Loading...
HomeMy WebLinkAbout2020-01-14 Meeting Minutes Engineering Services Committee Meeting Commission Chamber - 1/14/2020 ATTENDANCE: Present: Hons. Hardie Davis, Jr., Mayor; M. Williams, Chairman; Hasan, Vice Chairman; Frantom, member. Absent: Hon. Garrett, member. ENGINEERING SERVICES 1. Presentation by Mr. William Clemons regarding drainage and drive way repairs at his home at 2047 Story Mill Estates Drive. Item Action: Rescheduled Motions Motion Type Motion Text Made By Seconded By Motion Result Defer Motion to refer this item to the next committee meeting after some research is done. Motion Passes 3-0. Commisioner Sean Frantom Commissioner Ben Hasan Passes 2. Renaming of River Shoals Parkway to Topgolf Way. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 3. Approve Supplemental Agreement One and PE Design Phase (Task Order 2) to Hussey Gay Bell and DeYoung (HGB) in the amount of $836,591 for the Wheeler Road Multimodal Corridor Project as well as authorize the Mayor to execute the revised GDOT Project Framework Agreement as requested by the AED. RFQ 17-127 Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 4. Approve the purchase of Caterpillar model D-8T WH/W GPS Dozer, bid item #19-226, from Yancey Brothers as the compliant bidder with no exceptions. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 5. Augusta Regional Airport Standard Aero Facility Entrance Turn Lane Update. Also, Approve Turn Lane as Designed and Authorize Its Construction utilizing Augusta Engineering Department On-Call Services at Cost not to exceed $150,000. Requested by AED. Item Action: Disapproved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Mr. M. Williams votes No. Motion Fails 2-1. Commissioner Ben Hasan Commisioner Sean Frantom Fails 6. Approve Supplemental Agreement One and PE phase design phase (Task Order #2) to Hussey Gay Bell and DeYoung in the amount of $419,581.00 for the Enhance Operations at Wheeler Road and Robert C Daniel Project as well as authorize the Mayor to execute the revised GDOT Project Framework Agreement as requested by the AED. RFQ 17-127 Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 7. Approve Supplemental Agreement One and PE design phase (Task Order #2) to Hussey Gay Bell and DeYoung in the amount of $408,715 for the Barton Chapel Road @ Gordon Hwy Project as well as authorize the Mayor to execute the revised GDOT Project Framework Agreement as requested by the AED. RFQ 17-127 Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 8. Approve the deeds of dedication, maintenance agreements, and road resolutions submitted by the Engineering Department and the Augusta Utilities Department for Hayne's Station, Phase X. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 9. Approve award of the On-Call ITS Construction & Emergency Repair contract to Southeast Utilities of Georgia, Inc. Award is contingent upon receipt of signed contracts and required documents for the AED. RFP #20- 100. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 10. Motion to authorize condemnation to acquire title of a portion of property for permanent easement and temporary construction easement (Parcel 153-0- 414-00-0) 3724 Tahitian Trail. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 11. Motion to authorize condemnation to acquire title of a portion of property for permanent easement (Parcel 154-0-213-00-0) 2430 Tobacco Road, Lot E. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 12. Discuss the salaries of the rank-and-file employees in Augusta Utilities. (Requested by Commissioner Marion Williams) Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve receiving this item as Commissioner Ben Hasan Commisioner Sean Frantom Passes information. Motion Passes 3-0. 13. Motion to adopt parking management ordinance as amended by Traffic Engineering and Planning Department. (Requested by Mayor Hardie Davis, Jr.) Item Action: Rescheduled Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve referring this item to the full Commission with no recommendation. Commissioner Ben Hasan Commisioner Sean Frantom No action is taken on this motion due to the passage of the substitute motion. Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Substitute motion to approve holding a work session to discuss this matter on January 27, 2020 at 11:00 a.m. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 14. Motion to adopt parking management plan as recommended by SP+. (Requested by Mayor Hardie Davis, Jr.) Item Action: Rescheduled Motions Motion Type Motion Text Made By Seconded By Motion Result Defer Motion to approve referring this item to the full Commission with no recommendation. Commissioner Ben Hasan Commisioner Sean Frantom No action is taken on this motion due to the passage of the substitute motion. Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Substitute motion to approve holding a work session on this matter on January 27, 2020 at 11:00 a.m. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 15. Motion to adopt parking management contract with SP+. (Requested by Mayor Hardie Davis, Jr.) Item Action: Rescheduled Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve referring this item to the full Commission with no recommendation. Commissioner Ben Hasan Commisioner Sean Frantom No action is taken on this motion due to the passage of the substitute motion. Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Substitute motion to approve holding a work session to discuss this matter on January 27, 2020 at 11:00 a.m. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 16. Motion to approve the minutes of the Engineering Services Committee held on December 10, 2019. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 3-0. Commisioner Sean Frantom Commissioner Ben Hasan Passes 17. Discuss storm water and flooding issues. (Requested by Commissioner John Clarke - referred from January 8 Commission meeting) Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve coming back in the second quarter for a work session on the storm water program. Motion Passes 3-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes www.augustaga.gov Engineering Services Committee Meeting 1/14/2020 1:05 PM Attendance 1/14/20 Department: Presenter: Caption: Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: AGEND.d ITEM REQUEST FORM commission meetings: First and third ruesdays of each month - 2:00 p.m.committee meetings: second and last Tuesdays of each month - 1:00 p.m. commission/Commiftee: (Please check one and insert meeting date) Commission Public Safety Committee Public Services Committee Administrative Services Committee Date of Meeting Date of Meeting Date of Meeting Date of Meeting Engineering Services Committee Date of Meeting /-//-7o ZnFinance Committee Date of Meeting contact rnformation for rndividuavpresenter Making the Request: Name: Address: Telephone Number: Fax Number:716'3co ?szo E-Mail Address: Caption/Topic of Discussion to be placed on the Agenda: r) Please send this request form to the Ms. Lena J. Bonner Clerk of Commission Suite 220 Municipal Building 535 Telfair Street Augusta, GA 30901 following address: Telephone Number: Fax Number: E-MaiI Address: 706-821-1820 706-821-1838 nmorawski@augustaga.gov Requests may be faxed, e-mailed or delivered in person and must be received in the Clerk,soffice no later than 9:00 a.m. on the Thursday preceding the Co-*rrio, or Committeemeeting of the following week. A five-minute time limit will be allowed for presentations. Engineering Services Committee Meeting 1/14/2020 1:05 PM William Clemons Department: Presenter: Caption:Presentation by Mr. William Clemons regarding drainage and drive way repairs at his home at 2047 Story Mill Estates Drive. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: AGENDA ITEM REQUEST FORM Commission meetings: First and third Tuesdays of each month – 2:00 p.m. Committee meetings: Second and last Tuesdays of each month – 1:00 p.m. Commission/Committee: (Please check one and insert meeting date) __________ Commission __________ Public Safety Committee __________ Public Services Committee __________ Administrative Services Committee __________ Engineering Services Committee __________ Finance Committee Contact Information for Individual/Presenter Making the Request: Name: ______________________________________________________________ Address: ____________________________________________________________ Telephone Number: ___________________________________________________ Fax Number: _________________________________________________________ E-Mail Address: ______________________________________________________ Please send this request form to the following address: Ms. Lena J. Bonner Telephone Number: 706-821-1820 Clerk of Commission Fax Number: 706-821-1838 Suite 220 Municipal Building E-Mail Address: nmorawski@augustaga.gov 535 Telfair Street Augusta, GA 30901 Requests may be faxed, e-mailed or delivered in person and must be received in the Clerk’s Office no later than 5:00 p.m. on the Wednesday preceding the Commission meeting and 5:00 p.m. on the Tuesday preceding the Committee meeting of the following week. A five-minute time limit will be allowed for presentations. X Date of Meeting _____________ Date of Meeting _____________ Date of Meeting _____________ Date of Meeting _____________ Date of Meeting 01/14/2020 Date of Meeting _____________ Michele Pearman (IT-GIS) 535 Telfair St. Bldg 2000 706-945-4568 pearman@augustaga.gov Caption/Topic of Discussion to be placed on the Agenda: Renaming River Shoals Parkway to Topgolf Way Information Technology Department Tameka Allen • Director Gary Hewett • Deputy Director Reggie Horne • Deputy Director Augusta Richmond County Government Information Technology Department • GIS Division 525 Telfair St 3rd Floor – Physical 530 Greene Street A-101 – Mailing Augusta, GA 30901 Augusta, GA 30901 OFFICE: (706) 821-2843 FAX: (706) 826-4753 EMAIL: gisaddressing@augustaga.gov WWW.AUGUSTAGA.GOV Date: January 3, 2020 To: Engineering Services Committee For Action By: The Augusta Commission From: Michele Pearman GIS Manager Re: Road Name Change of River Shoals Parkway to Topgolf Way Mrs. Michele Pearman, GIS Manager/ Addressing Coordinator, talked with the petitioner, Mr. Troy Jordan, Jordan Trotter Commercial Real Estate Firm, on behalf of the TOPGOLF USA AG, LLC and discussed with him the criteria for having a road renamed. Finding that the road renaming generally fell under the guidelines for the Augusta Richmond County Street Renaming Policy, a petition was prepared by staff and given to the petitioner so that they could obtain the required 66% (two-thirds) signatures needed to rename the road. The petition having been returned to this office, the renaming request was reviewed using the criteria of the Augusta Richmond County Street Renaming Policy. Staff findings are as follows: The existing road name of River Shoals Parkway appears to have no significance in Augusta, Georgia. The road name change does appear to pass the test of continuity. It is proposed that the entire length of River Shoals Parkway be renamed to Topgolf Way and therefore, the third criteria should be considered; The road name change is acceptable to all property owners addressed to River Shoals Parkway, with the standards requiring a minimum of 66% of the adjoining property owners (66%, or 2 of 3 adjoining property owners, have approved the name change) along River Shoals Parkway. It is therefore, staff’s recommendation that the Engineering Services Committee recommend to the Augusta Commission that the road name be changed in accordance with the Augusta Richmond County Street Renaming Policy. cc: Sean Frantom, Commission Member, District 7 John Clarke, Commission Member, District 10 "}', 1.-. • 1 · . . .. • "':·-·---•.J-" =· --.. , "'' ,. f -' ' ,l;,# ' . , • ,.-, .... f;) s-.:;,,. . . . d . _,,_,____...__... .........., • . • This I " :e Iii\ If! never dedicated as •· .... "" public in 2012. Need t, dedicate now as part I <! , re2;1 'l, Cabela Public b Augusta, GA .,_!!I' .. l't !fl Department of Information Technology Geospatlal Information Solutfons {GISJ Otvfslon 535 T•lf•lr St Bide 2000 I Aucust1, GA 30901 www.augustap.1ov/&1s I glsl!)au1ustaga.1ov Uke, Follow, Shilre IAusustaGIS 0000 Auguno, GA Dlsctalmtt 11le dota rqrnenttd on this m11p has bun cvmpllnl by the bntmethods ovollab . A.ccumcy Is com Input upon dte soura Information os a,mp/ltd by vorloin ogendes ond deportments botlt lnkmal and utemol to rlle contolldatrd g,owmmrnt of Auruna, GA. Auc,una, GA ond 1he cvmponles con trotted to dnelop these data os,&1me no kpol responslblHtles for the Information or oauroq coMtllned on this mr,p. tt Is strictly /otblddtn to HII or rrprvdu« theH mops or data forony rnson without the wrltkn consent o/the Au1uno Commluto11. N W*E s Map Scale 1 inch = 200 feet II Print Date Jul 22, 2019 12 12 12 8 9 16 21 SHEET Civil EngineeringLand PlanningLandscape Architecture Water ResourcesProperty ServicesArborist Services 50 Warm Springs Circle Roswell Georgia 30075(770)641-1942 www.aecatl.com NO . RE V I S I O N S DA T E CO P Y R I G H T B Y A E C , I N C . PROJECT NO.: 19-4320CIVIL DRAWN BY: JWMCIVIL DESIGNED BY: JWM, MDVLANDSCAPE DRAWN BY: SLR, JPSLANDSCAPE DESIGNED BY: SLR, JPSCHECKED BY: MDV DATE - 06/17/2019 TO P G O L F A U G U S T A CI T Y O F A U G U S T A , G E O R G I A LEVEL II #6960 Exp 03-15-2021 1 RE V I S E D P E R C I T Y C O M M E N T S 07 - 1 0 - 2 0 1 9 C4.1 SI T E P L A N A N D P A V I N G PL A N S 0 Scale 1" = 40' 804040 Know what'sbelow. before you dig.Call R Dial 811 or Call 1-800-282-7411 Utilities Protection Center, Inc. NORTH M: \ 2 0 1 9 J O B S \ 1 9 - 4 3 2 0 T o p G o l f A u g u s t a \ C i v i l \ 1 9 - 4 3 2 0 T o p G o l f B A S E B 0 1 . d w g , 8 / 1 3 / 2 0 1 9 6 : 2 1 : 5 8 P M , j j w , A R C H f u l l b l e e d D ( 2 4 . 0 0 x 3 6 . 0 0 I n c h e s ) , 1 : 1 SHEET Civil EngineeringLand PlanningLandscape Architecture Water ResourcesProperty ServicesArborist Services 50 Warm Springs Circle Roswell Georgia 30075(770)641-1942 www.aecatl.com NO . RE V I S I O N S DA T E CO P Y R I G H T B Y A E C , I N C . PROJECT NO.: 19-4320CIVIL DRAWN BY: JWMCIVIL DESIGNED BY: JWM, MDVLANDSCAPE DRAWN BY: SLR, JPSLANDSCAPE DESIGNED BY: SLR, JPSCHECKED BY: MDV DATE - 06/17/2019 TO P G O L F A U G U S T A CI T Y O F A U G U S T A , G E O R G I A LEVEL II #6960 Exp 03-15-2021 1 RE V I S E D P E R C I T Y C O M M E N T S 07 - 1 0 - 2 0 1 9 C5.1 GR A D I N G A N D DR A I N A G E P L A N S 0 Scale 1" = 40' 804040 Know what'sbelow. before you dig.Call R Dial 811 or Call 1-800-282-7411 Utilities Protection Center, Inc. NORTH M: \ 2 0 1 9 J O B S \ 1 9 - 4 3 2 0 T o p G o l f A u g u s t a \ C i v i l \ 1 9 - 4 3 2 0 T o p G o l f G R A D I N G G 0 1 . d w g , 8 / 1 3 / 2 0 1 9 6 : 2 2 : 1 1 P M , j j w , A R C H f u l l b l e e d D ( 2 4 . 0 0 x 3 6 . 0 0 I n c h e s ) , 1 : 1 Information Technology Department July 22, 2019 Jones Communications of GA Comcast Service Center 105 River Shoals Parkway Augusta, GA 30909 RE: TPN: 008-0-014-00-0 105 RIVER SHOALS PKWY Dear Augusta-Richmond County Property Owner, Tameka Allen • Director Gary Hewett • Deputy Director Reggie Horne • Deputy Director The Augusta GIS Division is the agency responsible for the approval and assignment of road names and addresses as well as their reassignment, if necessary. Authority for this function is conferred by Georgia Code 46-5-122, as amended. Pursuant to the Augusta Road Naming and Addressing Ordinance, a system to assign addresses and road names has been implemented to aid the rapid response of the emergency 911 communication network and to assist the police, fire, and ambulance services in locating your property quickly in case of an emergency. Utility, Post l, and other services benefit from an accurate addressing assignment system. Mr. Troy Jordan with the Jordan Trotter Commerical Real Estate Group, has presented to us the proposal to rename River Shoals Parkway to Top Golf Drive, future site of the Top Golf entertainment complex in the Villages at Riverwatch. We have received an approval letter signed by James A. Macke, Vite President, Government Affairs on July 12, 2019 and our office is compelled to notify you of how you may/may not be affected. Should the proposal be approved by the Augusta Commission, your associated situs (location) address (es) would change to reflect the new road name. A notice would be sent out at the time the situs address is changed. I have enclosed a map oflocation. If you have questions and/or concerns, please call my office within the Information Technology Department -GIS Division at (706) 945-4568 or emailing to gisaddressing@augustaga.gov . Sincerely, Michele Pearman GIS Manager/ Addressing Coordinator Enc Augusta Richmond County Government Information Technology Department• GIS Division 525 Telfair St 3rd Floor-Physical 530 Greene Street A-101-Mailing Augusta, GA 30901 Augusta, GA 30901 OFFICE: (706) 821-2843 FAX: (706) 826-4753 EMAIL: gisaddressing@augustaga.gov WWW.AUGUSTAGA,GOV Information Technology Department Tameka Allen • Director Gary Hewett • Deputy Director Reggie Horne • Deputy Director Augusta Richmond County Government Information Technology Department • GIS Division 525 Telfair St 3rd Floor – Physical 530 Greene Street A-101 – Mailing Augusta, GA 30901 Augusta, GA 30901 OFFICE: (706) 821-2843 FAX: (706) 826-4753 EMAIL: gisaddressing@augustaga.gov WWW.AUGUSTAGA.GOV January 3, 2020 Jones Communications of GA Comcast Service Center 105 River Shoals Parkway Augusta, GA 30909 RE: TPN: 008-0-014-00-0 105 RIVER SHOALS PKWY Dear Augusta-Richmond County Property Owner, This is the second notice due to a modification requested by the applicant, for the rename of River Shoals Parkway to Topgolf Way (previously submission was Drive). Please contact our office immediately should this present an issue with your approval letter received on July 12, 2019. The Augusta GIS Division is the agency responsible for the approval and assignment of road names and addresses as well as their reassignment, if necessary. Authority for this function is conferred by Georgia Code 46-5-122, as amended. Pursuant to the Augusta Road Naming and Addressing Ordinance, a system to assign addresses and road names has been implemented to aid the rapid response of the emergency 911 communication network and to assist the police, fire, and ambulance services in locating your property quickly in case of an emergency. Utility, Postal, and other services benefit from an accurate addressing assignment system. Mr. Troy Jordan with the Jordan Trotter Commerical Real Estate Group, has presented to us the proposal to rename River Shoals Parkway to Topgolf Way, future site of the Topgolf entertainment complex in the Villages at Riverwatch. We have received an approval letter signed by James A. Macke, Vice President, Government Affairs on July 12, 2019 and our office is compelled to notify you of how you may/may not be affected. Should the proposal be approved by the Augusta Commission, your associated situs (location) address (es) would change to reflect the new road name. A notice would be sent out at the time the situs address is changed. I have enclosed a map of location. If you have questions and/or concerns, please call my office within the Information Technology Department – GIS Division at (706) 945-4568 or emailing to gisaddressing@augustaga.gov . Sincerely, Michele Pearman GIS Manager / Addressing Coordinator Enc From:Sanita Cheatham To:James L.. Perkins; Augusta GA GIS-Addressing; Patrick ClaytonSubject:RE: Approve: River Shoals Parkway Renaming Date:Friday, July 26, 2019 10:21:38 AM Attachments:image001.png Augusta 911 has no issues with renaming street. Sanita Cheatham Assistant Director Augusta 911 Center 911 4th Street Augusta, GA 30901 Work #: (706)821-1211 Fax #: (706)821-1213 From: James L.. Perkins <JPerkins@augustaga.gov> Sent: Thursday, July 25, 2019 2:36 PM To: Augusta GA GIS-Addressing <gisaddressing@augustaga.gov>; Patrick Clayton <PClayton@augustaga.gov>; Sanita Cheatham <SCheatham@augustaga.gov> Subject: RE: Approve: River Shoals Parkway Renaming Fire Department has no objections Captain James Perkins NFPA Certified Fire Plans Examiner Augusta Fire Department Office of Fire Prevention 3117 Deans Bridge Rd. Augusta, GA 30906 Office (706) 821-1641 From: Augusta GA GIS-Addressing <gisaddressing@augustaga.gov> Sent: Thursday, July 25, 2019 2:34 PM To: Patrick Clayton <PClayton@augustaga.gov>; James L.. Perkins <JPerkins@augustaga.gov>; Sanita Cheatham <SCheatham@augustaga.gov> Subject: Approve: River Shoals Parkway Renaming IT-GIS has received a request for road renaming, an agenda item will be submitted with recommendation to approve in accordance to our Road Naming Policy. Action: Renaming of River Shoals Parkway to Top Golf Drive There is already a precedent set in this area for renaming in honor of corporate commitment to the Augusta community with Cabela’s (Cabela Drive previously a portion of Alexander Drive). Approval: As an emergency department, IT-GIS requests concurrence with the recommendation for approval of the renaming of River Shoals Parkway to Top Golf Drive. Please respond back to this email. Location & Map: River Shoals Parkway is off of Riverwatch Parkway and terminates in the Village at Riverwatch, at the new development’s location. RESOLUTION WHEREAS: Jordan Trotter Commercial Real Estate Firm, on behalf of the TOPGOLF USA AG, LLC, initiated a request for a Road Name Change for River Shoals Parkway to be renamed to Topgolf Way. WHEREAS: The existing public road name of River Shoals Parkway appears to have no significance in the area; WHEREAS: It is proposed that the entire portion of the River Shoals Parkway, from Riverwatch Parkway to its termination into the new development of Topgolf in the Village at Riverwatch, be renamed to Topgolf Way; WHEREAS: The renaming request is acceptable to the minimum requirement of 66% of the adjoining property owners (66%, or 2 or 3 adjoining property owners, have approved the name change) for River Shoals Parkway; WHEREAS: This road name change request is being made to honor the commitment Topgolf, known as TOPGOLF USA AG, LLC; now has to the Augusta community; NOW THEREFORE, BE IT RESOLVED BY THE AUGUSTA COMMISSION: THEREFORE: Let it be known that Augusta, Georgia does hereby adopt the road name change of Topgolf Way, from Riverwatch Parkway to the termination into the Topgolf Complex in the Village at Riverwatch, to Topgolf Way. Traffic Engineering is to be notified of the name change and road signs should be erected accordingly. _________________________________ _________________________________ Lena Bonner, Clerk of Commission Tameka Allen, Chief Information Officer _________________________________ Hardee Davis Jr., Mayor CERTIFICATE The undersigned qualified and acting Clerk of the Augusta Commission certifies that the foregoing is a true and correct copy of a resolution adopted at a legally convened meeting of the Augusta Commission held on _______________________________________. ______________________________ Lena Bonner, Clerk of Commission ______________________________ Date Engineering Services Committee Meeting 1/14/2020 1:05 PM Renaming of River Shoals Parkway to Topgolf Way Department:Information Technology Department Presenter:Michele Pearman, GIS Manager Caption:Renaming of River Shoals Parkway to Topgolf Way. Background:Jordan Trotter Commercial Real Estate Firm, on behalf of the TOPGOLF USA AG, LLC, requests a road name change for River Shoals Parkway to be renamed to Topgolf Way. Analysis:Historical • From research and information received from Historic Augusta Inc, along with various internet research there was no findings of significance to River Shoals Parkway. Road Continuity • It is recommended that road names should avoid transitioning at any given geographic point. Following Augusta’s Road Naming Policy, developments are permitted to request a road name change to signify a commitment to the Augusta Community. A precedent was set in the Village at Riverwatch with the renaming of a portion of Alexander Drive which was renamed Cabela Drive in 2013. Topgolf Way was acceptable to our standards. Renaming River Shoals Parkway would ensure a continuous road name. Acceptability • Property Owners: 3 of 3 property owners are in agreement with the proposed change as indicated in the provided supporting documents. • Emergency Services: Approval from the minimum 2 of 3 emergency services departments was received Financial Impact:None Alternatives: Recommendation:Approve the renaming of River Shoals Parkway to Topgolf Way. Funds are Available in the Cost for replacement of street name signs will be paid for by the requestor. Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission (SA02 – For changes greater than $20,000) July 2019 AUGUSTA, GEORGIA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT WHEREAS, We, Hussey Gay Bell & DeYoung, entered into a contract with Augusta, Georgia on 10/17/2017, for Engineering Design Services for the Wheeler Road Multimodal Corridor Project, File Reference No. 17-014 (A), and WHEREAS, certain revisions to the design requested by Augusta, Georgia are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Engineering additional services to extend PE phase (Task Order 2) It is agreed that as a result of the above described modification the contract amount is increased by $836,591.00 from $636,840.46 to a new total of $1,473,431.46. Any modifications to submittal dates shall be as identified in the attached proposal. This Agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, Hussey Gay Bell & DeYoung, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This _________ day of _____________, 2020. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA, GEORGIA Honorable Hardie Davis, Mayor Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Augusta Richmond County Project Number(s): 340-041110- TP1807002 Supplemental Agreement Number: 1 Purchase Order Number: 350536; PI#0012867 Augusta-Richmond County, Georgia PI#12867 BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project is set up and authorized to CPB#TP1807002 (PI#0012867). This request is for SA1to Hussey Gay Bell and DeYoung in the amount of $836,591.00 for TIP project Enhance Operations at Wheeler Road Multimodal Corridor (I-20) project. Funding is available in the Transportation Improvement Program funds. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. 750,000$ 669,273$ Intersection Safety 142,116$ Traffic Improvements 25,202$ 1,586,591$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department CPB#TP1807002 Honorable Hardie Davis, Jr., Mayor CAPITAL PROJECT BUDGET WHEELER ROAD MULTIMODAL CORRIDOR (I-20) TIP Project Funds - Wheeler Rd @ Robert C Daniel Jr Parkway MPO TIP Funds Z230 1 of 2 1/3/2020 Augusta-Richmond County, Georgia PI#12867 CPB#TP1807002 CAPITAL PROJECT BUDGET WHEELER ROAD MULTIMODAL CORRIDOR (I-20) CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB ADDITION CPB Transportation Impvt Program PI - 0012868 (750,000.00)$ (750,000.00)$ Wheeler Rd @ Augusta West Parkway (669,273.00)$ (669,273.00)$ Intersection Safety 328-041110-219828921 (142,116.00)$ (142,116.00)$ Traffic Improvements (25,202.00)$ (25,202.00)$ 328-041110-219824905 TOTAL SOURCES: (750,000.00)$ (836,591.00)$ (1,586,591.00)$ USE OF FUNDS ENGINEERING - DESIGN 340-041110-52.12115/TP1807002 750,000.00$ 669,273$ 1,419,273$ Intersection Safety 328-041110-219828921 142,116$ 142,116$ Traffic Improvements 25,202$ 25,202$ 328-041110-219824905 TOTAL USES: 750,000.00$ 836,591.00$ 1,586,591.00$ MPO TIP Funds Z230 2 of 2 1/3/2020 Engineering Services Committee Meeting 1/14/2020 1:05 PM Wheeler Road Multimodal Corridor Project Department:Engineering Dept. Presenter:Hammed Malik Caption:Approve Supplemental Agreement One and PE Design Phase (Task Order 2) to Hussey Gay Bell and DeYoung (HGB) in the amount of $836,591 for the Wheeler Road Multimodal Corridor Project as well as authorize the Mayor to execute the revised GDOT Project Framework Agreement as requested by the AED. RFQ 17-127 Background:This project is listed in the Transportation Improvement Program (TIP) and developed using the 2040 Long Range Transportation Plan (LRTP). The project will improve the traffic flow along Wheeler Rd by improving turning lanes and storage, modifying traffic signals, and installing sidewalk and ADA improvements. Hussey Gay Bell and DeYoung (HGB) was selected for Design Engineering through the Procurement RFQ process. In October 2017 Augusta Commission awarded design services contract to HGB. PE Concept Phase (Task Order #1) which included traffic studies and analysis, historical and archeological investigations, environmental analysis, development of various solution concepts, and public input meetings as required by GDOT’s Planning and Development Process (PDP). Analysis:Approval of this agenda item allows AED and HGB to continue the engineering design work that started with Concept Development (Task Order #1)in 2017. This item is supplement to existing contract with HGB. Task Order #2 will allow Hussey Gay Bell and DeYoung to complete the PE process and deliver to Augusta a complete set of construction plans and specifications that can be bid and built using our standard Procurement processes. Financial Impact:MPO Z230s funds will be used to complete the preliminary engineering phase of this project. The ARTS MPO identified federal funding sources to complete Task Order #2. This is a standard Federal reimbursable expense at 80%. The MPO approved the use of these funds at their Policy Committee meeting on June 6, 2019. Federal match at 80% (669,273), City of Augusta, Ga match 20% (167,318). Alternatives:1) Do not approve and close the project without completing needed improvements. Recommendation:Approve Supplemental Agreement One and PE Design Phase (Task Order 2) to Hussey Gay Bell and DeYoung (HGB) in the amount of $836,591 for the Wheeler Road Multimodal Corridor Project as well as authorize the Mayor to execute the revised GDOT Project Framework Agreement as requested by the AED. Funds are Available in the Following Accounts: MPO Transportation Improvement Program Z230s funds 340- 041110-5212115 /JL TP1807002 (669,273) and 328-041110- 5212115/JL 219828921 (142,116) and /JL 219824905(25,202) REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Invitation to Bid Sealed bids will be received at this office until Friday, May 17, 2019 @ 11:00 a.m. for furnishing for: Bid Item #19-226 Waste Handler – Dozer for Augusta, GA – Environmental Services Department Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 Bid documents may be viewed on the Augusta, Georgia web site under the Procurement Department ARCbid. Bid documents may Documents may be examined during regular business hours at the offices of Augusta, GA Procurement Department. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, May 3, 2019 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No bids may be withdrawn for a period of ninety (90) days after bids have been opened, pending the execution of contract with the successful bidder. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov No bid will be accepted by fax, all must be received by mail or hand delivered. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle April 11, 18, 25, May 2, 2019 Metro Courier April 11, 2019 OFFICIAL Page 1 of 1 VENDORS YANCEY BROTHERS 4165 MIKE PADGETT HWY AUGUSTA, GA 30906 FLINT EQUIPMENT CO 1206 BLAYLOCK STREET ALBANY, GA 31705 UNITED RENTAL 2425 MIKE PADGETT HWY AUGUSTA, GA 30906 Attachment B Yes Yes No Bid E-Verify Number 686717 344722 SAVE Form Yes Yes Year 2019 2019 Brand Caterpillar John Deere Model D8T WH 1050K Bid Price $899,900.00 $793,383.00 Approximate Delivery Time 19-20 Weeks ARO 90-120 Days ARO Exceptions Noted Yes Carlson GPS System $50,550.00 $47,205.00 Bid Opening Item #19-226 Waste Handler-Dozer for Augusta, Georgia-Environmental Services Department Bid Due: Friday, May 17, 2019 @ 11:00 a.m. Waste Handler-Dozer Total Number Specifications Mailed Out: 22 Total Number Specifications Download (Demandstar): 0 Total Electronic Notifications (Demandstar): 21 Georgia Procurement Registry: 647 Mandatory Pre-Bid/Telephone Conference: N/A Total packages submitted: 2 Total Non-Compliant: 0 Optional Equipment Engineering Services Committee Meeting 1/14/2020 1:05 PM Approve the purchase of Caterpillar model D-8T WH/W GPS Dozer, bid item #19-266, from Yancey Brothers as the compliant bidder with no exceptions. Department:Environmental Services Presenter:Mark Mehall Caption:Approve the purchase of Caterpillar model D-8T WH/W GPS Dozer, bid item #19-226, from Yancey Brothers as the compliant bidder with no exceptions. Background:Over the years, the Environmental Services Department (ESD) has operated a variety of sizes and types of dozers. We have used large dozers that are designed for high volume operations. We have also used mid-sized dozers designed for medium and lower sized operations. Currently, the ESD operates with three mid-sized dozers. They operate on the working face of the landfill. They were bought as a package deal in 2014. They were purchased due to the cost and operational effectiveness three mid-sized dozers would give us at that time. The three dozers currently operating are reaching their normal life expectancy. It is now time to examine all options to effectively replace this equipment. Upon examining landfill operations over the past year, it has become apparent we need to move to operating large dozers in order to maintain our current operations. The volume of trash received has increased in recent years to a point where a mid-size dozer in no longer adequate. In addition, equipment breakdowns based on the effects of the lower undercarriage of the mid-size dozer and the need to seek replacement rental equipment have accentuated this move. The ESD is proposing a two-stage transition process in order to address this need. Over a two-year period, two larger dozers will replace the current three mid-sized dozers. A large dozer will be purchased in FY 2019 followed by another purchase in FY 2020. The ESD in conjunction with the Procurement Department released bid #19-266 in an effort to procure a large dozer. There were two responsive bidders to the solicitation. The initial low bidder was Flint Equipment with a John Deere 1050 K. This bid did not meet several specifications as set forth in the bid. (See attached award memo.) Therefore, it was determined that the bid was not compliant with the requested specifications. In response to the bid protest submitted by Flint Equipment Co., a motion to deny the protest request was approved by Commission at the December 21, 2019 Commission meeting (Item No. 26). The ESD recommends we accept the Yancey Brothers bid of a Caterpillar D-8T WH/W GPS. It was the second lowest bid. It meets the requirements set forth in the bid specifications. Analysis:The daily cover needs of the landfill necessitate the phasing out of the three mid-sized 2014 John Deere 850 K dozers. We are proposing a two-stage transition process. We are moving forward with the purchase of an initial large dozer. We are proposing the purchase of a Caterpillar D-8T. Next year we will implement the 2nd stage with the purchase of an additional large dozer. The three existing John Deere 850 K’s will be sold on government deals to help offset the purchase costs. A further cost saving benefit of this transition will be the inclusion of a GPS system in each new large dozer. This will allow us to achieve additional cost effectiveness through advanced location capabilities. It will also improve communication with the compactor. This will help us achieve better compaction of the cell. This in turn will lead to less need for additional airspace. Financial Impact:The purchase price of the Caterpillar D-8T dozer is $950,450.00 with the GPS system installed prior to onsite delivery. Alternatives:1. Approve the purchase of the Caterpillar D-8T WH/W GPS. 2. Do not approve. Recommendation:Approve the purchase of the Caterpillar D-8T WH/W GPS. Funds are Available in the Following Accounts: Funds are available in 541-04-4210 / 54.22510 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 1/14/2020 1:05 PM Augusta Regional Airport-Standard Aero Entrance Left Turn Lane Design and Construction File Reference: 20-014 (A) Department:Engineering Presenter: Caption:Augusta Regional Airport Standard Aero Facility Entrance Turn Lane Update. Also, Approve Turn Lane as Designed and Authorize Its Construction utilizing Augusta Engineering Department On-Call Services at Cost not to exceed $150,000. Requested by AED. Background:Standard Aero is Augusta Regional Airport (AGS) General Aviation Fixed Base Operator Tenant and associated with AGS over 40 years. In the 1970's Standard Aero developed a jet engine repair facility, an avionics navigation shop and a structural and aircraft systems repair shop at AGS. Presently Standard Aero employs over 160 people at the Augusta Facility. Primary entrance to Standard Aero facility is from Doug Barnard. However, Doug Barnard has large volume of heavy truck traffic serving large industrial complexes located in close proximity to AGS. Due to truck traffic in the vicinity of Standard Aero entrance area, safety of Standard Aero employees entering the facility is a concern and was discussed at Augusta Commission meeting dated June 18, 2019. Analysis:On June 18, 2019, Augusta Commission tasked Augusta Engineering Department (AED) to develop a plan and design to install a turning lane from Doug Barnard Parkway into the South Entrance of Service Road into AGS. Accordingly, AED completed needed fieldwork and designed turning lane. Per proposed design, all improvements will be on AGS side of the road and AGS has to donate additional right-of-way if needed. Financial Impact:Not to exceed $150,000. Funded by TIA Discretionary funds upon Augusta Commission Approval. Alternatives:Do not approve. Recommendation:Augusta Regional Airport Standard Aero Facility Entrance Turn Lane Update. Also, Approve Turn Lane as Designed and Authorize its Construction utilizing Augusta Engineering Department On-Call Services at cost not to exceed $150,000. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: 235 TIA Discretionary 235-04-1110 - 5414110 (JL TBD) REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Augusta-Richmond County, Georgia PI#12866 BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project is set up and authorized to CPB#TP1809004 (PI#0012866). This request is for SA1to Hussey Gay Bell and DeYoung in the amount of $419,581.00 for TIP project Enhance Operations at Wheeler Road and Robert C Daniel. Funding is available in the Transportation Improvement Program funds. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. 225,000$ 335,665$ Intersection Safety 83,916$ 644,581$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department CPB#TP1809004 Honorable Hardie Davis, Jr., Mayor CAPITAL PROJECT BUDGET WHEELER ROAD AND ROBERT C DANIEL TIP Project Funds - Wheeler Rd @ Robert C Daniel Jr Parkway MPO TIP Funds Z230 1 of 2 1/3/2020 Augusta-Richmond County, Georgia PI#12866 CPB#TP1809004 CAPITAL PROJECT BUDGET WHEELER ROAD AND ROBERT C DANIEL CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB ADDITION CPB Transportation Impvt Program PI - 0012868 (225,000.00)$ (225,000.00)$ Wheeler Rd @ Augusta West Parkway (335,665.00)$ (335,665.00)$ Intersection Safety 328-041110-219828921 (83,916.00)$ (83,916.00)$ TOTAL SOURCES: (225,000.00)$ (419,581.00)$ (644,581.00)$ USE OF FUNDS ENGINEERING - DESIGN 340-041110-52.12115/TP1809004 225,000.00$ 335,665.00$ 560,665.00$ Intersection Safety 83,916.00$ 83,916.00$ 328-041110-5212115-219828921 TOTAL USES: 225,000.00$ 419,581.00$ 644,581.00$ MPO TIP Funds Z230 2 of 2 1/3/2020 (SA02 – For changes greater than $20,000) July 2019 tAUGUSTA, GEORGIA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT WHEREAS, We, Hussey Gay Bell & DeYoung, entered into a contract with Augusta, Georgia on 10/17/2017, for Engineering Design Services for the Enhanced Operational Efficiency of Various Intersections Wheeler Road @ Robert C. Daniel Jr., Parkway Project, File Reference No. 17-014 (A), and WHEREAS, certain revisions to the design requested by Augusta, Georgia are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: Engineering additional services to extend PE phase (Task Order 2) It is agreed that as a result of the above described modification the contract amount is increased by $419,581.00 from $220,634.44 to a new total of 640,215.44. Any modifications to submittal dates shall be as identified in the attached proposal. This Agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, We, Hussey Gay Bell & DeYoung, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. This _________ day of _____________, 2020. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA, GEORGIA Honorable Hardie Davis, Mayor Approved: Date Approved: Date [ATTACHED CORPORATE SEAL] ATTEST: ATTEST: Title: Title: Augusta Richmond County Project Number(s): 340-041110- TP1809004 Supplemental Agreement Number: 1 Purchase Order Number: 350539; PI#0012866 Engineering Services Committee Meeting 1/14/2020 1:05 PM Enhance Operations at Wheeler Rd and Robert C Daniel Pky Extend PE Phase and Approve Revised GDOT PFA GDOT PI#0012866 Department:Engineering Presenter: Caption:Approve Supplemental Agreement One and PE phase design phase (Task Order #2) to Hussey Gay Bell and DeYoung in the amount of $419,581.00 for the Enhance Operations at Wheeler Road and Robert C Daniel Project as well as authorize the Mayor to execute the revised GDOT Project Framework Agreement as requested by the AED. RFQ 17-127 Background:This project is listed in the Transportation Improvement Program (TIP) and developed using the 2040 Long Range Transportation Plan (LRTP). The project will improve the traffic flow at the intersection of Wheeler Rd and Robert C Daniel by widening the north leg of the intersection to allow for a left turn lane, two through lanes, and a right turn lane. Hussey Gay Bell has already gone through the Procurement RFQ process. In October 2017, Augusta Commission awarded design services to HGB. PE phase Task Order #1 which included traffic studies and analysis, historical and archeological investigations, environmental analysis, development of various solution concepts, and public input meetings as required by GDOT’s Planning and Development Process (PDP). Analysis:Approval of this agenda item will allow Hussey Gay Bell to continue the preliminary engineering work that they have already started with concept development (Task Order #1) in 2017. This item will be a supplement to the existing contract with HGB. Task Order #2 will allow Hussey Gay Bell and DeYoung to complete the PE process and deliver to Augusta a complete set of construction plans and specifications that can be bid and built using our standard Procurement processes. Financial Impact:MPO Z230s funds will be used to complete the preliminary engineering phase of this project. The ARTS MPO identified federal funding sources to complete Task Order #2. This is a standard Federal reimbursable expense at 80%. The MPO approved the use of these funds at their Policy Committee meeting on June 6, 2019. Federal match at 80% (335,665) and City of Augusta, Ga match 20% (83,916). Alternatives:1) Do not approve design and construction plan development phase and terminate the project. Recommendation:Approve Supplemental Agreement One and PE phase design phase (Task Order #2) to Hussey Gay Bell and DeYoung in the amount of $419,581.00 for the Enhance Operations at Wheeler Road and Robert C Daniel Project as well as authorize the Mayor to execute the revised GDOT Project Framework Agreement as requested by the AED. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING: MPO Transportation Improvement Program Z230s funds 340-041110- 5212115 TP1809004 (335,665) and 328-041110- 5212115/219828921(83,916) REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission ENGINEERING DEPARTMENT Hameed Malik, P.E., Ph D, John Ussery, P.E., Director Assistant Director Traffic Engineering Administration Section 505 Telfair Street - Augusta, GA 30901 (706) 796-5040 – Fax (706) 796-5045 WWW.AUGUSTAGA.GOV DATE: December 20, 2019 TO: The Honorable Hardie Davis, Jr., Mayor Members of the Commission Marion Williams, Chairman, Engineering Services Committee THROUGH: Jarvis Sims, Interim Administrator FROM: Hameed Malik, P.E., Ph.D, Director SUBJECT: Enhance Operations Barton Chapel Road @ Gordon Hwy Project Extend PE Phase and Approve Revised GDOT PFA GDOT PI#0012868 CAPTION: Approve Supplemental Agreement One and award extended PE phase (Task Order #2) to Hussey Gay Bell and DeYoung in the amount of $408,715 for the Barton Chapel Road @ Gordon Hwy Project as well as authorize the Mayor to execute the revised GDOT Project Framework Agreement as requested by the AED. BACKGROUND: This project is listed in the Transportation Improvement Program (TIP) and developed using the 2040 Long Range Transportation Plan (LRTP). The project will improve the safety and traffic flow at the intersection of Gordon Hwy and Barton Chapel Rd by widening the intersection, adding turn lanes, and improving the traffic signal. Hussey Gay Bell and DeYoung has already gone through the Procurement RFQ process and was chosen for PE phase Task Order #1 which included traffic studies and analysis, historical and archeological investigations, environmental analysis, development of various solution concepts, and public input meetings as required by GDOT’s Planning and Development Process (PDP). Committee Meeting Date: Commission Meeting Date: Agenda Item Number: Approval Letter Date: Entered into the MuniAgenda by/date Engineering Administration Section 452 Walker St, Ste 110 - Augusta, GA 30901 (706) 796-5040 – Fax (706) 796-5045 WWW.AUGUSTAGA.GOV Agenda Item___________ December 20, 2019 Page 2 ANALYSIS: Approval of this agenda item will allow Hussey Gay Bell and DeYoung to continue the preliminary engineering work that they have already started with Task Order #1. This item will be a change order addition to the original contract already in effect for Hussey Gay Bell and DeYoung. Task Order #2 will allow Hussey Gay Bell and DeYoung to complete the PE process and deliver to Augusta a complete set of construction plans and specifications that can be bid and built using our standard Procurement processes. FINANCIAL IMPACT: MPO Z230s funds will be used to complete the preliminary engineering phase of this project. The ARTS MPO identified federal funding sources to complete Task Order #2. This is a standard Federal reimbursable expense at 80%. The MPO approved the use of these funds at their Policy Committee meeting on June 6, 2019. Federal funds at 80% ($326,972) and City of Augusta, Ga match 20% (81,743). ALTERNATIVES: 1) Approve Supplemental Agreement One and award extended PE phase (Task Order #2) to Hussey Gay Bell and DeYoung in the amount of $408,715 for the Enhance Operations at Barton Chapel Road @ Gordon Hwy as well as authorize the Mayor to execute the revised GDOT Project Framework Agreement as requested by the AED. RECOMMENDATION: Approve Alternative Number One. REQUESTED AGENDA DATE: Committee Meeting: N/A Commission Meeting: January 7, 2020 FUNDS ARE AVAILABLE IN THE FOLLOWING: MPO Transportation Improvement Program Z230s funds 340-041110-5212115-TP1807001 (326,972) and 328-041110- 5212115/212828014 (81,743) JU/vrj File Augusta-Richmond County, Georgia PI# 12868 BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project is set up and authorized to cpb#tp1807001. This request is FOR SA1 to Hussey Gay Bell and DeYoung in the amount of $408,715.00 for TIP project Enhance Operations at Barton Chapel Rd @ Gordon Hwy Project. Funding is available in the Transportation Improvement Program funds. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. 279,000$ 326,970$ Intersection Safety 81,750$ 687,720$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department CPB#TP1807001 Honorable Hardie Davis, Jr., Mayor CAPITAL PROJECT BUDGET Operational Efficiency of Various Intersections for Augusta, Georgia Project TIP Project Funds - Barton Chapel Rd @ Gordon Highway MPO TIP Funds Z230 1 of 2 12/27/2019 Augusta-Richmond County, Georgia CPB#TP1807001 CAPITAL PROJECT BUDGET Operational Efficiency of Various Intersections for Augusta, Georgia Project CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB ADDITION CPB Transportation Impvt Program PI - 0012868 (279,000.00)$ (279,000.00)$ Barton Chapel Rd @ Gordon Hwy Project MPO TIP Funds Z230 -$ (326,970.00)$ (326,970.00)$ Barton Chapel Rd @ Gordon Highway Intersection Safety 328-041110-212828014 (81,750.00)$ (81,750.00)$ TOTAL SOURCES: (279,000.00)$ (408,720.00)$ (687,720.00)$ USE OF FUNDS ENGINEERING - DESIGN 340-041110-52.12115 279,000.00$ 326,970.00$ 605,970.00$ 328-041110-212828014 81,750.00$ 81,750.00$ TOTAL USES:279,000.00$ 408,720.00$ 687,720.00$ 2 of 2 12/27/2019 Augusta-Richmond County, Georgia PI# 12868 BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby adopted: Section 1: This project is set up and authorized to cpb#tp1807001. This request is FOR SA1 to Hussey Gay Bell and DeYoung in the amount of $408,715.00 for TIP project Enhance Operations at Barton Chapel Rd @ Gordon Hwy Project. Funding is available in the Transportation Improvement Program funds. Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. 279,000$ 326,970$ Intersection Safety 81,750$ 687,720$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Original-Commission Council Office Copy-Engineering Department Copy-Finance Department Copy-Procurement Department CPB#TP1807001 Honorable Hardie Davis, Jr., Mayor CAPITAL PROJECT BUDGET Operational Efficiency of Various Intersections for Augusta, Georgia Project TIP Project Funds - Barton Chapel Rd @ Gordon Highway MPO TIP Funds Z230 1 of 2 12/30/2019 Augusta-Richmond County, Georgia CPB#TP1807001 CAPITAL PROJECT BUDGET Operational Efficiency of Various Intersections for Augusta, Georgia Project CPB AMOUNT CPB NEW SOURCE OF FUNDS CPB ADDITION CPB Transportation Impvt Program PI - 0012868 (279,000.00)$ (279,000.00)$ Barton Chapel Rd @ Gordon Hwy Project MPO TIP Funds Z230 -$ (326,970.00)$ (326,970.00)$ Barton Chapel Rd @ Gordon Highway Intersection Safety 328-041110-219828921 (81,750.00)$ (81,750.00)$ TOTAL SOURCES: (279,000.00)$ (408,720.00)$ (687,720.00)$ USE OF FUNDS ENGINEERING - DESIGN 340-041110-52.12115 279,000.00$ 326,970.00$ 605,970.00$ 328-041110-219828921 81,750.00$ 81,750.00$ TOTAL USES:279,000.00$ 408,720.00$ 687,720.00$ 2 of 2 12/30/2019 Engineering Services Committee Meeting 1/14/2020 1:05 PM Enhance Operations Barton Chapel Road @ Gordon Hwy Project Department:Engineering Dept. Presenter:Hameed Malik Caption:Approve Supplemental Agreement One and PE design phase (Task Order #2) to Hussey Gay Bell and DeYoung in the amount of $408,715 for the Barton Chapel Road @ Gordon Hwy Project as well as authorize the Mayor to execute the revised GDOT Project Framework Agreement as requested by the AED. RFQ 17-127 Background:This project is listed in the Transportation Improvement Program (TIP) and developed using the 2040 Long Range Transportation Plan (LRTP). The project will improve the safety and traffic flow at the intersection of Gordon Hwy and Barton Chapel Rd by widening the intersection, adding turn lanes, and improving the traffic signal. Hussey Gay Bell and DeYoung (HGB) has already gone through the Procurement RFQ process. In October 2017 Augusta Commission awarded design services contract to HGB. PE Concept phase (Task Order #1 which included traffic studies and analysis, historical and archeological investigations, environmental analysis, development of various solution concepts, and public input meetings as required by GDOT’s Planning and Development Process (PDP)) is completed. Next phase is design and construction plan development (Task Order #2). Analysis:Approval of this agenda item allows AED and Hussey Gay Bell and DeYoung to continue the preliminary engineering design work that started with concept development (Task Order #1) in 2017. This item will be a supplement to the existing contract with HGB. Task Order #2 will allow to complete the PE process and deliver to Augusta a complete set of construction plans and specifications that can be bid and built using our standard Procurement processes. Financial Impact: MPO Z230s funds will be used to complete the preliminary engineering phase of this project. The ARTS MPO identified federal funding sources to complete Task Order #2. This is a standard Federal reimbursable expense at 80%. The MPO approved the use of these funds at their Policy Committee meeting on June 6, 2019. Federal funds at 80% ($326,972) and City of Augusta, Ga match 20% ($81,743-SPLOST). Alternatives:Do not approve design and construction plan development phase and terminate the project. Recommendation:Approve Supplemental Agreement One and PE design phase (Task Order #2) to Hussey Gay Bell and DeYoung in the amount of $408,715 for the Barton Chapel Road @ Gordon Hwy Project as well as authorize the Mayor to execute the revised GDOT Project Framework Agreement as requested by the AED. Funds are Available in the Following Accounts: MPO Transportation Improvement Program Z230s funds 340- 041110-5212115-TP1807001 ($326,972) and 328-041110- 5212115/219828921 ($81,743) REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 1/14/2020 1:05 PM HAYNE'S STATION, PHASE X SUBDIVISION DEDICATION Department:Engineering Presenter:Hameed Malik, PhD., P.E., Director Caption:Approve the deeds of dedication, maintenance agreements, and road resolutions submitted by the Engineering Department and the Augusta Utilities Department for Hayne's Station, Phase X. Background:The final plat for Haynes Station, Phase X, was approved by the Commission on August 20, 2019. The subdivision design and plat for this section, including the storm drain system, have been reviewed and accepted by our engineering staff and the construction has been reviewed by our inspectors. The Utilities Department has inspected and reviewed the water and sanitary sewer installations, and hereby requests acceptance of the utility deed. The Utilities Department has inspected and reviewed the water and sanitary sewer installations, and hereby requests acceptance of the utility deed. Analysis:This section meets all codes, ordinances and standards. Portions of this subdivision lie within the 100-year flood plain and wetlands, which are noted on the final plat. Acceptance of said utility deed shall dedicate, as required, the water and sanitary sewer mains along with the applicable easements to Augusta, Georgia for operation and maintenance. Financial Impact:By accepting these roads and storm drainage installations into the County system and after the 18-month maintenance warranty by the developer/contractor for the road and storm drainage has expired, all future maintenance and associated costs will be borne by Augusta, Georgia. By acceptance of the utility deed and maintenance agreement, all future maintenance and associated costs for water and sanitary sewer installations will be borne by Augusta, Georgia, and positive revenue will be generated from the sale of water and sanitary sewer taps and monthly billing of same. Alternatives:1. Approve the deeds of dedication, maintenance agreements, and road resolutions submitted by the Engineering and Augusta Utilities Departments for Haynes Station, Phase X. 2. Do not approve and risk litigation. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: N/A REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Request for Proposal Request for Proposals will be received at this office until Thursday, November 14, 2019 @ 11:00 a.m. for furnishing: COMMODITY CODE (RFP items may have more parent codes) – RFP ITEM FOR ENGINEERING DEPARTMENT – ANNUAL CONTRACT RFP Item 20-100 On-Call ITS Construction and Repair 022-912-00; 022-913-00; 022-913-19 RFP Item 20-101 Roadway Striping 022-912-76; 024-550-72 RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 RFP documents may be viewed on the Augusta Georgia web site under the Procurement Department ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Friday, November 1, 2019 @ 5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 90 days after time has been called on the date of opening. Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov No bid will be accepted by fax all must be received by mail or hand delivered. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle October 10, 17, 24, 31, 2019 Metro Courier October 10, 2019 OFFICIAL VENDORS Attachment "B" E-Verify Number SAVE Form Original 7 Copies Fee Proposal ATG Communications 5100 Pierce Ct Evans, GA 30809 Yes 424561 Yes Yes Yes Yes Southeastern Utilites 1020 Franke Industrial Dr. Augusta, GA 30909 Yes 241608 Yes Yes Yes Yes RFP Item #20-100 On-Call ITS Construction & Repair - Annual Contract for the Augusta, GA – Engineering Department RFP Due: Thursday, November 14, 2019 @ 11:00 a.m. Total Number Specifications Mailed Out: 2 Total packages submitted: 2 Total Noncompliant: 0 20-100 Official Tab Sheet Page 1 of 1 ATG Communications 5100 Pierce Ct Evans, GA 30809 Southeastern Utilites 1020 Franke Industrial Dr. Augusta, GA 30909 ATG Communications 5100 Pierce Ct Evans, GA 30809 Southeastern Utilites 1020 Franke Industrial Dr. Augusta, GA 30909 Evaluation Criteria Ranking Points 1. Completeness of Response • Package submitted by the deadline • Package is complete (includes requested information as required per this solicitation) • Attachment B is complete, signed and notarized N/A Pass/Fail PASS PASS PASS PASS 2. Qualifications & Experience (0-5)20 5.0 5.0 100 100 3. Organization & Approach (0-5)10 5.0 4.5 50 45 4. Scope of Services A) Ability to repair and construct intelligent transportation system (ITS) related items such as underground conduit repair or replacement, electrical conductor repair or replacement, fiber optic cable repair and installation, fiber optic cable splicing, fiber optic cable testing, pull box repair and installation, and various other services necessary to keep ITS network functional. B) The contractors will need to respond to department requests within 24 hours of first notification. (0-5)25 5.0 5.0 125 125 5. Financial Stability (0-5)10 5.0 5.0 50 50 6. References (0-5)5 5.0 5.0 25 25 Within Richmond County 5 5 5 0 25 Within CSRA 5 4 5 20 0 Within Georgia 5 3 0 0 Within SE United States (includes AL, TN, NC, SC, FL) 5 2 0 0  All Others 5 1 0 0 30 29.5 370 370 8. Presentation by Team (0-5)10 0 0 9. Q&A Response to Panel Questions (0-5)5 0 0 Lowest Fees 5 10 5 0 50 Second 5 6 5 30 0 Third 5 4 0 0 Forth 5 2 0 0 Fifth 5 1 0 0 Total Phase 2 - (Total Maximum Ranking 15 - Maximum Weighted Total Possible 125) 5 5 30 50 35 34.5 400 420 RFP Item #20-100 On-Call ITS Construction & Repair - Annual Contract for the Augusta, GA – Engineering Department Evaluationi Committee Meeting: Thursday, December 5, 2019 @ 9:00 a.m. Total (Total Possible Score 500) Total (May not Receive Less Than a 3 Ranking in Any Category to be Considered Vendors Phase 1 Total - (Total Maximum Ranking 30 - Maximum Weighted Total Possible 375) Phase 1 Ranking of 0-5 (Enter a number value between 0 and 5) Scale 0 (Low) to 5 (High) 7. Proximity to Area (only choose 1 line according to location of the company - enter the ranking value for the one line only) Weighted Scores Procurement DepartmentRepresentative:__Nancy Williams_______________________________________ Procurement Department Completion Date: __12/5/19______________________ Phase 2 (Option - Numbers 8-9) (Vendors May Not Receive Less Than a 3 Ranking in Any Category to be Considered for Award) Internal Use Only Total Cumulative Score (Maximum point is 500) Evaluator: ______Cumulative________________ Date: __12/5/19 10. Cost/Fee Proposal Consideration (only choose 1 line according to dollar value of the proposal in relation to all fee proposals - enter the point value for the one line only) To: �m: Date: Subject: ENGINEERING DEPARTMENT Hameed Malik, PE, Ph. D., Director John Ussery, PE, Assistant Director of Traffic MEMORANDUM Ms. Geri Sams, Director Procurement John Ussery, PE, Assistant Director of Traffic, AED December 16, 2019 2020 Annual Bid -ITS Construction & Emergency Repair Item #20-100 The chart below reflects Traffic Engineering recommendation for Bid Items stated. The recommended bidder has the lowest line item total of the two bids received. Please contact John Ussery at 706-821-1710 for additional information. [ BID# 20-100 Thank You. /:sc DESCRIPTION --=r _____ A_W_ARD __ T_O_: ____ __J ITS Construction & Emergency Repair Southeast Utilities of Georgia, Inc. cc: John Ussery, Assistant Director of Traffic Engineering, AED Guy Shepherd, Manager Streetlight Maintenance, Signs & Striping Arthur Jacobs, Crew Supervisor Markings File Engineering Division -Administration Section 424 Walker St, Ste 110-Augusta, GA 30901 (706) 796-5040 -Fax (706) 796-5045WWW.AUGUSTAGA.OOV Advanced Technology Group 5100 Pierce Ct Evans, GA 30809 Southeast Utilities of Georgia 1020 Franke Industrial Drive Augusta, GA 30909 Hameed Malik Engineering John Ussery Traffic Engineering Treza Edwards Compliance Bid Item #20-100 On-Call ITS Construction & Repair Engineering Department Mailed 10/10/19 Bid Item #20-100 On-Call ITS Construction & Repair Engineering Department Bid Due: Thurs. 11/14/19 @ 11:00 a.m. Page 1 of 1 Bid Item #20-100 On-Call ITS Construction & Repair Engineering Services Committee Meeting 1/14/2020 1:05 PM ITS Construction & Emergency Repair Department:Engineering Dept. Presenter:Hameed Malik Caption:Approve award of the On-Call ITS Construction & Emergency Repair contract to Southeast Utilities of Georgia, Inc. Award is contingent upon receipt of signed contracts and required documents for the AED. RFP #20-100. Background:The Intelligent Transportation System (ITS) Project is currently being utilized by AED Traffic Engineering (TE). This project connected numerous traffic engineering devices together utilizing fiber optics and high speed communications into one cohesive network. Often times work needs to be done to the system that requires specialized equipment and training that this contractor can provide. Also, due to the growth of Augusta, construction activities can damage portions of the ITS System that will need immediate repair. This additional resource will afford AED a practical approach to completing and sustaining much needed maintenance and repair services in a timely and efficient manner. Analysis:This RFP procurement will provide the Augusta Engineering Department Traffic Division with a highly qualified contractor to work on the ITS network and repair, replace, and expand the network as directed. The Augusta Engineering Department worked through the Procurement RFP process to find the most qualified consultant to perform these essential services. This will be an annual contract with the option to extend for three additional years. RFPs were evaluated December 5, 2019, with Southeast Utilities of Georgia being the selected firm. Forms were evaluated based on qualifications, relevant experience, and the ability to provide the requested services. Unit fees of the requested primary services from the contractor are listed in the attachment. Financial Impact: These services will be provided on an as-needed basis as directed by AED Traffic Engineering. Funding for these services will be provided in the TE Annual Budget item General Traffic Supplies #101041710-5311610. Alternatives:1) Do not approve annual contract and identify alternative source for providing covered services. Recommendation:Approve award of the On-Call ITS Construction & Emergency contract to Southeast Utilities of Georgia, Inc. Award is contingent upon receipt of signed contracts and required documents for the AED. Funds are Available in the Following Accounts: 101041710-5311610 not to exceed 2020 budget funding REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 1/14/2020 1:05 PM Motion to Authorize Condemnation Department:Engeering Department Presenter:Law Department Caption:Motion to authorize condemnation to acquire title of a portion of property for permanent easement and temporary construction easement (Parcel 153-0-414-00-0) 3724 Tahitian Trail. Background:The City has been unable to reach an agreement with the property owner and therefore seeks to acquire title through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 3,321 square feet of permanent easement and 4,706 square feet of and temporary construction easement. The appraised value is $1,065.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 514043490-5411120 J/L 81500100-5411120 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 1/14/2020 1:05 PM Motion to Authorize Condemnation Department:Engeering Department Presenter:Law Department Caption:Motion to authorize condemnation to acquire title of a portion of property for permanent easement (Parcel 154-0-213-00-0) 2430 Tobacco Road, Lot E. Background:The City has been unable to reach an agreement with the property owner and therefore seeks to acquire title through condemnation. In order to proceed and avoid further project delays, it is necessary to condemn a portion of subject property. The required property consists of 600 square feet of permanent easement. The appraised value is $450.00. Analysis:Condemnation is necessary in order to acquire the required property. Financial Impact:The necessary costs will be covered under the project budget. Alternatives:Deny condemnation. Recommendation:Approve condemnation. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: G/L 514043490-5411120 J/L 81500100-5411120 REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 1/14/2020 1:05 PM Augusta Utilities Salaries Department: Presenter:Commissioner Marion Williams Caption:Discuss the salaries of the rank-and-file employees in Augusta Utilities. (Requested by Commissioner Marion Williams) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Engineering Services Committee Meeting 1/14/2020 1:05 PM Parking Management Ordinance Department: Presenter:Mayor Hardie Davis, Jr. Caption:Motion to adopt parking management ordinance as amended by Traffic Engineering and Planning Department. (Requested by Mayor Hardie Davis, Jr.) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Engineering Services Committee Meeting 1/14/2020 1:05 PM Parking Management Plan Department: Presenter:Mayor Hardie Davis, Jr Caption:Motion to adopt parking management plan as recommended by SP+. (Requested by Mayor Hardie Davis, Jr.) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Engineering Services Committee Meeting 1/14/2020 1:05 PM Approve parking management contract Department: Presenter:Mayor Hardie Davis, Jr. Caption:Motion to adopt parking management contract with SP+. (Requested by Mayor Hardie Davis, Jr.) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Engineering Services Committee Meeting Commission Chamber - l2ll0l20l9 ATTENDANCE: Present: Hons. Hardie Davis, Jr., Mayor; M.Williams, Chairman; Hasan, Vice Chairman; Garrett and Frantom, members. ENGINEERING SERVICES 1. Motion to approve amended agreement between the City of Augusta and Item Atlantic Coast Consulting, Inc. for a quarterly contract through March 31, Action: 2020. Approved Motions f#:"" Motion rext Motions fr"J:'" Motion rext Made Seconded Motion By By Result Unanimous consent is given to add this item to the agenda. Made By Seconded By Motion Result Motion to refer this item to the full Approve commission with no commissioner commissioner h recommendation. Ben Hasan Brandon Garrett rasses Motion Passes 4-0. 2. Approve award of Construction Contract to Superior Construction Company Item Southeast,LLC subject to Value Engineering and in the amount not to exceed Action: S10,500,000 for Transportation Investment Act (TIA) Project, 5th Street Approved Bridge over Savannah River Repair and Restoration Projects, subject to bonds as requested by AED. Bid 19-291 Motions Motion Text Made By Seconded By Motion Type Motions Motion Motion Textrype Motion to approve with construction beginning on the Laney Walker ^ section of the project.ADDroVe- -rr--'- (Companion item to Item #8) Mr. Frantom out. Motion Passes 3-0. 4. Motion to approve the minutes of on November 12,2019. Motion to approve. Approve ili*1#"1-' S:rffisioner ;:#il:'ffi:- Fa,s Motion Fails 2- I . Motions Motion Motion Textrype Motion to approve ^ reconsiderine thisADDTOVCr r ttem. Motion Passes 4-0. Motions r#:"' Motion rext Made Bv Commissioner Commissioner Brandon Garrett Ben Hasan Passes Motion Result Motion to Approve ffi5,',Xl'.u,,., ;:fffilxf*' S:#il:H;:.. passes 4_0. 3. Approve award of Construction Contract to E R Snell Contactor, Inc. in the Item amount of $3,386,198.47 for Transportation Investment Act (TIA) Project, Action: James Brown Blvd. (9th Street) Improvements Project, subject to receipt of Approved signed contracts and proper bonds as requested by AED .Bid 19-292 Made By Seconded By Seconded By Made By Seconded By Motion Result Motion Result Motion Result Commissioner Ben Hasan CommissionerBrandon Passes Garrett the Engineering Services Committee held 5. Motion to determine that Clanton Road, as shown on the attached plat has Item ceased to be used by the public to the extent that no substantial public purpose Action: is served by it or that its removal from the county road system is otherwise in Approved the best public interest, and to receive as information the results of the public hearing held regarding the issue of abandonment pursuant to O.C.G.A. $32- 7-2, with the abandoned property to be quit-claimed to the appropriate party (ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and adopt the attached Resolution. Motions fr"J:" Motion rext Motion to approve. Approve Mr. Frantom'out. uommlssloner rurotion pJsr.rl-0. Ben Hasan Made By Made By Seconded By Commissioner Brandon Garrett Made By Seconded By seconded By Motion Result Commissioner Brandon Garrett rasses Motion Result Passes warranty. Motion Result Item Action: Approved Item Action: Approved 6. Motion to approve the Clanton Road swap with a l2-month (Referred from December 3 Commission meeting) Motions f#:"' Motion rext Motion to aoprove. Approve Mr. Frantom out. uommlssloner rurotion plrr.r"i-0. Ben Hasan Motions f#:"' Motion rext Motion to approve. with an l8-month Commissioner CommissionerAoorove '" ':'""':' :"":'j'""^"'*^ :""":^^"";"" .. Passeswarranty to be given. Ben Hasan Brandon Garreff Motion Passes 4-0. 7. Approve purchase of traffic signal radar detection system from Wavetronix at a cost of $28,073. Item Action: Approved 8. Discuss the sidewalks from Laney-Walker to Reynolds Street through the Item Downtown Development Authority. (Requested by Commissioner Marion Action:Williams) approved Motions r#:" Motion rext Made Bv Motion to ^ approve.APProve Motion passes 4_0. Commissioner Commissioner Ben Hasan Brandon Garrett Passes Seconded By Made By Seconded By Motion Result Motion Result Motions Motion Motion Textr ype Motion to approve with construction to begin on the Laney Walker A _--^_.^ section of the project.APProve (companion item to Item #3) Mr. Frantom out. Motion Passes 3-0. Commissioner Brandon Passes Garrett Commissioner Ben Hasan www.ausustasa.sov Engineering Services Committee Meeting 1/14/2020 1:05 PM Minutes Department: Presenter: Caption:Motion to approve the minutes of the Engineering Services Committee held on December 10, 2019. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Engineering Services Committee Meeting 1/14/2020 1:05 PM Discuss Storm Water Issues Department: Presenter:Commissioner John Clarke Caption:Discuss storm water and flooding issues. (Requested by Commissioner John Clarke - referred from January 8 Commission meeting) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: