HomeMy WebLinkAbout2021-02-09 Meeting Minutes Engineering Services Committee Meeting Virtual/Teleconference - 2/9/2021
ATTENDANCE:
Present: Hons. Garrett, Chairman; Hasan, Vice Chairman; Johnson and
McKnight, members.
Absent: Hon. Hardie Davis, Jr., Mayor.
ENGINEERING SERVICES
1. Motion to approve adjusting daily landfill operation schedule as recommended
by Engineering Director. (Requested by Commissioner Garrett)
Item
Action:
Approved
Motions
Motion
Type Motion Text Made
By
Seconded
By
Motion
Result
It was the consensus of the
committee that this be added to the
agenda with no objection.
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Jordan Johnson
Commissioner
Ben Hasan Passes
2. Approve to Supplement Construction Contract to E R Snell Contactor, Inc. in
the amount of $87,978.36 for completing the supplemental Traffic Operation
needed improvements in conjunction with the Transportation Investment Act
(TIA) Project, 15th Street Pedestrian Improvements Project as requested by
AED . Bid 18-260.
Item
Action:
Approved
Motions
Motion Text Made By Seconded By
Motion
Type
Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Jordan Johnson Passes
3. Motion to approve to Supplement Construction Two to Superior Construction
Company Southeast, LLC in the amount of $550,000 for Transportation
Investment Act (TIA) Project, 5th Street Bridge over Savannah River Repair
and Restoration Projects as requested by AED . Bid 19-291
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Catherine Smith-
McKnight
Passes
4. Motion to approve supplemental funding (SA2) for Engineering Phases of
Design Consultant Services Agreement to Hussy Gay Bell (HGB) in the
amount of $198,700 for the Broad Street Improvements Project as requested
by the AED. RFP 18-311.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Catherine Smith-
McKnight
Passes
5. Approve the revised upfront construction cost of $150,000 on the installation
of 16 street lights along D’Antignac Street between Walton Way and R.A.
Dent Blvd with an annual cost of $8,570.88. Construction funding is available
in Street Lighting Upgrades SPLOST IV account and ongoing operations and
maintenance in annual street lighting budget. Requested by AED
Item
Action:
Approved
Motions
Motion Text Made By Seconded By
Motion
Type
Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Catherine Smith-
McKnight
Passes
6. Motion to approve and authorize the Augusta Engineering Department to
accept and receive REBC grant from Georgia Department of Transportation
(GDOT) for 13th Street (SR4) Enhancement and Beautification in conjunction
with TIA funded 13 Street (SR4) Improvements Project. Requested by AED
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Jordan Johnson
Commissioner
Ben Hasan Passes
7. Update on status of Methane Gas production at the landfill; and the amount
generated by this system from 2018, 2019 and 2020. (Requested by
Commissioner Brandon Garrett)
Item
Action:
Approved
Motions
Motion
Type Motion Text Made
By
Seconded
By
Motion
Result
It was the consensus of the
committee that this item be received
as information without objection.
8. Motion to approve the minutes of the Engineering Services Committee held
on March 10, 2020.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Jordan Johnson Passes
9. Motion to approve continued funding of the current “On-Call Construction
Material Inspection and Testing, Construction Monitoring and Quality
Assurance/ Quality Control, and Geotechnical Inspections and Investigations
(CMT Geotech)” Services Contract in the amount of $1,000,000 as requested
by AED. RFP 19-179
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Catherine Smith-
McKnight
Passes
10. Approve continued funding of the current “On-Call Professional Services for
Engineering and Field Design, small to Medium Scale Maintenance Task
Design, Regulatory Periodic Inspection Compliance and Structural
Inspection & Investigations” Services (CEI Services) Contract in the amount
of $500,000 as requested by AED. RFP 19-241
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Catherine Smith-
McKnight
Passes
11. Motion to approve entering into Memorandum of Understanding (MOU)
with Phinizy Center for Water Science (Nonprofit Organization) to assist
Augusta Engineering Department (AED) with implementing Section 319(h)
grant supported activities that are designed for stream water quality
restoration in local waterbodies. Also authorized Mayor to sign MOU as
requested by the Augusta Engineering Department. Requested by AED.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve Motion to
approve. Mr.
Commissioner
Jordan Johnson
Passes
Hasan out.
Motion Passes
3-0.
Commissioner
Catherine Smith-
McKnight
www.augustaga.gov
Engineering Services Committee Meeting
2/9/2021 1:15 PM
Attendance 2/9/21
Department:
Presenter:
Caption:
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
2/9/2021 1:15 PM
Daily Landfill Operation Schedule
Department:
Presenter:
Caption:Motion to approve adjusting daily landfill operation schedule as
recommended by Engineering Director. (Requested by
Commissioner Garrett)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
1
1785 Oak Road
Snellville, GA 30078
PROPOSAL & CONTRACT
Date January 26, 2021
Augusta Engineering Department
452 Walker St.
Augusta , GA 30901
15th ST. FINAL CHANGE ORDER
Estimator: Chip Price
E.R. Snell Contractor, Inc., subject to the terms and conditions following and hereinafter stated, proposes to furnish all labor, material and equipment required for the
performance of the following described work in connection with construction or improvements at the above stated project.
DOT REVISIONS TRAFFIC SIGNALS
SIGNAL #2 LANEY WALKER LS 1 $ 4,235.68 $ 4,235.68
SIGNAL #3 POPE ST. LS 1 $ 11,584.59 $ 11,584.59
SIGNAL #4 WALTON WAY LS 1 $ 10,319.09 $ 10,319.09
TRAFFIC CONTROL FOR ALL SIGNALS LS 1 $ 7,200.00 $ 7,200.00
SOLAR POWERED LIGHTED CROSSWALK LS 1 $ 31,532.00 $ 31,532.00
15TH STREET REMOVE EXISTING LIGHTING LS 1 $ 23,107.00 $ 23,107.00
TOTAL FOR CHANGE ORDER $ 87,978.36
Prepared By Chip Price Date 01/26/21
Acceptance of Proposal Date
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby adopted:
Section 1: This project is set up and authorized to CPB#371-041110-T15040146
to Supplement Construction in the amount of $87,978.36
to E R Snell Contractor for the 15th Street Pedestrian Improvements Project.
Funding is in the project TIA Discretionary funds.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
SPLOST Phase VI 373,510$
SPLOST Phase VI 382,610$
TIA Discretionary 109,080$
TIA Funds 5,652,600$
TIA Funds 93,480$
TIA Discretionary 87,980$
6,699,260$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
CPB#371-041110-T15040146
Honorable Hardie Davis, Jr., Mayor
CAPITAL PROJECT BUDGET
15th Street Pedestrian Improvements
1 of 4 1/29/2021
Augusta-Richmond County, Georgia CPB#371-041110-T15040146
CAPITAL PROJECT BUDGET
15th Street Pedestrian Improvements
CPB AMOUNT CPB NEW
SOURCE OF FUNDS CPB ADDITION CPB
SPLOST PHASE VI (373,510)$ -$ (373,510)$
328-041110-5212115
210328103
SPLOST PHASE VI (382,610)$ (382,610)$
328-041110-5212115
210328103
TIA DISCRETIONARY (109,080)$ (87,980)$ (197,060)$
TIA Funds (5,746,080)$ (5,746,080)$
371-041110-T15040146
TOTAL SOURCES:(6,611,280)$ (87,980)$ (6,699,260)$
USE OF FUNDS
ENGINEERING
328-041110-5212115 756,120$ -$ 756,120$
TIA DISCRETIONARY 109,080$ 87,980$ 197,060$
TIA FUNDS 5,746,080$ 5,746,080$
TOTAL USES:6,611,280$ 87,980$ 6,699,260$
2 of 4 1/29/2021
3 of 4 1/29/2021
4 of 4 1/29/2021
Engineering Services Committee Meeting
2/9/2021 1:15 PM
15th Street Pedestrian Improvements Project (John C Calhoun to Central Ave)
Department:Engineering
Presenter:
Caption:Approve to Supplement Construction Contract to E R Snell
Contactor, Inc. in the amount of $87,978.36 for completing the
supplemental Traffic Operation needed improvements in
conjunction with the Transportation Investment Act (TIA)
Project, 15th Street Pedestrian Improvements Project as
requested by AED . Bid 18-260.
Background:Currently, E.R. Snell Contactor, Inc. is under contract with
Augusta, GA for Transportation Investment Act (TIA) Project,
15th Street Pedestrian Improvements. The Augusta Commission
awarded this contract on December 15, 2018. During the
construction phase additional improvements to Traffic Signals
and Pedestrian Crosswalk were identified. With a section of this
road being a state road, AED coordinated these changes with
GDOT and got GDOT approval . To keep the project on
schedule and avoid standby time expenses, AED proceeded with
this work.
Analysis:E.R. Snell Contractor, Inc. is currently under contract with
Augusta, GA/Augusta Engineering for 15th Street Pedestrian
Improvements work and the cost provided of $87,978.36. This
cost was analyzed and determined to be reasonable and cost
effective for the type of work being performed.
Financial Impact:Funds are available in the amount of $87,978.36 TIA
discretionary funds.
Alternatives:Do not approve and find alternative to complete Laney Walker
Blvd. needed improvements.
Recommendation:Approve to Supplement Construction Contract to E R Snell
Contactor, Inc. in the amount of $87,978.36 for completing
supplemental Laney Walker roadway section needed
Improvements in conjunction with Transportation Investment
Act (TIA) Project, 15th Street Pedestrian Improvements Project
as requested by AED. Bid 18-260.
Funds are
Available in the
Following
Accounts:
TIA Discretionary Funds 235-041110-5414110
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project is authorized to CPB#371-041110-T15041217. This request is to Supplement
Construction Two to Superior Construction Company Southeast, LLC in the amount
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
TIA Design 992,200$
TIA Construction 8,000,000$
LMIG FUNDS 1,000,000$
TIA Discretionary 1,500,000$
TIA Discretionary 158,202$
LMIG FY2021FUNDS 550,000$
12,200,402$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Honorable Hardie Davis, Mayor
CAPITAL PROJECT BUDGET
CPB#371-041110-T15041217
5th Street Bridge over the Savannah River (Bridge Repair and Restoration)
(Bid 19-291
of $550,000 for Transportation Investment Act (TIA) project subject to bonds as
requested by AED. Funding is available in GDOT LMIG FY 2021 funds.
1/20/2021
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
CPB#371-041110-T15041217
5th Street Bridge over the Savannah River (Bridge Repair and Restoration)
(Bid 19-291
CPB AMOUNT CPB New
SOURCE OF FUNDS CPB Addition CPB
TIA Project
371-041110/5212115-T15041217 ($200,920)($200,920)
TIA Project
371-041110/5212115-T15041217 ($791,280)($791,280)
TIA Project
371-041110-T15041217 ($8,000,000)($8,000,000)
GDOT LMIG Funds ($1,000,000)($1,000,000)
TIA Discretionary ($1,500,000)($1,500,000)
TIA Discretionary ($158,202)($158,202)
GDOT LMIG 2021 ($550,000) ($550,000)
TOTAL SOURCES: ($11,650,402) ($550,000) ($12,200,402)
USE OF FUNDS
ENGINEERING
371-041110-5414210/T15041217 $992,200 $992,200
TIA Project
371-041110-5414110-T15041217 $8,000,000 $8,000,000
GDOT LMIG Funds
371-041110-5414110 $1,000,000 $1,000,000
TIA Discretionary
235-041110-5414110 $1,500,000 $1,500,000
TIA Discretionary
235-041110-5414110 $158,202 $158,202
GDOT LMIG 2021 $550,000 $550,000
TOTAL USES: $11,650,402 $550,000 $12,200,402
1/20/2021
Engineering Services Committee Meeting
2/9/2021 1:15 PM
5th Street Over the Savannah River –Bridge Repair and Restoration Project TIA Project#RC07-
001217/PI#0011418 Bid #19-291 File Reference: 21– 014(T)
Department:Engineering
Presenter:
Caption:Motion to approve to Supplement Construction Two to Superior
Construction Company Southeast, LLC in the amount of
$550,000 for Transportation Investment Act (TIA) Project, 5th
Street Bridge over Savannah River Repair and Restoration
Projects as requested by AED . Bid 19-291
Background:Currently, Superior Construction Company Southeast, LLC is
under contract with Augusta, GA for Transportation Investment
Act (TIA) Project, 5th Street Bridge over Savannah River
(Bridge Repair and Restoration) Improvements Project. The
Augusta Commission awarded this contract on December 17,
2019. Project construction total cost is $11,559,000.00.
However, certain improvements were placed on hold for later
release and the initial award amount was limited to
$10,500,000.00. Bridge rehabilitation work is progressing and is
at a stage that remaining items need to be added to keep project
completion as scheduled. To maintain project schedule and
avoid standby time cost, supplementing the subject contract is a
cost effective way to complete the remaining improvements .
Analysis:Superior Construction Company Southeast, LLC is currently
under contract with Augusta, GA/Augusta Engineering for 5th
Street Bridge over Savannah River (Bridge Repair and
Restoration)) Improvements work. Bridge rehabilitation work is
progressing and is at a stage that remaining items need to be
added to keep project completion as scheduled. The Supplement
amount is the same amount that the contractor provided in the
accepted total bid amount.
Financial Impact:GDOT LMIG FY2021 Funds.
Alternatives:
1) Do not approve and find alternative to complete warranted
improvements and meet TIA project completion schedule.
Recommendation:Approve to Supplement Construction Two to Superior
Construction Company Southeast, LLC in the amount of
$550,000 for Transportation Investment Act (TIA) Project, 5th
Street Bridge over Savannah River Repair and Restoration
Projects as requested by AED. Bid 19-291
Funds are
Available in the
Following
Accounts:
GDOT LMIG FY2021 Funds 335-041110
REVIEWED AND APPROVED BY:
Attachment A December 10, 2020
TIA Band 3 Broad Street Improvement Project – James Brown Linear Park Page 1 of 5
Attachment A - Scope of Work
TIA Band 3 Broad Street Improvement Project
James Brown Linear Park
Augusta Engineering Department
12/10/2020
The scope of work presented below is prepared by Barge Design Solutions for Hussey Gay
Bell and the Augusta Engineering Department in association with the TIA Band 3 Broad
Street Improvement Project in the City of Augusta.
I. Project Description
II. Scope of Services
III. Project Understanding, Assumptions, and Exclusions
IV. Time of Performance
V. Client’s Responsibilities
VI. Compensation
I. Project Description
An exciting opportunity within the Broad Street Improvement Project has emerged to
transform the streetscape improvements for a segment of the street to a signature linear
park. The Hussey Gay Bell (HGB)/Barge Design Solutions (Barge) team propose to fully
design the James Brown Linear Park, located on Broad Street between the 650 linear-
foot block between James Brown Boulevard and 8th Street. Based on the schematic
design proposed to the City in April 2020 and revised again in July 2020, the
approximately 2.5-acre James Brown Linear Park will include the following features:
• Relocated James Brown bronze statue set within an interpretive area of
decorative hardscape and signage elements that convey James Brown’s life
story.
• Central plaza aligned with the Atlantic Commons includes musical/audio
element, decorative hardscape and a water feature.
• Locations designed for local, informal music performances.
• Decorative paving and patterning that extends from building-face to building-
face through, across and the length of the median park.
• Extensive custom shade structures along the linear park promenade.
• Location for new art piece.
• Site furnishings, amenities, and site utilities to promote flexible and multiple uses
and events.
Barge anticipates that the following design disciplines will be involved: landscape
architecture, fountain/water feature design, audio design, irrigation design, and civil,
electrical, plumbing and structural engineering.
Compared with the cost of constructing an improved streetscape at the same location
Attachment A December 10, 2020
TIA Band 3 Broad Street Improvement Project – James Brown Linear Park Page 2 of 5
(approximately $1.5M), the cost to complete the James Brown Linear Park is
significantly higher (approximately $4.2M) due to the additional customized park
features and unique amenities. It is our understanding that the proposed scope of
work would be additive to the existing Broad Street Improvement project scope and
not generate an additional bid package or construction phase. This scope of services
is based on the understanding that the James Brown Linear Park design would be let
and constructed at the same time as the larger Broad Street Improvement project.
II. Scope of Services
A. Task 1 – Program Refinements and Stakeholder Engagement
The HGB/Barge team will conduct the following tasks:
1. Review / coordination meetings with Augusta Engineering Department (AED).
2. Stakeholder meetings (3 review meetings) and follow-up coordination with Augusta
Chamber, Visit Savannah and other stakeholders as identified by AED.
3. Schematic design layout refinements based on input from stakeholders.
4. Revised cost opinions of schematic design.
5. Two (2) photorealistic renderings for project promotion.
B. Task 2 – Preliminary Design
The Barge team will perform the following tasks associated with the Preliminary Plans Phase
necessary to complete the linear park design:
1. Prepare typical sections and enlarged plans as it relates to the linear park design.
2. Coordinate linear park design and layout with roadway plans.
3. Prepare preliminary plans.
4. Prepare draft provisions as it relates to the linear park design.
5. Prepare construction details.
6. Prepare updated Opinion of Probable Construction Cost (OPCC) (using Barge’s
method and not utilizing GDOT CES).
7. Prepare field plan review plans as part of the overall submittal for Broad Street.
8. Address field plan review comments specific to the specialized design of the linear
park.
C. Task 3 – Final Design
The Barge team will conduct the following tasks associated with the Final Plans Phase
necessary to complete the linear park design:
1. Prepare revised typical sections and enlarged plans for the linear park design.
2. Continue to coordinate linear park design and layout with roadway plans.
3. Prepare final plans.
4. Prepare Special Provisions as it relates to the linear park design.
5. Prepare construction details.
6. Prepare updated Opinion of Probable Construction Cost (again, not utilizing GDOT
CES).
7. Prepare FFPR related to the above-mentioned scope as part of the overall
Attachment A December 10, 2020
TIA Band 3 Broad Street Improvement Project – James Brown Linear Park Page 3 of 5
submittal for Broad Street.
8. Address FFPR comments specific to the specialized design of the linear park.
9. Contribute to Detailed Construction Quantities, Opinion of Probable Cost related to
the above-mentioned scope.
10. Prepare/submit final plans as part of overall submittal for Broad Street.
11. Revise plans, prepare amendments during bidding process.
D. Task 4 – Limited Construction Phase Services
The HGB/Barge team will perform the limited Construction Phase services tasks related to
the above-mentioned scope necessary to bid the project:
1. Pre-Bid Meeting Attendance.
2. Review Bid RFIs and Addenda.
3. Review bids as it relates to the above-mentioned scope.
4. No Owner Architect Contractor (OAC) meetings or construction site visits are
included in this scope of work but Barge would be pleased to provide, as an
additional service, attendance at OAC meetings and to conduct site walks and
prepare reports during construction.
III. Project Understandings, Assumptions, and Exclusions
A. The HGB/Barge team will provide the above-noted services based upon a given set of
assumptions. These assumptions are as follows.
1. Construction budget is assumed to be $4,200,000.
2. Permit, recording fees, etc., are to be paid by the Client/Owner.
3. Design will not be phased, and one set of Broad Street construction documents will
be produced that will include the documentation for the James Brown Linear Park.
4. Design services will include structural, site electrical and plumbing, audio/sound
design, water feature design and irrigation, as necessary.
5. Appropriate sanitary sewer, water, gas, electric, and communication services are
available to the site; offsite utility design services can be provided as an additional
service.
6. There are no historical structures involved with the project.
7. Adequate water supply and pressure is available to achieve required fire protection
flows and pressures, as well as water feature flows and pressures.
8. Adequate sanitary sewer service is available such that no pretreatment or lift station
design is required.
9. Design fee is based upon the schematic site plan (Attachment B), as developed by
the HGB/Barge team and last revised in July 2020. Modification or changing of the
Attachment A December 10, 2020
TIA Band 3 Broad Street Improvement Project – James Brown Linear Park Page 4 of 5
site plan may require additional services, depending upon the scope and timing of
changes.
10. Irrigation is to be from a domestic water source, and no supplemental pumping
systems are required.
11. Playground equipment is not included in the scope.
12. Geotechnical report will be provided by others.
13. Schedule is dependent upon the timely receipt of critical information, such as final
site plan, building footprints with utility points of connection, responses from
regulatory authorities, and Owner/Contractor/Property Owners. Information to be
provided by others will be received in a timely manner that corresponds to the civil
engineering/site development project schedule. If the information is not received in
a timely manner, then additional design fees may be required.
B. The following excluded services can be provided as an additional service with an
appropriate adjustment in fees.
1. Record drawing preparation based upon markups prepared by the general
contractor.
2. Services resulting from significant changes in general scope or character of the
project or its design.
3. Design revisions requested by those outside the project team and stakeholders
beyond the Task 1 Program Refinements & Stakeholder Engagement Phase.
4. Site renderings, other than those noted in Task 1 scope of services.
5. Additional review meetings with client and/or design teams.
6. Preparation of multiple, separate construction contract packages.
7. Opinion of probable construction cost, except as otherwise noted.
8. LEED certification.
9. Retaining wall design.
10. Sanitary sewer lift station design.
11. Traffic study and traffic signal design.
12. Offsite utility design services.
It is understood and agreed that Barge’s services under this agreement do not include
project observation or review of the Contractor’s performance or any other construction-
phase services, and that such services will be provided by the Client. The Client assumes
all responsibility for interpretation of the contract documents and for construction
observation, and the Client waives any claims against Barge that may in any way be
connected thereto.
IV. Time of Performance
The HGB/Barge team is prepared to begin work within two (2) weeks upon receipt of a signed
professional services agreement or written authorization to proceed.
Barge and Client are aware that many factors outside HGB/Barge team’s control may affect
Attachment A December 10, 2020
TIA Band 3 Broad Street Improvement Project – James Brown Linear Park Page 5 of 5
HGB/Barge team’s ability to complete the services to be provided under this Agreement.
HGB/Barge team’s will perform these services with reasonable diligence and expediency,
consistent with sound professional practices.
V. Client’s Responsibilities
The HGB/Barge team’s strives to work closely with our clients. In order for the project team to
function efficiently, certain information is needed to be provided by the Client and other
interested stakeholders in a timely manner. These items and responsibilities are noted below.
A. Provide information as required to support development of HGB/Barge team’s scope, as
required in the project agreement for services.
B. Provide review comments in a timely manner. To meet the proposed schedule, we
anticipate short review periods of two to three business days by City staff at key deliverable
milestones and general buy-in and consensus from the other design team members during
the monthly review meetings.
C. Provide single point of contact for project coordination purposes.
D. Coordination of stakeholder meetings, including public announcements/invitations,
providing meeting space, meeting information, and associated expenses will be provided
by Client.
VI. Compensation
The compensation to be paid to HGB/Barge team for providing requested services listed above
is a Lump Sum fee to be distributed according to the Fee Summary Table.
FEE SUMMARY TABLE
TASK
FIRM
FEE
Project Management; QA/QC
HGB
$9,885
Task 1: Program Refinements & Stakeholder
Engagement
BARGE $20,325
Task 2: Preliminary Design BARGE $64,670
Task 3: Final Design BARGE $76,835
Task 4: Limited Construction Phase Services
BARGE
$26,985
$198,700
The fees provided above are valid up to sixty (60) days from the date of this proposal.
(SA1 – For changes greater than $25,000) June 2020
ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
Augusta Richmond County Project Number(s): 371-041110-T15040107
GDOT Number (s):
RC07-000107
PI 0011382
Supplemental Agreement Number: 2
Purchase Order Number: 19ENG752
WHEREAS, We, Hussey Gay Bell (HGB). Consultant, entered into a contract with Augusta-Richmond
County on July 31, 2012 for engineering design services associated with the improvements to Broad
Street Improvements. Project RC07-000107, PI 0011382, File Reference No. 20-014 (T), and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered
by the scope of the original contract, we desire to submit the following Supplemental Agreement
to-wit:
Additional Engineering Services to complete needed survey and storm sewer data.
It is agreed that as a result of the above described modifications the contract amount is increased
by $198,700.00 from $2,366,119.69 to a new total of $2,564,819.69.
Any modifications to submittal dates shall be as identified in the attached proposal. This agreement
in no way modifies or changes the original contract of which it becomes a part, except as specifically
stated herein.
NOW, THEREFORE, We, Hussey Gay Bell (HGB). Consultant, hereby agree to said Supplemental
Agreement consisting of the above mentioned item, and agree that this Supplemental Agreement
is hereby made a part of the original contract to be performed under the specifications thereof, and
that the original contract is in full force and effect, except insofar as it might be modified by this
Supplemental Agreement.
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY Hussey Gay Bell (HGB).
AUGUSTA, GEORGIA
Hardie Davis, Mayor
Approved Date: Approved: Date:
[ATTACHED CORPORATE SEAL]
ATTEST: ATTEST:
Title:
Title:
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project is authorized to CPB#371-041110-T15040107
This request is for Supplemental Agreement Number Two to
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
TIA Design 2,078,800$
TIA Funds 287,330$
TIA Funds 198,700$
2,564,830$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Honorable Hardie Davis, Mayor
CAPITAL PROJECT BUDGET
CPB#371-041110-T15040107
Broad Street Improvements
(RFP #18-311)
Supplemental Agreement Number Two
Hussey Gay Bell (HGB) in the amount of $198,700.00
Funding is available in the TIA project budget:
1/20/2021
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
CPB#371-041110-T15040107
Broad Street Improvements
(RFP #18-311)
Supplemental Agreement Number Two
CPB AMOUNT CPB New
SOURCE OF FUNDS CPB ADDITION CPB
TIA Project
371-041110/5212115-T15040107 (2,366,130)$ (198,700)$ (2,564,830)$
TOTAL SOURCES: ($2,366,130) ($198,700) ($2,564,830)
USE OF FUNDS
ENGINEERING
371-041110-5212115/T15040107 $2,366,130 $198,700 $2,564,830
TOTAL USES: $2,366,130 $198,700 $2,564,830
1/20/2021
CPB#371-041110-T15040107
1/20/2021
CPB#371-041110-T15040107
1/20/2021
Engineering Services Committee Meeting
2/9/2021 1:15 PM
Broad Street Improvements Project Design Services for Roadway Improvements TIA Project Number:
RC07-000107 / PI#0011382 RFP Item: 18-311File Reference: 21 – 014(T)
Department:Engineering
Presenter:
Caption:Motion to approve supplemental funding (SA2) for Engineering
Phases of Design Consultant Services Agreement to Hussy Gay
Bell (HGB) in the amount of $198,700 for the Broad Street
Improvements Project as requested by the AED. RFP 18-311.
Background:The Broad Street Improvements is a project from the “Approved
Investment List” of TIA that was approved by voters of the
CSRA in July 31, 2012 referendum. The Broad Street is a Band
3 project. The project improvements consist of improving
roadway safety by resurfacing, reconstructing the existing curb
and gutter, replacing sidewalks and improving the storm water
system. The project will improve pedestrian safety at
intersections with new high visibility crosswalks. New street
landscaping will be provided, where possible, to enhance
pedestrian use and improvement roadway aesthetics. In April
2019, commission approved the award of the design phase of the
project to HGB. The roadway design is in progress and
supplement services are warranted for landscaped/hardscaped
design completion.
Analysis:On April 5, 2019 commission approved to move the project
from preliminary initial concept to design. The project is in
design phase and supplemental professional services are needed
for streetscape improvements for a segment of the street to a
signature linear park. The purpose of this supplement is to
complete customized park preliminary and final design.
Financial Impact:Project TIA Funds.
Alternatives:1). Do not approve and find an alternative to complete the
project and meet TIA project completion schedule.
Recommendation:Approve supplemental funding (SA2) for Engineering Phases of
Design Consultant Services Agreement to Hussy Gay Bell
(HGB) in the amount of $198,700 for the Broad Street
Improvements Project as requested by the AED.
Funds are
Available in the
Following
Accounts:
Project TIA Funds 371-041110-T15040107-5212115
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
2/9/2021 1:15 PM
D’Antignac Street
Department:Engineering
Presenter:
Caption:Approve the revised upfront construction cost of $150,000 on
the installation of 16 street lights along D’Antignac Street
between Walton Way and R.A. Dent Blvd with an annual cost of
$8,570.88. Construction funding is available in Street Lighting
Upgrades SPLOST IV account and ongoing operations and
maintenance in annual street lighting budget. Requested by
AED
Background:At the request of University Hospital, Georgia Power will install
16 street lights along D’Antignac Road in front of University
Hospital. The existing street lighting system is no longer
working and beyond our ability to repair it. The upfront cost to
install the street light system will be $150,000 dollars. The
yearly cost to operate and maintain the system will be $8,570.88
which will be covered by the annual street lighting budget.
Analysis:The cost proposal was received by Augusta, GA on September
28, 2020, in the amount of: Contractor Bid Georgia Power
$150,000 upfront $8,570.88 annually
Financial Impact:Adequate funds are available and expenditures of this amount
will leave sufficient amount for emergencies through the end of
the fiscal year.
Alternatives:1) Do not approve
Recommendation:Approve the revised upfront construction cost of $150,000 on
the installation of 16 street lights along D’Antignac Street
between Walton Way and R.A. Dent Blvd with an annual cost of
$8,570.88. Construction funding is available in Street Lighting
Upgrades SPLOST IV account and ongoing operations and
maintenance in annual street lighting budget.
Funds are
Available in the
Following
Accounts:
SPLOST IV 328-041110-54.14410/219824905, 276-041610-
5312310
REVIEWED AND APPROVED BY:
13th Street REBC Concept Report
Summary
The proposed project is a landscape beautification project located in downtown Augusta,
Georgia. The proposed project location is on 13th Street. Thirteenth street is the gateway from
South Carolina into Augusta’s Medical District. The project is also in the shadow of the historic
Sacred Heart Cultural Center. Greene Street and Telfair Street bookend the project. Close to
twenty five feet are available beyond the back of the curb in either direction. Both properties are
currently owned by the applicant.
Augusta, Georgia chose thirteenth Street for two reasons. First, it transitions from a more
pedestrian area to an area of more vehicle traffic. Second, it offers the widest, most consistent
right-of-way along the 13th street corridor. This area fits best to serve as our “impact area”.
Augusta, Georgia acknowledged and addressed this important area in the past. Today, many of
the plants and trees are beyond their prime.
We applied GDOT landscape policy 6755-9, Landscaping on D.O.T. Right of Way when
creating a concept plan. The speed limit is 35 mph through the corridor requiring a minimum
horizontal clearance of four feet from back of the curb (Central Business District). No plants from
the invasive list were used in the design. The designer included Native and adapted trees where
appropriate.
The City of Augusta has implemented many GDOT beautification grant projects. If awarded the
funds to complete this project, Augusta, Georgia will bid the project. Then a qualified landscape
contractor will complete the project. Augusta, Georgia tree and landscape maintenance team
will maintain the project. Augusta, Georgia may also award a maintenance contract for ongoing
maintenance.
Cost Estimate
Item Unit Cost QTY Total Cost
Mobilization LS 3500 1 3500
Grading and Demolition LS 3500 1 3500
0
Irrigation LS 5000 1 5000
0
Plants 0
Large Tree Ea 800 15 12000
Small Tree Ea 500 14 7000
7 gallon Ea 75 49 3675
3 gallon Ea 35 72 2520
1 gallon Ea 10 1006 10060
0
Sod SF 1 0 0
0
Mulch 0
Hardwood cy 57 78 4446
Base Cost $48,201.00
Site Analysis
1.Looking North from Telfair Street
2.Looking South from Greene Street
3.Looking West from 13th Street North of Bridge
4.Looking West from 13th Street South of Bridge
5.Looking West from 13th Street South of Bridge
6.Looking East from 13th Street South of Bridge
City of Augusta
Attn: The Honorable Hardie Davis, Jr., Mayor of Augusta
535 Telfair St., Suite 200
Augusta, GA 30901 November 2, 2020
Page 2 of 3
Stipulations to Your REBC Grant Project:
· REBC Grant Funds cannot be used for highway construction, design, administration, or
hardscape of any kind. All clearing, grubbing, grading, hardscape and infrastructure
installation must be completed and funded separately from the proposed planting.
· Please increase the spacing of Nuttall Oak trees from 20' to 40', and reducer the number
of Kousa Dogwoods from 14 to 10, so that site is not overcrowded. The trees and shrubs
closest to the intersections must be placed so that they do not block sight distances. Grant
amount has been reduced to reflect these changes.
Checklist for Receiving Grant Funds:
Complete electronic contract execution process within 45 days of the date of this grant
award notification (see Instructions, enclosed).
Finalize plans from your original grant proposal. Grant recipients have one year from the
effective date of the REBC Agreement to obtain a Special Encroachment Permit, but this
process can take some time. Recipients are STRONGLY ENCOURAGED to submit
their application and final plans to their District Traffic Operations Office for a
Special Encroachment Permit within 90 days of this notification. Be sure to read
Policy No. 6755-9, Landscaping on the Right of Way, for guidance, available at:
http://www.dot.ga.gov/informationcenter/programs/environment/landscapes/Pages/defau
lt.aspx
Include important information in your construction documents and plans – photographs,
speed limit, right of way boundary lines, locations of existing trees and site elements,
setback distances from the edge of the road, existing billboards, etc.
Submit a digital copy of your project plans to the District Traffic Engineer in the District
Office of Traffic Operations, via GPAS AMPS, either for formal submission or a conceptual
review. The District will do an initial review and submit comments back to you with an
original Special Encroachment Permit Application and a Mowing and Maintenance
Agreement, including a maintenance work plan.
Once the Special Encroachment Permit is approved, grant recipients have one year to
complete their projects. Failure to meet this deadline will subject these funds to
reallocation.
City of Augusta
Attn: The Honorable Hardie Davis, Jr., Mayor of Augusta
535 Telfair St., Suite 200
Augusta, GA 30901 November 2, 2020
Page 3 of 3
Grantee must request reimbursement of funds within ninety (90) calendar days after
project completion. To claim reimbursement, submit the following to the State
Maintenance Office Landscape Architecture Unit:
· One copy of the Special Encroachment permit you receive from the District Office.
This will include the signed Right of Way Mowing and Maintenance Agreement
· One copy of the final, approved landscape plans (8 ½ x 11 sheets)
· One copy of the final budget
· One copy of the completed and signed E-Verify Form
These documents may be sent electronically, or via mail. When the documents listed
above are sent to our office, we will email you a completed invoice cover sheet with
instructions for submittal. This cover sheet shall be printed on your official letterhead
and returned to our office, along with any supporting invoices. Only one
reimbursement payment will be issued. A sample invoice and invoice cover sheet will
be attached to the REBC Agreement for your reference.
Once the REBC Agreement is signed and dated by GDOT senior management in our system, we
will send you an original copy for your records, and set up a Purchase Order (PO) for the amount
of the grant.
The mailing address and email for the State Maintenance Office Landscape Architecture Unit is:
GDOT Office of Maintenance
REBC Grant Program, 10th Floor
600 West Peachtree Street
Atlanta, GA 30308
landscape@dot.ga.gov
Please document your project with digital photographs. The Department will display your
presentation to the Roadside Enhancement and Beautification Council, and it will be an important
documentation of your REBC Grant funding results.
Engineering Services Committee Meeting
2/9/2021 1:15 PM
GDOT Roadside Enhancement and Beautification Council Grant (REBC) Program Augusta
Engineering Grant Acceptance Project No. N/A File Reference: 21-014 (A)
Department:Engineering
Presenter:
Caption:Motion to approve and authorize the Augusta Engineering
Department to accept and receive REBC grant from Georgia
Department of Transportation (GDOT) for 13th Street (SR4)
Enhancement and Beautification in conjunction with TIA funded
13 Street (SR4) Improvements Project. Requested by AED
Background:The Roadside Enhancement and Beautification Council (REBC)
Grant Program provides funding for roadside enhancement and
beautification projects along Georgia's roadsides. The funding
comes from contributory value fees paid by outdoor advertising
companies to GDOT for vegetation removal at outdoor
advertising signs. Funds may be used for purchasing landscape
plant material, sod, topsoil, mulch and labor costs associated
with the approved items for installing plant material along state
routes throughout the state. Any local government, community
improvement district, or state agency may apply for grants
(maximum $50,000) for landscape enhancement of the state
right-of-way that involves the local community and displays the
right-of-way in an attractive manner promoting further pride in
Georgia. The REBC requires the use of Georgia Grown
materials . On May 19, 2020, Augusta Commission authorize
AED to submit grant application. On November 2, 2020, GDOT
notified Augusta that AED grant submittal was accepted for
funding.
Analysis:13th Street/SR 4 is TIA band 3 road improvements and
enhancement project and is under design. It is the gateway from
South Carolina into Augusta’s Medical District. Grant amount is
$32,801.00 and is supplemental needed funding for roadway
enhancement and beautification.
Financial Impact:
No matching funds required. Augusta will be receiving
$32,801.00 state funds.
Alternatives:1). Do not approve and identify other funding source to
complete designed landscaped enhancement.
Recommendation:Approve and authorize the Augusta Engineering Department to
accept and receive REBC grant from Georgia Department of
Transportation (GDOT) for 13th Street (SR4) Enhancement and
Beautification in conjunction with TIA funded 13 Street (SR4)
Improvements Project. Requested by AED
Funds are
Available in the
Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
2/9/2021 1:15 PM
Methane Gas production at landfill
Department:Augusta Commission
Presenter:Commissioner Brandon Garrett)
Caption:Update on status of Methane Gas production at the landfill; and
the amount generated by this system from 2018, 2019 and 2020.
(Requested by Commissioner Brandon Garrett)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting Commission Chamber - 311012020
ATTENDANCE:
Present: Hons. M. Williams, Chairman; Hasan, Vice Chairman; Garrett,
member.
Absent: Hons. Hardie Davis, Jr., Mayor; Frantom, member.
ENGINEERING SERVICES
1. Approve and authorize the Engineering Department (AED) to accept and Item
receive Federal Financial Assistance through Section 319(h) Nonpoint Source Action:
Implication Grant Program, grant authorization permitting Augusta, GA's Approved
Mayor to sign all documentation as requested by the AED.
Motions
fiil"Il Motion Text Made By Seconded By
Motion to
^ aDDrove.APProve vtotio, passes
3-0.
Commissioner Commissioner
Brandon Garrett Ben Hasan
Seconded By
Commissioner
Ben Hasan
Motion
Result
Passes
Motion
Result
2. Approve supplemental funding (SA4) for Construction Phase of Design Item
Engineering Consultant Agreement to Civil Services, Inc. in the amount of Action:
$161,465.60 for 5th Street Bridge over the Savannah River (Bridge Repair and Approved
Restoration) as requested by AED. RFQ 16-247.
Motions
Motion Motion Textr ype
Motion to
^ aDDrove.APProve vtotion passes
3-0.
Made By
Commissioner
Brandon Garrett Passes
3. Approve funding for Design Consultant Services Supplemental Agreement Item
Two to Cranston Engineering Group, Inc. in the amount of $72,640.00 for the Action:
James Brown Blvd. (9th Street) Improvement Project as requested by the Approved
AED. RFQ 16-246.
Motions
Y:j*t" Motion Text Made By seconded By Motion
Type ''"-- -J Result
Motion to
^ approve. Commissioner CommissionerApprove ilii ton passes Brandon Garrett Ben Hasan Passes
3-0.
4. Approve the continued funding of the current On-Call Field and Laboratory ltem
Testing for Soil and Construction Material, and Geotechnical Inspection and Action:
Investigation (CMT Geotech) Services contract in the amount of $180,240 for Approved
James Brown Blvd. Improvements Project. Requested by AED. RFP 19-179.
Motions
X:11"' Motion rext Made By Seconded By fJ.f;i,'rype
Motion to
^ approve. Commissioner CommissionerApprove ilotion passes Brandon Garreff Ben Hasan Passes
3-0.
5. Approve and accept Section of Harper Franklin Ave. (from Jimmie Dyess Item
Pkwy to its West 1761.46ft) and associated Improvements within road Right Action:
of-Way into Augusta, Georgia Public Roadway System upon receipt of its Approved
certified Plat, Deed of Dedication, 18-month Road Maintenance Agreement
and required other Legal Documentation as determined by Augusta
Engineering Department and Augusta Legal Department. Requested by AED.
Motions
$o]ion Motion Text Made By seconded By Motion
Type r'rvrrvrr r var Result
Motion to
Approve ffi3|,o#*u,,., ;:#[:H;:* ;:rfi;:,i;"' Passes
3-0.
6. Approve award of Lake Olmstead Dredging-sediment Disposal Site Item
Preparation Construction Services Phase I Contract in the amount of Action:
5742,856.25 to Waterfront Property Services, LLC dba Gator Dredging in the Approved
amount as requested by the AED. RFP 20-121.
Motions
X:11" Motion Text Made By seconded By MotionrYPe - ---- -'r Result
Motion to
a ____..- approve. Commissioner CommissionerApprove Motion passes Brandon Garrett Ben Hasan Passes
3-0.
7. Consider approving an Easement Deed of Dedication and a Release of Item
Aeronautical Use Provisions for Daniel Field. Action:
Approved
Motions
[,oj:" Motion Text Made By seconded By Motionrype - ------ -r Result
Motion to
^ approve. Commissioner CommissionerApprove Motion passes Brandon Garrett Ben Hasan Passes
3-0.
8. Approve and authorize Budget Transfer as a Separate Line Item to Augusta Item
Engineering Department (AED) FY2020 Operational Budget to pay for Action:
Georgia Municipal Association, Inc. (GMA) FY2O20 Services for Approved
Telecommunication and Right-of-Way Management. Also, approve such line
funding in AED subsequent years operational budgets to pay for yearly future
payments to GMA for such services. Requested by AED.
Motions
X:1" Motion Text Made By Seconded By MotionIYPe ' ---- -r Result
Motion to
Approve ilf,loo],'ru.,., ;:#il'i'8#:- ;:f#ilf'* passes
3_0.
9.
Approve the deeds of dedication, maintenance agreements, and road ltem
resolutions submitted by the Engineering Department and the Augusta Action:
Utilities Department for Granite Hill Subdivision, Section Four, Phase Two. Approved
Motions
Motion
Type
Approve
Motion Text
Motion to
approve.
Motion Passes
3-0.
Made By
Motion Text Made By
Motion to
approve. Commissioner
Motion Passes Brandon Garrett
Motion Text Made By
Motion to
approve. Commissioner
Motion Passes Brandon Garrett
Commissioner Commissioner
Brandon Garrett Ben Hasan Passes
Seconded By
Seconded By
Motion
Result
Motion
Result
Motion
Result
10. Motion to approve the minutes of the Engineering Services Committee held Item
on February 11,2020. Action:
Approved
3-0.
11. Motion to approve exercising the 3rd option to renew with Georgia-Carolina Item
Paving to provide on-call asphalt and concrete repairs for Bid 16-224. Action:
Approved
Motions
Motion
Type
Approve
Motions
Motion
Type
Approve
Commissioner
Ben Hasan Passes
Seconded By f;tji,"
Commissioner
Ben Hasan Passes
3-0.
12. Consider proposal from McKim & Creed to perform smoke and dye testing Item
in the 2nd Street Lift Station Sanitary Sewer Collection Area. Action:
Approved
Motions
fr"J:" Motion Text Made Bv seconded BY
Motion passes
3-0.
13. Approve Supplemental Agreement Four for the Phinizy Center for ltem
Watershed Assessment & Inventory Project in amount of $89,500 for the Action:continue Watershed Geomorphic data collection and Monitoring System Approved
maintenance as requested by AED. RFe 13-149.
Approve Motion to
approve.
Motions
Motion Motion Textrype
Motion to
^ aDDrove.APProve uotion passes
3-0.
Commissioner Commissioner passes
Brandon Garrett Ben Hasan
Motions
rr"J:"' Motion rext Made Bv
Motion to
Approve il3ffiurr.,
3-0.
Seconded By
Commissioner Commissioner
Brandon Garrett Ben Hasan
Seconded By
Motion
Result
Passes
Motion
Result
14. Approve supplemental funding (SAl) for Engineering Phases of Design Item
Consultant Services Agreement to Goodwyne, Mills & Cawood (GMC) in Action:
the amount of $183,540.00 for the Telfair Street Improvements Project as Approved
requested by the AED. Award is contingent upon receipt of signed
agreement. RFP 18-266.
Made By
Commissioner
Brandon Garrett
Commissioner
Ben Hasan Passes
www.augustaqa.gov
Engineering Services Committee Meeting
2/9/2021 1:15 PM
Minutes
Department:
Presenter:
Caption:Motion to approve the minutes of the Engineering Services
Committee held on March 10, 2020.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project is authorize to CPB# N/A. This request is to continue funding of the current
On-Call Field and Laboratory Testing for Soil and Construction Material, and Geotechnical
Inspection, Field Engineering Services Consulting Agreement in the amount of $1,000,000
Funding is available in TIA Discretionary Funds.
Section 2: The following revenues are anticipated to available to the Consolidated
Government to complete the project.
500,000$
180,240$
1,000,000$
1,680,240$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
CPB# N/A
On-Call Construction Management, Construction Inspection, and
Field Engineering Services (Bid 19-179)
to sustain construction quality assurance and quality control (QA/QC) during the project
TIA DISCRETIONARY FUNDS
Hardie Davis, Jr., Mayor
CAPITAL PROJECT BUDGET
construction phase which is essential to the production of quality roads and infrastructure.
TIA DISCRETIONARY FUNDS
TIA FUNDS
02.27.2020
Augusta-Richmond County, Georgia CPB# N/A
On-Call Construction Management, Construction Inspection, and
Field Engineering Services (Bid 19-179)
CAPITAL PROJECT BUDGET
CPB AMOUNT ADDITION CPB AMOUNT
SOURCE OF FUNDS CPB REQUEST
TIA Discretionary ($500,000) ($1,000,000) ($1,500,000)
TIA Funds ($180,240)($180,240)
TOTAL SOURCES: ($680,240) ($1,000,000) ($1,680,240)
USE OF FUNDS
TIA Discretionary $500,000 $1,000,000 $1,500,000
TIA Funds $180,240 $180,240
TOTAL USES: $680,240 $1,000,000 $1,680,240
02.27.2020
Engineering Services Committee Meeting
2/9/2021 1:15 PM
On-Call Construction Material Inspection and Testing, Construction Monitoring and Quality
Assurance/ Quality Control, and Geotechnical Inspections and InvestigationsRFP 19-179 Project
Number: N/A File Reference: 21-014(A)
Department:Engineering
Presenter:
Caption:Motion to approve continued funding of the current “On-Call
Construction Material Inspection and Testing, Construction
Monitoring and Quality Assurance/ Quality Control, and
Geotechnical Inspections and Investigations (CMT Geotech)”
Services Contract in the amount of $1,000,000 as requested by
AED. RFP 19-179
Background:The on-going TIA/SPLOST funded roadway improvements
projects and increase in infrastructure maintenance and
emergency repairs to aging infrastructures within the countyhave
placed a significant strain and workload on the Augusta
Engineering Department (AED) in-house engineering
construction services resources. AED has over twenty
TIA/SPLOST funded roadway, bridge and traffic operation
improvements projects presently under construction or about to
go into construction. AED has determined it would be beneficial
to continue supplementing its engineering resources with On-
Call CMT_Geotech Services. The assistance of outside
construction services will be temporary thereby, insuring a
quality finish product. It is a practical approach to sustain
construction quality assurance & quality control (QA/QC)
during the project construction phase. Project QA/QC is
essential to the production of quality roads and infrastructure.
Analysis:On August 6, 2019, The Augusta Commission approved the On-
Call Construction Material Inspection and Testing, Construction
Monitoring and Quality Assurance/ Quality Control, and
Geotechnical Inspections and Investigations contract to ATC
Group Services LLC, Matrix Engineering Group, Inc., and MC
Squared, Inc. Additional funds allocation to this contract is
needed to maintain the required level of service for construction
projects presently under construction and about to go under
construction.
Financial Impact:Funds are available in the amount of $1,000,000 TIA
discretionary fund.
Alternatives:1. Do not approve the contract award and find an alternative way
to provide the required CMT_Geotech Construction QA/QC
Services and meet TIA construction QA/QC requirements.
Recommendation:Approve continued funding of the current “On-Call Construction
Material Inspection and Testing, Construction Monitoring and
Quality Assurance/ Quality Control, and Geotechnical
Inspections and Investigations (CMT Geotech)” Services
Contract in the amount of $1,000,000. Funding is available in
TIA Discretionary Funds.
Funds are
Available in the
Following
Accounts:
TIA Discretionary Funds 235-041110
REVIEWED AND APPROVED BY:
Augusta-Richmond County, Georgia
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project is authorize to CPB# N/A. This request is to continue funding of the current
On-Call Professional Services for Engineering and Field Design, small to Medium Scale
Maintenance Task Desin, Regulatory Periodic Inspection Compliance and Structural
quality finished product. Funding is available in AED TIA Project Management.
Section 2: The following revenues are anticipated to available to the Consolidated
Government to complete the project.
500,000$
500,000$
1,000,000$
Section 3: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
CPB# N/A
On-Call Professional Services for Engineering and Field Design (Bid 19-241)
Inspection & Investigations Services (CEI Services) Contract in the amount of $500,000 for
AED TIA PROJECT MANAGEMENT FUNDS
Hardie Davis, Jr., Mayor
CAPITAL PROJECT BUDGET
the temporary assistance of outside professional engineering services to help insure a
AED TIA PROJECT MANAGEMENT FUNDS
02.27.2020
Augusta-Richmond County, Georgia CPB# N/A
On-Call Professional Services for Engineering and Field Design (Bid 19-241)
CAPITAL PROJECT BUDGET
CPB AMOUNT ADDITION CPB AMOUNT
SOURCE OF FUNDS CPB REQUEST
AED TIA PROJECT MANAGEMENT FUNDS ($500,000) ($500,000) ($1,000,000)
371-041114
TOTAL SOURCES:($500,000) ($500,000) ($1,000,000)
USE OF FUNDS
AED TIA PROJECT MANAGEMENT FUNDS $500,000 $500,000 $1,000,000
371-041114
TOTAL USES:$500,000 $500,000 $1,000,000
02.27.2020
Engineering Services Committee Meeting
2/9/2021 1:15 PM
On-Call Professional Services for Engineering and Field Design, small to MediumScale Maintenance
Task Design, Regulatory Periodic Inspection Compliance and Structural Inspection & Investigations
RFP 19-241 File Reference: 21-014(A)
Department:Engineering
Presenter:
Caption:Approve continued funding of the current “On-Call Professional
Services for Engineering and Field Design, small to Medium
Scale Maintenance Task Design, Regulatory Periodic Inspection
Compliance and Structural Inspection & Investigations”
Services (CEI Services) Contract in the amount of $500,000 as
requested by AED. RFP 19-241
Background:AED has infrastructure improvements to several projects in
design and under construction. This trend will continue for next
several years. Majority of the projects are local funded
(SPLOST) and regional funded ( TIA). There are few federal
funded projects too. In addition, AED is responsible for
operation and maintenance of storm conveyance system, flood
control structures (such as dam and levee) and bridges, Traffic
operation, and roadway lighting operation and maintenance. The
Augusta Engineering Department (AED) supplements small to
medium and specialized projects design efforts by on-call
professional services from Engineering Professional firms under
on-call CEI services contract. The assistance of outside
professional engineering services is temporary and helps insure a
quality finish product.
Analysis:On November 2019, The Augusta Commission approved On-
Call contract to ZEL Engineers, Infrastructure Management
Systems, Moreland Altobelli, Hussey Gay Bell and Cranston
Engineering being the selected firms. Additional funds
allocation to this contract is needed to maintain the required
level of design services for Infrastructure small to medium
projects design and specialty professional services.
Financial Impact:
Funds are available in the amount of $500,000 AED TIA Project
Management fund.
Alternatives:1. Do not approve contract award and find alternative way
providing needed Professional Engineering Services for small to
medium projects design and specialty professional services.
Recommendation:Approve continued funding of the current “On-Call Professional
Services for Engineering and Field Design, small to Medium
Scale Maintenance Task Design, Regulatory Periodic Inspection
Compliance and Structural Inspection & Investigations”
Services (CEI Services) Contract in the amount of $500,000 as
requested by AED.
Funds are
Available in the
Following
Accounts:
AED TIA Project Management Funds 371-041114 Item
forwarded for discussion dbw
REVIEWED AND APPROVED BY:
Stormwater BM P Installation and Performance Comparison 39(h) Grant 1 | 3 P a g e
M EM O RAN D UM O F UN D ERSTAN DIN G
between Augusta,
Georgia and
Phinizy Center for W ater Sciences
This M emorandum of Understanding (hereinafter "M emorandum") made this _ _ day of
, 2021, by and between AUGUSTA, GEORGIA, as a political subdivision of the State
of Georgia (hereinafter referred to as "Augusta, Georgia" or "Augusta"), as Party of the First Part,
and Phinizy Center for W ater Sciences (hereinafter referred to as "Institution") as Party of the Second
Part.
W HEREAS, the Institution is a professional/Nonprofit partnering entity assisting Augusta
Engineering Department (AED) with the Section 319(h) Grant entitled, "Stormwater BM P
Installation and Performance Comparison";
NOW , THEREFORE, as a desire of Augusta and Institution to properly coordinate the development
and implementation of this grant, the parties hereby agree as follows:
UN DERSTAN DIN G:
Augusta, Georgia and Institution do hereby agree to the following:
1. The Institution will provide services related to engineering design and study of Best M anagement
Practices (BM Ps) for aquatic habitat restoration and water quality, assistance in installation or
installation of those BM Ps, field recon assistance efforts, site and BM P selection efforts, survey
assistance, data analysis, and report writing efforts as shown in the awarded grant document scope of
work document. These activities will primarily be conducted through the work of professionals, as
shown in the awarded grant document (Section 319(h) FY2018 Grant - Element 15, Stormwater BM P
Installation and Performance Comparison). These professionals will be approved by Augusta
Engineering Department.
2. The Institution will provide Augusta with timesheets for each project task, using format approved
by Augusta Engineering Department, for all personnel involved in this project as well as a brief
summary of activities and percent completion for each project task for each quarterly reporting period
as required by the grant.
3. Augusta shall contribute the grant contractual/supplies category funds up to $262,750.00 for
the work provided and not to exceed the designated amount within the approved grant as shown
in the 319(h) grant Scope of W ork document.
4. The Institution shall submit quarterly reimbursement claims with detailed description of work done
during that quarter to AED within five days by end of the respective quarter. These reimbursement
claims shall be prepared in a format acceptable by the AED with payment to the Institution once
funds have been received by the granting agency.
5. Upon completion of the activities funded by Augusta, material produced under this M OU will
become property of Augusta. However, with written permission from Augusta Engineering
Department, the Institution has rights to use this material for their activities and scientific research
Stormwater BM P Installation and Performance Comparison 39(h) Grant 2 | 3 P a g e
purposes but must include Augusta personnel as designated collaborators and the following as proper
identification of funding for the project:
"The preparation of this report, map, document, project, etc., was financed in part through a grant from the
U.S. Environmental Protection Agency under the Provisions of
Section 319{h) of the Federal W ater Pollution Control Act, as amended and Augusta, Georgia, Augusta
Engineering Department."
Together with the month and year, the document was prepared and credit being given to the
Environmental Protection Division of the Department of Natural resources, State of Georgia.
D ELIVERABLES:
The Institution agrees to provide to Augusta Engineering Department any requested documentation
required under this M OU and per the grant scope of work.
TIM E:
This M OU will remain in effect for the duration of the 319(h) ‘Stormwater BM P Installation and
Performance Comparison” awarded grant duration unless otherwise amended.
TERM IN ATION :
Both parties may terminate this M OU at any time by giving of ninety (90) days written notice of such
termination. Upon receipt of such notice of termination, Institution shall discontinue all work under
this M OU and transfer project related all data and instrumentation to Augusta Engineering
Department along with summary of ongoing tasks, each task status and remaining work. Data gathered
and material produced will become property of Augusta.
M ISCELLAN EOUS:
1. This M emorandum of Understanding shall be controlled by and construed in accordance
with the laws of the State of Georgia.
2. Any notice given under this M emorandum shall be deemed given when provided in writing
to the following persons:
To Augusta, Ga:
AUGUSTA, EN GIN EERIN G
D EPARTM EN T EN GIN EERIN G
ADM IN ISTRATION
ATTN : DIRECTOR OF EN GIN EERIN G
452 W ALKER STREET, SUITE 110, AUGUSTA, GEORGIA 30901
To Phinizy Center for W ater Sciences:
PH IN IZY CEN TER FO R W ATER
SCIEN CES ATTEN TION : DR.
M ICH AEL ASH
1858 LOCK AN D DAM
ROAD AUGUSTA,
GEORGIA 30906
Stormwater BM P Installation and Performance Comparison 39(h) Grant 3 | 3 P a g e
This M emorandum of Understanding is the entire agreement between the parties, and may not
be amended, except by a writing executed by both parties.
APPROVED:
PH LN IZY CEN TER FO R W ATER SCIEN CES AUGUSTA, GEORGIA
By: _____________________ By: _____________________
Date: ___________________ Date: ___________________ _
ATTEST: __________________ ATTEST: __________________
Date: _________________________ Date: _________________________
05/21/2020
Engineering Services Committee Meeting
2/9/2021 1:15 PM
Section 319(h) CWA Grant- Stormwater BMP Installation and Performance Comparison Augusta
Engineering Impaired Creeks Restoration Program Memorandum of Understanding with Phinizy
Center for Water Sciences Project Number: N/A File Reference: 21-014(A)
Department:Engineering
Presenter:
Caption:Motion to approve entering into Memorandum of Understanding
(MOU) with Phinizy Center for Water Science (Nonprofit
Organization) to assist Augusta Engineering Department (AED)
with implementing Section 319(h) grant supported activities that
are designed for stream water quality restoration in local
waterbodies. Also authorized Mayor to sign MOU as requested
by the Augusta Engineering Department. Requested by AED.
Background:The Clean Water Act Section 319(h) Water Quality grant funds
support activities to identify and implement projects for
reduction of prioritized risks and concerns in the community
such as source assessment and control of pollutant of interest
load within state listed impaired water bodies. During 2016,
Augusta Engineering Department in partnering with Phinizy
Center for Water Sciences (PCWS) submitted two (2) separate
applications to seek federal funds for various activities
associated with surface water quality improvement program.
Best Management Practice (BMP) assessment grant targeted
compare the performance of stormwater BMPs to reduce adverse
hydrologic and pollutant loading from impervious surfaces. As a
team, AED and PCWS staff will work together to install and
manage various BMPs features, and monitor performance. This
program will allow AED to optimize its MS4 NPDES
stormwater Management Program.
Analysis:Phinizy Center for Water Science is AED’s partner submitting
this grant. Per grant submitted and approved workplan, specific
responsibilities are assigned to PCWS. This proposed MOU
allows the project to move forward without interruption to the
grant schedule or budget and fulfill grant requirements.
Financial Impact:AED is receiving $196,450.00 in federal funds. AED will
provide $132,418.00 matching non-federal funds [i) in-
kind=$64,118, and ii) $68,300] from its stormwater services
program funds.
Alternatives:1) Do not approve and fail to meet project goals, budget and
timeline, and also risk being not considered for receiving such
future grants.
Recommendation:Approve entering into Memorandum of Understanding (MOU)
with Phinizy Center for Water Science (Nonprofit Organization)
to assist Augusta Engineering Department (AED) implementing
Section 319(h) grant supported activities that are designed for
stream water quality restoration in local waterbodies. Also
authorized Mayor to sign MOU as requested by the Augusta
Engineering Department.
Funds are
Available in the
Following
Accounts:
Org key- 220041116 $196,450 Federal Funds $64,118 in-kind;
$68,300 from Stormwater Program 581-044320 -5211120
REVIEWED AND APPROVED BY: