Loading...
HomeMy WebLinkAbout2019-12-10 Meeting Minutes Engineering Services Committee Meeting Commission Chamber - 12/10/2019 ATTENDANCE: Present: Hons. Hardie Davis, Jr., Mayor; M. Williams, Chairman; Hasan, Vice Chairman; Garrett and Frantom, members. ENGINEERING SERVICES 1. Motion to approve amended agreement between the City of Augusta and Atlantic Coast Consulting, Inc. for a quarterly contract through March 31, 2020. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Unanimous consent is given to add this item to the agenda. Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to refer this item to the full Commission with no recommendation. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Brandon Garrett Passes 2. Approve award of Construction Contract to Superior Construction Company Southeast, LLC subject to Value Engineering and in the amount not to exceed $10,500,000 for Transportation Investment Act (TIA) Project, 5th Street Bridge over Savannah River Repair and Restoration Projects, subject to bonds as requested by AED. Bid 19-291 Item Action: Approved Motions Motion Text Made By Seconded By Motion Type Motion Result Approve Motion to approve. Mr. M. Williams votes No. Mr. Frantom out. Motion Fails 2-1. Commissioner Ben Hasan Commissioner Brandon Garrett Fails Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve reconsidering this item. Motion Passes 4-0. Commissioner Brandon Garrett Commissioner Ben Hasan Passes Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Brandon Garrett Passes 3. Approve award of Construction Contract to E R Snell Contactor, Inc. in the amount of $3,386,198.47 for Transportation Investment Act (TIA) Project, James Brown Blvd. (9th Street) Improvements Project, subject to receipt of signed contracts and proper bonds as requested by AED . Bid 19-292 Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve with construction beginning on the Laney Walker section of the project. (Companion item to Item #8) Mr. Frantom out. Motion Passes 3-0. Commissioner Ben Hasan Commissioner Brandon Garrett Passes 4. Motion to approve the minutes of the Engineering Services Committee held on November 12, 2019. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Mr. Frantom out. Motion Passes 3-0. Commissioner Ben Hasan Commissioner Brandon Garrett Passes 5. Motion to determine that Clanton Road, as shown on the attached plat has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, and to receive as information the results of the public hearing held regarding the issue of abandonment pursuant to O.C.G.A. §32- 7-2, with the abandoned property to be quit-claimed to the appropriate party (ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and adopt the attached Resolution. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Mr. Frantom out. Motion Passes 3-0. Commissioner Ben Hasan Commissioner Brandon Garrett Passes 6. Motion to approve the Clanton Road swap with a 12-month warranty. (Referred from December 3 Commission meeting) Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve with an 18-month warranty to be given. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Brandon Garrett Passes 7. Approve purchase of traffic signal radar detection system from Wavetronix at a cost of $28,073. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commissioner Brandon Garrett Passes 8. Discuss the sidewalks from Laney-Walker to Reynolds Street through the Downtown Development Authority. (Requested by Commissioner Marion Williams) Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve with construction to begin on the Laney Walker section of the project. (Companion item to Item #3) Mr. Frantom out. Motion Passes 3-0. Commissioner Ben Hasan Commissioner Brandon Garrett Passes www.augustaga.gov Engineering Services Committee Meeting 12/10/2019 1:05 PM Attendance 12/10/19 Department: Presenter: Caption: Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: AGREEMENT AMENDMENT Original Agreement: Consultant Services Agreement between "Department of Environmental Services Augusta, Georgia" and "Consulting Enginee/', dated February Zg,IOLZ. RFP #11-146 Scope: "Environmental Complaince, Testing, Engineering and Consulting for Augusta's Environmental Services Department" lnitial Extension: Two year extension (through L2/3L/21L9) executed s/t/2ot7 by ACC Atlantic Coast Consulting and Augusta, Georgia shall by execution as noted below mutually agree to extend the referenced agreement on a self-renewing Quarterly basis. Augusta shall maintain the right to terminate this agreement upon written notice. ln Witness Whereof, said parties have hereunto set their seals the day and year written below. Executed on behalf of both parties: AUGUSTA: Augusta, Georgia CONSULTANT Atlantic Coast Consulting, lnc. Hardie Davis, Mayor Approved Date: ATTEST: Richard Deason, CEO/ President Approved Date:_ ATTEST: CONSULTANT SERVICES AG REEMENT BETWEEN " DEPAR,TM ENT OF ENYT RONMENTAL SENWCES AUGASTA, GEORGU" AND I'CONSALTNG ENGINESR" This Agreemcnt is made and entered into this M ary of El*aOyra ZOJZby and behvcen Augusta. Ccorgia, a consolidated govcrnment and politicai suMivisioi? the Srate of Geoqia hcrcinalicr callcd nAugustl' and Atlantic {oast Consulting. lnc. a Corporation authoriz*d to do business in oeoryia, hercinaftcr called thc.Comurtrnt.o Whercss, Augustr desircs to engage a qualified and cxperienced consulting firm to furnish: "f,nvironmentrl Complience, Tesiing Engineeriog and Coneultlug for Augurterr Env iroamenta I Scrvices Deplrtmen l, Itr/hereas. thc Consultsnt has represcnted to Auguste that it is experienccd and qualilied to provide the seruiccs contuincd hcrein and Augustr has rclisd upon such rcprcmntation Nrl*', therefort, in consideration of thc mutual promises and covenant hercia contained, it is agrecd by and betw'een Augusta and the Consultrilt that: l-hc Consultrnt shall guther t'ronr Augusts all avsilsble data and information pertinent to the performance of the services fbr thc Pro.iect. Augustr shall havc the final dccision as to what data and information is pertirent 'Ihe Consultrnt shall ensure lhat the data and informalion mcst appticable standards as specified hcrcin. The Consulttnt shall report in writing any discovcry of errors or omissions contained in the data and inlbrmation furnished by Augu*tr. Thc Consultant shall visit and become familiar with the Projcct sites and shall bcoomc ocquaintcd with tocal condilions involved in carrying out this Agrcernent. The Concuttrnt may request that a rrprescntative of Augustr bc prcsent during the sitc visit. The Consulteat shall rccommcnd and secure Augurtr'r urincn approval ofl the manncr of project plans prescntation and the methods to bc uscd in tlrc plan preporation so that these plans can be best utilized, as determincd by the Consultrnt and apprtrved by Auguste. in the orderly preparation of thc detailed construction plans, specitications, and contraclt. Up<m receipt of Augultl's writtcn approvat of thc manner of the pn joct plan, pnrenurtion gnd methods of plan prcpsrltion. the Consultrnt shull procced with implcmcntatioil of thc pruject- TERM The term of this Agwment shall commencc on Jrnuary 1,2012 and tcrminate on Detcmbsr 31, 2017 (thc "lnitial Term") unlcss this Agreement is rcrminatcd carlier by Augurtr as hcrcin providett. This Agrcgnfit may be rcncwcd for two (2) or more successive two (2) yesr tcrms ithe "Renewal Tcrms") upon mutual agreernent of thg panics et the ratss contained hcrcin (as may bc adjustd as provided hereirr) no less than sixty (60) days prior to the expiration of the lnitial Tcrm or the then cuntnt Renewd Tcrm. CONTIN UATION OF SER]/ICE If Augutta docs not cxcrcise its right to renew this Agreement or if therc arc no rcnewal options rcnraining, Augusta will attanpt to awrd I new agreemcnt at least thrcc (3) months prior to thc cxpination of this Contract, In thc cvent a new agreement h8s not betn awarded within such time frame, Contractor shall provide scrviccs to Augu3ar on a month-to.month basis aficr thc cxpir.arion of rhis Agrcemcnr, et the then establishcd rates, if Augusta request$ this scrvice with at lcastthirty (30) days notice to thc Cottsuftmt. TER M IN ATION TRANSITION Prior to the termination of this Agrecmert, Cons[ltant shall work. with Augurtr to cnsurt that therc is no interruption or reduotion of servicc when the Consulhnt cnds its s*tticcs to Augurte. lf a new conract is awardcd to enother tirm othcr dran the Consultant. the Consultant shall coordinatc and cooperate with the ncwly sclected tirm, as well ss Augusta, to minimiae any disruptions in the services pmvidcd. RIGHT TO ENTER Thc Consultrnt shall notify all propcity owncm or occupants of the intcnt to enter pmpertie$ for fic purpose of acrcomplishing survcys or othcr field investigations in accordance with the prsctices of Auguste. Thc Coffisltrnt shall discuss with and recivc approval fom the Environmenlal Services Dcpartmcm prlor to sending said noticgs of intcnt to cntcr privalc propcrty, Upon request by the Conrultrnt, Augurtr will pruvide the necessary documents idcntilying the Concultrnt as being an authorized consultant of Augustr for thc purposc describcd in the Agreemcnt. lf the propcrty owncr or occupartt dcnics thc Conrullrnt permission lo enter, rueh incldent will be rcportcd to Au3urte and Augu*tr will initiate such action as is dictatcd by cuntrrt policy and proccdurt. pIRECTOR OF EN VIRONII,IENTA L SERVICES The Di6cror of Envirunmcntal Serviccs f'Dircctor") or duly appointed ruprcscntativc(s) shall act as the liaison bcnpcen thc Consultlnl and Augurtr and oll utiliths, and authorities or govemmenrs whose propcrties will be affccted. Alt "oncspondcnce, data, inform*ion. and rcports shall bc directcd to the Dircctor who will prcvide propcr distribution to the psrties concrrncd. The Conruliant shall mcet with Augurtr for rqvicw of thc work or subnrit in writing, a projcrt status updste on a monthly basis or as determined by Augusta. CONSI"JLTANT COORDINATION The Consulirnt shall cooperat€ fully with Fedeml and Statc ofliciats, consulrans on adjacent projects, municiprlitics and local govcmment otlicials, utility companics, railroads, and others, as mry be directed by Au3urtr, Such coopcration shall include attendance at mcetings, discussions, and hearing5, as may bc reqr.ested by Augustr, furnishing plans and other data produccd in thc coursc o[ work on thc Project, as may be rcqucsed t'rom time to timc by Augurtn to cflect such coopcration and compliance with rll dirtctivcs issued by Augurtr in rscordance with this agrcemcnt. It is undcrstod anrJ agrced that Federal and Statc rcgulators may have accsris lo the work and be furnishcd information as dirccted by Augurta. ACCTJRACY OF WORI( The Cwsultrnt shall be rcsponsible for the eFcuracy of the work and shall pronptly cor?ecr any matcrial cnors and omissions without adrlitional compcnsation. Acccptance of thc wo* by Augurte will not nlievc the Consultart of the rtsponsibility for subsequent correction of material crmrs and thc clarification of any ambiguitics. At any time during the construction of the improvement provided for by the plans or during any phase of work performed by others bascd on data sccured by the Consultrnt undcr the Agrccmcnt. the Courultrnt sholl confer with Augurte for the purposc of lnterprcting thc information obtaincd antl to conoct mrtcrial e$ors or omissions made by it. The Conrultrnt shall prcparc any plans or dala rcquired by Arguste to cofiect its errors or omissions. The above consultation, clarification, or corrcctiorr shall be made without added compensiadon to the Connulunt Thc Consult trt shsll give irnmediutc anention to thes€ changcs so there will bc a minimum of delay lo o&crs. CHANOF. IN THE WORK Augusta may at any time as the nced arises, ordcr changes within the scope of thc wodg ard/or order in writing a temporary sropping of the work, wlthout invalidating thc A5l-*cmcnt. lf such changcs in{rroasc or decrcass the amount due under the Agreemcnt or in the timc requircd for pcrformancc of the wort, an equitrble adjustment shall be authorized by Change OrTder. Augmta resetvcs the right to nrakc at sny timc such alterations in thc charactcr of the wo* as Augurtr may considcr neces$ary or desirable to complcte the proposed work in & sstisfactory mannff and consistent with the intent of this Agreement. Noticc of every such altcralion or changc shsll be given in writing to the Conrultant by Augurtr, and no such alteration ot change shall bc considered as constituting a waivcr of any of the povisions of this Agrccmcnt or as nullitying or irrvalidatingarry of such provlsions. Should any such altcration orchange rcsult in an incrcase or decrrasc in the quontity or the cost of the wo* described in this Agreemenl thc total amount payable under thc Contract will be accordingly modificd. tf altcrations or changes orc thus made, thc Agrecmcnt tirne will be corcspondirrgly modified, if the Conrultrnt so requests. and is mutually agreed upon by Augusta, bsforc commcncing the work attributable to such altcrations or changcs. It is undcrstood and agrrcd that the Consultrnt shall pcrfom all cxtra work that rnay be ordered in writing by Auguste arising out of thc modificatiol of the Specifications or Drawings madc or approvcd by Augurtr. For this extn wor*, thc Congultint $hall bc compcnsarcd as provided hercinafter and in the Changc Order covcring thc additional scrviccs. All Changc Ordcrs must b€ approvcd by Augutta and &osc govorflmcntal agcncies whosc approval is rcquircd. ADDI'I'IONAL SERVICES 'l'he Consuttsnt may bc rcquirsd to perform sdditional seruices or tasks related to the work ourlined in the Scope of this Agreement that arc specific to site conditions and are not typical in naturc. Thc Consultent shal!, at Augultr'3 rcqucst, submlt a pmposal inrlicating msn hours ond co$ts ro Auguate frrr approval, The Conrulunt shall not bcgin on any task until Auguttr issues wriuen authorization to proc€ed. DELI_VERY OF NOTICES Atl written noticcs. dernands, and other papcfs or documcnts to bc delivered to Augusta" under this Agrccment, shall bc dclivered to Augurte's ollice. 4330 Dcan.t Bridgc Rd, Blythc, Oeorgia 30t05, Atlsnrion: Dirwtor of Environmsntal Servicqs. or ot such othcr place or places as mry be subsequcntly designarcd by writtar noticc to the Conrultrnt All written notices dsmands, and other pspers or documents to bc delivernd to the Comultrnr undcr this Agrecment shall bc tlirr:crcd to or ar such a ptacc or places subsequently ro he dcsignated in writing by the Consultrnt to Augusta. SUPERVISION AND CONTROL 'fhe Consultlnt shall perform thc ssrviccs rcquircd to accomplish the work plan as stated above undcr such control an{ supcrvision by Augurtr as Auguctr may dcem appropriatc- Augusta muy, at rcasonablc limcs, inspect thc parr of thc pllnt" place of business, or wo:* site of thc Consultent or subunit thcrcoiwhich is peninent to the perfonnance of any contmct awatded or to bc awaded bY Augurtr. covENnNT AOATNST CONTNqENT FEES 'l}e Consultrnt shall comply with the rclcvail requircmrmB of all Fcderal, Statc, County, or local laws. The Consultrnt warants that it has not cmploycd or reralncd any complny or psmon. othcr thsn a bona lidc cmploycc wo*ing solely for ths Colrultrnl, to solicit or sccure this Agrcemenl. and that it has not paid or agreed to pay any comp$y or p€:Ton, other than a bona fidc cmployec working solely for thc Consultrnt, any fcc, commission, perccntage, brokcrage fcc, gifls, or any consideration, conringcnt upon or rcsulting from thc awald or making ofthis Agrecmcnt. For brcaeh or violation of this wun:anty, Augurte shall have the right to annul this Agrcement without liabiliry, or, at its discretion, to deduct from the Agrecment pricc or consideration, or othenilisc rccover. thc full amounr of such fce, commission" percentage. bnrkcragc fet, gift, or contingcnt fec, E MPLOYMENT O-F A UC USTA'S PERSONNEL 'l'he Concultrnt shall not employ sny person or per$ons in the employ of Augurta for any *,o* requircd by the terms of this Ageement, without thc writtcn permission of Augusta excepl as may otherwisc bc providetl for hercin. REVIEW OF WORI( Authorizcd rcprcscntalives of Augurta may et Blt r€asonable times review and ins?ect thc proicct activitix and data collected under the Agrccment and amendmenls thereto. All reports, d:'awingg studies, sprrcifications, cstimates, map$ and computations prepard by or tbr the Conrultrnt, of its prufessional obligatlon to corn".ct, at its expcnsc, any of its errors in work. The Environmental Service.s Departmcnt may request at any time and the Consultrnt shall produce pro$Ess prints or copics of any wo* as perfbrmed undcr this Agreement. Refusal by the Consultant to submit progrss rcports andyor plans shall be causc to withhold payrnent to thc Consultunt until the Consultgnt complies with Augusta's reguest in this rcgard, Augusta'r review rccommendalions shall he incorporated into the plans by tha Consultrrt Augustr may collect sutistical data rclating from Consuttrnt ard/or Concultant'r busincss and subconnactors and ConsultiDt cxprcssly agrces lo providc such infirrmation. INSURANCE Prior lo bcginning rvork, the Consultrnt shsll obtsin and furnish cefiificatcs to Augurtr for the following minimum amounts of insurancc: A. Workmen's Compensation.lnsurance in acsordancc with the laws of thc State of Garrgia Thc amount shall not be lcss tran Orc Million ($1,000,000.00) Dollan pcr accidenr. B. Gercral [.iabililv Insurancc in an amourt of rrot less Onc Million ($1,000,000.00) Dollars pcr occunrencc. C. Valuable Papcrs lnsunanqe in an amount guftisient to assurrg the restoration of any plans,' drawings, tield notes, or othcr similar data rclating to the wort covenrd by the projsct. D. Comgrehcnsinc Autooobile Liability tnsuraneq including operation of ownsd, non- owned and hircd automobiles, covcring bodily injury and/or pxlpcrty dhmage with limits E. F. of0nc Million ($1,0(8,000.00) Dollars pcr accident. hofcssional Lisbility lnsurarcc in an &mount of not less than Onc Million (31,000,000.0O) Dollan or if rcquirrd, in arnounl lhst correlatcs to the tmount of this agrccmcnt and noture of this projest. 'ftre Coneultent shalt procurc and maintain, at his own expefisc, during thc lifc of the Agreemenq in accordance with the provisions of thc laws of thc statc in which thc work is pcrfornred, Wor*man's Compcnsation Insurance, including occupational disease provisions. for all of his cmployees at tlre site of tfu project and in case fiy work is sublet thc Concultant shall rcquirc such subcontractor slmilar'ly o provide Workmrn's Compcnsation tnsurancc, including occupational discasc provision for all of the lattur's cmployees unless .such emptoyecs rrc covered by the Pmtcction affordcd by the Consultrnt. In casc any class of cmployees cngagcd in hazardorrs work under this Agrcemenr sl lhe site of thc project is not protected undsr Workmm's Compenration stitutc, the Consultant shsll providc snd shall caus€ each $ubcontractor to providr adequate and suitsble insurancc for thc protcotion of his employees not othcrwise protcctd. C. Each insurance policy shall bc rrnewcd et lcast tcn days before the expiration dale I. thcrcof. Insurance policies must bc ceried by a recognizcd insurarrcc company licenscd to do business in thc state in which the projcct is conslrucrcd and approved by Augusla'r Gcneral Counsel or other designatcd lcgal rcprescntative. The Consultmt shall not commcrcc work undsr this Conlract until he has obtained all of the insurancc requirrd and such insurancc has becn apprcvcd by Augurtr, nor shall ths Conrultrnl allow any subcontraclor lo commcncc wo* on his subcontract until the insurance required ofthc subcont?ctor has begr so obtained and apprrrved. ln the event any insurancc covcrage should bc cancelled or allowed to lapse the Concultroi will not bc permincd rc r*ork until adcquate ond satisfactory insuranw is in effect. Failurc to kecp insurance poticies in effect WILL NOT be causc for any claims for cxtension of time undcr this Contract. The Cogultent shall furnish a certificatc of insurancc indicating that thc Consulirnt has coveragc in accoldance with the rcquirements hcrrin sel forth to thc Envircnmcntal Serviccs Departmenr within thirty (30) days fmm the execution of the Contract. Consultrnt agrees that Auguete will makc no payrncnts pursuant to th€ terms of thE Conrract until atl requircd proof or cvidcoce ol' insurance has bcen provided ts the Augusta. GeOrgia rcprpsentetive. Consulbrtt agtes that the insurer shall waivc its rights of iubrogation, if any, against Augustr. These shall bc completcd by the authorizcd Rcsident Agcnt and nsturncd n the Errvironmentttt Scrricss Dcpartmcnt. This ccrtilicate shall bc dated snd show: (l) The namc of thc insurcd Consultrnt, the spccified job by namc, namc of thc insurer, rhe numbcr ofthe policy, its clfectivc datc and its temination datc. (Z) Staremcnr that the Insurrr will mail notice to Augusta ar lr:8st thirtY (30) days prior to any material changcs in pmvisions or eanccllarion of the policy' l{. J. rcgulations. COMPENSATION Augusta shalt compcnsate the Conuultrul for scrvices, which havc been authorizcd by Augurtr under the terms of this Agrcement. The CoacultrDt may submit to Argu$r a monthly invoice, in a form acccpublc to Augurtr rnd accompanied by all supporl doeumentalion requestcd by Augustl, for payment for the services, which wcrc completed during the billing puiod. Augurta shall rcvicw fbr approval said invoiccs, Augusta shall have the right to rcject paym€nt of any invoicc or pan thercof if nor properly supponed, or if the costs nequcstcd or a port thcrcof, os detcrmined solely by Atrgurta. are unltitsonably in excess of the actual stage of completion of each phase. Augueta shall pay each such invoice or portion thcrcof as approvcd, provided that rhc appruva! or paymenr of any such irtvoicc shall not bc considcrcd to bc cvidcncc oI pertbrmarrcc by the Conrottant to thcpoint indicated by such invoice, or olrcceipt of acccptance by Augurtr of the scrviccs covered by such invoice. Augucta shall pay any undisputed items containod in such invoiccs. Each invoice shall bc accompanied by a progrcss rcport describing the toal work -cccomplished for cach phase and any problems, which havc been, encountered which may inhibit €xecution of thc work. Thc Consultnnt shall also submit an accuratc updarcd schcdulc, and an itemized dcsuiption of the pcrcentage of total work conrptctr:d tbr cach phasc during the billing periul. lt is understood and agrecd that the agpnrval ofthc progress payrnont rcquest and thc paying ofa panial payment shall not be construed as acccptancc of any wo*, materials, or produos anrl shall not rclicvc thc Conrultrnt in any way from his rcsponsibilitics and obligations undcr thir Agr*mcnt. A panial paymcnt will not bs madc whcn, in thc judgmcnt of Augurts, thc wo* is not pmceeding in accordance with any ofthe prcvisiorrs ofthis Agrccmcnt. To the extcn( thar the priclng pravided by CONTRAC'I'OR is erroneous and defective, rhe Parlics may. hy agrccmcnt. corTcct Oricing effo,T to rcflect thc interrt of the partics. The terms of this Agreemcnt superrserles any and all provisions of thc ccorgaa prurnpr pay Act. ANNUAL RATE ADJUSTMENT Thc Consultrnl may bc cntitlcd to adjust the contracted billing rates annually. The Employment Cost Index (Not Seasonally Adjusted) for total conlpcnsation for civilian workcrs as published by the tJnitcd Statos Dcpanmcnt of Labor. Burcau of Labor Staristics("BH"), or it.s successor shal! be used &s pan of the crlculation to daermine the annual rate adjustment. lf BLS designates an index with a new title or codc numbcr or tablc number as being the continuarion ot'&e indcx cited ebove, thc new indcx will be uscd, or if no ncw indcx is dosignaterl, thc most ncarly compatible indcx shallbe used. The annual ratc sdjustmcnt will be determined based on the reportcd lrercent changc from thc BLS of the most recent l2-month availablc dau as well as other mutually agrccablc applicablc factors, with an implemenration of any adjustment bcing made on January ls, and evcry Jrnuary l tt ihcrcaffcr wiih thc fint adjustmcnl siarting in January of 201 3. Should the rcfcrenced indcx and/or othcr applicable thuors show a decrcsse, Augusta will be entitlcd to a reduccd cost up to thc allowablc limils as dcfincd heruinafter. In any event, thc adjustment will be limited to a maximum incrcasc or decrcase of four pctccnt (47o) rnnually. R IGHT TO REOTJIRE PERFORMANCE 'l'he lhilure of Aogusta at any timc to rcquirc pcrformancc by the Conrullrrnt of any provision hcrcof shrll in no way affcct the right of Augurtr thercafler to enforte same, Nor shall waiver by Augurta of any breach of any provision herrof be tskcn or hcld to be a waiver of any succealirtg brcach of such pnrvision or as a wsivcr of any provlsion iscltl ln tlc evcnt of hilurc of the Consultrnt lo deliver serviccs in accordance with the contract terms and conditions. Augulta, affer due writtcn noticc. may procurE the scrvices from othcr sourccs and hold thc Consultqut rcsgrcnsiblc lbr any rcsulting addltional purchasc and administrativc costs. This remedy sholl be in uddition to any othcr remedics that Auguste may have, sPECrqlEt) ExcusEs FoR DELAY oR NON-PERFORMANCq Concultant is not rlisponsiblc for dclry in performsnc€ causcd by hunicanes, fornadoes. floods. and other seyere and uncxpected acs of naturc. ln any such eveitt, thc agreemcnt pricc and schcduls shall bc cquitably adjusrcd. ASSIGNMENT Pxcepr as spccitically authorizcd in this Agrcemcnq the Conrulhnt shsll not assign, trarsfer, conv€y, sublet, or otherwise dispose of any work or of any of its rights, title. or interests thcrein, without the prior written conserrt ofAugurtr. CoNTRACT TISPUTES This Agreemcnt shall be deerncd to havc treen cxccuted in Augusta, Oeorgia, and all qucstions of inrerprrtation and construction shslt be govcmcd by ths kws of thc Statc of Georgia' All claims. disputcs and ofter maitcrs in qucstion betwccn Augurte and the Consullarl arising out of or rclaring to rhe Agrecrn€nt. or the bruach thercof shall bs decided in thc Supcrior Court of Richmond Ci<rurrty, GJorgia. The Comultrnlr by €xecuting this Agrccment, specifically sonselts to vcnue in itichmonrt County and wdves any right !o contest thc venue in the Superior Court of Richmond CourttY,Georyia. CONTRACT TERMINATION Pursuant to O.C,GA. $ 36-60-13, this Agrccment shall terminate absolutely and without further obligation on the parr of Augusta at lhc close of dre calendar ycar in which this Agrccmcnr is cxccutcd and at the closc oI cach succecding calundar year for which the agrecntcnt may bc rencwcd by the pailios hercto. This Agrecmcnt shal! neverlheless &utomatically be ncncwed unlcss Augustr pruvidcs writtcn notice to the Concultant of its intcntion to tcrminste thc Agreement at lcast thirty days prior to the close of thc calcnd:r ycar for which thc Agreement is pres€ntly cffectivc between thc parties and/or has bcen rcnewcd by Augusta. 'l'his Agrcemcnt shall obligare Auguslr solcly for rhose sums payable during thu inirial tcrm of execution or in the cvcnt of rcnewal by Augurtu for thosc sums payable in such individualrcnewalterms. Notwithstrrnding lhc lbrcgoing languagc, ihe Conrulhrt agrscs to continuously rcnrter thc professional services spocitied hy the Agreement to Augrrtr for such tems or renewal tcrms as arc effective purcuant to this Agreement and for which Augurte agrees ro pay in accordance with thc rcrms of thc Agrcement or any firtule arncndmenr thcrcto. Augurta may terminate this Contract ifi part or in wholc for its convcnience upon writrcn notice lo thc Consrltnnt. Failure o1'thc Consulrrnl which has not bern rcmedicd rlr waived, to pcrlorm or otherwisc comply with a nrsterial condition ol'the Agreemcnt shall constitute default. August+ Georgia may terminatc this contract is part or irt whole upon writtcn notice io the Consulmnt pursuant to this term. The Consultrnt shall bc paid for any validatcd scrvices under this Contract up t0 thc time ol'termination. SEPARA1'8 COI{TRACTS Augurtr rcscrves the right to lct other contrasts in connection with this Project. The Coacultaot shall affon! other contractorVconsultants rcasonable opportunity for the executior of their work and shall properly conncct and coordinate his work with thcirs. lf thc proper exouution or rcsults of an1' pafi of the Consultrnt'c work depends upon the work of any other consultant, the Conoultant shall inspect aod promptly report to the Dircctor any dcfccts in such work that rendcr it unsuitable for such proper execution and rrsulu. Augurta may pcrtbrm additional wort related to the Projcct or may let other contracts containiilg provisions similar to lhcse. 'fhe Consultrnl will afford thc othcr consultants who arc pattics to such contnacts (or Augurta, if Augustr is performints lhe additionsl work), ruasonablc opf,ortunity for thc execution of the work and shrll propcrly conncct and coordinate his wo* with theirs. lf the pcrformanc$ of additional wort by othcr conhactorVconsultants or Augurtr is not noted in the Agreemcrf prior to thq exccution of thc Agrccment, written ootiec thercof shall bc given to rhe Corculant prior ro starting any such additional wor*. lI thg Conrultrnt bclievcs that thc pcrformancc of such additional wor* by Augulta or othcrs involves him in additional expensc or t0 cntitlcs him ro an cxtensi6n of the contracl time, hc may mgke a claim thereftlre as provided in Scctions "Change in the Work". PERSONNEL Thc Consultxrt rcp6senrs that it has sccurcd all pcrsonncl ncccssary to complcte thls agr€emcnt, and all pcrsonncl cngagcd in thc work shsll be fully qualificd snd shall bc authoriz.ed or permined under law to pcrform such scrvices. No changcs or substirutlons shall be pcrmincrl in thc Conrultrnans key pcrsonnel as s€t forth hercin w]thour rhc prior writtsn approval of the Dirtctor of Environmental Scrvices or his dcsignee. Thc Conguttant shall emptoy in rrsponsiblc chargc of supenvision end dcsign of the work only pc6ons duly rcgistercd in tie appropriate category: and firnher shall employ only qualified survcyors in rcsponsiblc charye of any survey work. The Conruttrrrt shall endorsc all repnas, contract plans, and sutTcy data. Such cndorscments shall bc made by fl person duly registcrcd in thc appropriate catcgory by the Georgia Surc Board of Rcgistrarion- bcing in &a fbll employ of the Coasrltrot and csponsible ficr thc work prcscribcd by this Egrcemcnl. ELECTROiI tC DOCIJM ENTS Thc Comulrrnt shsll submlt clectnmic tilcs of ell prtjcct relatcd documcntation including the design calculation data fitcs to Augu*te in a format acccptable to Augoste. 1'A XES. PERMITS AND LIqENSFS 'lhe Consultrnt shall pay all applicablc taxes levicd by federal, st&tc, and local govemmcnts and obtain all permits on *y part;f thc wort as rcquired by law in connostion with the work' lt is undqstood and agru'cd ihat thu cost of srid taxcs is includcd in the Agrcement price(s) for the work Thc Conruttent shall procurc all temprary and permanent permits and lhenses necessary and insidcntat ro the duc and lawful prosecutio; of the work and shall pay all charges and fees, and all costs thercof shull bc dccmed to bc included ln thc Agrcemcrt pricc(s) for tlrc work. CONFIDENTI,ALITY Except as rcquired by rhc Gcorgia Open Records Act. the Consultrnt agrces that its conclusions onJ uny rsporrs * io. the corifideniial information of Augu3tr and that it will nst disclose its documentation to Augustr, and will only discuss thc same with it or its authorizcd rcprcscntativcs. Upon clmp[erion Of this agnlrnvnr krm, all documents, rcpot'ls, nrapr' data and studics prtpsred by the Concultrnt pu6uant thcreto strall becomc the property of Augurtr and be delivercd to the Director of Environmcntal Scflices' ll Except as requiret by the Georgia Opcn Reeords Act articles, papers, bulletins, repons, or othcr materials rcporting thc plans, progrcss, analysis, or rcsults and findings of thc work conducted under this agriccment shall not be presentcd pubticly or published without prior approval writing of Augurta. lt is further agrccd that if any information (not subject to disclosurc under the Oeoryia Open Rccords Act) conccrning the project, its conduct, results. or dao gathcred or pnrccsscd should be released by thc Consultrnt without prior approval from Augucta, thc rcleasc of same shall constitutc grounds for termination of this agrccmcnt without indcmnily to thc Con*ultrnt. but should any such information be rcleascd by Augustn or by thc Consultant with such prior wrincn approval, dre san:e shall be rcgardcd as public information and no longer subjcct tc the restrictions of this agrccment. I,OCAL SMALL BUS.INESS ln occordancc with Chaptcr l0B of the Augusta, GA. Code. Conrnactor exprcssly agrees Jo coltect and maintain alt records niccssar,v to for Augustq Gcorgia to evaluate thc cllirtiveness of its l,ocul Small Business Oppottunity hogram and to rnake guch reords available to Augusta, Gcoryia, 'l'he rcquircmenlr of thc Locsl Smatl Business Opportunity Prograrn can be found at wu"*,.uuqqu(asa.gov. In accordance rvith Augusta, CA. Code $ l-10-129(d)(7), for all contracu where a tocal small busincss goal has becn cshblished, the contractor is requircd to provide local smalt business urilization repons. Contractor shall rcport io Augusta, Georgia ths tolal dollars paid ro cach local small business on cach cootract. and shall providc such paymcnt affidavis. rcgarding payment to subconrractom as may be rqucstcd by Augusta Georyia. Such documents shall be in thc format specilicd by the Dircctor of minority and small husincss oppoaunities, and shatl bc subminsd al such times as rcquircd by Augusta, Gcorgia. Failure to providc such rtporls within thc time frcriod spccified by Augusta, Gcoryia shall errtitle August4 Geoqgia to exercise any of the rcmcdics set lbrth, including but not limited to. withholding payment from thc contriactor and/or eo llecting t iqu idatcd damagcs. E.VERIFY All consultants, contrastors. and subcontractors entering into coalracts with Augusta. Georgie for the physical performaace of serviccs shall be ruquircd to excoute an Aflidavit veri$ing its compliancc with O.C.C.A. $ l3-10-9t, ststing aflirmativcly that thc individual, firm, or corp()ftrtion which is conracring with Augusla, Gcoryia has rcgistercd whh and is panicipating in s fedsral work authorizstion prcgram. All consulBnts, contiilctors. snd subcoltractorc must provide their E-Verifu trumher and muE be in compliancc with the eleclronic verificuion of work authorizcd program$ operated by thc Unitcrl Stltes Dcpa$mcnt of Homcland Security or any equivalcnt iediral work authorization pnogtiam opcratd by rhc United Sates Dcpartment of Homeland Security to vcrifi infonnation of newly hird cmployecs, pur$uant to the lmntigration Retbrm and Control Act of 1936 (IRCA). P.L.99-603, in aceordancc with the applicability provisions anrl dcadlines established in O.C.C.A. $ l3-lG9l and shall continue to usc the federal authorization pn,gnm thruughout the controct term. All consultartts and contractors shsll funher agrcc that, should it employ or conract with any subcontracto(s) in connccdon with thc physicEl r2 perlbrm6ncc of scrviccs pursuant to its contrsct with Augustrg Gcorgia thc consulBnt or contr"ctor wilt sccure from such subcontrgoto(s) cach subcofltractor's E-Verifi' number as o,idence of yerification of compliancc with O,C.C.A. $ l3-10.91 on the subcontractor affidavit providcd in Rule 300-10-01-.08 or a substanrially similar form. All coflsultant.s and contractors ihall funhcr agrcc ro mointain rccords of such compliancc and pmvidc I copy of each such verification to Augusts" Georgia at the time thc subcontracto(s) is retained to pe#orm such physical scrvices. "Con'/{/laant aclmowkdges lhqt thit (r,napc, oal any &oagq b ta by omcndflena madifidg,cto* cienge order or dcr simltar documeatmay have rcquircd or mory rquirc he legidatlva authorintion of rte loard ol bmrrtrssrorrcrr !r d opprcvol of the llayor. Undcr &argta lau Conslbnt ls dccmcd to poststt knowlcitgc ctlne,zllag Atryustg Gcuyia's abttiy to ossume colravfrtqt obllgodons oad the oonsequcncs ol Consulunti prvlvlston a{gaads or sctvlq to lrugusta, earyld undcr an unaulhodzcd controcl, amandmcn; modtficacion, cioagc otdor or othcr stmilcr dccumcnt, inclwling he postibillly Ghattre Consul&intmay be ptwluded ftrn xlolvedog paymentfcolr/r unaudrcrircdgdsor scrulcas" Accardlngly, Cansuttait agrccs dtot lf lt pr{trdt,c,s gods o" EGn tc6 to Avgusto, Ccoryla andsr a cv4,,rsct that hos not *caived pmryr lcgistativt authoristioa or I thc Connlhnt providcs gads x servlca to Auusts, (*orgla fi crcsca ol he on! oonracatalty authodzal gd* ar servlcct, as raqulrcd by augusu, Cieoryta! Chorur and Wa liugw|lr., eceryrla mry vtlhlmld Pcyt rlnt lor any unauthulted goods or semiccs plvideit by Corr;ulEnt Consultant assymcs all rlst( of ncn.yltrncnt for the pftvisiot of any unauthodted gmds ar sen{cer ro ,ludush, 0,,argta, aad la *olve* all claims ,o pawGnt or to odwr remcdies ftr thc provitiott ol dny unauttwri*d gwds or fculccs to August4 fuorgro. how*er $alr.Llarize4 lncludltg, withoutllmlutimr, all ?alrredlss ,t lar o? qul$." JSIGNATURES ON FOLLOWTNG PACEI r3 LIOUIDATED DAMAOES Duc to the special nature of this licensing agr€ement and the other rernedics provided in this agr€emcnt the partics Bgr€c that liquidated damagcs arc not applicable. R ESpoNSt tlr Lrry"FOR C LA tMS AND LtA BILrry AND INDE MN IFICAI'ION The Consultrnt shall dclbnd, indcmnify and save harmlcss Augustr and Augusta'l olliserli. cmployecs and agcnts from any and cvery clrim and rislq and fi'om all losscs, damagcs, demands, suits. judgments and attomey fccs, and other cxpcnses of any kind (collectivcly "losscs') arising out oI this Contract or thc pcrtbrmance thcreof; Including any pcruonal injury, or dcath of any and all percons (ineluding but not limitcd lo the Conrultent, its agents. enrployees, subcontractor and their succesors and assignccs, as wetl as {ugurta or Augusla's agcnts and all third parrics); and including any propcfiy damnge of any kind, whethcr mngible or intangiblc, including loss of use resulting therc finm. in connection with or rclnted to the ncgligcnt or willful sct(s) or omissions of thc Consultant or its subcontractor whilc performing wo* undcr this Corrrract, or in connection with or rclatcd to (in whole or in part by rcason of) the presencc of the Consulrant or its subcontractor or thcir propcrty, cmployccs or BBents, upon or in pmximiry to the pffperty of Augurtr or any other pmpcrty (upon which thc Conrultent is performing any work called for. 'l'hc Conaultent will indcmnis and save Augurtr or Augurtr'f sglnts harmless from all claims growing out of the la*ful demands of subcontractors, lgborers, workmen, and mechanics, material mcn, and tbmishcrs of machinery ond parts 0rcrro[ equipment, tools. and all supplics, incuned in thc furthcrance of thc pertbrmancc of thc work. Thc Consultrnt shall, at Augucte's ltque.sr. furnish satisfaclory evidencc that all obligations of the naturc designatcd abovc have bccn paid, discharged. or waived, if thc Corsultant fails to do so Augustr may, after having ootifiDd the Consultrnt. eithcr pay unpald bills o withhold fronr the Consullrat's unpuid compenration a sum of moncy desmcd res.sonably sufficient to pay any and all such lawful claims until satisfactory cvidence is furnished rhat all liabilities havc been fully discharged wlrercupon palment to the Consultant shall bc resumed, in accordance with the terms of the Agrccmenr, but in no evefit shall the pnovisions of this sentencc bc construed to imposc any obligations upon Augurlr to either the Conrultrnt, his Surcty, or any third party. ln paying any unpaid bills of thc Consultrnt, any payment so made by Augurta shall bc considctci as a paymcnt made under the Agrecmcnt by Augruut Io the Conrothnt and Augurrr shall not bs liahle to thc Consultrnt for any such payrnents made in good faith. SA}'ETY Thc Conssltrni shall take the necessary precautions and bear the sole responsibility for the ufety of the methods employcd in pcrtbnning thc work. lhe Contultant shall at gll timcs comply with the rcgulations sct l'orth by t'cdenal, statc, and local lsws. rules, tnd regulutions concerning "OSflA' and all applicrble state labor laws. regulation$ afld standards. Thc ConsulAot shall indemnify and hold harmlcss Augusta from and *gninsr all liabilitics, suits, damages, cpsts, and cxpenses (including attomey's t'ces and courl costs) which rnay bu imposed on ,tugurta bccause olthe Conruttrnt. sub.controctor, or supplier's failure to comply with thc tN wtT!.lESS WHEREOF, ssid paries havc hereunto set thcir sc8ls the dey and year written belo*'. Exccuted on behalf of Consultrnt. CONSULTANT: r-)6, dC. )@R5;ib,a}r Approved Date: IATTACHSD CO '4,//r- bneffEffi'Lt t4 The Basis of Paynents for thc services furnished by the CON$ULTANT undcthis Agrccment shall bc those necessary ro perform thc worh and provide thc associated dclivemblcs, as outlincd bclow. SCHEDULE OT FEES Note Schcdule of fecs shall be in a scparilte scaled envelopc from the tcchnical Pruposals. Failurc to tdhere to this may csuse rcjecrion of your propoxl. Servicc Level (include OH&P)! Profcssional Rcgistered Engincer $ r25 hofcssional Registercd Geologist $ r25 Proicct Mananer s r40 Prniect Engincer $99 Proiat Planncr $99 Proiect Geologist $99 Envi(rnmentaf Compliance Manager $ 125 IlnvironrnpntalCnmoliancc Tcchnisiqn 3 83 Constnrctron Manacer $97 COA hoicct Manaser $ 83 COA Rcsident trroject Reo{cscr,rtativei $. 83 CQA Sslrior Site Monilo/ .* S 67 CQA Sitc Monitor4 $ 5? Desimer 967 Draftsman/CADD -- --$ 52 'fwo-Man Survcy C:ew s r50 Admin. /Chricsl t5 $51 $ 170Oher' . PrinciPal Markup on other reimbursable and subconsulans? ,Other (lnclude additional labor categories as nceded) ,nll other dirtct projcct expenses and profcssional scnices are rcimbursable at Cost 'i-fouiy rates shall includc ovcrlread. prolit, rnd applicablc dirrot personncl cxpenses ..H;;;ii *i.r i"r *-rit pc*on"ct stritl includc viiriclc ohargcs, mileage and atl travel :rlated cxpcnscslr;&prnr" rcntsl for cnvirunmcntal servicas (tcsting, CQA. and environmcntal) to be included in the hourlY ratcs. l5 GENERAT ECOPE Or $ERVICnS Scction 1..0 lntroductlol rnd Brcluround Augusta, Gcorgia currcntly owns app_roximately 1,177 acrcs SO1;thw€St of Augusta, Georgia' whlch is rhc siG of the exisiing ocans'griogc Road Msw Landfill. Thc landfill cunently scccpts 1000 to 1500 tons pcr dry oiiunicipal solid wastc from private collection vehicles. Active and ;il;i *;tilni orit. tanOtitt coririsc apprcximately t75 atrcs of the total pmPefly' Some additional acreagc *nrri". *cillary faiititics such as oflice arrd nraintenancc buildings' cuslomcr drop of a.ta, scdiment ponds, mads, und lcachsre holding facilitics' Thc Augusta Depanment of Environmcnul Services is rcsponsiblc for the frcilities at thc landfill. solid waste ,unug.nr"nr planning ftrr lhc City anrl all rcsidential solid wasts collections' Additionally. the departricnt is responiiblt fot thc Augusta Brovnfield program and other .n"i*"-.rttat ,orpii*ce isstlcs. Thesc include indoor iir quallty, undergfound storage tanlC environmcntal site assCSsmcnls, asbcstos manaS,Cment, and lcad paint abdemcnt tbr Augutls owned facilitics. Augus6. Ccorgia is sccking proposals frorn qualificd prufessione! cnvironmcntal consulting linis with ,*[ri*n". in pciforming landfill siti aoceprability_ studic's. landfill design seruises. and land{ill arviron*eitaicompliurice activities in thc State oiGcoryia. ,Th-csc.sclvices shall be pcrltrr*eo in accordance witrr ciroular 14 published by the EPD, Gcorgia G_eologicsurvcy aod with Ctrapter 391-3.4 of thc EPD Rules as wcll at the tatest rcvision of the Ccorgia Solid Waste fvf"nugctn*nr Act; EpD ufp-*o D&O plms and other applicable fcderal, statc, and local rulcs and regulations. Scction l.r , Pruicct $chalule An appropriate project schcdule will be prcparcd for each task requcstcd of the Consultlnt' Scction 12 Scryices As necded. Augusra will issuc I roquest firr scrvices io the Consultant. Subsequcnrly, the Consutant shall preparc a deraited scope of seryiccs to include, bul not limitcd lo. thc following in ftrrmation. l. Description of the Project;2, Outtine of scrviccs to be provided 3. Detailed task idcnti$ing specific project lask and/or work schcdule 4. Levcl of eflion msn'hours nccdcd to completc thc pmject 5. Project cost to include man houN, equipment, supplics or othcr rEsoufces l'he services to bc firrnishcd by the consuttant under this agrccmcnt shall bc those as idCntified below on an "8S nceded" basis for professional englnccring scrvicos' coflstruction managcmcrr und quaiity ,rru*n"" scnrices. cnvironmcntel testing senices. spccial services' other-municipal soiiO waste scrvices, and other scruices rcquested: t7 Grouo I - FnelneerlnP ScwlcF r Obtaln Major and/or Minor modifications to thc existing Solid Waste Pcrmits. r Prcparation of'Constnrction Drawings, contract doc'rtments End specifications for landflrll closurc and ccll constnrction prcjects. o Planning and projcct evaluation services for proposed thcility improvemcnts . Studies, o.potit and audits for compliance with fcdcral, 3lrtc, and local rcgulations' . Obtain any locally requira! permits (land disturbsnce pcrmits. retaining wall pcrmits. etc) r Erosion conlrol ptanning, design, permitting and compliancc o Contract documint pr"paration, bidding assistance and consruction admilistration scrvices.r ,Air p*mitting and landfill gas systcm dcsign r Solid waste thcititics design and cngineering r ttclirninsry enginecring and survcying feasibility analysis and conrsct documentation Prcparationo Archacological assessmcnt,invesigations r Altemate composite liner evaluation rnd associatcd design changes r Asistance with orgrrization and documcntation ollltc pcnnit opcrating rccord . other engincering activitiss a a t a a Clay resource cxPloratiorr Construction managcmcnt Constructisn quol iry assunrncu Construction msterials lesting and rcporting coordination of Gcorgia Environmentat Protection Division (GAEPD) and Prcpnntion of Responrca to GAEPD Inspection Comments Construction of eualiiy Assumnce Documcn* Prepaation (as requircd Enrimnmcntal Prorcctibn Division) and Submigal to GAEPD' Othcr construction managemcnt activitics' Environmental tcsting and reponing to EPD Assistance with various rtguluory agencies Environrncntal sltc asscsrments (Phasc I and 2) Brownficld sssistancc U nderground storage unk pcrm ittin g assistance Asbcstos abatemcnt Perm ittin g lndoor air qualitY ssscssments Lead paint sssessments Envircnmental Planning Faci I ity comPliance eudits Various pcrmirting rclated to wstlands, air' and wsste watcr lnspccdons by Georgin a o a a a a a a e a a IE Engineering Services Committee Meeting 12/10/2019 1:05 PM Amended Agreement with Atlantic Coast Consulting Department: Presenter: Caption:Motion to approve amended agreement between the City of Augusta and Atlantic Coast Consulting, Inc. for a quarterly contract through March 31, 2020. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB#371-041110-T15041217. This request is to award the Construction contract to Superior Construction Company Southeast, LLC subject to Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. TIA Design 992,200$ TIA Construction 8,000,000$ GDOT Funds 1,000,000$ TIA Discretionary 1,500,000$ 11,492,200$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Hardie Davis, Mayor CAPITAL PROJECT BUDGET CPB#371-041110-T15041217 5th Street Bridge over the Savannah River (Bridge Repair and Restoration) (Bid 19-291 Value Engineering and in the amount not to exceed $10,500.00 for Transportation Investment Act (TIA) project subject to bonds as requested by AED. Funding is available in the TIA project budget ($8,000,000), GODT State Funds ($1,000,000), and TIA Discretionary Funds ($1,500,000). 12/2/2019 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#371-041110-T15041217 5th Street Bridge over the Savannah River (Bridge Repair and Restoration) (Bid 19-291 CPB AMOUNT CPB New SOURCE OF FUNDS CPB Addition CPB TIA Project 371-041110/5212115-T15041217 ($200,920)($200,920) TIA Project 371-041110/5212115-T15041217 ($791,280)($791,280) TIA Project 371-041110-T15041217 ($8,000,000) ($8,000,000) GDOT Funds ($1,000,000) ($1,000,000) TIA Discretionary ($1,500,000) ($1,500,000) TOTAL SOURCES: ($992,200) ($10,500,000) ($11,492,200) USE OF FUNDS ENGINEERING 371-041110-5414210/T15041217 $992,200 $992,200 TIA Project 371-041110-5414110-T15041217 $8,000,000 $8,000,000 GDOT Funds 371-041110-5414110 $1,000,000 $1,000,000 TIA Discretionary 371-041110-5414110 $1,500,000 $1,500,000 TOTAL USES: $992,200 10,500,000$ $11,492,200 12/2/2019 Invitation to Bid Sealed bids will be received at this office until Tuesday, November 12, 2019 @ 3:00 p.m. for furnishing: Bid Item #19-291 5th Street Bridge Rehabilitation Over Savannah River – for Augusta, GA Engineering Department Commodity Codes: 92513, 91366, 91327, 91350, 91461, 98852, 91150, 57800 RFP documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors and suppliers exclusively from Augusta Blue Print. The fees for the plans and specifications which are non-refundable is $295.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.augustablue.com) at no charge through Augusta Blue Print (706 722-6488) beginning Thursday, October 3, 2019. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. A Mandatory Pre Bid Conference for ITB 19-291 will be held on Friday, October 25, 2019 @ 10:00 a.m. in the Procurement department, 535 Telfair Street, Room 605. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, October 29, 2019 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No bid may be withdrawn for a period of ninety (90) days after bids have been opened, pending the execution of contract with the successful bidder. A 10% Bid Bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov No bid will be accepted by fax, all must be received by mail or hand delivered. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle October 3, 10. 17, 24, 2019 Metro Courier October 3, 2019 Revised: 2/2/2016 OFFICIAL Vendors Attachment "B"E-Verify SAVE Form Addendums 1-2 Bid Bond Bid Price Compliance Review 11% Goal Cekra Inc 6316 Marywood Dr Wilmington, NC 28409 Yes 501321 Yes Yes Yes $13,796,106.00 NO Superior Construction 7072 Business Park Blvd. N Jacksonville, FL 32256 Yes 245523 Yes Yes Yes $11,559,000.00 YES L.C. Whitford Co. 3765 Francis Circle Alpharetta, GA 30004 Southern Road & Bridge 715 Wesley Ave Tarpon Springs, FL 34689 Seacoast Inc 518 Edsel Dr., Suite B Richmond Hill, GA 31324 JHC Corporation 150 N Industrial Palmetto, GA 30268 Massana Construction 115 Howell Road Tyrone, GA 30290 Comana Construction 1734 Sands Place Marietta, GA 30367 Total Number Specifications Mailed Out: Total Number Specifications Download (Demandstar): 10 Tatal Number Venodrs Notified Demandstar: 260 Georgia Procuement Registry: 1315 Mandatory Pre-Bid Conference Attendees: 12 Total Packages Submitted: 2 Total Noncompliant: 2 Bid Opening Bid Item #19-291 5th Street Bridge Rehabilitation over Savannah River for Augusta, GA - Engineering Department Bid Date: Tuesday, November 12, 2019 @ 3:00 p.m. Page 1 of 1 ( l Mandatory Pre-Bid Conference Sign-in Sheet Bid Item #19-291 Sth Street Bridge Rehabilitation Over Savannah River For Augusta, Georgia -Engineering Department Friday, October 25, 2019@ 10:00 a.m. PLEASE PRINT NAME I COMPANY/DEPT.I ADDRESS/CITY/STATE/TELEPHONE FAXNUMBER ZIP CODE NUMBER 535 Telfair Street, 706-821-2423 706-821-2811Suite 605 AuJmsta, GA 30901 2.Nancy Williams I Procurement I 535 Telfair Street,706-821-2888 706-821-2811Suite 605 Augusta, GA 30901 3.B��q>V\I t:Jro"� -&rry 60� �,'St,11,,\; fl 770 'if1tf- I/�')... 77/J <17'-{-J/1/ j -Ho.y h•'L ..i. /J6�e. �hf e. 1c1n O,A-3t2 I �b �k� -p,c_ l'JJ� �v-•oJ r � �79.;s-s,s-·� w,,n,� M:_ �iYo1 5.t1t:A()a..)OL�\-\�� �A\\.Yr\"-'� � � � 1.2.+ -'.)b.-1.-4\�� '+ t.1--�t...(;.l�=\-�ibVlC... ��--pl \ �. '"\""� ��"-l�S fL. 1 t-1.?,--� -c:4� ':::A,.G£� 6• fl,\,rt,� Ta\'\f\M I C,v, \ £uvt LJv.:)I '1 �" � a-' �h '{\.,\ ��u. s., l �04J?.:>4S-S-b1.c '\o4 .. ti4S"-oor1 "lV'\C...· �'lG�\Jy\)l\\t_fL :Q.14,i.: 1.6hr\) \-v r w-r Cl'vil �V\'Ll<>11 ( '\ol\. )to4'-\i � 9oA-lc4-�-a:» 7 M,(K'c.,.t.-�- �;;; EMAIL I Prime/Sub procbidandcontract @augustaga.gov procbidandcontract @augustaga.gov !3G-t,' M(J_ 1,CQW\ I �ub@..,MJ./�tc-rr,,'t �lam C �/.e/:,&Ce"Vc. ,,.., rt.All ,i<.®c��" """ 61(_ L\sq.�L�Q)�, I Q_c .. f��'W\�� e. � l,",\�¼v\� �Lt ��co� v\-�r) CMo-rcSt.. euv,'\ '""'"''·� 11\£.. •ltw f>t ,•,,c1:: ��r. ,-taJ). NAME s.fll I NAJAF \ 9• Cv�\.QJJ\ N\G� 10• h'! 6 �"'- l�a.'\ 6� u./(,,µ__ �v,JG 13.� �7/'v£YL 14. �V'I V/fNVf;EN 15�� , \rrnoj Mandatory Pre-Bid Conference Sign-in Sheet Bid Item #19-291 5th Street Bridge Rehabilitation Over Savannah River For Augusta, Georgia -Engineering Department COMPANYffiEPT. C-1V1L. .5G�IIIU..S_;J.Nt. MG\"S� �G� �'MP-"'""' eo\'�1"'-:tu.. � Cok J�l Corf 1iit L .c. 'J,rrot!> t,. C:Wor/vA So v1tH ';RN P.oAV t.r�ro�� Q01v\,()\.\�� 1)r1:') L�eor Friday, October 25, 2019@ 10:00 a.m. PLEASE PRINT ADDRESS/CITY/STATE/ ZIP CODE 951 L.Af,/G.'{ IAl4lklJLT)Jrp ,4-vGv.STA I GA-. HI;, \-\csV-X:.\\ ffi, h"-.\'f"O� I GI+ �C,?,.<\CJ 11 ;)'-l Sc.v,J.,s 'f I 4. c.. �,, .. �, '4'4.r. 3�1..-, �() N ::r,�al PtJiAu;+l-?i G.;JI 3t))b 8' 37as t,../t,ic.ts c,,cLI:. lllf�6fl-3T>OO'/ 6::b tJ. f�/Jfc 5,- �,€�-� 11 5 w�LN A'\'6 fAAPoN >P�N@'� ft...553�-r5-· �5� -kV (t I� du ( ..,Jl .'trio}-· TELEPHONE NUMBER �iB 5-9 o o I 110 -'1, ,1 -')..0'6" \ '11, ... "t �I-l-S-� (1,o) 48, 32,,c,s 770)3'/,-d(,/O... �-832-07/ 7 7 D 4-4 06--fJr7;). tC5lo-i'? :2. -52-4� FAXNUMBER 4-o 'r-6!5-f 63f '170 -'1 "<, ?---?..a�\ 11'1 -".Sl • 'tC.C. '(' J7tJ)J'ld ·dSt;-S �( � EMAIL �N/1:J,f Flt!CI Y1l St:3/l J// t-f..J 1/Y�. C,s1>, �,,«-<...@ Prime/Sub £-oil/ /l,AJlwl7 Wv:A, 'j� V\ft,.,U'J ;'\.)h-ll{,\-W I\ -c.c� \�u�� Q_ ..,._,� Ca �C♦ •• (.\a -::,-.. t.- ,n.t, I.-s.s 4 ¢J i.J 1, '--f,.� CD<(J. CoY"'\ 1,a,.. ly()l/�UNJ'-f'rv�� '"""' :Jfre,ver@ d d"t-._J� Jt)tl ��11Mk11Net'@ s OU.iH f�N�f. CO#\ PRIME' �dn0,;2Q \/5kjo/- NAME 16. --:---:. I , () 17.JIM\C2..- �t'Ylqf 1s. ,M (,'\rpQ. s�ccs.h'l 19.V·fnJ�Still 20.ty\y(l,� 00(,L,(O,i 21 . .J' tdti I\ Terrell22.A)f Pv H£,�.U:1 £ 2<, � C, Mandatory Pre-Bid Conference Sign-in Sheet Bid Item #19-291 5th Street Bridge Rehabilitation Over Savannah River For Augusta, Georgia -Engineering Department COMPANY/DEPT. .om?l·t� At..�u �J.zt fi<o. ,q�s� C-ri7, seAco '4:S'f �l,Y.J/ttOft1r( � l,, Friday, October 25, 2019@ 10:00 a.m. PLEASE PRINT ADDRESS/CITY/STATE/ ZIP CODE 635 �ci�-GA L1. C. � , �A-"2:.0101 f � � wcJ.J� e,.-s r. �J,( � 1 G,,4-30�0/ r10 tv;e,i 1>flr0e7v.-J;;i'€,,/3 ru11�t.JO �. 6-44- 5'16 6(/Sf;G 'J)fl,,-t:V� �t,A..J;i°"t ('.? fllUfr\U�\JID 1� � � TELEPHONE 2J-21k0� t/O& }gzf& g,,2f I 8Cf/ ( 10,) � �f - Cf-r � I FAX NUMBER - i,J; qz5,z5 I �r1?qi�;fo3, �/312;(,� I 8t:,q26',s--s> /' '1,3b � EMAIL �r,\(!_� 5 e, �t� tlaws(ec, Q, StAwfJi$f,'>tt . .tel--- Prime/Sub p tt-;t11,,t£ f;i.m,ze 5uper1t,r-b'()7Z B,.s,..ss Park Consrru, tu,ri 6l.vo IJ e.viPM/1 S'. v-1-(..�flLU" �,/tsot)vlllt, FL, 32256 q(/4-2q z-'-I 2"40 'fJ4-2e;2-2,s21seef} 5uper;�':J c.cnStflJt.ti()fl � Prime fupe_llt'OIL (1,./Jnt,,vc.-ry·J '7672-�uf111uS {)i Co'Y"-fftrJV,, Sov�s-r-) c�C. l!)LVD� I -.lA-dl,fof'iVrU,(, 1 /'l, {(.. q D v(-zq 7, -¥2'{o '1Vl/-Z,,9l-Z.(,�2-1 S"e.� e lufe,,.#'l.lor-I C6,J )-rtt IJ c,,-n11N • C,o,.,,, p /l1 y,,.,L ?(µ�tr[d'4;-j 2.-1• 2,;1 NAME 24. 25. 26. 27. 28. 29. 30. 31. Mandatory Pre-Bid Conference Sign-in Sheet Bid Item #19-291 5th Street Bridge Rehabilitation Over Savannah River ( For Augusta, Georgia -Engineering Department rt Friday, October 25, 2019@ 10:00 a.m. J\ COMPANY/DEPT. PLEASE PRINT · LJ ADDRESS/CITY/STATE/ TELEPHONE FAXNUMBER ZIP CODE NUMBER EMAIL Prime/Sub Mandatory Pre-Bid Conference Sign-in Sheet Bid Item #19-291 5th Street Bridge Rehabilitation Over Savannah River For Augusta, Georgia -Engineering Department Friday, October 25, 2019@ 10:00 a.m. PLEASE PRINT Engineering Services Committee Meeting 12/10/2019 1:05 PM 5th Street Over the Savannah River –Bridge Repair and Restoration ProjectTIA Project#RC07- 001217/PI#0011418 Bid #19-291 File Reference: 19 – 014(T) Department:Engineering Presenter: Caption:Approve award of Construction Contract to Superior Construction Company Southeast, LLC subject to Value Engineering and in the amount not to exceed $10,500,000 for Transportation Investment Act (TIA) Project, 5th Street Bridge over Savannah River Repair and Restoration Projects, subject to bonds as requested by AED. Bid 19-291 Background:The 5th Street Bridge over Savannah River (Bridge Repair and Restoration) is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in July 31, 2012 referendum. The 5th Street Bridge is a Band 2 project. The project improvements consist of bridge structural rehabilitation to convert the existing bridge to a pedestrian bridge and to perform repairs intended to enhance aesthetic and to extend the service life of the bridge. Analysis:Bids were received on November 12, 2019 with Superior Construction Company Southeast, LLC. being the low responsible bidder. The bid results are as follow: CONTRACTORS BID 1. Cekra Inc. $13,796,106 2. Superior Construction $11,559,000 It is the recommendation of the Engineering Department to award this project to Superior Construction. Financial Impact:Funds are available in Project TIA Funds ($8,000,000), GDOT State Funds ($1,000,000), and TIA Discretionary Funds ($1,500,000). Alternatives:1) Do not approve and find alternative to complete the project and meet TIA project completion schedule. Recommendation:Approve award of Construction Contract to Superior Construction Company Southeast, LLC subject to Value Engineering and in the amount not to exceed $10,500,000 for Transportation Investment Act (TIA) Project, 5th Street Bridge over Savannah River Repair and Restoration Projects, subject to bonds as requested by AED. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: Project TIA Funds ($8M) 371041110-5414210- JL T15041217, GDOT State Funds ($1M), and TIA Discretionary Funds ($1.5M) 235041110-5414210-JL TBD REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB#371-041110-T15041218 to approve and award the Construction contract to E. R. Snell Contractor, Inc. in the amount of $3,386,198.47 Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. TIA Design 576,923$ TIA Funds 7,900$ TIA Discretionary 22,000$ TIA Funds 3,386,198$ 3,993,021$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Hardie Davis, Mayor CAPITAL PROJECT BUDGET CPB#371-041110-T15041218 9th Street(James Brown Blvd.) Improvements (RFP #19-292) for the James Brown Blvd (9th Street) Improvements Project requested by AED. RFP 19-292 Funding is available in the TIA project budget. 12/2/2019 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#371-041110-T15041218 9th Street(James Brown Blvd.) Improvements (RFP #19-292) CPB AMOUNT CPB New SOURCE OF FUNDS CPB ADDITION CPB TIA Project 371-041110/5212115-T15041218 ($584,823) ($3,386,198) ($3,971,021) TIA Discretionary 235-041110/5212115-T19041026 ($22,000) -$ ($22,000) TOTAL SOURCES: ($606,823) ($3,386,198) ($3,993,021) USE OF FUNDS ENGINEERING 371-041110-5414210/T15041218 $584,823 $3,386,198 $3,971,021 TIA Discretionary 235-041110/5212115-T19041026 $22,000 $0 $22,000 TOTAL USES: $606,823 $3,386,198 $3,993,021 12/2/2019 Invitation to Bid Sealed bids will be received at this office until Thursday November 14, 2019 @ 3:00 p.m. for furnishing for the Bid Item #19-292 9TH Street James Brown Improvement Project for Augusta, GA Engineering Department: . Commodity Codes: 91313, 91327, 91350, 91384, 91396, 91438, 98852, 90976 Bid documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime contractors, subcontractors and suppliers exclusively from ARC. The fees for the plans and specifications which are non-refundable is 175.00 It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.e-arc.com) at no charge through ARC Southern (706 821-0405) beginning Thursday, October 3, 2019. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre Bid Conference will be held on Tuesday, October 29, 2019 @ 2:00 p.m. in the Procurement department, 535 Telfair Street, Room 605. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Thursday, October 31, 2019 @ 5:00 P.M. No bid will be accepted by fax, all must be received by mail or hand delivered. No bid may be withdrawn for a period of ninety (90) days after bids have been opened, pending the execution of contract with the successful bidder. A 10% Bid Bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond and a 100% payment bond will be required for award. Invitation for bids and specifications. An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark BID number on the outside of the envelope. Bidders are cautioned that acquisition of BID documents through any source other than the office of the Procurement Department is not advisable. Acquisition of BID documents from unauthorized sources placed the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov No bid will be accepted by fax, all must be received by mail or hand delivered. GERI A. SAMS, Procurement Director Publish: Augusta Chronicle October 3, 10. 17, 24, 2019 Metro Courier October 3, 2019 Revised: 2/2/2016 NAME 2.Nancy Williams 3.-r-,_,. . ..__ ........ I Mandatory Pre-Bid Conference Sign-in Sheet Bid Item #19-292 9TH Street James Brown Improvement Project For Augusta, Georgia -Engineering Department Tuesday, October 29, 2019@ 2:00 p.m. PLEASE PRINT COMPANY/DEPT. ADDRESS/CITY/STATE/ TELEPHONE FAX NUMBER ZIP CODE NUMBER Procurement 535 Telfair Street, 706-821-2423 706-821-2811Suite 605 Augusta, GA 30901 I Procurement I 535 Telfair Street,706-821-2888 706-821-2811 I�•·�\>\ \8.r'(,� {LS�ap t&Jtle, :DP£ I L45fto p Suite 605 Augusta, GA 30901 � T�-\-e\, ()\-. .o:30 � � �1r..1� (),-,d !1/al\l I l:}b�) l -2' 1 '"-- 761o -1\/ 3&-- 5�1/ EMAIL I procbidandcontract @augustaga.gov procbidandcontract @augustaga.gov � ��,°'� �odd �w� 1�s��}v,1 l£c>s�,A:ft#H-J°e-Zd 1,sa.3--827-t::J/3C-l�--SZ7-/�,glb2,,.J�� r 2�:rs� se �� .. "9..;td:f 29154-Z, 6.�O..,,.J � 7.�uJ �\teo!'1 �Q '--.:l-L.) �'!.."i·�c,...., fl. -Sv\f-\ \ I APAc.. 11'-'0 ..... �T 11.., Co<... � �""'--'::N'l 1t,.l � �-> "f">"7 {._1_<>4) 13(· 5..Z.J--, ,�,._. 7'3 I -&i.. ;;..o bu.,..�Q.. r.o.."--> c.c:.. c..r- l7<\S Cb.Ii..�I ??01r65&ol 770-9's-Z'IS,1 bJ�_ers�e.,, �&J\ vH)-f...p-.A ?$)f.l)1 .(ov'I,\ Prime/Sub p ,-=::, \ p NAME f.o,z£.,J7l:O A. s.MA-so ,-l 9_Ch,,u; .. � Jae../45on 10·Gre�-yw:,u� uJ)-t-d� &1tH?'� 12.l+d t9il-ffS,m., 13. '.6l--&l , {., (YI unnze IL 14.W\t..L Ll>{�ftg_. 15.7)�\t.) '('I\\ L-L.-$ Mandatory Pre-Bid Conference Sign-in Sheet Bid Item #19-292 9TH Street James Brown Improvement Project For Augusta, Georgia -Engineering Department Tuesday, October 29, 2019@2:00 p.m. PLEASE PRINT COMPANY/DEPT. ADDRESS/CITY/STATE/ TELEPHONE FAXNUMBER ZIP CODE NUMBER D . ..,�·ne.Ac., lg"Lq 7oG-(,p6-, -Co�-<@<o-,-N\�r-lA c-, � Me:r-h-� lh f'lC,SO-XJr-4-\r.Cic:>'3,� 9034-\1t., e,A_ • £1.,;s-\-c\ G:,t::,.... S'at-1< ct? 3JOJ-o//)..-L/f� [Z e.l/ fY1 ;· //l!!r }b,-.!fwa}S-'-1-JLf $'� °1e5'6ore, £;/0't� Pr2�url-? D. tv)(. Zee�� �tOlPJ C tJl!Jj Q;y,p, �I-';+.,, c.ri D $37-lo'o('oL, w 7 -°(o 'Y--/ ?, I \I ve.�-t� Llil5 ad tu'�� 704 74j bm·ktl,& �6/)� JLd ;J'? §·'J._",l'l/4u • /.,,,. 4/A/47 /4,/4 /!� '2-5'¥x ��69 J �d-� G' (\.'" ,Sevt;. 3S5'0�'4C/Tv H� 7c>� 6:>t?>/.>/2. .706 6�/5(5 <!rrcve+ e,,,_,;AJ o-A-.3c:;?/d &,{, r;>,o, � 77D '"7cte, p 8Z�-7017 tv� t <, A-g.,a,7Co�srtJJCf / 0 µ (µ,,.r--'STh t-J 457,... '(.""w«;> --s-r 70"'. -,1.,7..... \� °EA-J6 lt-J�-.J6' �'-C,':),--p.-1 Co.Pt �O!I.3cq-ol euims11)-rJ 4S2. el,(.,\� <i :,0(9. -;J-2,,? .\�8 e"N&ll�(t-Jc',i �� G--4 !,\)'iol EMAIL l.ore.tt � rn(! C.on4-re\C-i Nt�� 1k.ccrY1 C :f':te.1<f'-'"' €l)I> rl-5' /9�F,,�J11 JY�OY)'� ff OttVO.C..0f /J· C-;;,� ��. � /iJiJ-�_tf_,_, (:-.,1f l � b<oNS-lsvc@) tktJ/ �a,h-) hb.i:, @ Jdo..(, Col\"5lH>C�, o. t,.:> C,A,r-\-e,f" Q c:,V""\f"Sh,��\ �� o<..-d\s � u-�.s� � i....U Prime/Sub t-fhfl1t_, J;-/J-L, j_.S?ifP/ <;vb !_�MiP � plrPltL l 11l \ rfle .c..O� �':S .e,o--. NAME 16.�¥5J�s 17.J� Hz:::f rYl � '1s. f2l L-14---t+-1---o G�u!)W!V � 20. "'--- 21. 22. 23. COMPANY/DEPT. Mandatory Pre-Bid Conference Sign-in Sheet Bid Item #19-292 9TH Street James Brown Improvement Project For Augusta, Georgia -Engineering Department Tuesday, October 29, 2019@ 2:00 p.m. PLEASE PRINT ADDRESS/CITY/STATE/ TELEPHONE FAXNUMBER ZIP CODE NUMBER 4 S" � W"1.lw-J/ llu� ,or;, -s, ; 4--,1 V Al/A--£L...� sl., / {>. fr � 0 'fOJ ��� ,, J / 706 o21 i oq I - LJ, !UL �15 BC13> 'iv,!/�/ /C4,Ai"t... AAPJ6rr 1)� �7//z_ CA--ttc,,.t.., SC 'Z...t10,, �d�z.t-Z-�� t--" EMAIL Prime/Sub ""'J oi co..hs 0 �3"'11 J�@., �·� I<: <:Je>otJk,1/ '1 p,uw...r,-, @L-.J, /UL •CoAA Engineering Services Committee Meeting 12/10/2019 1:05 PM James Brown Blvd. (9th Street) Improvements Project(Laney Walker Blvd. to Reynolds Street)TIA Project#RC07-001218/PI#0011419Bid #19-292 Department:Engineering Presenter: Caption:Approve award of Construction Contract to E R Snell Contactor, Inc. in the amount of $3,386,198.47 for Transportation Investment Act (TIA) Project, James Brown Blvd. (9th Street) Improvements Project, subject to receipt of signed contracts and proper bonds as requested by AED . Bid 19-292 Background:James Brown Boulevard (9th Street) Improvements is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in July 31, 2012 referendum. This is a Band 2 project. The project improvements consist of improving roadway capacity and safety by resurfacing, reconstructing the existing curb and gutter, replacing sidewalks and improving the storm water system where needed. The project will improve pedestrian safety at intersections with new high visibility crosswalks and organize the existing parallel parking. Bicycle safety will be improved by providing pavement markings for share bicycle use within the corridor. New street trees will be provided, where possible, to enhance pedestrian use and improvement roadway aesthetic Analysis:Bids were received on November 14, 2019 with E.R. Snell Contractor, Inc. being the low responsible bidder. The bid results are as follow: CONTRACTORS BID 1. E R Snell Contractor, Inc. $3,386,198.47 2. Reeves Construction Co $3,661,000.42 3. Beam’s Contracting $4,197,156.23 4. J &B Construction Non- Compliance It is the recommendation of the Engineering Department to award this project to E.R. Snell Contractor. Financial Impact:Funds are available in Project TIA Funds. Alternatives:1) Do not approve and find alternative to complete the project and meet TIA project completion schedule. Recommendation:Approve award of Construction Contract to E R Snell Contactor, Inc. in the amount of $3,386,198.47 for Transportation Investment Act (TIA) Project, James Brown Blvd. (9th Street) Improvements Project, subject to receipt of signed contracts and proper bonds as requested by AED. Funds are Available in the Following Accounts: FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: Project TIA Funds: 371-041110/5212115 - T15041218/5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting Commission Chamber - llll}l20lg ATTENDANCE: Present: Hons. M. williams, chairman; Hasan, vice chairman; Garett, member. Absent: Hons. Hardie Davis, Jr., Mayor; Frantom, member. ENGINEERING SERVICES 1. Approve the purchase of a Kubota M5091 HDC Tractor Loader-Batwing- Item Sweeper Combo, bid item #19-252 from J & B Tractor Co., Inc., Augusta GA Action: as the compliant bidder with no exceptions. Approved Motions i#:" Motion Text Made By seconded By Motion to ^ aDprove.APProve Motion passes 3-0. Commissioner Commissioner Ben Hasan Brandon Garrett Passes Motions Motion Type Approve Motion Text Motion to approve. Seconded By Commissioner Ben Hasan Motion Result Motion Result Passes 2. Motion to determine that Clanton Road as shown on the attached map has Item ceased to be used by the public to the extent that no substantial public purpose Action: is served by it or that its removal from the county road system is otherwise in Approved the best public interest, pursuant to o.C.G.A. 532-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusti Utilities Department. (Requested by commissioner Hasan) Made By Commissioner Brandon Garrett Motion Passes 3-0. 3. Discuss the consulting agreement with Atlantic Coast Consulting, Inc. relating Item to the Environmental Services Department. (Requested by Commissioner Action: Ben Hasan) APProved Motions Motion -,-,--r-rD-- MotionI""'"" Motion Text Made By Seconded By Result'r ype Motion to apProve going to a month-to- month contract with the --. - -, - -- - Commissioner Approve ;U;l,J;i1;:,o,, ;:ffi::f*' Brandon passes Garrett 2020. Motion Passes 3-0. 4. Consider award of Bid Item #19-286 to Blair Construction, Inc. to construct Item the Fort Gordon 15th Street Collector Sanitary Sewer under the Task Order Action: Program RFQ #18-263 in the amount of $2,888,188.00. Approved Motions Motion . h Motion:""'"" Motion Text Made By Seconded ByType avrvrrv' ! var rvrssv sJ Result Motion to ^ approve. Commissioner CommissionerAoorove :YP'.""- vvrruurrrtvtrvr :"'^":""": PassesMotion Passes Ben Hasan Brandon Garrett 3-0. 5. Motion to approve the minutes of the Engineering Services Committee held ltem on october 29,2019. Action: Approved Motions Motion , Lf, ! n 6--^_r^r D-. Motion:""'"" Motion Text Made By Seconded By Type rvrlrr.rlr' r uar ryrss! sJ Result Motion to a -^^^^--^ approve. Commissioner CommissionerApprove iliotio, Passes Ben Hasan Brandon Garrett Passes 3-0. 6. Approve Award of "On-Call Professional Services for Engineering and FieldDesign, small to Medium Scale Maintenance Task Design, Regulatory Periodic Inspection Compliance and Structural Inspection & Investigations;,Services (CEI Services) Contract to ZEL Engineers, Infrasiructure Management Systems, Moreland Altobelli, Hussey Gay Bell and Cranston E'ngineering, subject to receipt of signed contract and proper insurance documents. The Contract is for three years with renewal option of two additional years. Also, approve $500,000 to fund the cEI Services. Requested by AED. RFP l9-241 Motion Result Motion Result Item Action: Approved Item Action: Approved Item Action: Approved 7. Motions r#:" Motion rext Made Bv Motion to ^ aDDrove.APProve votion passes 3-0. Commissioner Commissioner Ben Hasan Brandon Garreff Passes Seconded By Made By Seconded By Motion to award RFQ #19-282, Professional Services for the Preparation of a Risk and Resilience Assessment to HDR Engineering, Inc. in the amount of $249,680. Motions Motion Mofion Textr ype Motion to refer this item to the full Approve Commission with no recommendation.. Motion Passes 3-0. Commissioner Commissioner Brandon Garrett Ben Hasan Made By Seconded By Commissioner Commissioner Ben Hasan Brandon Garrett Passes 8. Discuss Street Light Fee. (Requested by Commissioner Bobby Williams) Motions Motion Motion Textr ype Motion to approve A -_-^_.^ receiving this item asApprove-rr- - .- information. Motion Passes 3-0. Motion Result Passes 9. Approve the installation of 46 street lights along Walton Way between 15th ltem Street and D'Antignac Street with an annual cost of $27,600.00. Funding is Action: available for construction in 2019 Capital Outlay Funds budget account Approved #272041610-54.14410, and annual maintenance and power is available through Street Lighting Fund #27 604161 0-53. 123 10. Motions *i:' Motion Text Made By seconded By f"".tilr ype Motion to ^ approve. Commissioner CommissionerApprove illotio, Passes Brandon Garrett Ben Hasan Passes 3-0. www.augustaga.gov Engineering Services Committee Meeting 12/10/2019 1:05 PM Minutes Department: Presenter: Caption:Motion to approve the minutes of the Engineering Services Committee held on November 12, 2019. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: THIS RESOLUTION OF THE AUGUSTA-RICHMOND COUNTY COMMISSION TO ABANDON CLANTON ROAD AS A PART OF THE ROAD SYSTEM OF AUGUSTA; THIS RESOLUTION, adopted by the Augusta-Richmond County Commission (“Commission”); WHEREAS, it has been proposed that the Commission make a determination that a Clanton Road as shown on the attached map, has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest and that the right-of-way should be abandoned as part of the Richmond County Road System; and WHEREAS, it has been Augusta, Georgia’s policy, pursuant to O.C.G.A § 32-7-2, to reduce the number of roads in Augusta, Georgia that are not utilized or useful to the public and to abandon such roads; and WHEREAS, a Public Hearing was held on December 2, 2019 at the Augusta-Richmond County Municipal Building, 2nd Floor, 535 Telfair Street, Augusta, Georgia; and WHEREAS, notice of such Public Hearing was published in The Augusta Chronicle, the newspaper in which Sheriff’s advertisements for Richmond County are published, on November 21, 2019 and November 28, 2019, and that the property owners located on Clanton Road were given notice; and WHEREAS, the results of the Public Hearing were reported to the Board of Commissioners and considered thereby; and WHEREAS, the Commission, at their meeting held, December 17, 2019, approved the proposed abandonment, pursuant to O.C.G.A. § 32-7-2 and the requirements of said statute having been met; NOW THEREFORE, be it resolved by the Commission and it is hereby resolved by the authority of same as follows: 1. It is hereby determined that all requirements of O.C.G.A. § 32-7-2 have been met for the abandonment and removal above-said of the Right-of-Way and such Right-of-Way no longer serves a substantial public purpose or that its removal from the county road system is otherwise in the best public interest and is hereby abandoned as part of the Richmond County Road System; 2. The land formerly comprising the Right-of-Way shall be quitclaimed as permitted by law to the adjoining property owner, subject to easements and restrictions deemed necessary by the Augusta Engineering Department and the Augusta Utilities Department, and the Mayor and Clerk of Commission are hereby authorized to execute the documents necessary to effectuate such transfer as directed by the Augusta Law Department. 3. This Resolution shall be recorded in the Minutes of the Augusta-Richmond County Commission, accompanied by the exhibits referred to herein; 4. This Resolution shall become effective immediately upon its adoption. DULY ADOPTED by the Augusta, Georgia Commission this ______ day of _____________________, 2019. AUGUSTA, GEORGIA COMMISSION By: ________________________________ Hardie Davis, Jr. As its Mayor Attest: ______________________________ Lena J. Bonner As its Clerk Engineering Services Committee Meeting 12/10/2019 1:05 PM Motion to Abandon Right of Way Department:Engeering Department Presenter:Law Department Caption:Motion to determine that Clanton Road, as shown on the attached plat has ceased to be used by the public to the extent that no substantial public purpose is served by it or that its removal from the county road system is otherwise in the best public interest, and to receive as information the results of the public hearing held regarding the issue of abandonment pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies), as provided by law and an easement to be retained over the entire abandoned portion for existing or future utilities as directed by Augusta Engineering Department and Augusta Utilities Department and adopt the attached Resolution. Background:The abandonment request has been reviewed by all essential county departments and administrators and approvals were received to this abandonment request. A plat of Clanton Road is attached. Pursuant to O.C.G.A. §32-7-2, a public hearing was held on December 2, 2019 for this matter. Analysis:In addition to the information provided in the above Background section, results of the public hearing will be presented to the Commission. Notice to the property owners located thereon has been provided, pursuant to O.C.G.A. §32-7-2(b)(1). Financial Impact:Cost of publication and advertisement of public hearing. Alternatives:Approve or deny request to determine that Clanton Road be abandoned. Recommendation:Approve determination and request for abandonment of Clanton Road pursuant to O.C.G.A. §32-7-2, with the abandoned property to be quit-claimed to the appropriate party(ies) as allowed by law, and an easement(s) as directed by the Augusta Engineering Department and the Augusta Utilities Department to be retained over the entire abandoned portion for existing or future utilities and drainage and adopt the attached Resolution. Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Finance. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 12/10/2019 1:05 PM Clanton Road Swap Department: Presenter: Caption:Motion to approve the Clanton Road swap with a 12-month warranty. (Referred from December 3 Commission meeting) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Engineering Services Committee Meeting 12/10/2019 1:05 PM Purchase Wavetronix Radar Detection System Department:Traffic Engineering Presenter:Hameed Malik Caption:Approve purchase of traffic signal radar detection system from Wavetronix at a cost of $28,073. Background:The Traffic Engineering Division of the Augusta Engineering Department in its charge to continue to improve traffic safety and flow has been testing a multi-range radar unit at one of our busiest intersections. After a 60 day trail, the new radar detection system has improved traffic safety and reduced wait times at the intersection. Analysis:Wavetronix is the only manufacturer and distributer of the multi- range, single unit radar detectors. All other types of radar devices used for vehicle detection from other manufacturers only have one midrange radar unit in each housing. Each Wavetronix unit houses two different radar detectors, one for short distances and one for long range detection. This will be a sole source purchase through the Procurement Department if approved by the Commission Financial Impact:Adequate funds are available in the Traffic Engineering account. Alternatives:1) Approve purchase of Wavetronix Radar Detection System. 2) Do not approve. Recommendation:Approve Alternative Number One. Funds are Available in the Following Accounts: 101041710-53111610 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting 12/10/2019 1:05 PM Sidewalks Laney-Walker to Reynolds St. Department: Presenter:Commissioner Marion Williams Caption:Discuss the sidewalks from Laney-Walker to Reynolds Street through the Downtown Development Authority. (Requested by Commissioner Marion Williams) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: