HomeMy WebLinkAbout2021-04-13 Meeting Minutes Engineering Services Committee Meeting Virtual/Teleconference - 4/13/2021 ATTENDANCE: Present: Hons. Hardie Davis, Jr., Mayor; Garrett, Chairman; Hasan, Vice Chairman; Johnson and McKnight, members. ENGINEERING SERVICES 1. Motion to approve transfer of ownership from Advanced Disposal Services Augusta, LLC to Waste Management, Inc. and to authorize the Mayor to execute a Consent to Change in Control. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Catherine Smith- McKnight Passes 2. Motion to approve professional services contract with WK Dickson for Phase 3 Design of the Camp Hancock Sewer Basin Outfall Infrastructure Rehabilitation Plan recommendations in the amount of $280,000.00. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Catherine Smith- McKnight Passes 3. Consider award of Bid Item #21-137 to Blair Construction, Inc. to construct the Fort Gordon Cyber CoE Campus Utilities Project D2 (MCA-2) under the Task Order Program RFQ #18-263 in the amount of $470,414.00. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Jordan Johnson Passes 4. Motion to approve the minutes of the Engineering Services Committee held on March 9, 2021. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Catherine Smith- McKnight Passes 5. Motion to determine that Crescent Drive as shown on the attached map has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Catherine Smith- McKnight Passes 6. Motion to determine that the Alley East of Heard Avenue and South of Central Avenue, as shown on the attached map has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, and to Item Action: Approved receive as information the results of the public hearing held regarding the issue of abandonment pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and adopt the attached Resolution. Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Catherine Smith- McKnight Passes 7. Motion to approve and provide funding for emergency repair to the main Storm Drain System and the Main Sewage Line serving the Fairwoods Subdivision at Nance Blvd. (Requested by Commissioner Sammie Sias) Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve with funding of $24.1 million from Engineering Grading & Drainage Stormwater SPLOST 7 and the remaining balance of $900,000 reallocated from Engineering Administration SPLOST 7 to Engineering Grading and Drainage - Stormwater for the repairs. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Catherine Smith- McKnight Passes 8. Motion to approve the installation of fully functional Traffic Signal Lights at the following intersections: 1)Tobacco Road/ Talbot Ave and Windsor Spring Rd/ Inverness Dr. (Requested by Commissioner Sammie Sias) Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve with funding in the amount of $700,000 with $300,000 from SPLOST VI fund balance, $226,000 from SPLOST 7 recapture from Ft. Gordon project and $174,000 from TIA discretionary funds balance for the design and construction to include the lights. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Catherine Smith- McKnight Passes www.augustaga.gov Engineering Services Committee Meeting 4/13/2021 1:10 PM Attendance 4/13/21 Department: Presenter: Caption: Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: CONSENT THIS CONSENT (this “Consent”) is made as of this ____ day of _________, 2020, by and between Augusta, Georgia, a political subdivision of the State of Georgia (“Augusta”) and Advanced Disposal Services Augusta, LLC a Delaware Limited Liability Company doing business as Advanced Disposal Services (“ADS”). R E C I T A L S WHEREAS, Augusta and ADS are Parties to a certain Solid Waste and Recyclables Collection Agreement, dated as of August 7, 2012 (as may be amended from time to time, the “Agreement”). WHEREAS, ADS intends to enter into a transaction (the “Transaction”) pursuant to which all of the equity interests in ADS will be sold to Waste Management, Inc., an entity incorporated under the laws of the State of Delaware (“Buyer”); WHEREAS, Section 20.4 of the Agreement provides that a change in “Control” (as defined in the Agreement) of ADS requires Augusta’s prior written consent (the “Change in Control”). WHEREAS, it is a condition to the consummation of the Transaction that Augusta consent to the Transaction and the resulting Change in Control resulting from the Transaction. NOW, THEREFORE, and in consideration of the foregoing recitals, which are incorporated herein, the mutual covenants and agreements herein contained, and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Parties hereto hereby agree as follows: 1. Augusta hereby (a) consents, in advance, to the Transaction and the resulting Change in Control that will occur upon the consummation of the Transaction, (b) waives any right to declare a breach of the Agreement by ADS resulting from the Change in Control that will occur upon the consummation of the Transaction, and (c) agrees that (i) the Agreement is in full force and effect, (ii) no default exists under the Agreement (or, if any such default does exist, that Augusta is hereby waiving it) and (iii) the copy of the Agreement (together with all amendments thereto) that is attached hereto as Exhibit A has not been amended, modified or supplemented. Augusta’s consent to the Transaction and the resulting Change in Control that will occur upon the consummation of the Transaction shall constitute Augusta’s agreement that ADS shall be entitled to continue to enforce the Agreement against Augusta and that, similarly, Augusta shall have the right to continue to enforce the Agreement against ADS after the consummation of the Transaction. 2. Except as provided herein, the Agreement shall remain in full force and effect. 3. Augusta and ADS acknowledge and agree that Buyer shall be a third party beneficiary of this Consent and that this Consent may not be amended or modified in any manner by the Parties hereto without receiving Buyer’s prior written consent. 2 IN WITNESS WHEREOF, the parties hereto have entered into this Consent as of the date first above written, intending to be legally bound hereby. AUGUSTA, GEORGIA By: Name: Title: Attest:________________________________ Lena J. Bonner, Clerk of Commission Date: ______________________ ADVANCED DISPOSAL SERVICES AUGUSTA, LLC By: Name: Title: Schedule 1 See attached. Engineering Services Committee Meeting 4/13/2021 1:10 PM Approve Transfer of Ownership from Advanced Disposal Services Augusta, LLC to Waste Management, Inc. Department:Environmental Services Presenter:Mark Mehall, Environmental Services Director Caption:Motion to approve transfer of ownership from Advanced Disposal Services Augusta, LLC to Waste Management, Inc. and to authorize the Mayor to execute a Consent to Change in Control. Background:Augusta, Georgia and Advanced Disposal Services Augusta, LLC are parties to the Solid Waste and Recyclables Collection Agreement dated August 7th, 2012. Section 20.4 of said Agreement provides that a change in control requires Advanced Disposal to notify Augusta for prior written approval. Analysis:Advanced Disposal Services Augusta LLC entered into a transaction with Waste Management, Inc. wherein all of the equity interests in Advanced Disposal are to be sold to Waste Management Inc. Advanced Disposal Services has provided notice of the change in control to Augusta and is requesting written Consent as set out in the Solid Waste and Recyclables Collection Agreement. Financial Impact:N/A Alternatives:1. Do not grant consent. 2. Ask for modifications to the agreement. Recommendation:Approve transfer of ownership from Advanced Disposal Services Augusta, LLC to Waste Management, Inc. and to authorize the Mayor to execute a Consent to Change in Control. Funds are Available in the N/A Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission DR A F T 1 OF 36 Revision Date: June 2006 STATE OF GEORGIA RICHMOND COUNTY MAJOR PROJECTS CONSULTANT SERVICES AGREEMENT BETWEEN AUGUSTA, GEORGIA (CITY) AND W.K. Dickson & Co., Inc. (CONSULTANT) CONSULTANT: W.K. Dickson & Co., Inc. PROJECT: Camp Hancock Rehabilitation Phase III DATE EXECUTED: DATE COMPLETED: DR A F T 2 OF 36 Revision Date: June 2006 STATE OF GEORGIA RICHMOND COUNTY MAJOR PROJECTS CONSULTANT SERVICES AGREEMENT BETWEEN AUGUSTA, GEORGIA (CITY) AND W.K. Dickson & Co., Inc. (CONSULTANT) This Agreement is made and entered into this ______ day of ____________, 2020 by and between AUGUSTA, Georgia, a political subdivision of the State of Georgia, hereinafter called the “CITY” and W. K. Dickson & Co., Inc., a Corporation authorized to do business in Georgia, hereinafter called the "CONSULTANT." WHEREAS, the CITY desires to engage a qualified and experienced consulting firm to furnish professional services for: The Camp Hancock Rehabilitation Phase III Project. WHEREAS, the CONSULTANT has represented to the CITY that it is experienced and qualified to provide the services contained herein and the CITY has relied upon such representation. NOW, THEREFORE, in consideration of the mutual promises and covenant herein contained, it is agreed by and between the CITY and the CONSULTANT that: DR A F T 3 OF 36 REVISION DATE: June 2011 GENERAL PROVISIONS CONSULTANT has agreed, in this Agreement with CITY to procure the services of licensed design professionals, to provide the engineering services required to provide professional engineering and design services for the Project in accordance with the requirements as outlined in and attached as Attachment A – Scope of Services and other relevant data defining the Project. CONSULTANT COORDINATION The CONSULTANT shall cooperate fully with all municipalities, local government officials, utility companies, and other consultants as directed by the CITY. CONSULTANT and all relevant parties agree to work together on the basis of trust, good faith and fair dealing, and shall take actions reasonably necessary to enable each other to perform this Agreement in a timely, efficient and economical manner. All parties agree to cooperate in a manner consistent with industry standard design practice and will exercise the degree of skill and diligence normally employed by professional engineers or consultants practicing under similar conditions. CONSULTANT will re- perform any services not meeting this standard without additional compensation. AMENDMENTS TO AGREEMENT Every amendment to the Scope of Services shall become and is hereby made a part of this Agreement. Amendments must be fully executed by both the CONSULTANT and CITY to be valid. REDUCTION IN REQUIRED SERVICES If reductions in the required services are ordered by CITY, the credits shall be the amounts for such services as described in subsequently executed Amendments to this Agreement, and no claim for damages for anticipated profits shall accrue to the CONSULTANT. DATE CHANGES If in this Agreement specific periods of time for rendering services are set forth or specific dates by which services are to be completed are provided and if such periods of time or dates are changed through no fault of CONSULTANT, the rates and amounts of compensation provided for herein shall be subject to equitable adjustment. AGREEMENT MODIFICATIONS This Agreement shall not be modified except by a duly executed Amendment hereto in writing under the hands and seals of both parties hereto. DR A F T 4 OF 36 REVISION DATE: June 2011 TIME OF COMPLETION The time of completion shall be as described in the schedule attached hereto as Attachment D - Schedule. This Agreement shall terminate immediately and absolutely at such time as appropriated and otherwise obligated funds are no longer available to satisfy the obligations of the CONSULTANT on behalf of the CITY under this Agreement. However, CONSULTANT will be compensated for all work prior to termination of contract even if the CITY has obligated the funds to other projects. PROJECT PROGRESS CONSULTANT'S services and compensation under this Agreement have been agreed to in anticipation of the orderly and continuous progress of the Project through completion. LITIGATION Nothing in this Agreement shall be construed as obligating the CONSULTANT to appear, support, prepare, document, bring, defend or assist in litigation either undertaken or defended in behalf of the CITY except in consideration of compensation. All such services required or requested of CONSULTANT by the CITY except suits or claims between the parties to this Agreement will be reimbursed as additional services. BINDINGS It is further agreed that the CITY and CONSULTANT each binds itself and themselves, its or their successors, executors, administrators and assigns to the other party to this Agreement and to its or their successors, executors and assigns in respect to all covenants of this Agreement. Except as above, neither CITY nor the CONSULTANT shall assign, sublet or transfer its or their interest in this Agreement without prior written consent of the other party hereto. EXTENT OF THE AGREEMENT This Agreement represents the entire agreement between CITY and CONSULTANT and supersedes all prior negotiations, representations and agreements, either written or oral. DR A F T 5 OF 36 REVISION DATE: June 2011 DEFINITIONS Wherever used in this Agreement, whether in the singular or in the plural, the following terms shall have the following meanings: Agreement Execution - means the date on which CONSULTANT executes and enters into an Agreement with CITY to perform the Work. Agreement Price - means the total monies, adjusted in accordance with any provision herein, payable to the CONSULTANT under this Agreement. CITY –means a legal entity AUGUSTA, Georgia, a political subdivision of the State of Georgia. CONSULTANT - means the party or parties contracting directly with the CITY to perform Work pursuant to this Agreement. Contract - means the Agreement Documents specifically identified and incorporated herein by reference. Contract Time - means the period of time stated in this Agreement for the completion of the Work. Subcontractor - means any person, firm, partnership, joint venture, company, corporation, or entity having a contractual agreement with CONSULTANT or with any of its subcontractors at any tier to provide a part of the Work called for by this Agreement. Supplemental Agreement - means a written order to CONSULTANT signed by CITY and accepted by CONSULTANT, effecting an addition, deletion or revision in the Work, or an adjustment in the Agreement Price or the Contract Time, issued after execution of this Agreement. Task Order – means a written order specifying a Scope of Services, time of completion and compensation limit for services being provided by CONSULTANT. Task Orders shall be incorporated by reference as part of the Supplemental Conditions of this Agreement. Work - means any and all obligations, duties and responsibilities, including furnishing equipment, engineering, design, workmanship, labor and any other services or things necessary to the successful completion of the Project, assigned to or undertaken by CONSULTANT under this Agreement. DR A F T 6 OF 36 REVISION DATE: June 2011 CONTRACT DOCUMENTS List of Documents The Agreement, the General Conditions, the Attachments, and any Supplemental Agreements, including Task Orders shall constitute the Agreement Documents (the “Agreement”). Conflict and Precedence The Agreement Documents are complementary, and what is called for by one is as binding as if called for by all. In the event there are any conflicting provisions or requirements in the component parts of this Agreement, the several Agreement Documents shall take precedence in the following order: 1. Agreement – Including Attachments 2. General Conditions 3. Supplemental Conditions – Including Task Orders DR A F T 7 OF 36 REVISION DATE: June 2011 GENERAL CONDITIONS 1. COMMENCEMENT OF WORK The performance of services as defined in the Prime Agreement between CONSULTANT and the CITY, and herein described in this Agreement as Attachment A shall be commenced upon receipt by the CONSULTANT of a written Notice to Proceed. The effective date of services shall be defined in the Notice to Proceed. 2. PROFESSIONAL STANDARDS The standard of care for all services performed or furnished by CONSULTANT under this Agreement will be the level of care and that is ordinarily used by members of CONSULTANT’S profession practicing under similar conditions. 3. CHANGES AND EXTRA WORK The CITY may, at any time, request changes in the work to be performed hereunder. All such changes, including any increase or decrease in the amount of the CONSULTANT’s compensation, which are mutually agreed upon by and between the CITY and the CONSULTANT, shall be incorporated in written Supplemental Agreements to the Agreement. Changes that involve an increase in the compensation shall be considered major and require the approval of the CITY. 4. PERSONNEL The CONSULTANT represents that it has secured or will secure, at its own expense, all personnel necessary to complete this Agreement; none of whom shall be employees of, or have any contractual relationship with, the CITY. All of the services required hereunder will be performed by the CONSULTANT under its supervision, and all personnel engaged in the work shall be qualified and shall be authorized or permitted under law to perform such services. All key professional personnel, including subcontractors, engaged in performing services for the CONSULTANT under this agreement are indicated in a personnel listing attached hereto as Attachment C – Listing of Key Personnel and incorporate herein by reference. No changes or substitution shall be permitted in the CONSULTANT’s Key Personnel without the prior written approval of the CITY or his designee. The CONSULTANT shall employ only persons duly registered in the appropriate category in responsible charge of supervision and design of the work. The CONSULTANT shall endorse all reports, contract plans, and survey data. Such endorsements shall be made by a person duly registered in the appropriate category by the Georgia State Board of Registration for Professional DR A F T 8 OF 36 REVISION DATE: June 2011 Engineers and Land Surveyors, being in the full employ of the CONSULTANT and responsible for the work prescribed by this Agreement. 5. ACCURACY OF WORK The CONSULTANT shall be responsible for the accuracy of the work and shall promptly correct errors and omissions in its plans and specifications without additional compensation. The CONSULTANT shall give immediate attention to these changes so there will be a minimum of delay to others. Acceptance of the work by the CITY will not relieve the CONSULTANT of the responsibility for subsequent correction of any errors and the clarification of any ambiguities. 6. CONFIDENTIALITY The CONSULTANT agrees that its conclusions and any reports are for the confidential use and information of the CITY and that it will not disclose its conclusions in whole or in part to any persons whatsoever, other than to submit its written documentation to the CITY, and will only discuss the same with it or its authorized representatives. Upon completion of this Agreement term, all documents, drawings, reports, maps, data and studies prepared by the CONSULTANT pursuant thereto shall become the property of the CITY and be delivered thereto. Articles, papers, bulletins, reports, or other materials reporting the plans, progress, analyses, or results and findings of the work conducted under this Agreement shall not be presented publicly or published without prior approval in writing of the CITY. It is further agreed that if any information concerning the PROJECT, should be released by the CONSULTANT without prior approval from the CITY, the release of same shall constitute grounds for termination of this Agreement without indemnity to the CONSULTANT, but should any such information be released by the CITY or by the CONSULTANT with such prior approval, the same shall be regarded as public information and no longer subject to the restrictions of this Agreement. 7. OPEN RECORDS CONSULTANT acknowledge that all records relating to this Agreement and the services to be provided under the contract may be a public record subject to Georgia’s Open Records Act (O.C.G.A. § 50-18-70, et seq.). CONSULTANT shall cooperate fully in responding to such request and making all records, not exempt, available for inspection and copying as provided by law. 8. JURISDICTION The law of the State of Georgia shall govern the CONTRACT between CITY and CONSULTANT with regard to its interpretation and performance, and any other claims related to this agreement. DR A F T 9 OF 36 REVISION DATE: June 2011 All claims, disputes and other matters in question between CITY and CONSULTANT arising out of or relating to the Agreement, or the breach thereof, shall be decided in the Superior Court of Richmond County, Georgia. The CONSULTANT, by executing this Agreement, specifically consents to jurisdiction and venue in Richmond County and waives any right to contest the jurisdiction and venue in the Superior Court of Richmond County, Georgia. 9. TERMINATION OF AGREEMENT FOR CAUSE If through any cause, the CONSULTANT shall fail to fulfill in a timely and proper manner its obligations under this Agreement, or if the CONSULTANT shall violate any of the covenants, agreements or stipulations of this Agreement, CONSULTANT will be given the opportunity to commence correction of obligation within 5 days of written notice and diligently complete the correction thereafter. Failure to maintain the scheduled level of effort as proposed and prescribed, or deviation from the aforesaid schedule without prior approval of the CITY, shall constitute cause for termination. The CITY shall thereupon have the right to terminate this Agreement by giving written notice to the CONSULTANT of such termination, and specifying the effective date thereof, at least five (5) days before the effective date of such termination. In such event, all finished or unfinished documents, maps, data, studies, work papers and reports prepared by the CONSULTANT under this Agreement shall become the property of the CITY, and the CONSULTANT shall be entitled to receive just and equitable compensation for any satisfactory work completed on such documents, as mutually agreed by the CITY and CONSULTANT. 10. TERMINATION FOR CONVENIENCE OF THE CITY The CITY may terminate this contract in part or in whole upon written notice to the CONSULTANT. The CONSULTANT shall be paid for any validated services under this Contract up to the time of termination. 11. COORDINATION AND COOPERATION WITH OTHER UTILITIES AND CONSULTANTS CONSULTANT shall thoroughly research all utility records to identify the existing facilities on the submitted roadway plans for avoidance, or resolution, of conflicts with the proposed Scope of Services. If the CITY undertakes or awards other contracts for additional related work, the CONSULTANT shall fully cooperate with such other CONSULTANTs and the CITY employees or appointed committee(s), and carefully fit its own work to such additional work as may be directed by the CITY. The CONSULTANT shall not commit or permit any act which will interfere with the performance of work by any other CONSULTANT or by CITY employees. DR A F T 10 OF 36 REVISION DATE: June 2011 12. COVENANT AGAINST CONTINGENT FEES The CONSULTANT warrants that no person or selling agency has been employed or retained to solicit or secure this Agreement upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by CONSULTANT for the purpose of securing business and that the CONSULTANT has not received any non-CITY fee related to this Agreement without the prior written consent of the CITY. For breach or violation of this warranty, the CITY shall have the right to annul this Agreement without liability or at its discretion to deduct from the Agreement Price of consideration the full amount of such commission, percentage, brokerage or contingent fee. 13. RESPONSIBILITY FOR CLAIMS AND LIABILITY The CONSULTANT shall be responsible for any and all damages to properties or persons caused by its employees, subcontractors, or agents, and shall hold harmless the CITY, its officers, agents and employees from all suits, claims, actions or damages of any nature whatsoever to the extent found to be resulting from the CONSULTANT, its subcontracts, or agent in the negligent performance or non-performance of work under this Agreement. These indemnities shall not be limited by reason of the listing of any insurance coverage. 14. INSURANCE The CONSULTANT shall, at all times that this Agreement is in effect, cause to be maintained in force and effect an insurance policy(s) that will ensure and indemnify the CITY against liability or financial loss resulting from injuries occurring to persons or property or occurring as a result of any negligent error, act, or omission of the CONSULTANT in performance of the work during the term of this Agreement. The CONSULTANT shall provide, at all times that this agreement is in effect, Worker's Compensation insurance in accordance with the laws of the State of Georgia. The CONSULTANT shall provide, at all times that this Agreement is in effect, Insurance with limits of not less than: A. Workmen’s Compensation Insurance – in accordance with the laws of the State of Georgia. B. Public Liability Insurance – in an amount of not less than One Million ($1,000,000) Dollars for injuries, including those resulting in death to any one person, and in an amount of not less than One Million ($1,000,000) Dollars on account of any one occurrence. C. Property Damage Insurance – in an amount of not less than One Million ($1,000,000) Dollars from damages on account of an occurrence, with an aggregate limit of One Million ($1,000,000) Dollars. DR A F T 11 OF 36 REVISION DATE: June 2011 D. Valuable Papers Insurance – in an amount sufficient to assure the restoration of any plans, drawings, field notes, or other similar data relating to the work covered by the Project. E. Professional Liability Insurance – in an amount of not less than One Million ($1,000,000) Dollars or an amount that correlates to the aggregate fee on the project should it exceed $1,000,000. CITY will be named as an additional insured with respect to CONSULTANT’s liabilities hereunder in insurance coverage’s identified in items (b) and (c). The policies shall be written by a responsible company(s), to be approved by the CITY, and shall be noncancellable except on thirty-(30) days' written notice to the CITY. Such policies shall name the CITY as co-insured, except for worker's compensation and professional liability policies, and a copy of such policy or a certificate of insurance shall be filed with the Director at the time of the execution of this Agreement. 15. PROHIBITED INTERESTS 15.1 Conflict of Interest: The CONSULTANT agrees that it presently has no interest and shall acquire no interest, direct or indirect, that would conflict in any manner or degree with the performance of its services hereunder. The CONSULTANT further agrees that, in the performance of the Agreement, no person having such interest shall be employed. 15.2 Interest of Public Officials: No member, officer, or employee of the CITY during his tenure or for one year thereafter, shall have any interest, direct or indirect, in this Agreement or the proceeds thereof. 15.3 Employment of CITY’s Personnel: The CONSULTANT shall not employ any person or persons in the employ of the CITY for any work required by the terms of the Agreement, without the written permission of the CITY except as may otherwise be provided for herein. 16. SUBCONTRACTING The CONSULTANT shall not subcontract any part of the work covered by this Agreement or permit subcontracted work to be further subcontracted without the CITY's prior written approval of the subcontractor. All subcontracts in the amount of $5,000 or more shall include, where possible, the provisions set forth in this Agreement. 17. ASSIGNABILITY The CONSULTANT shall not assign or transfer whether by an assignment or novation, any of its rights, obligations, benefits, liabilities, or other interest under this Agreement without the written consent of the CITY. DR A F T 12 OF 36 REVISION DATE: June 2011 18. EQUAL EMPLOYMENT OPPORTUNITY During the performance of this Agreement, the CONSULTANT agrees as follows: (1) the CONSULTANT will not discriminate against any employee or applicant for employment because of race, creed, color, sex or national origin; (2) the CONSULTANT will, in all solicitations or advertisements for employees placed by qualified applicants, receive consideration for employment without regard to race, creed, color, sex or national origin; (3) the CONSULTANT will cause the foregoing provisions to be inserted in all subcontracts for any work covered by the Agreement so that such provision will be binding upon each subcontractor, provided that the foregoing provision shall not apply to contracts or subcontracts for standard commercial supplies of raw materials. 19. DRUG FREE WORKPLACE CONSULTANT shall be responsible for ensuring that its employees shall not be involved in any manner with the unlawful manufacture, distribution, dispensation, possession, sale or use of a controlled substance in the workplace. For purposes of the policy, “workplace” is defined as CITY owned or leased property, vehicles, and project or client site. Any violation of the prohibitions may result in discipline and/or immediate discharge. CONSULTANT shall notify the appropriate federal agencies of an employee who has a criminal drug statute conviction for workplace violation. CONSULTANT may require drug or alcohol testing of employees when contractually or legally obligated, or when good business practices would dictate. 20. ANTI-KICKBACK CLAUSE Salaries of architects, drafters, engineer’s, and technicians performing work under this Agreement shall be paid unconditionally and not less often than once a month without deduction or rebate on any account except only such payroll deductions as are mandatory by law. The CONSULTANT hereby promises to comply with all applicable "Anti-kickback" laws and shall insert appropriate provisions in all subcontracts covering work under this Agreement. 21. AUDITS AND INSPECTORS At any time during normal business hours and as often as the CITY may deem necessary, the CONSULTANT shall make available to the CITY and/or audit representatives of the CITY for examination all of its records with respect to all matters covered by this Agreement. It shall also permit the CITY and/or representatives of the audit, examine and make copies, excerpts, or transcripts from such records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. DR A F T 13 OF 36 REVISION DATE: June 2011 The CONSULTANT shall maintain all books, documents, papers, accounting records and other evidence pertaining to costs incurred on the Project and used in support of its proposal and shall make such material available at all reasonable times during the period of the Agreement, and for three years from the date of final payment under the Agreement, for inspection by the CITY or any reviewing agencies, and copies thereof shall be furnished upon request at cost plus 10%. The CONSULTANT agrees that the provisions of this Article shall be included in any Agreements it may make with any subcontractor, assignee, or transferee. 22. OWNERSHIP, PUBLICATION, REPRODUCTION AND USE All documents and materials prepared as an instrument of service pursuant to this Agreement are the property of the CITY. The CITY shall have the unrestricted authority to publish, disclose, distribute, and otherwise use, in whole or in part, any reports, data, maps, or other materials prepared under this Agreement without according credit of authorship. The CITY shall hold harmless the CONSULTANT against all claims arising out of such use of documents and materials without the CONSULTANT’s knowledge and written consent. 23. VERBAL AGREEMENT OR CONVERSATION No verbal agreement or conversation with any officer, agent, or employee of the CITY, either before, during, or after the execution of this Agreement, shall affect or modify any of the terms or obligations herein contained, nor shall such verbal agreement or conversation entitle the CONSULTANT to any additional payment whatsoever under the terms for this Agreement. All changes to this Agreement shall be in writing and appended hereto as prescribed in Article 3 above. 24. INDEPENDENT CONTRACTOR The CONSULTANT shall perform the services under this Agreement as an independent contractor and nothing contained herein shall be construed to be inconsistent with this relationship or status. Nothing in this Agreement shall be interpreted or construed to constitute the CONSULTANT or any of its agents or employees to be the agent, employee, or representative of the CITY. 25. NOTICES All notices shall be in writing and delivered in person or transmitted by certified mail, postage prepaid. Notices shall be addressed as follows: CITY: CONSULTANT: ADMINISTRATOR AUGUSTA, GEORGIA W.K Dickson & Co., Inc. 535 Telfair Street 1450 Greene Street, Suite 145 Augusta, GA 30901 Augusta, GA 30901 DR A F T 14 OF 36 REVISION DATE: June 2011 Copy to: DIRECTOR AUGUSTA UTILITIES DEPARTMENT 452 Walker Street, Suite 200 Augusta, GA 30901 26. TEMPORARY SUSPENSION OR DELAY OF PERFORMANCE OF CONTRACT To the extent that it does not alter the scope of this agreement, Augusta, GA may unilaterally order a temporary stopping of the work or delaying of the work to be performed by CONSULTANT under this agreement. 27. DEFECTIVE PRICING To the extent that the pricing provided by CONSULTANT is erroneous and defective, the parties may, by agreement, correct pricing errors to reflect the intent of the parties. 28. SPECIFIED EXCUSES FOR DELAY OR NON-PERFORMANCE CONSULTANT is not responsible for delay in performance caused by hurricanes, tornadoes, floods, and other severe and unexpected acts of nature. In any such event, the contract price and schedule shall be equitably adjusted. 29. HOLD HARMLESS Except as otherwise provided in this agreement, CONSULTANT shall indemnify and hold harmless Augusta, GA, and its employees and agents from and against all liabilities, claims, suits, demands, damages, losses, and expenses, including attorneys’ fees, arising out of or resulting from the negligent performance of its Work. 30. GEORGIA PROMPT PAY ACT NOT APPLICABLE The terms of this agreement supersede any and all provisions of the Georgia Prompt Pay Act. 31. RIGHT TO INSPECT PREMISES Augusta, Georgia may, at reasonable times, inspect the part of the plant, place of business, or work site of CONSULTANT or any subcontractor of CONSULTANT or subunit thereof which is pertinent to the performance of any contract awarded or to be awarded by Augusta, Georgia. 32. E-VERIFY All contractors and subcontractors entering into contracts with Augusta, Georgia for the physical performance of services shall be required to execute an Affidavit verifying its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm, or corporation which is contracting with Augusta, Georgia has registered with and is participating in a federal work authorization program. All contractors and subcontractors must provide their E-Verify number and must be in compliance with the electronic verification of work authorized programs operated by the United States Department of Homeland Security or any equivalent federal work authorization DR A F T 15 OF 36 REVISION DATE: June 2011 program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA), P.L. 99-603, in accordance with the applicability provisions and deadlines established in O.C.G.A. § 13- 10-91 and shall continue to use the federal authorization program throughout the contract term. All contractors shall further agree that, should it employ or contract with any subcontractor(s) in connection with the physical performance of services pursuant to its contract with Augusta, Georgia the contractor will secure from such subcontractor(s) each subcontractor’s E-Verify number as evidence of verification of compliance with O.C.G.A. § 13-10-91 on the subcontractor affidavit provided in Rule 300-10-01-.08 or a substantially similar form. All contractors shall further agree to maintain records of such compliance and provide a copy of each such verification to Augusta, Georgia at the time the subcontractor(s) is retained to perform such physical services. 33. LOCAL SMALL BUSINESS LANGUAGE In accordance with Chapter 10B of the AUGUSTA, GA. CODE, Contractor expressly agrees to collect and maintain all records necessary to for Augusta, Georgia to evaluate the effectiveness of its Local Small Business Opportunity Program and to make such records available to Augusta, Georgia. The requirements of the Local Small Business Opportunity Program can be found at www.augustaga.gov. In accordance with AUGUSTA, GA. CODE § 1-10-129(d)(7), for all contracts where a local small business goal has been established, the contractor is required to provide local small business utilization reports. Contractor shall report to Augusta, Georgia the total dollars paid to each local small business on each contract, and shall provide such payment affidavits, regarding payment to subcontractors as may be requested by Augusta, Georgia. Such documents shall be in the format specified by the Director of minority and small business opportunities, and shall be submitted at such times as required by Augusta, Georgia. Failure to provide such reports within the time period specified by Augusta, Georgia shall entitle Augusta, Georgia to exercise any of the remedies set forth, including but not limited to, withholding payment from the contractor and/or collecting liquidated damages. 34. ACKNOWLEDGEMENT “Consultant acknowledges that this contract and any changes to it by amendment, modification, change order or other similar document may have required or may require the legislative authorization of the Board of Commissioners and approval of the Mayor. Under Georgia law, Consultant is deemed to possess knowledge concerning Augusta, Georgia's ability to assume contractual obligations and the consequences of Consultant's provision of goods or services to Augusta, Georgia under an unauthorized contract, amendment, modification, change order or other similar document, including the possibility that the Consultant may be precluded from recovering payment for such unauthorized goods or services. Accordingly, Consultant agrees that if it provides goods or services to Augusta, Georgia under a contract that has not received proper legislative authorization or if the Consultant provides goods or services to Augusta, Georgia in excess of the any contractually authorized goods or services, as required by Augusta, Georgia's Charter and Code, Augusta, Georgia may withhold payment for any unauthorized goods or DR A F T 16 OF 36 REVISION DATE: June 2011 services provided by Consultant. Consultant assumes all risk of non-payment for the provision of any unauthorized goods or services to Augusta, Georgia, and it waives all claims to payment or to other remedies for the provision of any unauthorized goods or services to Augusta, Georgia, however characterized, including, without limitation, all remedies at law or equity." This acknowledgement shall be a mandatory provision in all Augusta, Georgia contracts for goods and services, except revenue producing contracts. IN WITNESS WHEREOF, said parties have hereunto set their seals the day and year written below: CITY: CONSULTANT: AUGUSTA, GEORGIA (CITY) W. K Dickson & Co., Inc. BY: BY: PRINTED NAME:The Honorable Hardie Davis Jr PRINTED NAME William G. Wingate, III__ AS ITS: MAYOR AS ITS: Vice President______ ATTEST CLERK: ATTEST: PRINTED NAME: PRINTED NAME: _______________________ AS ITS: Clerk of Commission AS ITS: ___________________ DATE: DATE: Copy to: DIRECTOR AUGUSTA UTILITIES DEPARTMENT 452 Walker Street, Suite 200 Augusta, GA 30901 DR A F T 17 OF 36 REVISION DATE: June 2006 CONSULTANT’S RESPONSIBILITIES CONSULTANT, in order to determine the requirements of the Project, shall review the information in Attachment A – Scope of Services. CONSULTANT shall review its understanding of the Project requirements with CITY and shall advise CITY of additional data or services which are not a part of CONSULTANT’s services, if any, necessary for design to begin. PROJECT UNDERSTANDING Upon request from the CONSULTANT, CITY may provide all criteria and full information as to CITY's and CONSULTANT'S requirements for this part of the project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expendability, and any budgetary limitations. CONSULTANT may request from the CITY to furnish data, reports, surveys, and other materials that may be relied upon in performing CONSULTANT'S services. REVIEW OF WORK Authorized representatives of the CITY may at all reasonable times review and inspect the project activities and data collected under the Agreement and amendments thereto. All reports, drawings, studies, specifications, estimates, maps and computation prepared by or for the CITY in association with this Agreement shall be subject to review. The CITY may at any time request progress reports, prints or copies of any work performed under this Agreement. Refusal by the CONSULTANT to submit progress reports and/or plans shall be cause to withhold payment to the CONSULTANT until the CONSULTANT complies with the CITY’s request in the regard. The CITY’s review recommendations shall be incorporated into the plans by the CONSULTANT. CONSULTANT'S INSURANCE CONSULTANT will maintain throughout this AGREEMENT the following insurance limits as specified in General Condition 14 – Insurance. CITY’S RESPONSIBILITIES CITY-FURNISHED DATA CITY will provide to CONSULTANT all data in CITY's possession relating to CONSULTANT's services on the PROJECT. CONSULTANT will reasonably rely upon the accuracy, timeliness, and completeness of the information provided by CITY. RIGHT TO ENTER The CONSULTANT will notify all property owners or occupants of the intent to enter properties for the purpose of accomplishing work in accordance with the practices of the CITY. The DR A F T 18 OF 36 REVISION DATE: June 2011 CONSULTANT shall discuss with and receive approval from the CITY prior to sending notices of intent to enter private property. Upon request by the CONSULTANT, the CITY will provide the necessary documents identifying the CONSULTANT as being in the employ CITY for the purpose described in the Agreement. ADVERTISEMENTS, PERMITS, AND ACCESS Unless otherwise agreed to in the Scope of Services, CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights-of-way, and access necessary for CONSULTANT's services or PROJECT construction. TIMELY REVIEW CITY will examine CONSULTANT's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as CITY deems appropriate; and render in writing decisions required by CITY in a timely manner. PROMPT NOTICE CITY will give prompt written notice to CONSULTANT whenever CITY observes or becomes aware of any development that affects the scope or timing of CONSULTANT's Services, or of any defect in the work of CONSULTANT or construction contractors. CITY'S INSURANCE CITY will maintain property insurance on all pre-existing physical facilities associated in any way with the PROJECT. LITIGATION ASSISTANCE The Scope of Services does not include costs of CONSULTANT for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by CITY. All such Services required or requested of CONSULTANT by CITY, except for suits or claims between the parties to this AGREEMENT, will be reimbursed as additional services. DR A F T 19 OF 36 REVISION DATE: June 2011 ATTACHMENT A – SCOPE OF SERVICES PROJECT DESCRIPTION: This project involves providing Professional Engineering Services related to assisting Augusta Utilities Department (AUD), for Phase III of the Camp Hancock Outfall Rehabilitation project that is the implementation of the “Infrastructure Rehabilitation Plan for the Camp Hancock Basin - Sanitary Sewer Interceptor” (IRP) as prepared for the Augusta Utilities Department by W.K Dickson, Inc. (WKD) and dated 3/17/16 (See attached exhibit of the area). The Camp Hancock Basin is in a predominately residential area but also serves the Augusta Municipal Golf Course, the Augusta Aquatics Center, Aquinas High School, the Charlie Norwood VA Medical Center, and Trinity Hospital. The system consists of 140 mains, totaling 31,506 linear feet (LF), with diameters in the 18”, 21” & 24” size range and includes 140 manholes. The primary purpose of this project will be to develop Construction Documents that will allow AUD to Bid and Contract with a Contractor in order to facilitate rehabilitation measures as identified in the IRP and subsequent updates and discussions with AUD staff. Recently it has been determined that a proposed project to extend the runway at Daniel Field will also possibly have an impact on the Camp Hancock outfall. In response to this AUD has requested that this project evaluate the short- term rehabilitation and potential long term requirements concerning the outfall. This Contract, between AUD and CONSULTANT, will be for the third phase of the implementation and will consist of the following general activities: • CONSULTANT will collect new CCTV/PACP data in the immediate project area for the purpose of comparison and verification of rehabilitation recommendations. This will involve the use of sub consultants to perform site improvements for access in order to execute cleaning and CCTV activities, land surveying of key infrastructure route and determination of critical property boundaries within the project area. • CONSULTANT will prepare technical memorandum presenting a detailed alternatives analysis associated with impacts to the Camp Hancock outfall, and mitigation thereof, by the impending extensions of runway 5/23 at the Daniel Field Airport. Such analysis shall investigate relocation of the gravity sewer and pump station and force main alternatives. This memorandum deliverable shall also present: o Short term rehabilitation needs in order to ensure continued serviceability of the existing gravity sewer via trenchless technology (CIPP), dig and replace and rerouting options. There is at least one location known at this point that requires immediate attention. o Long term needs will consider the time horizon in which the construction of the proposed runway may be as many as ten years in the future. The mitigation of this may require the relocation of a portion of gravity sewer or DR A F T 20 OF 36 REVISION DATE: June 2011 introduction of a pump station and force main to maintain service. This technical memorandum will discuss potential mitigation alternatives and the general financial impacts to assist AUD to provide quantitative estimates to the airport for preliminary design purposes. • Develop rehabilitation construction documents which denote the required rehabilitation of each component within this portion of the system with sufficient detailing to aid in the execution of the rehabilitation. The area of focus will be the section of the outfall in the vicinity of the intersection of Damascus Road and Highland Avenue, near Augusta Municipal Golf Course (See attached sketch). It is anticipated at this time that the construction documents will only address the short-term recommendations consisting of relocation efforts around the cabinet shop, CIPP lining and spot repairs for the upstream section through the landfill area. The anticipated construction value of this section will be approximately $1,000,000.00. Should initial investigations determine a different solution then scope adjustments will be considered at that time. • Develop Contract documents and technical specifications to be used in the permit approval and Bidding process of Phase III outfall rehabilitation plan. • Assist in the bidding process, including Pre-Bid meetings, Bid Openings, Requests for information and clarifications, and issuance of recommendation of award and certified bid tabulation. • Construction Administration, including shop drawing review, periodic site visits, contractor pay request review, Final inspection and closeout. • Provide construction observation on a periodic basis for the rehabilitation process. These types of projects are more sensitive to being there onsite during the construction. The periodic presence of the engineer representative will help validate the contractor performance. SCOPE OF SERVICES: The CONSULTANT proposes to provide the following Scope of services for the fees listed under “Basis of Compensation”. Professional Services: Cleaning and Collection of CCTV Data There are sections of Camp Hancock trunk main in the immediate vicinity of this project for which no recent CCTV/PACP data exists. It is anticipated that 1,656 linear feet of outfall will be DR A F T 21 OF 36 REVISION DATE: June 2011 investigated. CONSULTANT will subcontract this service as an initial effort to conduct a condition assessment. The CONSULTANT will use the condition assessment to prepare technical memorandum for short- and long-term suggestions. It is anticipated that the OWNER will provide the necessary water supply for the cleaning process and disposal site for the solids from the cleaning without a fee. It is understood that some portions of this sewer pipeline are inaccessible for cleaning and evaluation. Therefore, this work also includes necessary site improvements and clearing to establish the access necessary for cleaning and evaluation activities. It is anticipated that the clearing operations will be performed by Bobcat grinder with bucket attachment and that there will be two loads of surge stone provided for temporary drainage issues. Survey and SUE Evaluations: CONSULTANT shall provide additional design, permitting, and construction services associated with the proposed rerouting and in place rehabilitation dictated by CCTV process. It is anticipated that the portion of outfall around the cabinet shop would be rerouted around and that the remaining upstream portion would be rehabilitated using CIPP and spot repairs. The project location and proposed limits of construction are outlined in the attached location map. CONSULTANT proposes to provide the following scope of services for the fees listed below under “COMPENSATION.” The modified services shall include: a. SUE (Subsurface Utility Engineering) & Field Surveying & Mapping by SUBCONSULTANT – Upon approval/notification by AUD that Right of Entry is available the subconsultants will mobilize to collect data within the project area. i. SUE SUBCONSULTANT will provide Level B SUE services within the limits shown on the attached location map. SUE work will be performed in accordance with the standards as set by the American Society of Civil Engineers (ASCE) in publication CI/ASCE 38-02 – Standard Guidelines for the Collection and Depiction of Existing Subsurface Utility data. Quality Level B SUE designation will be performed. SUE Field Crews shall designate utilities using electromagnetic and GPR equipment to mark the location of the facilities. Both electromagnetic and GPR sweeps will be done to determine if there are additional utilities not depicted in the records. Any additional utilities found will be documented on a field sketch. Completed field sketches compiled by the SUE Field Crews are submitted to CONSULTANT and relayed to the survey SUBCONSULTANT. ii. Surveying SUBCONSULTANT will provide survey services and collect all utilities designated within the project limits by the SUE crews. SUBCONSULTANT will establish vertical and horizontal survey control utilizing GPS and conventional surveying methods. SUBCONSULTANT will perform a location survey of the alignment, which will include the location of all marked utilities, edge of pavement, centerline of road, wet weather drainage, fences, sidewalks, concrete structures, above ground DR A F T 22 OF 36 REVISION DATE: June 2011 appurtenances, buildings, signs, storm drains, rail lines and facilities, and spot elevations as needed within the proposed corridor. iii. The SUBCONSULTANT will provide the following: 1. Reconnaissance to locate existing property corners and evidence of property corners to perform existing right-of-way resolution using existing maps and deeds within the project area; 2. On-line research for maps and documents needed to perpetuate existing property lines and existing rights-of-way. Additional courthouse research will be performed if documents needed to resolve property lines are not available on-line. Research shall be as necessary to the extent that the current record deed, plats, and plans of the existing rights-of-way are found in the public records. b. The SUBCONSULTANTS will utilize traffic control and safety designation as necessary to collect data within the roadways and rights of way. c. Easement Plat Preparation – The project will be constructed, operated, and maintained in existing rights-of-way and easements, and where needed, new easements will be obtained by the OWNER. To assist the OWNER with acquiring the new easements, the ENGINEER’s professional survey subconsultant will prepare survey maps of the proposed new easements to be acquired. To efficiently prepare the plats of the proposed easements, the OWNER and ENGINEER will work together as the project evolves and develops. Upon completion of the existing property deed research, the field surveying of the portions of the properties of the project area and the preliminary engineering of the Project, including the establishment of any underground utilities, the ENGINEER will identify the potential locations of the easements required for the Project. Upon the OWNER approving the preliminary engineering and the ENGINEER receiving authorization from the OWNER to prepare the surveys of the potential easements, the ENGINEER’s subconsultant will start the preparation of the surveys of the potential easements for the Project. Utilizing the finalized design plans prepared by the ENGINEER’s subconsultant, the ENGINEER will prepare and submit to the OWNER an easement map for each affected property for the OWNER to use to begin obtaining the required easements for the Project. The ENGINEER’s subconsultant will prepare the easement maps in accordance with the OWNER provided standards. The OWNER intends to acquire easements for any portion of the project not in the public right-of-way. For planning purposes and for defining a unit cost for easement map preparation, up to five (5) easement plats are planned. The easement maps shall identify and distinguish between permanent utility and temporary construction easements, and shall meet the following general requirements: i. Easement plats will comply with the rules set forth by the Georgia Board of Professional Engineers and Land Surveyors and the Georgia mapping law; DR A F T 23 OF 36 REVISION DATE: June 2011 ii. Easement plats shall be prepared in accordance with the Owner’s Water & Sanitary Sewer System-Guidelines, found at: https://www.augustaga.gov/DocumentCenter/View/6507/Water-Sanitary- Sewer_2015?bidId= iii. Easement maps will be an exhibit to the easement agreements to be prepared by the OWNER and will be prepared on 8.5”x14” sized paper; iv. All easement plats shall have a general vicinity map, which shall clearly identify the general location of the parcels where the easement(s) shall be obtained; v. All easement plats shall have distinct line types for the easement lines, which will define the easement(s) location(s) on each parcel; vi. The total square footage of each easement shall be indicated on the easement map(s); vii. All easement maps will identify the applicable jurisdictional boundaries; viii. Each parcel requiring an easement will be clearly identified with a parcel identification number for reference to the agreement to be prepared by the OWNER’s attorney; ix. One digital copy in PDF format of the easement maps will be provided to the OWNER for use in obtaining the easements; x. All easement plats shall be sealed by a Professionally Licensed Surveyor; xi. The OWNER will review the form and format of the proposed easement maps for compliance with the recording requirements at the county register of deeds; xii. The OWNER shall be responsible for negotiating the easements with property owners; and, xiii. The OWNER shall record the easement documents and return one (1) copy to the ENGINEER for our records. Technical Memorandum COSULTANT will evaluate past and current condition assessment data for the proposed project area, preliminary concept plans provided by the Daniel Field Airport and visual inspection to help develop a technical memorandum recommending both short and long term needs for the Camp Hancock Outfall in this area. The upper portion of this section of the outfall runs through a closed construction debris landfill and significant terrain changes. It is anticipated that the condition assessment will support a short-term recommendation to upgrade the upper section using CIPP technology and spot repairs. The long-range evaluation will identify both gravity and pumped DR A F T 24 OF 36 REVISION DATE: June 2011 solutions to allow the outfall to continue to function once the runway extension is constructed. This will assist AUD in negotiating the longer-term issues associated with the airport. Design Development CONSULTANT will prepare Contract documents for AUD to invite bids for the construction of the sewer repairs and rehabilitation in Phase III recommended section. This Scope of Services assumes that design drawings and specifications will be developed for the assets and rehabilitations identified in the Technical Memorandum. The design drawings will be submitted as CAD based drawings. The CONSULTANT will utilize existing plans, GIS data, field sketches and other sources available from the owner to prepare the documents for bidding. CONSULTANT will also engage the services of SUBCONSULTANTS as appropriate, including survey services as necessary for sanitary sewer replacements or relocations. CONSULTANT will assist in bidding and general construction services. It is assumed that the work will be implemented under one (1) construction contract; if additional construction contracts are required, this agreement will be amended to authorize additional engineering services and fees. CONSULTANT will be responsible for the submittal of 90 percent and Final Bid Set documents that meet the following requirements: Design Drawings 1. Cover Sheet 2. General Notes and Legend 3. Sheet Index 4. Sanitary Sewer Rehabilitation/Relocation Sheets - The plan sheets (22-inch by 34- inch) will contain a plan view for sewer rehabilitation at a horizontal scale of 1-inch equals 40 feet. Streets and other pertinent features shall be labeled for better field identification. The sheets shall also contain tables of applicable information such as pipeline rehabilitation method, diameter, material, stationing of point repairs, laterals, and manhole rehabilitation methods. The drawings shall be reproducible in black and white without the need for color to distinguish information shown on the drawings. 5. Plan and profile sheets of replacement or re-routed sanitary sewer. 6. Details as appropriate for the work, including but not limited to: • Cured-in-place Pipe components; • Sewer Installation Details; • Generic Erosion and Sediment Control Details; • Generic Traffic Control Details, and; • Paving Details: GDOT and AED. DR A F T 25 OF 36 REVISION DATE: June 2011 Specifications Standard specifications and Contract Documents will be provided by CONSULTANT to AUD. The CONSULTANT will be expected to provide: 1. Upfront CONTRACT documents for AUD’s use in the procurement process 2. Bid forms to be incorporated into the CONTRACT documents 3. Special Provisions Section (as applicable) 4. Contract Exhibits: Scope of service, site drawings, reports and other background information, as applicable and as generated performing Work related to other sections identified herein 5. Technical Specifications shall include, but not be limited to: • Temporary erosion & sediment control • Preconditioning of sewers and manholes • Flow bypass and/or diversion pumping • Cured-in-place pipe lining of existing sewer mains • Point Repairs • Utility and private service line repairs • Manhole interior rehabilitation • New or replacement manhole construction • Pipe replacement by open cut • Paving Technical Review Ensuring a quality deliverable is the responsibility of the CONSULTANT. CONSULTANT shall have all progress drawings and specifications submitted to an internal technical review committee at the 90 percent completion milestone. The CONSULTANT's review committee shall consist of technical staff knowledgeable on the type of work designed and independent for the specific project. Following the technical review, design modifications shall be made by the CONSULTANT to finalize the construction documents. Completion of Construction Documents Presentation of the construction documents, plans and specifications, at the 90 percent completion will be made to AUD following the CONSULTANT's internal technical review. Following AUD's review, design modifications shall be made by the CONSULTANT and submitted to AUD as Draft Final Documents (Draft 100 percent). Upon approval, these documents shall be finalized and will be considered Final Documents (Final 100 percent). DR A F T 26 OF 36 REVISION DATE: June 2011 Prepare Final Cost Estimates The CONSULTANT will review and/or prepare detailed cost estimates based on the construction documents and submit the cost estimates to the AUD at the 90 percent and final design milestones. Permitting This Scope assumes that a City of Augusta Engineering Department and/or a Georgia Department of Transportation (GDOT) permit will be required. It is assumed that standard traffic control, erosion and sediment control details will be included in the design documents to assist AUD and/or the CONTRACTOR in securing the required permits. Efforts above and beyond this can be provided by the CONSULTANT if required, under an amendment. Project Bidding The CONSULTANT shall provide services during the bidding phase to include providing technical interpretation of the Bid Documents, attending one (1) bid opening, evaluating one (1) set of bids and recommending award, and preparing Contract Documents for signature. Conformed documents will be the responsibility of the CONSULTANT. It is assumed that the duration of the Bid Period will be eight (8) weeks and that the AUD will be distributing the bid packages. An additional two months is assumed from selection of the CONTRACTOR to the issuance of the Notice to Proceed. While a formal prequalification process is not anticipated, the CONSULTANT will work with the AUD to include qualification requirements in the Specifications that will be submitted by the bidders with the bids. General Services during Construction After award of the contract, CONSULTANT will assist the AUD with Contract administration and provide periodic observation of the construction work. It is anticipated that the construction period for the sewer rehabilitation project will be no longer than 6 months including 150 days for substantial completion and 30 days for final completion for total construction duration of 180 days. An increase in the construction schedule will require an amendment to authorize additional construction services. The CONSULTANT will provide general services during construction as described herein. In the performance of its services during the Construction Phase, the CONSULTANT shall not supervise, direct or have control over CONTRACTOR's work nor shall the CONSULTANT have authority over or responsibility for the means, methods, techniques, sequences, procedures of construction or safety precautions and programs incidental to the work selected by the CONTRACTOR(s), or for any failure of the CONTRACTOR's compliance with laws, rules, regulations, ordinances, codes or orders applicable to work. DR A F T 27 OF 36 REVISION DATE: June 2011 Administration of Construction Contract As part of general administration of the construction Contract, the CONSULTANT will consult with and advise AUD and act as its representative during the construction period. The CONSULTANT will provide contract administration and general services required for the Project, including: • AUD's representative for the duration of the construction contract, all communications to and from the CONTRACTOR shall go through the CONSULTANT. On behalf of AUD, the CONSULTANT shall administer the construction Contract, respond to CONTRACTOR's correspondence, and issue instructions from AUD; • Maintain a complete document file for the project. Documents to be maintained include, but are not limited to: correspondence, quality control procedures, quality control testing; site inspection records, shop drawing schedule, change orders, scheduling, project meetings, cost and disbursement data, progress reports and all other documents pertaining to the construction Contract; • Hold a pre-construction meeting and monthly progress meetings that will address critical schedule requirements, payment procedures, emergency procedures, schedule updates, coordination issues, change orders, quality assurance testing approvals, and any other issues related to completion of the project. One pre-construction meeting and 6 monthly progress meetings should be budgeted. • CONSULTANT shall submit a Work Summary spreadsheet that the AUD will utilize to report to Cityworks on areas that have been inspected or rehabilitated along with each monthly pay application by the CONTRACTOR. A comprehensive list is to be provided with each pay application identifying each pipe and/or manhole or other asset, and what was done (cleaning, lining, etc.). A sample Work Summary template will be provided by AUD for this spreadsheet. • CONSULTANT will address RFI’s from the CONTRACTOR in a timely manner. The project budget includes up to six (6) RFI’s for the project. Site Visits The CONSULTANT will visit the site (excluding visits coinciding with monthly progress meetings) to observe the progress and quality of the executed work of the CONTRACTOR and to determine, in general, if such work is proceeding in accordance with the Contract Documents. During the CONSULTANT's visits, and on the basis of on-site observations, the CONSULTANT shall keep AUD informed of the progress of the work, shall endeavor to guard AUD against defects and deficiencies in such work, and may recommend to AUD disapproval or rejection of work failing to conform to the Contract Documents. It is understood that AUD does not desire to have the CONSULTANT provide full-time inspection services. This Scope includes an average of 20 hours DR A F T 28 OF 36 REVISION DATE: June 2011 per week of site visits for three 3 months. If additional site visits are required, this contract will be amended to provide such additional services. Shop Drawing Review The CONSULTANT will review and approve (or take other appropriate action with respect to) Shop Drawings and samples, the results of tests and inspections, and other data that the CONTRACTOR is required to submit for conformance with the design concept of the Project and compliance with the information given in the Contract Documents; and receive and review (for general content as required by the Specifications) instructions, guarantees, bonds and certificates of inspection which are to be assembled by the CONTRACTOR in accordance with the Contract Documents, and transmit them to AUD with written comments. This task includes review of the pre-construction video performed by the CONTRACTOR and advice to AUD regarding CONTRACTOR's suggestions for additions or deletions of required rehabilitations and confirmation of the selected rehabilitation method throughout the life of the project. The CONSULTANT will review cured-in- place liner design calculations provided by the CONTRACTOR. Preparation of Design Clarifications The CONSULTANT will issue necessary interpretations and clarifications of the Contract Documents; have authority, as AUD's representative, to require special inspection or testing of the work; act as initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the work there under, and make decisions on all claims of AUD and CONTRACTOR relating to the acceptability of the work or the interpretation of the requirements of the Contract Documents pertaining to the execution and progress of the work. Work Change Directives will be issued to document required point repairs, CIPP lining and/or other rehabilitation methods added or deleted to the contract documents. This Scope does not include reissuing the drawings or design of open-cut replacement. Quality Assurance Testing The CONSULTANT will specify the quality assurance testing that is necessary for the project in the construction specifications relative to its designs. Coupon testing required of the CIPP lining CONTRACTOR will be performed by CONTRACTOR at an independent testing laboratory. Review of Applications for Payment Based on on-site observations and review of the applications for payment with the accompanying data and schedules, the CONSULTANT will determine the amounts payable to CONTRACTOR on a monthly basis. The CONSULTANT will then recommend by email to AUD, payments reasonably due to CONTRACTOR. DR A F T 29 OF 36 REVISION DATE: June 2011 Change Orders and Time Extensions The CONSULTANT will provide services in connection with change orders to the Construction Contract to reflect minor changes or deletions requested by AUD, CONSULTANT or the CONTRACTOR and make revisions to Drawings and Specifications occasioned thereby. An accurate listing of additional costs and credits as a result of change orders will be maintained by the CONSULTANT. Upon receipt of a requested change order, the CONSULTANT will review it in detail and then discuss it with AUD, and together, will determine the manner in which to proceed. Larger changes or claims asserted by CONTRACTOR and major redesigns requested by AUD may require additional analyses or evaluation beyond the Scope of this Contract. It is anticipated that up to 2 (two) change orders will be processed for the project. Final Inspections The CONSULTANT will conduct a walk-through inspection with the CONTRACTOR and AUD to determine if the Project has reached substantial and/or final completion and prepare a punch list of work items remaining. The CONSULTANT will conduct one final inspection to determine if the work is acceptable, so that the CONSULTANT may recommend, in writing, final payment to the CONTRACTOR and may give written notice to AUD and the CONTRACTOR that the work is acceptable. The CONSULTANT will observe the work of the CONTRACTOR to see that it has been completed in substantial accordance with respect to the Contract Documents prepared by the CONSULTANT. It is assumed that the CONSULTANT will review 100 percent of the post rehabilitation inspection videos provided by the CONTRACTOR prior to post-rehabilitation inspection. Comments from review of post-rehabilitation inspection videos and the final inspection visit will be incorporated into the final punch list and forwarded to the CONTRACTOR. Final Completion At the conclusion of the project, the CONSULTANT will receive, review and transmit to AUD with written comments guarantees, bonds, certificates and post inspection videos and/or photographs that are required by the Contract Documents and provided by the CONTRACTOR. Record drawings indicating the implemented rehabilitation and replacement work will be the responsibility of the CONSULTANT and will be submitted in PDF and CADD format. To assist AUD’s endeavor in Asset Management, the CONSULTANT will provide AUD with GIS data files reflective of completed rehabilitated assets. A. TIME OF PERFORMANCE 1. CONSULTANT will begin work within ten (10) days of Notification to Proceed and work diligently to complete the Scope of Services. It is anticipated that the first phase of this project will require approximately five (5) months to allow for construction. DR A F T 30 OF 36 REVISION DATE: June 2011 B. MISCELLANEOUS 1. Additional Services AUD may request additional services from time to time. These services will be provided on an as-needed basis only when requested by AUD. Should the need arise for additional services during the course of the project; the CONSULTANT will be pleased to provide AUD with an estimated cost prior to authorization of additional services. 2. Services Not Included AUD reserves the right to amend this Agreement so that the CONSULTANT may furnish additional services such as those listed below. Additional compensation for additional services rendered will be provided by AUD based on negotiated terms. Additional services shall be considered any services not explicitly described herein. Additionally, specific services considered additional are listed below: • Pre- and/or post-rehabilitation flow monitoring • Evaluation of aerial stream crossings • Geotechnical services • Hydraulic capacity evaluations • Professional Engineering services related to additional or extended design, bidding, and construction services • Additional permitting not indicated in Scope (railroad, wetlands, etc.) DR A F T 31 OF 36 REVISION DATE: June 2011 ATTACHMENT B - COMPENSATION The City shall pay the CONSULTANT for services set forth in Scope of Services, Basic Services The OWNER shall pay the CONSULTANT for services set forth in Scope of Services as follows: Item/Description Terms Fee CCTV/Cleaning NTE $62,000.00 Technical Memo LS $26,000.00 Design Services LS $98,000.00 Construction Contract Admin/Observation NTE $94,000.00 Total Fee $280,000.00 The CITY shall compensate the CONSULTANT for services, which have been authorized by the CITY under the terms of this Agreement. The CONSULTANT may submit to the CITY a monthly invoice, in a form acceptable to the CITY and accompanied by all support documentation requested by the CITY, for payment for the services, which were completed during the billing period. The CITY shall review for approval said invoices. The CITY shall have the right to reject payment of any invoice or part thereof if not properly supported, or if the costs requested or a part thereof, as determined solely by the CITY, are unreasonably in excess of the actual phase of completion of each phase. The CITY shall pay each such invoice or portion thereof as approved, provided that the approval or payment of any such invoice shall not considered to be evidence of performance by the CONSULTANT to the point indicted by such invoice, or of receipt of acceptance by the CITY of the service covered by such invoice. The CITY shall pay any undisputed items contained in such invoices. Each invoice shall be accompanied by a letter progress report describing the total work accomplished for each phase and any problems, which have been encountered, which may inhibit execution of the work. The CONSULTANT shall also submit an accurate updated schedule, and an itemized description of the percentage of total work completed for each phase during the billing period. When the CITY authorizes the CONSULTANT to proceed with the work authorized in a Task Order, it agrees to pay the CONSULTANT for work completed, on the basis of the standard billing rates shown in Attachment B to the Contract of those principals and employees engaged directly on the work. DR A F T 32 OF 36 REVISION DATE: June 2011 Compensation for design services shall be invoiced based on the percentage of work completed against the lump sum contract amount stipulated. Overtime may be performed at the discretion of the CONSULTANT, but the premium time portion of the overtime will not be billed to the CITY unless the CONSULTANT has requested acceleration of the scheduled work in writing. ATTACHMENT C – LISTING OF KEY PERSONNEL CONSULTANT shall provide qualified personnel to perform its work. The list of key personnel below, including a designated Program Manager will not change or be reassigned without the written approval of the CITY. Those personnel committed for this work are as follows: David L. Pond, PE Jeremy Brashears, PE William Wingate, PE Jake Berkshire, PE SadhanaPriya Veeravalli, EIT DR A F T 33 OF 36 REVISION DATE: June 2011 ATTACHMENT D – SCHEDULE FOR PERFORMANCE CAMP HANCOCK BASIN OUTFALL Phase III IMPLEMENTATION CAMP HANCOCK PHASE III SCHEDULE – Technical Memorandum - 90 Days Construction Documents 90% - 100 Days AUD 90% Construction Documents Review - 20 Days Final Construction Documents - 20 Days AUD 100% Review Approval - 20 Days Bidding/Contracting - 140 Days Construction Phase - 185 Days DR A F T 34 OF 36 REVISION DATE: June 2011 CONSULTANT SERVICES As a part of this Agreement the CONSULTANT agrees to furnish the following checked items (CONSULTANT to initial in the space provided acknowledging responsibility to furnish said item). Prior to Authorization to Proceed:  Detailed Scope of Services based upon Schedule A of this Agreement to be submitted with Cost Proposal clearly defining the CONSULTANT’S understanding of the project limits, design objectives and CONSULTANT’S services to be provided.  Cost Proposal that will include cost of design, preparation of construction plans and specifications, and other services requested in the CITY’s Request for Proposal.  Schedule for submittal of review documents at 90% and final documents. Prior to submitting 90% review documents:  Locate all existing utilities using available information collected by the CONSULTANT. The CITY will furnish available information on water and sewer locations however the CONSULTANT must verify to CITY’S satisfaction.  Provide CITY with information on the project site(s), including the following: • Past and present use of the land (specifically identify any landfilling activities in the area); identify any nearby designated wetlands • Soil type(s) • Boring results when required by CONSULTANT for new facilities or where depth of line and existing site conditions warrant. • Brief description of the area (e.g., residential, commercial, industrial) including general slope of the land, and whether trees, signs, etc. will be in conflict with the new facilities. Include number of properties affected and number of easements required with property owners identified. • Identification of potential problems in meeting design objectives.  Site Plan (If Required) Throughout project:  Prepare printed responses to comments received from the CITY following reviews.  Provide the necessary plats for easement acquisition and DOT/other permit application.  Prepare Public Works/DOT/Other permit applications for signature by the CITY.  Prepare and submit plans to EPD for review and approval when required. DR A F T 35 OF 36 REVISION DATE: June 2011  Prepare plans and specifications, using Augusta Utilities Design Standards and Specifications (latest version). Specifications must mirror that provided by the CITY.  Prepare construction cost estimates at each review stage, 90% and with the submittal of final documents. Provide cost breakdown for any items to be lump sum in the construction contract. Upon completion of design:  Coordinate with the City Procurement Department to advertise the project.  Fax bid information to CITY.  Attend the Pre-Bid Meeting as a technical reference to the CITY.  Prepare letter of recommendation for award of the contract.  Develop conformed contract documents and forward to the CITY for execution.  Attend the pre-construction meeting as a technical reference to the CITY.  Provide clarification related to the plans/specifications throughout design and construction.  Provide record drawings at completion of the project electronically, per the Utilities Design Standards and Specifications (latest version).  Provide Services During Construction as follows: • Attend project meetings as scheduled by the CITY • Recommend design changes as field conflicts arise (site visits may be required) • Review and approval of pay requests from the construction Contractor (line of communication will be construction contractor to resident observer to CONSULTANT to CITY) • Provide clarification of plans and specifications throughout construction. • Revise/update plans and/or easement plats as changes occur that require resubmittal to DOT/other agencies. • Construction Administration Services called for in attached scope. DR A F T 36 OF 36 REVISION DATE: June 2011 ADDITIONAL SERVICES: 1. Revisions to the plans/contract documents to extend the limits of the project after this AGREEMENT has been executed by the CITY. 2. Revisions due to incorrect locations of existing utilities by the CONSULTANT (i.e., correct location given by CITY, incorrectly marked on plans by engineer) will be the responsibility of the CONSULTANT. Other revisions required by the CITY, DOT, EPD, or other government agency at their request will be considered an additional service. 3. Out-of-town meetings or conferences required of the CONSULTANT by the CITY. 4. Other not described above, as approved by the CITY. NOTE: It is the responsibility of the CONSULTANT as contracted by the CITY to provide professional surveying and engineering services. It is expected that such professionals will operate in a manner which assures the interests of the common welfare, rather than in a manner which promotes their own financial gain. It is expected that such professionals will act as a faithful agent for the CITY as a client. It is the duty of the CONSULTANT to protect the safety, health and welfare of the public in the performance of their professional duties. Engineering Services Committee Meeting 4/13/2021 1:10 PM Camp Hancock Sewer Basin IRP - Phase 3 Design Department:Utilities Presenter:Wes Byne Caption:Motion to approve professional services contract with WK Dickson for Phase 3 Design of the Camp Hancock Sewer Basin Outfall Infrastructure Rehabilitation Plan recommendations in the amount of $280,000.00. Background:The IRP report was completed by WK Dickson in June 2016 and it was found that it was prudent to move forward with implementing the recommendations in the IRP by dividing the sewer basin into multiple phases. Construction of Phase 1 is completed and Phase 2 will be going to Bid soon. AUD wishes to move forward with implementation of Phase 3 design. For continuity with the previous phase, WK Dickson has been requested to provide a scope of services and fee for Phase 3 of the overall IRP project. This scope of services consists of design services, bid package preparation, bidding assistance, and construction phase services. The scope also consists of reviewing CCTV data of approximately 1,900 Linear Feet of sewer line in preparation for Phase 3. The Professional Fees for this project is $280,000.00. The project will improve the structural integrity of the sanitary sewer system within the project area. Analysis:WK Dickson has provided a fee to perform these design services that was deemed to be fair and reasonable. Financial Impact:Funds are provided in 507043420-5212115/81500090-5212115 Alternatives:No alternatives are recommended. Recommendation:AUD recommends the Commission award a contract to WK Dickson in the amount of $280,000.00 for Phase 3 Design of the Camp Hancock Sewer Basin Outfall IRP recommendations. Funds are Available in the Following Accounts: Funds are available in 507043420-5212115/81500090-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Invitation to Bid Sealed bids will be received at this office until Monday, March 1, 2021 @ 3:00 p.m. for furnishing – Via ZOOM ZOOM Meeting ID: 977 2149 1891 Passcode: 551628 Bid Item #21-137 Cyber CoE Campus Utilities – Project D2 (MCA-2) Task Order – for Augusta, GA - Utilities Department Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 Bid documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901 (706-821-2422). Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from Augusta Blue Print. The fees for the plans and specifications which are non-refundable is $65.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.augustablue.com) at no charge through Augusta Blue Print (706 722-6488) beginning Thursday, January 28, 2021. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Pre Bid Proposal Conference will be held on Wednesday, February 10, 2020 @ 10:00 a.m. Via Zoom Meeting ID: 995 1846 5750 Passcode: 324862 All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Thursday, February 11, 2021 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No proposal may be withdrawn for a period of ninety (90) days after RFPs have been opened, pending the execution of contract with the successful vendor. A 10% Bid Bond is required. A 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov No bid will be accepted by fax, all must be received by mail or hand delivered. GERI A. SAMS, Procurement Director Mailed to Pre-Qualified Task Order Vendors February 3, 2021 Revised: 2/19/2016 NO.ITEM UNIT QTY UNIT PRICE TOTAL PRICE QTY UNIT PRICE TOTAL PRICE W-2-A 4"DIP restrained joint pipe (RJP)LF 230 96.40 22,172.00 230 88.00 20,240.00 W-2-B 6" DIP restrained joint pipe (RJP)LF 40 97.54 3,901.60 40 60.00 2,400.00 W-2-C 8" DIP restrained joint pipe (RJP)LF 1150 100.39 115,448.50 1150 63.00 72,450.00 W-2-D 12" DIP restrained joint pipe (RJP)LF 200 113.00 22,600.00 200 79.00 15,800.00 W-4-A.1 4" - 90 degree bend, MJ, RJF EA 2 501.01 1,002.02 2 422.00 844.00 W-4-A.2 4" - 45 degree bend MJ, RJF EA 4 482.30 1,929.20 4 422.00 1,688.00 W-4-A.3 4" - 22.5 degree bend, MJ, RJF EA 2 479.63 959.26 2 422.00 844.00 W-4-A.4 4" Plug, MJ, RJF EA 1 754.47 754.47 1 252.00 252.00 W-4-B 6" - 45 degree bend, MJ, RJF EA 2 548.75 1,097.50 2 630.00 1,260.00 W-4-C.1 8" - 90 degree bend, MJ, RJF EA 2 700.27 1,400.54 2 707.00 1,414.00 W-4-C.2 8" - 45 degree bend, MJ, RJF EA 8 647.43 5,179.44 8 707.00 5,656.00 W-4-C.3 8" - 22.5 degree bend, MJ, RJF EA 2 643.03 1,286.06 2 707.00 1,414.00 W-4-C.4 8" x 8" Tee, MJ, RJF EA 2 889.14 1,778.28 2 986.00 1,972.00 W-4-C.5 8" Plug, MJ, RJF EA 2 1,143.06 2,286.12 2 382.00 764.00 W-4-D.1 12" - 45 degree bend, MJ, RJF EA 4 1,085.76 4,343.04 4 1,155.00 4,620.00 W-5-A Fire Hydrant Assembly w/8" x 6" Tee EA 2 6,217.71 12,435.42 2 4,552.00 9,104.00 W-5-B Fire Hydrant Assembly w/12" x 6" Tee EA 1 6,501.70 6,501.70 1 13,849.00 13,849.00 W-6 8" Valve (Open left (ccw); MJ, RJF) and Box w/ "WATER" on box cover EA 3 1,758.00 5,274.00 3 1,773.00 5,319.00 W-10 12" x 8" Tapping Sleeve and Valve and Box w/ "WATER" on box cover EA 1 7,637.69 7,637.69 1 7,216.00 7,216.00 W-12 12" Insert Valve (install, close (unless noted to remain open) and bury) and Box w/ "WATER" on box cover EA 1 25,030.46 25,030.46 1 22,660.00 22,660.00 W-14-A 4"Water Meter & Vault Installation (AUD Detail 1.20.1)EA 1 18,114.43 18,114.43 1 20,616.00 20,616.00 W-14-B 4" RPZ Backflow Preventer (AUD Details 5.5, 5.6 & 5.7)EA 1 15,520.79 15,520.79 1 11,214.00 11,214.00 W-15 8" Fire Value Vault (AUD Std. Detail 1.21.2) for MCA-2 EA 1 25,385.77 25,385.77 1 29,224.00 29,224.00 W-16 Remove Plug and Connect EA 6 2,246.88 13,481.28 6 1,045.00 6,270.00 W-18 Close (and abandon) Valve (AUD Detail 1.18)EA 2 2,601.14 5,202.28 2 896.00 1,792.00 W-19 Remove Fire Hydrant EA 1 1,881.46 1,881.46 1 715.00 715.00 W-20 Remove water meter and box EA 1 2,246.88 2,246.88 1 385.00 385.00 S-1-A.1 8" diameter PVC sanitary sewer pipe SDR 26, Depth 6' to 10', including Type II (No. 57 stone) bedding material LF 140 110.93 15,530.20 140 56.00 7,840.00 S-1-A.2 8" diameter DIP sanitary sewer pipe, Depth 6' to 10', including Type II (No. 57 stone) bedding material LF 40 183.57 7,342.80 40 130.00 5,200.00 AUGUSTA UTILITIES DEPARTMENT - CYBER COE CAMPUS PROJECT D2 JLA 3042.1803 BLAIR CONSTRUCTION, INC.BEAM'S CONTRACTING, INC. 1 of 3K/\420602\Admin\General\Project D2 Bid Tab.xlsx NO.ITEM UNIT QTY UNIT PRICE TOTAL PRICE QTY UNIT PRICE TOTAL PRICE AUGUSTA UTILITIES DEPARTMENT - CYBER COE CAMPUS PROJECT D2 JLA 3042.1803 BLAIR CONSTRUCTION, INC.BEAM'S CONTRACTING, INC. S-1-B 10" diameter PVC sanitary sewer pipe SDR 26, Depth 8' to 12', including Type II (No. 57 stone) bedding material LF 261 116.28 30,349.08 261 64.00 16,704.00 S-6 Pre-cast Manholes (up to 6' depth)EA 3 8,589.90 25,769.70 3 4,422.00 13,266.00 S-7 Additional vertical depth of Manhole over 6'VLF 10 369.88 3,698.80 10 132.00 1,320.00 S-8 Sanitary Sewer exterior manhole joint wrapping EA 2 2,154.89 4,309.78 2 151.00 302.00 S-12 Sanitary Sewer Tie-ins (manhole or line)EA 1 4,308.69 4,308.69 1 1,100.00 1,100.00 S-13 Sanitary Sewer Service Connection (6")EA 4 1,358.82 5,435.28 4 2,816.00 11,264.00 S-14 Concrete Pipe Encasement CY 15 464.45 6,966.75 15 286.00 4,290.00 S-15 Water main crossings EA 3 1,950.39 5,851.17 3 3,122.00 9,366.00 S-18.A Sanitary Manhole Abandonment (AUD Det. 2.11)EA 1 3,349.61 3,349.61 1 2,200.00 2,200.00 S-18.B Sanitary Manhole Removal EA 1 4,683.78 4,683.78 1 1,650.00 1,650.00 S-19 Adjust Manhole to grade EA 1 2,108.95 2,108.95 1 935.00 935.00 P-2 Asphalt Pavement Removal and Replacement (2.5" 9.5 MM Superpave, 10.5" Graded Aggregate Base)SY 25 175.54 4,388.50 25 354.00 8,850.00 P-5 Remove and Replace Concrete Sidewalk (3,500 psi, 4" Thick)SY 25 89.34 2,233.50 25 89.00 2,225.00 P-9 Remove and Replace Concrete Curb and Gutter (GDOT Detail 9032B, Type 2, 3 or 4)LF 25 67.78 1,694.50 25 64.00 1,600.00 M-1 Flowable Fill (GDOT-Excavatable type) into abandoned water and irrigation mains CY 60 427.21 25,632.60 60 167.00 10,020.00 M-2 Miscellaneous Concrete (3,500 psi)CY 25 880.00 22,000.00 25 203.00 5,075.00 M-3 Rock Excavation (or equivalent)CY 25 114.28 2,857.00 25 35.00 875.00 M-4 Select Backfill CY 325 68.89 22,389.25 325 5.00 1,625.00 M-5 Clearing & Grubbing AC 2 6,600.00 13,200.00 2 2,750.00 5,500.00 M-6 Remove irrigation and water lines under future MCA-2 building limits and 10' beyond, dispose pipe materials offsite and backrill to existing grade. Backfill and compact to trench bakfill project specifications.LF 725 67.29 48,785.25 725 18.00 13,050.00 M-7 Silt Fence, Type C and as required for site utility installation (as approved by resident iinspector) See Note 1 below.EA 2600 4.40 11,440.00 2600 3.50 9,100.00 M-8 Erosion Control Inlet Protection (Sd2-F, Sd2-P) See Note 1 below EA 45 1,588.95 71,502.75 45 385.00 17,325.00 M-9 Erosion Control Tree Protection (Tr) See Note 1 below EA 5 1,650.00 8,250.00 5 330.00 1,650.00 M-10 Erosion Control Construction Exit (Co (50'x20') See Note 1 below EA 1 5,473.71 5,473.71 1 1,650.00 1,650.00 LS-1 Mobilization, Demobilization LS 1 23,939.96 23,939.96 1 5,500.00 5,500.00 LS-2 Bonds, Insurance LS 1 7,111.14 7,111.14 1 4,950.00 4,950.00 LS-3 Line Item Not Used NA 0 0.00 0.00 0 0.00 0.00 2 of 3K/\420602\Admin\General\Project D2 Bid Tab.xlsx NO.ITEM UNIT QTY UNIT PRICE TOTAL PRICE QTY UNIT PRICE TOTAL PRICE AUGUSTA UTILITIES DEPARTMENT - CYBER COE CAMPUS PROJECT D2 JLA 3042.1803 BLAIR CONSTRUCTION, INC.BEAM'S CONTRACTING, INC. LS-4 Traffic Control for vehicular and pedestrian way (for construction under this contract)LS 1 8,715.00 8,715.00 1 5,500.00 5,500.00 LS-5 Temporary and Permanent Grassing as approved by resident inspector. See Note 1 below LS 1 6,600.00 6,600.00 1 2,750.00 2,750.00 LS-6 As-built Survey GPS coordinates (X, Y, & Z) for installed sanitary sewer and water lines LS 1 2,750.00 2,750.00 1 2,750.00 2,750.00 LS-7-A Allowance No. 1 - Owner Project Allowance LS 1 30,000.00 30,000.00 1 30,000.00 30,000.00 LS-7-B Allowance No. 2 - Material Testing Allowance LS 1 5,000.00 5,000.00 1 5,000.00 5,000.00 TOTAL CONSTRUCTION COST 768,517.94 470,414.00 **S-19 - Total Price listed as $2,246.88, corrected to $2,108.95 **M-1 - Total Price listed as $26,662.60, corrected to $25,632.60 ** Total Construction Cost listed as $768,684.83, corrected to $768,517.94 ENGINEERING CERTIFICATE To the best of my knowledge the enclosed bids are mathematically correct. TREVOR A. WIMBERLY, P.E. JOHNSON, LASCHOBER & ASSOCIATES, PC 3/15/2021 DATE 3 of 3K/\420602\Admin\General\Project D2 Bid Tab.xlsx Project Vicinity Map AUD Fort Gordon Cyber CoE Utilities Cyber CoECampus Utilities Engineering Services Committee Meeting 4/13/2021 1:10 PM Fort Gordon Cyber CoE Campus Utilities Project D2 (MCA-2) Department:Utilities Presenter:Wes Byne Caption:Consider award of Bid Item #21-137 to Blair Construction, Inc. to construct the Fort Gordon Cyber CoE Campus Utilities Project D2 (MCA-2) under the Task Order Program RFQ #18- 263 in the amount of $470,414.00. Background:Augusta Utilities Department (AUD) is the contracted water, sanitary sewer, and irrigation utility provider for Fort Gordon. Fort Gordon is constructing a new Cyber Center of Excellence (CoE) campus, which encompasses the existing campus facilities around Signal Tower. Project D2 is the second phase of AUD utility construction on campus to serve the new and existing facilities. The project includes 1600 feet of water main, 441 feet of sanitary sewer main, and related service installations. The campus masterplan has projects scheduled out to 2028. Analysis:Blair Construction, Inc. submitted an acceptable bid package and was the lowest responsive bidder. The Utilities Department reviewed the bid and found it to be fair and reasonable. We concur with Johnson, Laschober and Associates’ recommendation to award this contract to Blair Construction, Inc. to construct the Cyber CoE Campus Utilities Project D2 (MCA-2). Financial Impact:$470,414.00 funding is available from the following accounts: 515043490-5425410/88880160-5425410. Alternatives:No alternatives are recommended. Recommendation:Recommend approval for Utilities Department to contract Blair Construction, Inc. to construct this project for the amount of $470,414.00. Funds are Available in the Following Accounts: Funds are available in the following accounts: 515043490- 5425410/88880160-5425410. REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting VirtuaUTeleconference - 3lgl\021 ATTENDANCE: Present: Hons. Garrett, chairman; Johnson and McKnight, members. Absent: Hons. Hardie Davis, Jr., Mayor; Hasan, Vice Chairman. ENGINEERING SERVICES 1. Request to approve an agreement with the Phinizy Center for Water Sciences Item to manage public u...tJand educational activities related to the constructed Action: wetland treatment system at the James B Messerly Water Pollution Control Approved Plant. Motions |#:" Motion Text Made By Seconded By Motion to , aDDrove.APProve uotio, passes 3-0. Commissioneruommlssloner Jordan Johnson Catherine Smith- Passes McKnight Motion Result 2.Approve Amendment No. 9 to Agreement with ESG Operations, Inc. to Item establish the final budget amount for 2021. Action: Disapproved Motions ffit:"' Motion rext Made By Seconded By Motion Result Motion to approve. Ms. A Approve Mir"ier,i.',o,., ffr#T:ffi ;:#il:H;:tt Fails No. Motion Fails 2-1. 3. Approve change order for the Cityworks/enQuesta integration project currently in progress in the amount of $41,000.00 for the Augusta Utilities Metering and Customer Service software (lTB 12-221). Division and integrate with enQuesta CIS Item Action: Approved 4. Approve Bid Recommendation for Instruments for Water Plants (Bid Item 20- Item 210). Action: Approved Motions Motion Type Approve Motions Motion Type Approve Motions Motion Type Approve Motion Text Made By Motion to approve. Commissioner Motion Passes Jordan Johnson 3-0. Motion Text Motion to approve. Motion Passes 3-0. Motion Text Made By Motion to approve. Commissioner Motion Passes Jordan Johnson 3-0. Commissioner Catherine Smith- Passes McKnight Seconded By Motion Result Motion Result Motion Result Commissioneruommlssloner Jordan Johnson catherine Smith- Passes McKnight Made By Seconded By Seconded By 5. Motion to approve the minutes of the Engineering Services Committee held ltem on February 23,2021. Action: Approved Commissioner Catherine Smith- Passes McKnight 6. Authorize the execution of a Joint Funding Agreement with the U. S. Item Department of the Interior U. S. Geological Survey (USGS) for the Action: operation, modeling and analyzing of monitoring wells to investigate water Rescheduled levels and water quality for Augusta's groundwater production facilities. Motions Made By Seconded By Motion Motion MotionType Text Result A .^.^_^_-^ Motion to Commissioner CommissionerADDTOVCI r approve. Jordan Johnson Brandon Garrett No action is taken on this motion due to the loss of a quorum. Motions Motion Motion Text Made Seconded MotionrYPe By By Result It was the consensus of the committee that this item be referred to the full Commission with no recommendation. www.augustaga.gov Engineering Services Committee Meeting 4/13/2021 1:10 PM Minutes Department: Presenter: Caption:Motion to approve the minutes of the Engineering Services Committee held on March 9, 2021. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Augusta, GA Disclaimer The data represented on this map has beencompiled by the best methods available. Accuracyis contingent upon the source information ascompiled by various agencies and departmentsboth internal and external to the consolidatedgovernment of Augusta, GA. Augusta, GA and thecompanies contracted to develop these dataassume no legal responsibilities for the informationor accuracy contained on this map. It is strictlyforbidden to sell or reproduce these maps or datafor any reason without the written consent of theAugusta Commission.Print Date Mar 23, 2021 Department of Information TechnologyGeospatial Information Solutions (GIS) Division535 Telfair St Bldg 2000 | Augusta, GA 30901www.augustaga.gov/gis | gis@augustaga.gov Like, Follow, Share #AugustaGIS µ 1 inch = 100 feetMap Scale Crescent Drive AGENDA ITEM Engineering Services Committee April 13, 2021 Motion to determine that Crescent Drive as shown on the attached map has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department. Department: Law Caption: Motion to determine that Crescent Drive as shown on the attached map has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department. Background: The abandonment request has been reviewed by all essential county departments and administrators and approvals were received to this abandonment request. The map of said Crescent Drive is attached. Analysis: In addition to the information provided in the above Background section, publication notices will be made for a public hearing to be held, with results to be presented to the Commission. Notice to the property owners located thereon will be made, pursuant to O.C.G.A. §32-7-2(b)(1). Financial Impact: Cost of publication and advertisement of public hearing. Alternatives: Approve or deny request to determine that Crescent Drive be abandoned. Recommendation: Approve determination and request for abandonment of Crescent Drive pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies) as allowed by law, and an easement(s) as directed by the Augusta Engineering Department and the Augusta Utilities Department to be retained over the entire abandoned portion for existing or future utilities and drainage. Funds are available In Following Accounts: REVIEWED AND APPROVED BY: Engineering Services Committee Meeting 4/13/2021 1:10 PM Motion to Abandon Right of Way- Crescent Drive Department:Engineering Presenter:Law Caption:Motion to determine that Crescent Drive as shown on the attached map has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party (ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department. Background:The abandonment request has been reviewed by all essential county departments and administrators and approvals were received to this abandonment request. The map of said Crescent Drive is attached. Analysis:In addition to the information provided in the above Background section, publication notices will be made for a public hearing to be held, with results to be presented to the Commission. Notice to the property owners located thereon will be made, pursuant to O.C.G.A. §32-7-2(b)(1). Financial Impact:Cost of publication and advertisement of public hearing. Alternatives:Approve or deny request to determine that Crescent Drive be abandoned. Recommendation:Approve determination and request for abandonment of Crescent Drive pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies) as allowed by law, and an easement(s) as directed by the Augusta Engineering Department and the Augusta Utilities Department to be retained over the entire abandoned portion for existing or future utilities and drainage. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission THIS RESOLUTION OF THE AUGUSTA-RICHMOND COUNTY COMMISSION TO ABANDON THE ALLEY EAST OF HEARD AVENUE AND SOUTH OF CENTRAL AVENUE AS A PART OF THE ROAD SYSTEM OF AUGUSTA; THIS RESOLUTION, adopted by the Augusta-Richmond County Commission (“Commission”); WHEREAS, it has been proposed that the Commission make a determination that the alley East of Heard Avenue and South of Central Avenue as shown on the attached plat, has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest and that the right-of- way should be abandoned as part of the Richmond County Road System; and WHEREAS, it has been Augusta, Georgia’s policy, pursuant to O.C.G.A § 32-7-2, to reduce the number of roads in Augusta, Georgia that are not utilized or useful to the public and to abandon such roads; and WHEREAS, a Public Hearing was held on March 24, 2021 at the Augusta-Richmond County Municipal Building, 2nd Floor, 535 Telfair Street, Augusta, Georgia; and WHEREAS, notice of such Public Hearing was published in The Augusta Chronicle, the newspaper in which Sheriff’s advertisements for Richmond County are published, on March 11, 2021 and March 18, 2021, and that the property owners located on the alley East of Heard Avenue and South of Central Avenue were given notice; and WHEREAS, the results of the Public Hearing were reported to the Board of Commissioners and considered thereby; and WHEREAS, the Commission, at their meeting held, April 20, 2021, approved the proposed abandonment, pursuant to O.C.G.A. § 32-7-2 and the requirements of said statute having been met; NOW THEREFORE, be it resolved by the Commission and it is hereby resolved by the authority of same as follows: 1. It is hereby determined that all requirements of O.C.G.A. § 32-7-2 have been met for the abandonment and removal above-said of the Right-of-Way and such Right-of-Way no longer serves a substantial public purpose or that its removal from the county road system is otherwise in the best public interest and is hereby abandoned as part of the Richmond County Road System; 2. The land formerly comprising the Right-of-Way shall be quitclaimed as permitted by law to the adjoining property owner, subject to easements and restrictions deemed necessary by the Augusta Engineering Department and the Augusta Utilities Department, and the Mayor and Clerk of Commission are hereby authorized to execute the documents necessary to effectuate such transfer as directed by the Augusta Law Department. 3. This Resolution shall be recorded in the Minutes of the Augusta-Richmond County Commission, accompanied by the exhibits referred to herein; 4. This Resolution shall become effective immediately upon its adoption. DULY ADOPTED by the Augusta, Georgia Commission this ______ day of _____________________, 2021. AUGUSTA, GEORGIA COMMISSION By: ________________________________ Hardie Davis, Jr. As its Mayor Attest: ______________________________ Lena J. Bonner As its Clerk AGENDA ITEM Engineering Services Committee January 5, 2021 Motion to determine that the Alley East of Heard Avenue and South of Central Avenue as shown on the attached map has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department. Department: Law Caption: Motion to determine that the Alley East of Heard Avenue and South of Central Avenue as shown on the attached map has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department. Background: The abandonment request has been reviewed by all essential county departments and administrators and approvals were received to this abandonment request. The map of said Alley East of Heard Avenue and South of Central Avenue is attached. Analysis: In addition to the information provided in the above Background section, publication notices will be made for a public hearing to be held, with results to be presented to the Commission. Notice to the property owners located thereon will be made, pursuant to O.C.G.A. §32-7-2(b)(1). Financial Impact: Cost of publication and advertisement of public hearing. Alternatives: Approve or deny request to determine that the Alley East of Heard Avenue and South of Central Avenue be abandoned. Recommendation: Approve determination and request for abandonment of the Alley East of Heard Avenue and South of Central Avenue pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies) as allowed by law, and an easement(s) as directed by the Augusta Engineering Department and the Augusta Utilities Department to be retained over the entire abandoned portion for existing or future utilities and drainage. Funds are available In Following Accounts: REVIEWED AND APPROVED BY: Engineering Services Committee Meeting 4/13/2021 1:10 PM Motion to Abandon Right of Way- East of Heard Ave. & South of Central Ave. Department:Engineering Presenter:Law Caption:Motion to determine that the Alley East of Heard Avenue and South of Central Avenue, as shown on the attached map has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, and to receive as information the results of the public hearing held regarding the issue of abandonment pursuant to O.C.G.A. §32- 7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and adopt the attached Resolution. Background:The abandonment request has been reviewed by all essential county departments and administrators and approvals were received to this abandonment request. Pursuant to O.C.G.A. §32-7-2, a public hearing was held on March 24, 2021 for this matter. The map of said Alley East of Heard Avenue and South of Central Avenue is attached. Analysis:In addition to the information provided in the above Background section, results of the public hearing will be presented to the Commission. Notice to the property owners located thereon has been provided, pursuant to O.C.G.A. §32-7-2(b)(1). Financial Impact:Cost of publication and advertisement of public hearing. Alternatives:Approve or deny request to determine that the Alley East of Heard Avenue and South of Central Avenue be abandoned. Recommendation:Approve determination and request for abandonment of Alley East of Heard Avenue and South of Central Avenue pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit- claimed to the appropriate party(ies) as allowed by law, and an easement(s) as directed by the Augusta Engineering Department and the Augusta Utilities Department to be retained over the entire abandoned portion for existing or future utilities and drainage and adopt the attached Resolution. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 4/13/2021 1:10 PM Storm Drain System and the Main Sewage Line serving the Fairwoods Subdivision at Nance Blvd. Department: Presenter:Commissioner Sammie Sias Caption:Motion to approve and provide funding for emergency repair to the main Storm Drain System and the Main Sewage Line serving the Fairwoods Subdivision at Nance Blvd. (Requested by Commissioner Sammie Sias) Background:The department directors have evaluated this problem and confirmed it as an emergency. Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Engineering Services Committee Meeting 4/13/2021 1:10 PM Traffic Signal Lights Tobacco Rd and Talbot AveWindsor Sporing Rd and Inverness Dr; Department: Presenter:Commissioner Sammie Sias Caption:Motion to approve the installation of fully functional Traffic Signal Lights at the following intersections: 1)Tobacco Road/ Talbot Ave and Windsor Spring Rd/ Inverness Dr. (Requested by Commissioner Sammie Sias) Background:1)Tobacco Road and Talbot Ave Traffic Signal Lights will off set an intersection that is extremely dangerous with daily near misses and vehicle accidents. This intersection funnels traffic from the major KJ or former BI-Lo's shopping center, the new Neighborhood Wall Mart shopping center, Jiffy Lube, Taco Bell, Waffle House, McDonalds, Dollar Tree, and a Sonic Drive in. 2)Windsor Spring Rd and Inverness Dr. after the widening of Windsor Spring Road this intersection which handles all the traffic from the South Hampton is now a life threating hazard. Analysis:Both of these intersections were tested and met the traffic standards for a full traffic signal light. The conditions at these two intersections will not improve with time. Actually, the danger grows with each passing day. We must provide funding. These critical safety issues have existed for too long without resolution leaving a majority of the South Augusta citizens at risk. Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: