed to
complete these selected tasks.
Financial Impact:Funds are available in the amount of $113,987.12 TIA
Discretionary fund.
Alternatives:Project is under design. AED adopted a phased design approach
and on December 3, 2019 Augusta Commission approved
funding for bridge condition assessment and concept phase
initial tasks. Bridge structure condition assessment and concept
tasks are complete and now there is need of completing final
design & construction plans. Supplemental Funds are needed to
complete these selected tasks.
Recommendation:Approve Supplement funding (SA1) for Final Engineering Phase
of Design Consultant Contract to Civil Services, Inc. in the
amount of $113,987.12 for Highland Avenue Bridge over CSX
Railroad (Bridge Repair and Restoration) as requested by AED.
RFQ 19-242.
Funds are
Available in the
Following
Accounts:
($113,987.12) 235-041110-52.12115 / T20040118-52.12115
TIA Discretionary Funds
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
8/11/2021 1:20 PM
Maintenance city right-of-ways, parks,medians
Department:
Presenter:Commissioner Brandon Garrett
Caption:Discuss what needs to be done to get our city-owned properties
such as medians, parks, public buildings, Riverwalk, and entry
ways maintained to highest standard. (Requested by
Commissioner Brandon Garrett)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting Commission Chamber - 712712021
ATTENDANCE:
Present: Hons. Garrett, Chairman; Hasan, Vice Chairman; Johnson and
McKnight, members.
Absent: Hon. Hardie Davis, Jr., Mayor.
ENGINEERING SERVICES
1. Report from the Administrator regarding the identification of a funding source Item
for the installation of four speed humps along Bellemeade Drive with a Action:
construction cost of $14,000. Also approve the creation of a new speed hump Approved
fee district for the parcels adjacent to Bellemeade Drive. Funding is available
in SPLOST IV Recapture funds. (Referred from July 14 Engineering
Services Committee)
Motions
Motion
Type
Approve
Motion Text
Motion to approve the
designation of a funding
source of the traffic
operations section of the
FY22 budget for the
installation of the four
speed humps for
Bellemeade Drive and
receive a recommendation
back from the
Administrator at the next
meeting regarding a
funding source for the
installation of speed
humps in other areas
without charging
taxpayers for those
Made By Seconded By f"'rtil
Commissioner Commissioner PassesJordan Ben Hasan
Johnson
installations.
Motion Passes 4-0.
2. Motion to approve the minutes of the Engineering Services Committee held Item
on July 14,2021. Action:
Approved
3. Motion to determine that a portion of Parham Road (off Gordon Highway), Item
Tract 5-B, and Tract 6 as shown on the attached map has ceased to be used by Action:
the public to the extent that no substantial public purpose is served by it or that Approved
its removal from the county road system is otherwise in the best public
interest, pursuant to O.C.G.A. 532-7-2, with the abandoned property to be
quit-claimed to the appropriate party(ies), as provided by law and an easement
to be retained over the entire abandoned portion for existing or future utilities
as directed by Augusta Engineering Department and Augusta Utilities
Department.
Motions
Motion- ----- Motion TextI ype
Motion to
^ aDDrove.APProve uotlo, Passes
4-0.
Motions
fr"J:'" Motion rext Made Bv
Motion to
. aDDrove.APProve vtotion Passes
4-0.
Seconded By HX|I
Commissioner
c.ii,"*. i."r,r'- fi:fffi::f"' Passes
Seconded By Motion
Result
Commissioner
catherine Smith- uommlssloner Passes
McKnight Ben Hasan
4. Motion to determine that Tract 5-B as shown on the attached map has ceased Item
to be used by the public to the extent that no substantial public purpose is Action:
served by it or that its removal from the county road system is otherwise in the Approved
best public interest, pursuant to O.C.G.A. 532-7-2, with the abandoned
property to be quit-claimed to the appropriate party(ies), as provided by law
and an easement to be retained over the entire abandoned portion for existing
or future utilities as directed by Augusta Engineering Department and Augusta
Utilities Department.
Motions
Motion to approve
h_l r deleting this item commissionerDelete ;-^:l'lg tllt_ n:t" catherine smith- commissioner
from thi agenda. .t:]3t-t.,1,1smtth- Ben Hasan Passes
Motion passes 4-0. McKnight
5. Notification of Emergency Procurement of Services to assess and repair speed ltem
control system for pump turbine number 9 at the Goodrich Street Raw Water Action:
Pumping Station. Approved
Motions
r#:"" Motion rext Made Bv
Motion Motion Text Made By
Type
Motion to. aDDrove.APProve Motion passes
4-0.
Commissioner
catherine Smith- commissioner
McKnight Ben Hasan
Seconded By
Seconded By
Motion
Result
Motion
Result
Passes
6. Approve Streetlight fee rate modification with Annual Residential rate of Item
$100.00 for each Parcel and Annual Commercial Rate of $150.00 for each Action:
Parcel outside the boundaries of the Cities of Hephzibah and Blflhe. Rescheduled
Accordingly adopt Streetlighting Fee rate table in "Exhibit B" attached
hereto and dated August 3,2021 and Streetlighting Management Program
Charges Adjustment Resolution as required by the Augusta, GA
Streetlighting Management Ordinance. Requested by AED.
Made Seconded Motion
By By Result
It was the consensus of the
committee that another street light
sub-committee meeting be held
next week, that this item be
received as information and
referred to the next committee
meeting.
7. Approve Supplemental funding (SA#2) for continuity of Engineering Phase of Item
Design Engineering Consultant Agreement to Hussey Gay Bell and DeYoung Action:
(HGB) in the amount of $80,700.00 for Augusta Engineering Transportation Approved
Motions
fr"J:"' Motion rext
Improvement Program (TIP) Operational
Project. Requested by AED. RFQ 17-127
Efficiency of Various Intersections
Motions
Motion
Type
Approve
Motion Text
Motion to
approve.
Motion Passes
4-0.
Seconded By Motion
ResultMade By
Commissioner
Catherine Smith-
McKnight
Commissioner
Ben Hasan Passes
www.auqustaga.gov
Engineering Services Committee Meeting
8/11/2021 1:20 PM
Minutes
Department:
Presenter:
Caption:Motion to approve the minutes of the Engineering Services
Committee held on July 27, 2021.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY: