HomeMy WebLinkAbout2019-06-11 Meeting Minutes Engineering Services Committee Meeting Commission Chamber - 6/11/2019
ATTENDANCE:
Present: Hons. M. Williams, Chairman; Hasan, Vice Chairman; Garrett
and Frantom, members.
Absent: Hon. Hardie Davis, Jr., Mayor.
ENGINEERING SERVICES
1. Approve proposal to update financial model and revenue projections for
Galardi, Rothstein Group in the amount of $98,000.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Ben Hasan Passes
2. Consider approving the Easement Abandonment and Deed of Dedication for
New Easement for a sanitary sewer at 3006 Bransford Road.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commissioner
Ben Hasan
Commissioner
Brandon Garrett Passes
3. Motion to approve the minutes of the Engineering Services Committee held
on May 28, 2019.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Ben Hasan Passes
4. Motion to determine that East Telfair Street as shown on the attached map has
ceased to be used by the public to the extent that no substantial public purpose
is served by it or that its removal from the county road system is otherwise in
the best public interest, pursuant to O.C.G.A. §32-7-2, with the abandoned
property to be quit-claimed to the appropriate party(ies), as provided by law
and an easement to be retained over the entire abandoned portion for existing
or future utilities as directed by Augusta Engineering Department and Augusta
Utilities Department.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Ben Hasan Passes
5. Discuss/approve the placement of a monument in honor of Dr. Martin Luther
King, Jr. (Requested by Commissioner Bill Fennoy)
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Defer
Motion to refer this item
to the full Commission
with no
recommendation.
Motion Passes 4-0.
Commissioner
Ben Hasan
Commisioner
Sean Frantom Passes
6. Approve seed grant from Georgia EPD for water operational data network for
the Savannah River.
Item
Action:
Approved
Motions
Motion Text Made By Seconded By
Motion
Type
Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Ben Hasan Passes
7. Move to approve for the Engineering Department to bring back to the
Commission a design plan to install a turning lane from Doug Barnard Pkwy
into the South Entrance or service road into the Augusta Regional Airport.
(Requested by Commissioner Sammie Sias)
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Ben Hasan Passes
8. Approve entering into a monthly maintenance and power agreement with
Georgia Power Company to light, maintain, and repair the high mast lighting
located around the intersection of Interstate 20 (I-20) and State Route 28
(Washington Road). Funding is available in the Street Lighting budget
account #276041610-5312310.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner Sean
Frantom
Commissioner
Ben Hasan Passes
9. Approve entering into a monthly maintenance and power agreement with
Georgia Power Company to light, maintain, and repair the high mast lighting
located around the intersection of Interstate 520 (Bobby Jones) and State
Route 1 (Deans Bridge Road). Funding is available in the Street Lighting
budget account #276041610-5312310.
Item
Action:
Approved
Motions
Motion
Type
Motion Text Made By Seconded By Motion
Result
Approve
Motion to
apprrove.
Motion Passes
4-0.
Commisioner
Sean Frantom
Commissioner
Ben Hasan Passes
10. Approve entering into a monthly maintenance and power agreement with
Georgia Power Company to light, maintain, and repair the high mast lighting
located around the intersection of Interstate 520 (Bobby Jones) and State
Route 78 (Gordon Hwy). Funding is available in the Street Lighting budget
account #276041610-5312310
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner
Sean Frantom
Commissioner
Ben Hasan Passes
11. Approve entering into a monthly maintenance and power agreement with
Georgia Power Company to light, maintain, and repair the high mast lighting
located around the intersection of Interstate 520 (Bobby Jones) and
Wrightsboro Road. Funding is available in the Street Lighting budget
account #276041610-5312310.
Item
Action:
Approved
Motions
Motion
Type Motion Text Made By Seconded By Motion
Result
Approve
Motion to
approve.
Motion Passes
4-0.
Commisioner
Sean Frantom
Commissioner
Ben Hasan Passes
www.augustaga.gov
Engineering Services Committee Meeting
6/11/2019 1:20 PM
Attendance 6/11/19
Department:
Presenter:
Caption:
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
A-1
April 8, 2018
Tom Wiedmeier, Director
Augusta Utilities
452 Walker St, Suite 200
Augusta, GA 30901
Subject: Proposed Scope of Services for Utility Financial Analysis
On behalf of Galardi Rothstein Group (GRG), I am pleased to submit this proposed scope
of services to continue our support of Augusta Utilities financial management, utility
billing data analysis, and rate setting initiatives.
GRG has provided services (originally procured via RFQ #11-056) that have involved
detailed analyses of costs of service using industry standard methodologies and
constructed analytical tools to perform cost allocations and design utility rates and
charges. These analyses have both provided the foundation for Augusta Utilities’
proposed rates for FY 2019, and identified a number of opportunities to enhance billing
data analysis and reporting. Provided in the attached proposal is a brief description of
tasks recommended for continuing support of Augusta Utilities. GRG Principals’ detailed
resumes are provided as an Appendix.
I’d like to point out that given the uncertainties about existing billing system reporting
and revenue reconciliation analytics, GRG has included an amount in its proposed
budget based on an assumption that direct support for this subtask will involve an
average of 1.5 days per month. While this is based in part on historical experience and
our assessment of prospective billing reporting requirements, we are certainly
amenable to adjusting this budget item as you deem appropriate.
We appreciate the opportunity to submit this proposal and continue to serve Augusta
Utilities. Please call me at (512) 422-3244 if you have any questions or require additional
information.
Sincerely,
Eric Rothstein, CPA
Principal
A-2
Project Background
GRG has served as Augusta Utilities’ water and sewer rate consultant to conduct cost-of-
service analyses, develop financial plans, develop alternative rate designs, and advise
the Augusta Commission and Utilities Department. We have developed a variety of
analytical tools including cash-flow forecasting and cost of service analysis models, and
tools to evaluate alternative designs of water and sewer rates and charges.
Over the course of our recent work with Augusta Utilities Department, GRG identified
several inconsistencies within the Department’s water and sewer billing reports. These
issues have important implications for AUD’s prospective financial planning and rate
proposals -- and require resolution. While we have been able to make progress working
with the Department’s billing staff, there is still a high level of uncertainty regarding
selected billing statistics such as number of customer accounts by class and
demand/flows per account.1
GRG is uniquely positioned to support AUD’s forthcoming billing data analysis and
financial planning activities because of our prior work with Augusta Utilities as well as
our national leadership in areas of particular relevance to Augusta’s current situation.
GRG’s experience building AUD’s current set of analytical tools will enable us to
efficiently complete updates and analyze alternative financial plan and rate options.
Also, GRG has previously resolved erroneous billing system reports and other data
inaccuracies with the same billing software vendor for other clients. GRG’s national
leadership in support of low-income assistance legislation and affordability program
structuring uniquely positions us to help advance low-income assistance program
development for AUD.
Scope of Work
For 2019, GRG’s scope of services includes four primary tasks that are complemented by
several supporting efforts including support of Augusta Commission decision processes
and project management:
1. Cost of Service Analysis / Billing Data / Revenue Forecasts
As noted, in conjunction with our prior engagement, the GRG team developed a cost-of-
service analysis model to determine equitable distributions of cost responsibilities
across different AUD customer types. GRG also developed revised revenue forecasts
based on initial analysis of billing data. These forecasts were complicated by several
inconsistencies in the billing data, and several alternative approaches were developed
to forecast revenues and determine appropriate margins of error within the customer
data to inform consideration of rate design alternatives.
1 To complicate matters, bill distribution reports and other standardized reporting is seemingly
unavailable from the billing software without time-consuming efforts to create customized reports or
otherwise mine data within the software.
A-3
Deliverables: Summary of cost-of-service preliminary results and updated revenue
forecasts for AUD’s revenue bond issuance.
2. Rate Design Scenarios / FY 2019 Rates / Commission Presentations
For the FY 2019 rate setting process, GRG modified and expanded the basic water and
sewer rate design modeling developed in conjunction with our cost-of-service analysis
effort. This modeling involves detailed revenue forecasting by customer types and
evaluation of residential and non-residential customer bill impacts. Using this modeling,
a broad array of alternative water and sewer rate design alternatives was developed for
consideration by AUD. After initial bill impacts were analyzed, GRG developed more
than a dozen alternative rate designs that minimized impacts to low volume customers.
This task includes the selection and presentation of the FY 2019 rate design alternative
to the Department’s Commissioners, as well as an estimation of FY 2019 revenue
impacts based on the selected residential rate structure.
Deliverables: Revised and expanded rate design tool, development and analysis of
multiple rate design scenarios, FY 2019 revenue impact analysis, and presentation of FY
2019 selection to Commissioners.
3. Affordability Program Development (2019)
Though administrative and legal constraints may limit the extent and nature of potential
low-income affordability programs, several options are available for implementation by
AUD. Through its work with several utilities, as well as our work with AWWA, NACWA,
USWA and WEF, GRG has gained extensive experience in identifying viable program
options and assisting with program implementation, typically through partnerships with
local social service agencies. GRG can support AUD in establishing affordability programs
by providing information on attributes of programs elsewhere in the U.S., and by
helping to specify program implementation and reporting requirements.
Deliverables: Low-income affordability program design and implementation technical
memorandum and presentations.
4. Billing Data Report Review / Development & Revenue Tracking (2019)
To address myriad billing system issues, GRG proposes a coordinated effort with the
Department’s billing staff and billing software vendor.2 This task will be structured to
develop revised summary reporting that is internally consistent and bill distribution
reports that accurately identify numbers of customers and corresponding levels of
demand/flows by customer type. The task will involve a thorough analysis of the
difference between actual and predicted revenues, and billed revenues by rate
2 Based on the issues identified so far, and because many standard billing system reports are
unavailable or appear inaccurate, GRG believes the involvement of S&S in this investigative process is
critical. GRG has worked with S&S before to resolve similar reporting issues for other municipal
utilities.
A-4
component (customer charge, volumetric rates, etc) and customer class. Because the
resource requirements for this task are difficult to estimate, the budget assumes 12
hours per month by GRG personnel to support the investigation of billing system
irregularities and develop revised reporting. Additional time beyond this estimate is not
supported, but may be added at the discretion of the Department. GRG will also
compare FY 2019 revenue performance—under new residential rates—to forecasted
rate revenues in order to determine whether the Department’s forecasted financial
performance and capital improvement program remains on track.
Deliverables: Billing and revenue report reconciliation and consumption/revenue trend
analyses for FY 2019
Compensation
GRG has developed a budget estimate for the proposed scope of services based on
expectations of prospective requirements for 2019 sub-tasks. These budget amounts
provide not-to-exceed allowances for the work described above. Notably, requirements
of the billing data report review and development task are highly contingent upon work
and reports completed by the S&S billing software vendor. These amounts may be
adjusted at AUD’s discretion with the explicit understanding that GRG’s work products
are contingent upon both the availability of adequate billing system reports and
budgeting of adequate time to complete analyses.
Revised Billingn Data Review, Cost of Service Analysis $10,045
Rate Design Scenarios, 2020 Rate Design Considerations 21,159
Affordability Program Development 10,020
Billing Data, Report Revisions, Revenue Analysis 47,950
PM/Contingency 9,090
Total $98,264
A-5
Appendix I - Detailed Resumes
Eric P. Rothstein, CPA
Principal
Distinguishing Qualifications
· A leading expert in developing financial strategies to support major water, wastewater and storm water
infrastructure programs; securing acceptance of multi-year rate increases in politically charged
environments; and addressing water affordability.
· Served as feasibility consultant and municipal advisor for numerous water and sewer utility bond issues
with principal amounts totaling in excess of $4 billion. Related presentations before rating agencies and
investors have addressed enterprise fund management and financial policies as well as cash flow
forecasts.
· Experienced in utility management processes, strategic business planning, regionalization,
public/private partnership evaluation, and facilitation of complex decisions affecting diverse stakeholder
groups.
· Co-authored industry-standard manuals and research publications on water and wastewater
ratemaking, affordability, capital planning, financial capability assessments, and public-private
partnerships.
· Registered Municipal Advisor; Member, U.S. EPA Environmental Finance Advisory Board (EFAB)
Education
· MA, Economics, University of California-Davis, 1983
· AB, Economics, Ripon College, 1981
Selected Key Project Experience
For several wastewater permittees facing Consent Decrees including the City of Akron, City of Atlanta,
East Bay Municipal Utility District, Northeast Ohio Regional Sewer District, Metropolitan Sewer
District of St. Louis, and the City and County of Honolulu, Eric has assisted in conducting financial
capability assessments per EPA-prescribed methodologies and in developing alternative approaches to
assessment that more appropriately reflect utility capital financing options. These efforts have successfully
supported negotiation positions related to the scope and schedule of potential Consent Decree provisions.
Eric is currently engaged with the City of Peoria, IL and with the Guam Waterworks Authority in similar
Consent Decree negotiations.
For the National Association of Clean Water Agencies (NACWA), Eric has served as Principal Author for
several white papers and publications related to Financial Capability Assessments used to develop
wastewater Consent Decree schedules. Examples include NACWA’s Financial Capability and Affordability
in Wet Weather Negotiations (2007) and The Evolving Landscape for Financial Capability Assessment:
Clean Water Act Negotiations and the Opportunities of Integrated Planning (2013). These papers provide
critical reviews of the U.S. Environmental Protection Agency’s (EPA’s) established policies and guidance on
financial capability assessments for wet weather programs and offers practical guidance for negotiations on
enforcement policies and practices related to consideration of financial capability.
A-6
For the Detroit Water and Sewerage Department, Eric provided management assistance to the utility’s
leadership team in several areas between 2015 and June 2017. He served as Program Manager for its
Drainage Charge Implementation Program and was Chair/Facilitator of its Blue Ribbon Panel on
Affordability. Eric is providing management assistance for its Minimizing Lead in Drinking Water program,
strategic planning efforts, and evaluation of cost allocation and rate structure options.
For the Denver Water Distributors, Eric is leading a negotiation team to address concerns related to
various aspects of Denver Water’s (DW) rate setting and capital financing practices. Eric has led
negotiation sessions, presented before the DW Board, and provided regular update briefings to the
Distributor’s Technical Advisory Committee.
Eric was appointed in October 2015 by Michigan Governor Rick Snyder to serve as one of five members
of the independent Flint Water Advisory Task Force to conduct a review of the events and decision-
making that led to the Flint, Michigan water crisis. The task force developed recommendations to address
governmental failures, mitigate impacts on the Flint community, and improve protection from drinking water
contaminations for communities in the State of Michigan.
For the U.S. Bankruptcy Court, Eastern District of Michigan, Southern Division, in 2014 and 2015, Eric
served as an independent utility advisor for mediation related to the creation of the Great Lakes Water
Authority (GLWA). Following execution of a Memorandum of Understanding and Articles of Incorporation
by the Incorporating Municipalities (City of Detroit; Macomb, Oakland and Wayne counties; and the State of
Michigan), Eric served as Implementation Planning Program Manager for the successful standup of the
GLWA – a regional utility serving approximately 40 percent of the population of the State of Michigan.
For the Water Replenishment District of Southern California, Eric was engaged in 2014 to provide an
expert report related to the consistency of the District’s rate-setting requirements with industry-standard
practices contemplating proportionate distribution of cost responsibilities based on cost causation. These
practices are consistent with prescripts of State of California law.
For Jefferson County, Alabama, Eric served as the County’s rate consultant between 2010 and its exit
from bankruptcy in 2013. He reviewed cost-of service analyses and alternative rate proposals to address the
County’s outstanding sewer warrant obligations, developed revisions to its sewer rates that were approved
in November 2012 and again in September 2013, and led strategic financial planning related to the County’s
bankruptcy Plan of Adjustment. Eric was deposed and provided expert witness testimony in various court
proceedings stemming from the County’s declaration of bankruptcy in 2011, and led development of a
Municipal Advisor Report related to its Series 2013 Sewer Warrant issue to effectuate the County’s exit from
bankruptcy.
For the Halifax Regional Water Commission, Eric led development of a Cost of Service and Rate Design
report to the Nova Scotia Utility and Accounting Review Board (NSUARB Docket No. NSUARB-W-HRWC-
R-11), in response to the Board’s Order and Decision to hold separate hearings to determine appropriate
ratemaking methodologies for Canada’s first regulated water, wastewater and storm water utility. Eric led
preparation of the report and the development of cost allocation and rate design models to illustrate the
implications of alternative methodological approaches. He supported development of HRWC’s subsequent
application for water, wastewater and storm water rates filed with the NSUARB in December 2012, and he
provided expert witness testimony in support thereof in April 2012. In April 2014, Eric prepared an expert
report on HRWC Cost Shares for Use of the Angus L. Macdonald Bridge and provided expert witness
testimony in M06127 – Halifax-Dartmouth Bridge Commission/Halifax Regional Water Commission:
Waterline on the Angus L. MacDonald Bridge – HDBC-G-14.
A-7
For the City of Atlanta, since 2004, Eric has provided a broad array of utility management consulting
services ranging from support of major multi-year rate increases, to securing funding for low-income
affordability programs, to capital improvement project prioritization. He has served as the Department of
Watershed Management’s primary coordinator for its revenue bond issues used to finance its $3 billion
wastewater Consent Decree program. This has included issues in 2004, 2008, 2009 (2), 2013 and 2015
and, in 2006, implementation of its Tax-Exempt Commercial Paper program with a shelf registration of $1.2
billion. Eric led development of the Department’s Financial Capability Based Schedule Extension Request
Report used to secure the City’s 13-year extension of its wastewater Consent Decree schedule. He
prepared each of the Department’s Financial Capability Assessment filings. He has led the development
and updating of strategic financial planning tools for water and sewer rate development and policy-level
consideration of overall program financing strategies (as well as detailed project expenditure, status, and
schedule tracking).
For the Egyptian Ministry of Housing, through a USAID contract, Eric developed guidance on tariff
setting, capital project prioritization, and strategic planning for the newly established water and wastewater
sector regulatory agency. He traveled to utilities across upper Egypt to collect data and hold workshops on
utility finance and rate setting practices. The project involved the development of a guidance manual,
detailed financial planning and cost-of-service analysis modeling, and testing of financial analysis and
prioritization tools with four major Egyptian utilities. He also provided presentations on financial planning
and strategic planning principles to USAID staff and Technical Assistance contractors.
For the Milwaukee Wholesale Customers (MWC), through sub-contracts with SHEH, Inc., Eric reviewed
the Milwaukee Water Works (MWW) rate increase applications filed in 2010 and 2014, reviewed pre-filed
testimony, and offered expert witness testimony related to revenue requirements and appropriate rates of
return at hearings before the Wisconsin Public Service Commission (WPSC). The WPSC allowed rate
increases that were substantially lower than those requested by MWW in both cases.
For the City of Winnipeg, Manitoba, Eric served as Project Manager for a comprehensive cost-of-service
rate studies for the City’s water, wastewater and storm water systems conducted in 1997 and 2012. In 1997,
the consulting team facilitated decision-making through an extensive public involvement process that
featured monthly meetings of a Citizen’s Advisory Committee comprised of a diverse set of stakeholder
representatives. For both studies, detailed cost allocation analyses were conducted and customized
computer rate analysis models developed to facilitate rate updating for budgetary changes, revision to cost
allocations, and rate design modifications.
For Augusta-Richmond County, Georgia, Eric has provided strategic financial planning, bond feasibility
and comprehensive cost-of-service rate assistance since 2000. Strategic financial planning facilitated the
City’s adoption of a 7-year, 11 percent per annum rate increase schedule to support infrastructure
reinvestment in excess of $400 million. Eric managed three bond feasibility studies over the course of the
program implementation, helping the County secure strong credit ratings and favorable financing terms. A
cost-of-service study in 2004 involved special queries of a new billing system for development of user
characteristic data and consideration of specific cost assignments for previously unsewered portions of the
County’s wastewater system. Cost-of-service rate study updates were commissioned in 2012 and address
water conservation and water affordability issues.
Previous to his work as a utility management consultant, Eric served in several financial management
positions for the City of Austin, Texas. In this capacity, he directed staff of up to 22 people in utility
ratemaking, evaluation of regionalization alternatives and proposed utility investments, analysis of capital
financing options, internal control evaluation, and revenue forecasting.
Boards / Certifications / Professional Licenses
Member, U.S. EPA Environmental Financial Advisory Board (EFAB)
A-8
· Appointed September 2017
Registered Municipal Advisor
· MSRB Registration No. (MSRB ID): K0764
Certified Public Accountant
· Oregon License No. 7998, June 1995 - 2018
Membership in Professional Organizations
American Water Works Association
· Strategic Management Practices Committee
· Rates and Charges Sub-Committee
- Chair, Water Rate Structures and Pricing (M34)
- Member, Water Rates, Fees and Related Charges (M1), 4th – 7th Editions
International Water Association
· Economics and Statistics Specialist Group
· Editorial Board, Utility Management International, 2008-2012
National Association of Clean Water Agencies
· Utility Management Committee
Water Environment Federation
· Technical Practice Committee – Chair, 2014-2017
· Utility Management Committee
- Chair, Finance and Administration Sub-Committee, 2011 -2014
- Chair, Financing and Charges for Wastewater Systems (M27), Manual of Practice Task Force,
2005
- Coordinator, Asset Management Hot Topics Workshops, 2005-2007
Selected Publications
“Why Flint Matters,” Journal of the American Water Works Association (AWWA), July 2016, pp. 38-42
“The Birth of the Great Lakes Water Authority,” Program Management Office Close-Out Report, Great Lakes
Water Authority and Detroit Water and Sewerage Department, June 2016
Flint Water Advisory Task Force – Final Report, State of Michigan, March 2016
Blue Ribbon Panel on Affordability – Final Report, City of Detroit, February 2016
Sustainability Reporting Statements for Wastewater Systems, Water Environment Federation (WEF) Special
Publication, October 2012 (Task Force Chair, Chapter 1 Author)
“The Business Case for Low Income Affordability Programs,” Proceedings of the Utility Management
Conference, Miami, FL, February 2012
“Strategic Planning: A Portfolio Management Approach to Effective Utility Management,” with Tom Sigmund,
Proceedings of the Utility Management Conference, Miami, FL, February 2012
“Financial Sustainability in an Uncertain World,” with Debbie Galardi, Water Utility Management
International, vol. 6, issue 4 (December 2011), pp. 23-27.
A-9
“Developing A Financially Sustainable Capital Program to Meet Consent Decree Requirements,”
Proceedings of the Water Environment Federation Technology Exposition and Conference (WEFTEC),
October 2009
“Regionalization of Water Service in Central Florida: Capacity Rights Contracting for the Yankee Lake
WTF,” Proceedings of the American Water Works Association (AWWA) Annual Conference and Exposition,
June 2007 and the Florida Water Resources Conference, April 2007
“Affordability Tools,” Section 8: Affordability Special Publication, Water Environment Federation, 2007
“Tough Choices in Paradise: Capital Project Prioritization on Oahu,” with Ross Kaneko, Barry Usagawa,
Scott Muraoka and Jason Takaki, Proceedings of the AWWA-WEF Joint Management Conference,
February 2007 and Proceedings of the AWWA Annual Conference and Exposition, June 2007
“Financial Sustainability as a Foundation for Infrastructure Development and Management: Best Practices,”
with Debbie Galardi, Water Utility Management International, vol. 2, issue 1 (March 2007), pp. 10-13
Selected Presentations / Seminars
“Flint and its Implications for the Nation”, Panel Discussion with James A. Beard, CFO, City of Atlanta, One
Water Summit conference, Atlanta, GA, June 2016
“Exit from Bankruptcy: Jefferson County, Alabama’s Historic Plan of Adjustment and $1.7 Billion Sewer
Warrant Issue Sustainability Reporting Statements for Wastewater Systems,” presented at the Utility
Management Conference, Austin, TX, February 2015
“The Business Case for Sustainability Reporting,” presented at the Sustainability Reporting Statements for
Wastewater Systems Special Publication Workshop, WEFTEC 2013, October 2013
“Building Support for Rate Increases,” presented at the Central States Water Environment Association
(CSWEA) Annual Conference, May 17, 2013
“Which Direction is Your Utility Heading,” presented at the Illinois City Managers Association Conference,
Galena, Illinois, June 28, 2012
“Financial Sustainability in an Uncertain World,” presented at the Illinois Section American Water Works
Association (AWWA) Annual Conference, March 2012
“Doing More With Less: Financial Planning and Management in Stressful Times,” presented at the Central
States Water Environment Federation (WEF) Wisconsin Government Affairs Seminar, February 23, 2012
“Financing Water Utilities’ Sustainability Initiatives: Challenging Institutionalized Governance and Market
Failures,” with Debbie Galardi, presented at the AWWA Water Sustainability Conference, Portland, Oregon,
March 2012
“Building Support for Rate Increases,” presented at the CSWEA Government Affairs Seminar, Madison, WI,
February 2012
“A Season on The Brink: Atlanta’s Financial Capability Based Consent Decree Extension,” presented at the
Utility Management Conference, Denver, CO, February 2011
“Making Wet Weather Affordable: Never Let A Good Crisis Go To Waste,” presented at the National
Association of Clean Water Agencies (NACWA) Winter Conference, Fort Lauderdale, FL, January 2011
“Water Efficiency Programs: Risk Management for an Uncertain World,” presented at the Wisconsin Water
Association Conservation Seminar, September 2011
“Financial Capability Assessment Revisited: Structuring Consent Decrees To Recognize Capital Financing
Constraints And Market Change,” presented at the Utility Management Conference, San Francisco, CA,
February 2010
A-10
Expert Witness Depositions and Testimony
· Expert Report of Eric P. Rothstein in the Matter of Leonard S. Bohn v. City of Taylor, MI, Case No. 15-013727-
CZ, State of Michigan in the Circuit Court for the County of Wayne, filed December 2016
· Expert Report of Eric P. Rothstein in the Matter of City of Dallas v. Abney, et al. Cause No. D150045-C, 260th
Judicial District, Orange County Texas, filed June 21, 2016
· Expert Report and Written Direct Expert Testimony of Eric P. Rothstein in the Matter of City and County of
Honolulu v. Hawaii State Department of Health, Docket 15 – CWB – EMD – 3, filed April 25, 2016.
· Direct Testimony by Declaration (2014) – Superior Court Of California, County of Los Angeles, Central District,
Cities of Cerritos, Downey and Signal Hill vs. Water Replenishment District of Southern California, Lead Case
No. Bs128136
· Expert Witness Testimony (2013) – Nova Scotia Utility and Review Board: In the Matter of a Joint Application
by the Halifax Regional Water Commission and the Halifax-Dartmouth Bridge Commission for a Determination
of Appropriate Charges Related to the Use of the Angus L. Macdonald (M06127)
· Expert Report (2013) – San Diego County Water Authority v. Metropolitan Water District of Southern
California, Case No: CPF-10-510830 and CPF-12-512466, Superior Court of California, County of San
Francisco, regarding rate-setting challenges
· Expert Witness Testimony (2013) – Hawaii Public Utilities Commission, In the Matter of the Application
of Hawaiian Beaches Water Company, Inc., for review and approval of rate increases; revised rate
schedules, Docket No. 2013-0203
· Deposition And Expert Witness Testimony (2013): United States Bankruptcy Court, Northern District Of
Alabama, Southern Division, In Re: Jefferson County, Alabama, a political subdivision of the State Of
Alabama, Debtor, Case No.: 11-05736-Tbb, Chapter 9, The Bank Of New York Mellon as Indenture
Trustee, et al., Plaintiffs v. Jefferson County, Alabama, Defendant, AP No.: 12-00016-Tbb
· Expert Witness Testimony (2013) – Nova Scotia Utility and Review Board: Application for the Approval
of a Schedule of Rates and Charges and Schedule of Rules and Regulations for the Delivery of Water,
Wastewater and Storm Water Services, Matter No. M05463
· Expert Witness Testimony (2012) – Public Service Commission of Wisconsin: Application of City of
Waukesha Water Utility, Waukesha County, Wisconsin, for Authority to Increase Water Rates, Docket
No. 6240-WR-107
· Expert Witness Testimony (2009-2011) – United States District Court, Northern District of Georgia,
Atlanta Division, United States of American and the State of Georgia, Plaintiffs v. The City of Atlanta,
Defendant, Civil Action File No. 1-98-CV-1956-TWT (various hearings re: Schedule Extension, Service
Delivery Strategy)
· Expert Witness Testimony (2012) – Public Service Commission of Wisconsin: Application of Oak Creek
Water and Sewer Utility For Authority to Increase Water Rates, Docket No. 4310-WR-104
· Expert Witness Testimony (2011) – Nova Scotia Utility and Review Board: Application of the Halifax
Regional Water Commission for approval of a Cost of Service and Rate Design Methodology
(NSUARB-W-HRWC-R-11)
· Expert Witness Testimony (2010, 2014) – Public Service Commission of Wisconsin: Application of
Milwaukee Water Works, Milwaukee Water Works, Milwaukee County for Authority to Increase Water
Rates, Docket No. 3720-WR-107 and Docket No. 3720-WR-108
· Deposition (2010): The Bank of New York v. Jefferson County, Alabama, Civil Action No. CV-2009-
02318
A-11
Cody W. Stanger
Principal
Distinguishing Qualifications
· Managed development of complex financial planning models to evaluate funding
alternatives, assess debt management scenarios, and establish affordability statistics
for multi-billion-dollar capital infrastructure programs for Jefferson County, AL;
Atlanta, GA; Honolulu, HI; and Houston, TX.
· Lead technical consultant for the State of Virginia’s Chesapeake Bay Pollutant
Trading Program, one of the nation’s largest nitrogen and phosphorus credit markets
for municipal and industrial point source dischargers.
· Lead technical consultant for two projects for the American Water Works Association
Research Foundation (AwwaRF): Asset Management Planning and Reporting
Options for Water Utilities (project #2848) and Decision Process and Trade-off
Analysis Model for Supply Rotation and Planning (project #3003) in which he
developed management tools that (1) identify reporting metrics that facilitate renewal
and replacement decision-making for managers of public infrastructure assets and
(2) evaluates the cost, risk, reliability, and environmental trade-offs of different water
delivery strategies.
Education
M.B.A., Finance, University of Texas at Austin (2003)
B.A., Economics, Brigham Young University (1999)
Representative Experience
· Rate Analysis, Revenue Forecasting, and Municipal Advisor’s Report;
Environmental Services Department, Jefferson County, AL. Mr. Stanger
estimated the revenue impacts of changes to ESD’s service rates, including
migration to a tiered volumetric rate structure and proposed rate increases over a 40-
year forecast horizon. He developed a detailed revenue forecasting framework that
integrated account growth, price elasticity response to rate increases, price-
independent consumption trends, and post-metering billing adjustments to forecast
key financial performance indicators and ultimately support negotiations with existing
creditors through development of the County’s bankruptcy Plan of Adjustment. He
also co-authored a municipal advisor’s report for the sale of the Series 2013 Sewer
Warrants ($1.79 billion) to allow the County to emerge from Chapter 9 bankruptcy
protection.
· CSO/SSO Program Financing and Bond Feasibility Studies; City of Atlanta
Department of Watershed Management; Atlanta, GA. Mr. Stanger has developed
a number of strategic financial planning tools to facilitate policy-level consideration of
overall program financing strategies (as well as detailed project expenditure, status,
and schedule tracking). These tools have been instrumental in assessing potential
rate impacts and affordability implications, are serving as the basis for negotiations
A-12
with the US EPA, and provide critical information for ongoing efforts to secure federal
and state financial assistance for program implementation. Just recently, Mr. Stanger
completed a municipal advisor’s report for the Department’s Series 2015 Water and
Wastewater Revenue Refunding Bonds, enabling the refinancing of $1.24 billion of
existing debt.
· State of Virginia’s Chesapeake Bay Pollutant Trading Program; Virginia
Nutrient Credit Exchange Association; VA. Mr. Stanger manages development of
the regulatory compliance plan for more than 125 municipal and industrial point
source dischargers through a Trading Optimization Model he created. He facilitates
workshops with trading participants and evaluates operating policies and other
incentives to promote market participation. The Trading Optimization Model supports
development of treatment technology upgrade schedules in five major watersheds to
demonstrate compliance with collective nitrogen and phosphorus wasteload
allocations (WLAs). The tool also generates projections of state grant funding
requests and accounts for various credit pricing scenarios and revenue distribution
among participants.
· Acquisition of Water Reclamation Facility; Forsyth County, Georgia. Mr.
Stanger estimated the value of a privately-owned water reclamation facility. The
analysis considered the costs and benefits of integrating the plant into the County’s
current system, evaluated various capital improvement costs required for the County
to assume ownership of the plant and increase capacity, and presented a range of
feasible purchase prices based on various risk assessment profiles. In response to
the evaluation, the County Board of Commissioners was able to secure a much
lower sales price from the private entity.
· Management Models for an Integrated Water Resource Strategy; City of Boise,
ID. To support Boise’s Strategic Plan initiative, developed framework of specific
goals and objectives that would shape the City’s comprehensive water policy. In
conjunction with private water providers and other water rights stakeholders,
identified alternative management models for water policy implementation and
evaluated each on the basis of legal/regulatory issues, water supply development,
and water delivery efficiency (including service extension to new customers). Mr.
Stanger also conducted an economic review of municipal vs. private system
ownership options in which he determined the potential cost differential for City
residents based on various ownership transfer scenarios.
· Egypt Water/Wastewater Sector Policy Reform; Egyptian Ministry of Housing
(through a United States Agency for International Development contract);
Cairo, Egypt. For the Egyptian Ministry of Housing, through a USAID contract, Mr.
Stanger developed guidance on tariff setting, capital project prioritization, and
strategic planning for the newly established water and wastewater sector regulatory
agency. The project involved the development of a guidance manual, detailed
financial planning and cost-of-service analysis modeling templates in the Arabic
language, and testing of financial analysis and prioritization tools with four major
Egyptian utilities. He was the primary author of the planning tool that was intended to
standardize the reporting and financial planning framework used by service providers
throughout the country.
· Bond Feasibility and Certification Studies; Colorado Springs Utilities;
Colorado Springs, CO. Mr. Stanger performed financial analysis to secure funding
A-13
for the Southern Delivery System project that provides water to surrounding
communities through 2040. He conducted annual reviews of financial planning
documents provided by Colorado Springs Utilities in order to certify additional
revenue bonds for the project. These studies have required a detailed review of
customer growth projections, an assessment of the system’s ability to meet debt
service coverage ratios and target fund balances, and analysis of necessary rate
increases to comply with bond covenants over the term of the bonds. As a result of
these efforts, the client secured $180 million for the project.
· Cost and Risk Evaluation of Species Relocation; Confidential Commercial
Airport Client; CA. In response to a Biological Opinion issued by the U.S. Fish and
Wildlife Service, Mr. Stanger evaluated the cost and risk associated with various site
alternatives associated with the relocation of a sensitive aquatic species. The
analysis identified and analyzed financial and non-financial decision factors of each
relocation alternative, including compliance risk, administrative burden, and liability
concerns. Maintenance, monitoring, and public involvement costs were projected
across a 30-year operational period, and economic results compared across five
different site and/or management alternatives. The results were used to support
negotiations with one potential site owner.
Select Publications and Presentations
Ispass, Alan, and Cody Stanger. 2011. Asset Management Strategies for Addressing
Aging Infrastructure – How is it Best Implemented by Public Utilities? Presented at the
Pre-Conference Workshop, annual Water Environment Federation of Utah (WEAU)
meeting in St. George, UT. April 5.
Stanger, Cody. 2011. Nutrient Credit Trading – A Model for Success. Presented at the
EPA Region 8 Nutrients and Water Quality Conference in Salt Lake City, UT. February
16.
Stanger, Cody. 2010. Integrated Financial Management – A Creative Approach to
Capital Planning Strategies. Presented at the American Water Works Association
(AWWA) Intermountain Section annual meeting in Sun Valley, ID. August 27.
Stanger, Cody. 2009. Adaptive Management and Virginia’s State-Wide Nitrogen and
Phosphorus Credit Trading Program. Presented at the American Water Resources
Association (AWRA) Summer Specialty Conference at Snowbird, UT. June 29.
Stanger, Cody. 2008. Managing the Impacts of Conservation Against Fiscal Constraints.
Presented at the American Water Works Association (AWWA) Intermountain Section
annual meeting in St. George, UT. September 10.
Harvey, Glenn, Mark Haley, Chris Pomeroy, Cy Jones and Cody Stanger. 2007. The
Virginia Nutrient Credit Trading Program – How Program Structure and Pricing Affects
Willingness to Participate and the Ability to Develop Optimal Compliance Plans Through
Trading. Proceedings of the Water Environment Federation Conference. San Diego:
WEFTEC 2007.
Other
· Fluent in Spanish
Engineering Services Committee Meeting
6/11/2019 1:20 PM
AUD Rate Study and Financial Model
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Approve proposal to update financial model and revenue
projections for Galardi, Rothstein Group in the amount of
$98,000.
Background:In 2012, the Commission approved a contract with the Galardi,
Rothstein Group to perform a rate study and develop a financial
model for AUD. This work resulted in the new residential rate
structure that was implemented on January 1, 2019. As we are
transitioning from a debt funded Capital Improvement Program
(CIP) to a rate funded CIP the financial model is an essential
tool to project our available funding and therefore the scheduling
of projects.
Analysis:There have been significant changes since the financial model
was first developed. These include: Data used for cost
allocations is approximately five years old and improvements
made to our billing system will yield more accurate revenue
data. There is also a new residential rate structure in place. In
addition, we would like to investigate and possibly propose a
Customer Assistance Program to assist our most disadvantaged
customers. Most Utilities our size have some type of Customer
Assistance Program. It is good practice to update the
department's financial model every five years.
Financial Impact:We recommend that $98,000 be approved for the work described
above. This would be utilized on a time and materials basis.
Alternatives:The Commission could elect not to approve this work.
Recommendation:Accept proposal from Galardi, Rothstein Group in the amount of
$98,000.
Funds are
Available in the
Following
Accounts:
507043490-5212999/81100010
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
BR
A
N
S
F
O
R
D
R
O
A
D
N/F AMY
K
.
T
I
C
E
N/F DAVID J. HOGG
N/F PHILIPPE ERRAMUZPE ROFS PIN 033-3-161-00-0
3006 BRANSFORD ROAD
N/F
M
A
R
Y
A
S
H
T
O
N
M
I
L
L
S
EXISTING SEWER EASEMENT ( TO BE ABANDONED )
DB: 10-Y PG: 482
DB: 1586 PG: 536
DR
A
W
I
N
G
T
Y
P
E
DR
A
W
I
N
G
I
N
F
O
R
M
A
T
I
O
N
AU
G
U
S
T
A
U
T
I
L
I
T
I
E
S
D
E
P
A
R
T
M
E
N
T
45
2
W
A
L
K
E
R
S
T
R
E
E
T
,
S
U
I
T
E
2
0
0
AU
G
U
S
T
A
,
G
A
3
0
9
0
1
RI
C
H
M
O
N
D
C
O
U
N
T
Y
,
G
E
O
R
G
I
A
SH
O
W
I
N
G
P
R
O
P
O
S
E
D
S
A
N
I
T
A
R
Y
S
E
W
E
R
EA
S
E
M
E
N
T
O
V
E
R
P
A
R
C
E
L
0
3
3
-
3
-
1
6
1
-
0
0
-
0
AK
A
3
0
0
6
B
R
A
N
S
F
O
R
D
R
O
A
D
1 of 1
AP
P
R
O
V
A
L
CI
T
Y
O
F
A
U
G
U
S
T
A
BR
A
N
S
F
O
R
D
RO
A
D
Engineering Services Committee Meeting
6/11/2019 1:20 PM
Easement Abandonment and Deed of Dedication for New Easement
Department:Augusta Utilities
Presenter:Tom Wiedmeier
Caption:Consider approving the Easement Abandonment and Deed of
Dedication for New Easement for a sanitary sewer at 3006
Bransford Road.
Background:A lot was purchased, at 3006 Bransford Road. The lot turned
out to be, not a single lot, but a combination of one lot and a
partial lot. At the time that the subdivision was created, a
sanitary sewer, for said subdivision, ran down the side property
line of the partial lot. When the full lot and the partial lot where
combined, it put the sanitary sewer in the center of the lot.
Analysis:For the lot to be suitable for building, the sanitary sewer needed
to be moved, to a new location. The relocation, of the sanitary
sewer, creates the need to abandon the existing sanitary sewer
easement and acquire a new easement over the location of the
new sanitary sewer.
Financial Impact:None
Alternatives:Deny approval for the Easement Abandonment and Deed of
Dedication for New Easement, for a sanitary sewer at 3006
Bransford Road.
Recommendation:Approve the Easement Abandonment and Deed of Dedication
for New Easement, for a sanitary sewer at 3006 Bransford Road.
Funds are
Available in the
Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting Commission Chamber - 512812019
ATTENDANCE:
Present: Hons. Hardie Davis, Jr., Mayor; M. Williams, Chainnan;
Hasan, Vice Chairrnan; Garrett and Frantom, members.
ENGINEERING SERVICES
1. Presentation by Ms. Constance L. Albury-Jackson regarding lack of street Item
lights, lack of sidewalks and speeding issues. Action:
None
Made Seconded Motion
By By Result
Ms. Albury-Jackson will not be
attending the meeting and will be
rescheduled for a later date.
2. Approve Amendment No. 8 to Agreement with ESG Operations, Inc. to Item
establish the final budget amount for 2019. Action:
Approved
Motions
fr'J:" Motion rext
Motions
f#:"' Motion rext Made By Seconded By Motion
Result
Motion to aoorove.
Approve Mr. Garrett ort. uommlsloner
rvrotion pasr.r-:-0. Sean Frantom
Commissioner
Ben Hasan Passes
3. Approval of Professional Services Contract in the amount of $211,010 to Item
integrate AUD's enQuesta Customer Billing System with Cityworks AMS Action:
software to complete Phase II of Augusta Utilities Cifyworks Asset Approved
Management Software (AMS) Project.
Motions
Motion Motion Text Made By Seconded By MotionType Result
Motion to approve and
to determine if there are ^
Approve any additional fees
-- - commisioner commissioner
involved. Sean Frantom Ben Hasan Passes
Motion Passes 4-0.
4. Approve the Professional Services contract with Jacobs Engineering to Item
implement phase one recommendations outlined in the Strategic Asset Action:
Management Plan (SAMP) in the amount of $495,000. Approved
Motions
X:j*1" Motion Text Made By Seconded By Motionlype ------ -r --------- -'t Result
Motion to
^ approve. Commisioner CommissionerApprove ilo,io, passes Sean Frantom Brandon Garrett Passes
4_0.
5. Award Bid Item # l8-3 15 for LP Tanks for Generators. Item
Action:
Approved
Motions
[|j*1" Motion Text Made By seconded By Motion
f ype - ------ -r --------- -r Result
Motion to
Approve i|3,',X],'ru,,., ;:fffi::f*' f;mmisioner
sean passes
4-0.
6. Motion to approve professional services contract with WK Dickson for Phase Item2 Design of the Camp Hancock Sewer Basin Outfall Infrastructure Action:
Rehabilitation Plan recommendations in the amount of $185,000.00. Approved
Motions
X:jtl" Motion Text Made By Seconded By Motion
f 5ipe ----- -'t Result
Approve Motion to Commissioner Commisioner Sean Passesapprove. Ben Hasan Frantom
Motion Passes
4-0.
7. Consider approving the Deed of Easement, from Norwood VA Medical ItemCenter. Action:
Approved
Motions
fr"J:" Motion Text Made By Seconded By
Motion to
^ aDDrove.APProve Motion passes
4-0.
8. Discuss customers being double billed for utilities. (Requested by Item
Commissioner John Clarke) Action:
Approved
Motions
f#:"t Motion rext Made By
Commissioner Commissioner
Brandon Garrett Ben Hasan Passes
Motion
Result
Motion
Result
Motion
Result
Motion to approve
a .^__^--^ receiving this item as Commissioner CommisionerApprove information. Ben Hasan sean Frantom Passes
Motion Passes 4-0.
9. Consider approving the Deed of Dedication for water and sanitary sewer Item
systems and easements on 2215 Tobacco Road. Action:
Approved
Seconded By
Seconded By
Motions
f#:"' Motion rext Made Bv
Motion to
^ aDDrove.APProve vtotion passes
4-0.
Commisioner Sean CommissionerFrantom Ben Hasan Passes
10. Motion to approve authorizing the Engineering Dept. to proceed with a Item
temporary solution of installing a left turn lane at an estimated cost of Action:
$120,000 to improve an extremely dangerous entrance to the Augusta Approved
Regional Airport. (Requested by Commissioner Sammie Sias)
Motions
Motion Text Made By Seconded By Motion
Result
Motion to approve
^ receiving this item as Commisioner CommissionerApprove information. sean Frantom Ben Hasan Passes
Motion Passes 4-0.
11. Approve the proposal from Cranston Engineering for the evaluation, Item
inspection and improvements of the Highland Avenue Water Treatment Plant Action:
reservoir embankments. Approved
Motions
X:jt1'" Motion Text Made By seconded By Motion'I'ype - ---- -'t --------- -r Result
Motion to approve in
^ the amount of Commissioner CommisionerApprove $12g,360. Ben Hasan sean Frantom Passes
Motion Passes 4-0.
12. Motion to approve the minutes of the Engineering Services Committee held Item
on May 14,2019. Action:
Approved
Motions
X:j*1"' Motion Text Made By Seconded By MotionIYPe r --------- -'I Result
Motion to
Approve ixffiru,,., fi:#il:'ffi:- S;#H;:r passes
4-0.
13. Motion to determine that Smith Lane as shown on the attached map has Item
ceased to be used by the public to the extent that no substantial public Action:
purpose is served by it or that its removal from the county road system is Approved
otherwise in the best public interest, pursuant to o.C.G. A. 532-7-2, with the
abandoned property to be quit-claimed to the appropriate party(ies), as
provided by law and an easement to be retained over the entire abandoned
portion for existing or future utilities as directed by Augusta Engineering
Department and Augusta Utilities Department
Motions
Motion Motion Text Made By seconded By MotionTYPe Result
Motion to
Approve ffi5;oo;'iu,,., ;:#il:'ffi:- ;:rffi:;f*' passes
4-0.
14. Update from staff on status of the painting of the Blythe Fire Station. Item
(Requested by commissioner John ctarke) Action:
Approved
Motions
[,ojl" Motion Text Made By seconded By Motion
I YPe ---- -" Result
Motion to approve
a.-_-_.- receiving this item as Commisioner CommissionerApprove .c_._- i---- ;--------'-.---^ :"":-'""'""-' passes^ ^rr'"'- information. Sean Frantom Ben Hasan
Motion Passes 4-0.
15. Approve two additional inmate crews to maintain city's right-of-ways funded Item
from Storm Water Utility Fund. (Requested by Commissioner Ben Hasan) Action:
Approved
Motions
Motion r/r^..:^-'T!^-,a f,,r-r^n-- d r rh Motion;"""- Motion Text Made By Seconded BylYPe -.---- -'t Result
Motion to
^ approve. Commissioner CommissionerApprove Motion passes Ben Hasan Brandon Garrett Passes
4_0.
16. Discuss presentation from Mclaughlin Whitewater Design Group regarding ltem
city-commissioned- Design and Concept Study for the Whitewater/Savannah Action:
River Project. (Deferred from the May 21st Commission Meeting) Approved
Motions
[,ojl" Motion Text Made By seconded By Motion
I YPe '.---- -r Result
Motion to approve
^ receiving this item Commissioner CommissionerApprove as information. Brandon Garrett Ben Hasan Passes
Motion Passes 4-0.
Engineering Services Committee Meeting
6/11/2019 1:20 PM
Minutes
Department:
Presenter:
Caption:Motion to approve the minutes of the Engineering Services
Committee held on May 28, 2019.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
6/11/2019 1:20 PM
Motion to Abandon Right Of Way
Department:Law
Presenter:Law
Caption:Motion to determine that East Telfair Street as shown on the
attached map has ceased to be used by the public to the extent
that no substantial public purpose is served by it or that its
removal from the county road system is otherwise in the best
public interest, pursuant to O.C.G.A. §32-7-2, with the
abandoned property to be quit-claimed to the appropriate party
(ies), as provided by law and an easement to be retained over the
entire abandoned portion for existing or future utilities as
directed by Augusta Engineering Department and Augusta
Utilities Department.
Background:Noah Wagner on behalf of Dominium has requested the
abandonment of East Telfair Street in its entirety (between East
Boundary Street and East Cedar Street) in order to fence the
River Glen Apartments, thereby making it a gated community
with a vehicle access gate off of East Boundary Street in order to
provide safety for the residents. The abandonment request has
been reviewed by all essential county departments and
administrators and approvals were received to this abandonment
request. The map of said East Telfair Street is attached.
Analysis:In addition to the information provided in the above Background
section, publication notices will be made for a public hearing to
be held, with results to be presented to the Commission. Notice
to the property owners located thereon will be made, pursuant to
O.C.G.A. §32-7-2(b)(1).
Financial Impact:Cost of publication and advertisement of public hearing.
Alternatives:Approve or deny request to determine that East Telfair Street be
abandoned.
Recommendation:Approve determination and request for abandonment of East
Telfair Street, with public hearing to be held regarding the issue
of abandonment pursuant to O.C.G.A. §32-7-2, with the
abandoned property to be quit-claimed to the appropriate party
(ies) as allowed by law, and an easement(s) as directed by the
Augusta Engineering Department and the Augusta Utilities
Department to be retained over the entire abandoned portion for
existing or future utilities and drainage.
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
6, CLk otr Cowr s/zr/cto
Department of Public Worki a;A bngineering
Clifford A. Goins Assistant Director
Public Works - Engineering
CLIFFORD A. GOINS,INTERM ASSISTANT DIRECTOR
PUBLIC.WOB.KS - ENGINEERINIG DTVIS{ON
701,530 Greene Street
Augusta, Georgia 30911
1706 FAX(?06) 821-1708
TO:
FROM:
HONORABLE BOB YOUNG, MAYOR
MEMBERS OF COMMSSION
ULMER BRTDGES, CHAIRMAN, ENGINEERING SERVICES COMMITTEE
RANDY OLIVER, ADMINISTRATOR
a4
DATE: MAY ?3,2000
MAY 30,2OOO COMMITTEE MEETING
SUBJECT: MONUMENT/I{ISTORICAL MARKER POLICY
FILEREFERENCE: 2000-009
CAPTION:
ADOPT POLICY FOR PLACEMENT OF MONUMENTS AND OTHER
MARKERS ON PUBLIC zuGHTS OF WAYS OR OTI{ER PUBLIC
PROPERTY.
BACKGROUND:
There have been several requests in the past few months to place a monument or
other appropriate marker in the right of way or on public property to commemorate
a specific ierson or event. While this has been done in the past on a case by case
basis, the need to establish a policy has become apparent.
The Public Works and Engineering Department has performed a limited field
reconnaissance on the existing monuments and historical markers in the area. By
far, the majority of the existing monuments are on Greene Street with the historical
markers at various locations. The median iuea on Green Street and other streets
with width medians makes them ideal for the placement of monuments. Historichl
markers can be placed in more confined locations.
ANALYSIS:
The criteria of the policy for placement of monuments or historical markers would
include:1. Application for placement of monument or marker submitted to an ad hoc
committee comprised of,. Planning and Zoning. Public Works and Engineering Department
Administrator's Office
.'AGEMiAITEM
May 19,2000
PAGE TWO
2- The applicant would be required to enter into a perpetual maintenance
agreement. The City would reserve the right to remove the monument or
marker from the right of way or public property in case of disrepair or
damage of a significant nature not being addressed by the appticant.
3. The successful applicant would apply for and secue an encroachmentpermit frori the Public works and Engineering Department. This permitwould address site requirements such as sight distances, clear zone,
restrictions, etc.
4. Installation will be in accordance with City specifications and under City. ,inspection.
,
FINA}ICIAL IMPACT:
The agenda item does not contain a request for funding.
ALTERNATIVES:
Do not approve recommended policy in whole or in part.
RECOMMENDATION:
It is recommended that the Commission adopt the Monument/tlistorical Marker
Policy as outlined in the Agenda Item.
PIIBLIC WORKS DEPARTMEI{T DIRECTOR:
ADMINISTRATOR:cAe^-a.6 P. qs-*L s/'
F'UNDS ARE AV LE IN THE FOLLOWING ACCOUNTS:
FINAIICE:Sl.,
COMN4ITTEE ACTION:
CAG&mw
xc: Lon Morrey, Compffoller
Kakoli Basu
Agenda File
Main File
Ms. Teresa Smith, Pre-Constmction Engineer
,. tl
pol-rcy FoIJlctsMENr OF MONUMENTS AND OrHER MARKERS ON
PUBLITryGHTS OF WAYS OR OTHER PUBLTC pROpERTy
The criteria of the policy for placement of monuments or historical markers would
include:
l.Application for placement of monument or marker submitted to an ad hoc committee
comprised of :
Planning and Zoning
Public Works and Engineering Department
Administrator's Office
2. The applicant would be required to enter into a perpetual maintenance agreement.
The City would reserye the right to remove the monument or marker from the right of
way or public property in case of disrepair or damage of a significant nature not being
addressed by the applicant.
3. The successful applicant would apply for and secure an encroachment permit from
the Public Works and Engineering Department. This permit would address site
requirements such as sight distances, clear zone, restrictions, etc.
4. Installation will be in accordance with City specifications and under City inspection.
As adopted by the Augusta Commission this 20th day of July.
o
o
o
Clerk of Commission
'\.
Engineering Services Committee Meeting
6/11/2019 1:20 PM
Placement of a MLK monument
Department:
Presenter:Commissioner Bill Fennoy
Caption:Discuss/approve the placement of a monument in honor of Dr.
Martin Luther King, Jr. (Requested by Commissioner Bill
Fennoy)
Background:See attachment.
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
APPENDIX A
SCOPE OF WORK
SFY2019 REGIONAL WATER PLAN SEED GRANT
1. Project Title: Initiating and Upgrading Publicly Accessible Water Monitoring for the
Savannah-Upper Ogeechee and Coastal Regional Water Plans
2. Lead Organization: City of Augusta
452 Walker Street
Suite 200
Augusta, GA 30901
706-826-8991
Primary Contact: Tom Wiedmeir
Director
City of Augusta
452 Walker Street
Suite 200
Augusta, GA 30901
706-312-9016
E-mail: twiedmeier@augustaga.gov
Project Start Date: May 2019
Project End Date: August 2021
Grant Amount:
$ 75,000
37%
In Kind Match Amount:
$ 45,437
23%
Cash Amount:
$ 79,210
40%
Total Project Amount:
$199,647
100%
3. Project Goals:
The goals of this project are to develop and implement a structure for a permanent real-time,
publicly accessible, 24/7/365 operational data network on the Savannah River and Ogeechee
River using the latest data collection technology available. The system will be a network of
strategically placed monitors to provide crucial baseline and continual (user-defined) interval
data. After consultation with the data stakeholders, the most mission-appropriate equipment will
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
2
be purchased. After consultation with the data’s stakeholders, the monitors will be set in
locations that best provide actionable data. A user friendly web-based interface “dashboard” will
be created to allow real-time, publicly accessible,24/7/365 operational data observation and CSV
export via desktop, mobile device, or tablet. In addition to monitoring data, information from
other local, state. and federal servers will be pulled into the interface. A 50-year funding strategy
will be created to operate and maintain the system, solicited from individuals, corporations,
local, state and federal sources.
Goals include:
· Goal 1: Determine a tiered methodology for establishing, and later expanding, a baseline
real-time publicly accessible data collection system on both river systems, backed by
reliable funding and maintenance allocations for the next 50 years.
· Goal 2: Develop an action plan in conjunction with federal agencies, as well as local and
state agencies on both sides of the Savannah River, that will outline the agreed upon
baseline monitoring locations, parameters, and level of participation foreseeable by each
partner.
· Goal 3: Acquire and/or assemble and install phase 1 test monitors.
· Goal 4: Develop app and public interface for data and determine appropriate systems for
data collection/recall. Upon completion, a release of a public interface and a phase 1
monitoring stations on the Savannah and Ogeechee Rivers will be made available. The
intent is to pursue additional funding for this undertaking from partnering bi-state funding
sources, using the seed grant as a match.
This project will help the Savannah-Upper Ogeechee, as well as the Coastal Council, address a
number of the priority management practices, goals, and needs expressed in the Regional Water
Plans. These are included below:
RWP Goal Project Approach
Improve interstate water planning in the
Savannah River basin.
Georgia, South Carolina and federal agencies
will be engaged in the entirety of the project
process. All partners shall work with EPD to
establish and build upon ongoing relationships
with South Carolina stakeholders and other
Water Planning Councils to equitably address
water sharing issues.
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
3
ED1. Develop Regional or Customize
State or Other Available Educational
Program and Materials for Localized
Implementation
Designing and implementing a
user-friendly public interface that houses the
baseline monitoring data as well as other vital
sources, such as USGS gauges, the public,
including researchers, students, and river users,
will have access to information that was
previously unknown; increasing issue
awareness around our water resources,
specifically flow. Increased engagement along
the river systems. It will also be beneficial for
local entities such as industry and water utilities
to check levels water upstream from their
outfalls.
WQ4. Support Forestry Commission
Water Quality Program
A real-time publicly accessible platform will
provide information crucially needed to help
inform decisions on land use practices, and also
provides a desktop tool to support the Georgia
Forestry Commission in spotting issues as they
occur.
WS2. Monitor Streamflow to Confirm the
Frequency and Magnitude of the Predicted
Gap
This project will create, and implement, the
action plan required to install, and fund for 50
years, the quantity and quality gauges needed
on the Ogeechee River.
WQ8. Develop and Implement Waste
Water Treatment Asset Management
Programs
This project will provide crucial
information for water utilities to make
informed decisions about threats to drinking
water intakes and the efficiency of wastewater
outfalls.
WD4. Monitor Agricultural Withdrawal and
Use
This project will implement a strategy to ensure
flow gauges and other water indicators are
strategically placed in the
relevant locations to highlight potential issues
and impacts of agricultural practices.
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
4
This project will help achieve success for the following goals found in the Savannah/
Upper Ogeechee and Coastal Regional Water Plans:
1. Improve interstate water planning in the Savannah River basin:
a. This plan, from its onset, will be created and executed in concert with both
Georgia and South Carolina. By involving both states and federal agencies in the
entire process, we will have naturally engaged the parties relevant to bi-state
issues. South Carolina is finalizing its water planning councils by early 2019, and
this project would serve as a fitting jumping-off point to encourage an effective
working relationship between the Georgia and South Carolina water planning
councils. Also, by including all of the appropriate stakeholders in the basin, we
will produce a product with better buy-in and support for years to come.
2. ED1. Increasing issue awareness around our water resources, specifically flow:
a. By creating a user-friendly public interface that houses the baseline monitoring
program as well as other vital sources of data such as USGS gauges, we are creating
a natural conduit for increased engagement along the river systems. The water data
will not only be accessible to the general public, but will also provide an
unprecedented way for agencies and entities, such as water utilities, to check the
water upstream from their outfalls instantaneously.
b. The platform will also house, free to the public, historical river quality and
quantity data, and QAQC-corrected instantaneous data, creating a public platform
where scientists, researchers, and agency staff can access and use data to inform
better decisions.
3. WQ4. Supporting the Georgia Forestry Water Quality Program:
a. The support and increase of real-time, publicly accessible, and
easy-to-use data provides a tool crucially needed to help inform decisions on land
use practices, and also provides a desktop tool to help Georgia Forestry spot issues
as they are occurring.
4. WS2. Monitor Stream Flow in the Ogeechee River:
a. This project will create, and implement, the action plan required to install, and
fund for 50 years, the quantity and quality gauges needed on the Ogeechee River.
5. WQ8. Develop and Implement Waste Water Treatment Asset Management
Programs:
a. This project, funded and supported in part by three of the biggest utilities in the
Savannah basin, will provide crucial information needed to make informed
decisions about not only threats to drinking water intakes, but the efficiency of
their wastewater outfalls.
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
5
6. WD4. Monitor Agricultural Withdrawal and Use:
a. To take a holistic approach to the quality and quantity needs of the river systems,
water withdrawals must be part of the equation. For that reason, this project will
implement a strategy to ensure flow gauges and other water indicators are
strategically placed to highlight potential issues and impacts.
4. Project Background:
With a 10,577 square-mile watershed, the Savannah River is a vast water system that is home to
significant and complex uses. Its management has vast implications for Georgia and South
Carolina that go beyond drinking water and habitat to include political interest, even national
security. There used to exist an extensive monitoring system, for a time two, throughout the
basin, which is now outdated and largely removed. The data collected during that time has been
used over the years for valuable analysis by several bi-state entities. The system, however, faced
challenges that eventually caused its demise. Created to answer a specific question, “the goal of
this research was to characterize the effects of the urban corridor on Savannah River water
quality under baseline and storm event conditions, with special attention to dissolved oxygen and
carbon dynamics. The study was designed to identify source and sink areas for key inorganic and
organic constituents ( Savannah River At Risk, 2006-2008 )”.
This project has a different and much broader intent. The network of monitors were supported
after the original study was completed in 2008 and expanded over the years, but the location of
those gauges largely remained the same. Now we are facing a serious issue: these systems have
not been looked at holistically. Most are no longer collecting data, and none are collecting
publicly accessible real-time data, which is the most crucially needed. Now is the time to revisit
the system in place, and reshape the future of the network of sampling on the river. With the
onset of the imminent Cutoff Bends project, we are also gearing up for a massive restoration.
Baseline data will be critical to determine the current conditions of the river, and the
benefits/impacts of restoration in the future.
5. Project Activities:
All project activities will be performed with an emphasis on reviewing basinwide data in as
integrated a manner as possible. The City of Augusta will subcontract to the Savannah
Riverkeepers whom will include South Carolina stakeholders on the Savannah River from the
project’s inception, and ensure sufficient contact with all registered water users or dischargers in
the basins for feedback.
Upon completion of the project, a release of a public interface and phase 1 monitoring stations
on the Savannah and Ogeechee Rivers will be made. The intent is to pursue additional funding
from bi-state sources using the seed grant as match, as well as to execute the 50-year business
plan once approved by the Savannah-Upper Ogeechee Regional Water Planning Council.
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
6
Project Activity #1: Introduce Project to Watershed Partners
Task 1: Pre-planning phone call; securing of partnership/financial commitments
Deliverables: Sign in sheet; Letters of Commitment for partnership/financial
commitments
Measures of Success: Attendance of 60% of stakeholders
Project Activity #2: Assign Research Responsibilities
Task 2: Convene 3 meetings
Deliverables: Table of Responsibilities by organization for each research area
Measures of Success: Assignment of all 4 research areas
Project Activity #3: Ensure communication and coordination between GA EPD Water
Quality Monitoring Program and USGS
Task 3: Phone call(s) to discuss monitoring activities/other related work in the project
area to avoid any duplication of work or similar projects
Deliverables: Meeting Agenda and Minutes
Measures of Success: 100% attendance from GA EPD Water Quality
Monitoring Program members and USGS that are involved in this specific
coordination process
Project Activity #4: Creation of Draft Action Plan (Determining a tiered methodology for
starting and expanding an easy-to-use real-time publicly accessible data collection system on
both river systems that has a reliably stable funding, and maintenance allocations to
perpetuate it for the next 50 years.)
Task 4: Thorough research of real-time monitoring systems used throughout the world to
determine the best, low-cost, highly effective gauge system; and of scholarly journals
with insight on such.
Deliverables: Compiled findings in a report on cost-effective real-time
monitoring systems worldwide, with suggested steps forward.
Measures of Success: On time report delivered to GA EPD according to
Implementation/Drawdown schedule
Task 5: Review the previous and existing real-time monitoring systems on the Savannah
River; interview water users, stakeholders, and planners to aid in determining the
appropriate selection of baseline monitoring indicators, locations, with their feedback.
Deliverables: Report on baseline monitoring indicators and locations with
suggested steps forward.
Measures of Success: On time report delivered to GA EPD according to
Implementation/Drawdown schedule
Task 6: Review the funding structures used to fund long-term monitoring projects; create
suggested plan to fund monitoring and interface program for at least 50 years.
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
7
Deliverables: Report on long-term funding strategies and suggested steps
forward.
Measures of Success: On time report delivered to GA EPD according to
Implementation/Drawdown schedule
Task 7: Review public interfaces for database management systems, such as real-time
monitoring systems, and recommend platform needs for creating mobile and computer
based websites/interfaces.
Deliverables: Report on public platforms and suggested steps forward.
Measures of Success: On time report delivered to GA EPD according to
Implementation/Drawdown schedule
Task 8: Convene working task force to use compiled info to create business plan. Task
force would include all agencies, all council members interested in participating, and
water users that are interested in serving.
Deliverables: Draft Water Monitoring Action/Business Plan including overall
program, monitor location maps, suggested phasability, and financial plan.
Measures of Success: On time report delivered to GA EPD according to
Implementation/Drawdown schedule
Project Activity #5: Meetings to update the Savannah/Upper Ogeechee Regional Water
Plan and Coastal Plan on parameters
Task 9: Present draft action plan and findings to the Savannah-Upper Ogeechee and
Coastal Water Planning Councils for comment.
Deliverables: Compiled comments from councilmembers.
Measures of Success: Present at 2 Water Council sessions
Task 10: Meet with stakeholders in the basins to gather and assess feedback on the
proper baseline monitoring locations, parameters, and level of participation/involvement
desired.
Deliverables: Notes and attendee lists from each meeting.
Measures of Success: Convene 3 stakeholder meetings
Project Activity #6: Finalize Water Monitoring Plan
Task 11: Consolidate all draft reports; Combine with Water Council and
stakeholder recommendations; Delegate sections to be written and
finalize QA/QC Water Monitoring Action/Business Plan.
Deliverables: Completed QA/QC Water Monitoring Action/Business Plan.
Measures of Success: 100% approval from Water Councils and 90%
approval rate from stakeholders of plan.
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
8
Project Activity #7: Install up to 5 water monitors sondes.
Tasks 12: Purchase/create up to 5 new water data sondes; Install up to 5 new water
monitoring sondes at locations designated in Action Plan.
Deliverables: Report on the installation of all new monitoring sondes.
Measures of Success: A minimum of 3 new monitoring sondes installed.
Project Activity #8: Operation of Real-time Data Collection System
Tasks 13: Create data parameters; Establish data storage needs; Contract with web-based
database manager to create system; Upload historical data from past projects.
Deliverables: Link to historical data system that GA EPD can test.
Measures of Success: 10 years of historical data available on system.
Project Activity #9: Monitor Data & Test Data Collection System
Tasks 14: Run hourly tests to verify data from all monitors are recording properly for 5
days; Run daily tests on data for 4 weeks; Run daily reports on data for 3 months
Deliverables: Link to data system with both historical and live water data GA
EPD can test.
Measures of Success: 3 months of live data available on system.
Project Activity #10: Develop Public/Private Interfaces.
Tasks 15: Develop the public interfaces for real-time monitoring sondes system, as well
as QA/QC corrected real-time monitoring data, and existing data collection ongoing
throughout the river basins. Emphasis will be put on providing easy-to-use access to
present and past data throughout each river system.
Deliverables: Website (free to the public with both real-time and historical
data) and mobile app created.
Measures of Success: GA EPD has access to the water monitoring website
and mobile app for historical and real-time data on the Savannah River and
Upper Ogeechee Rivers.
Project Activity #11: Conduct Outreach and Education Activities
Tasks 16: Set up meeting places; Create and execute marketing plan to invite public and
private involvement
Deliverables: Sign-in sheets; photo-documentation, handouts and/or a report on
workshops/field days with head counts.
Measures of Success: Host up to 10 workshops/field days to inform 200
people on website and mobile app features; including 50 university and school
teachers or professors.
Project Activity #12: Reporting Requirements
Task 17: Submit quarterly financial and progress reports to GAEPD
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
9
Deliverables: Complete and submit quarterly progress reports, reimbursement
request invoices, and Minority Business Enterprise/Woman Business Enterprise
(MBE/WBE) reports to GAEPD each by January 15th, April 15th, July 15th, and
October 15th of each project year. Track grant and matching funds according to
implementation schedule and provide supporting documentation for all in-kind and
cash match.
Measures of Success: Documentation for expenditures and match contributions,
status of activities/tasks in progress reports
Task 18: Submit final close-out report to GAEPD.
Deliverables: One (1) electronic DRAFT Closeout Report for review and comments;
One (1) electronic and one (1) paper Final Closeout Report detailing results of project
to GAEPD within 60 days of project completion.
Measures of Success: Demonstrates that all components of the report fulfill GAEPD
directives.
6. Roles and Responsibilities of Partnering Organizations:
Specific Responsibilities
City of Augusta
· Execute grant contract with GAEPD
· Account for/contribute to 63% of total project costs in matching
expenses or in-kind services or cash match
· Request payments from GAEPD on a quarterly basis
· Pay funds to appropriate contractor(s) and vendor(s), and
request reimbursements from GAEPD
· Track all grant funds expended and all match values provided in
accordance with the implementation schedule
· Track all project activities in accordance with the
implementation schedule
· Complete and submit quarterly progress reports with invoices to
GAEPD by January 15th, April 15th, July 15th, and October 15th
of each project year (Payment of invoice is contingent on work
completed and a review of the quarterly report.)
· Complete and submit close-out report at conclusion of
project
GAEPD · Provide 37% of total project costs
· Review and approve project deliverables
· Participate in meetings, as appropriate
· Provide project oversight and contract management
· Provide monitoring guidance and training
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
10
Other Invited
Partners
Specific Responsibilities
Regional Water Councils
Savannah
Riverkeeper
· General Stakeholder
· The City of Augusta’s sub-contractor to this project
· Participate in meetings, as appropriate
· Provide monitoring guidance and training as appropriate
· Serve on Project Advisory/Steering Committee
Regional Water
Councils
Savannah Upper
Ogeechee GA Water
Council
Ogeechee
Riverkeeper
Coastal GA Water
Council
· General Stakeholder
· Participate in forums on Historical and future data and BMPs.
· General Stakeholder
· Lead stakeholder group on the Ogeechee and assisting throughout
the development of this project
· General Stakeholder
· Participate in forums on Historical and future data and BMPs.
Columbia County
· Serve on Project Advisory/Steering Committee
· Provide matching cash for project as described in Letter of
Commitment
· Participate in meetings, as appropriate
· Provide monitoring guidance and training, as appropriate
U.S. Army Corps
of Engineers
Savannah
District (US-
COE)
· Serve on Project Advisory Committee
· Participate in interview sessions and discussion forums about past
data collected, ongoing work, needs in the future and best practices
· Render in-kind services
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
11
The Nature
Conservancy
Georgia
and South Carolina
(TNC)
· Serve on Project Advisory Committee
· Participate in interview sessions and discussion forums about past
data collected, ongoing work, needs in the future and best practices.
· Explore ways to partner new water quality monitors with flow meters
installed.
· Help develop action plan, best course of action to ensure appropriate
flow gauges to meet needs identified in the Water Basin Councils
action plan on both rivers.
· Render in-kind services
U.S. Geological
Survey
(USGS)
· Serve on Project Advisory Committee
· Participate in interview sessions and discussion forums about past
data collected, ongoing work, needs in the future and best practices.
· Explore ways to partner new water quality monitors with flow
meters installed.
· Help develop action plan, best course of action to ensure appropriate
flow gauges to meet needs identified in the Water Basin Councils
action plan on both rivers.
· Render in-kind services
South Carolina
Department of
Health and
Environmental
Control
(SC DHEC)
· Participate in interview sessions and discussion forums about past
data collected, ongoing work, future needs, and best practices.
· Render in-kind services
National Oceanic
and
Atmospheric
Administration
(NOAA)
· Participate in interview sessions and discussion forums about past
data collected, ongoing work, future needs and best practices.
· Render in-kind services
Phinizy Center for
Water Sciences
· Provide professional analysis, historical data from old sondes system,
sondes installation, and sondes repair.
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
12
7. Project Location:
The project will be conducted in the Savannah-Upper Ogeechee, as well as Coastal Council
regions. Counties include the following: Banks, Burke, Columbia, Chatham, Elbert, Effingham,
Franklin, Glasscock, Hart, Jefferson, Jenkins, Lincoln, Madison, McDuffie, Oglethorpoe, Rabun,
Richmond, Screven, Stephen, Taliaferro, Warren and Wilkes
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
13
8. Project Budget:
Item
Item Class Category Grant Funds
(60%
Maximum)
Matching Funds
(40% Minimum,
10% as Cash)
Total
In Kind Cash
A
Personnel:
One (1) Project Lead-Tom Wiedmeier
0.025 FTE ($104,000/ year) for 12
months/year-23 months totaling
$5,200
Description of Duties: Serve as lead
of stakeholder committee, serve as
liaison with Water Planning Council
and approve reports.
$5,200
$5,200
One (1) Scientific Advisor- Oscar
Flite 0.05 FTE ($83,200/year) for 12
months/year-24 months totaling
$8,320
Description of Duties: Participate in
all stakeholder groups, review and
advise on City of Augusta’s
comments on project, collect and
provide data aid in interagency
discussions and provide updates to
reports.
$8,320
$8,320
One (1) Grant Administrator- Leedra
Collins 0.05 FTE ($72,800/year) for
12 months/year- 24 months totaling
$7,280
Description of Duties: Administer
contracts, maintain reporting
requirements, maintaining financial
records and collate reports.
$7,280
$7,280
Sub Total: $0 $0 $20,800 $20,800
B
Fringe Benefits:
$0 $0 $0 $0
Sub Total: $0 $0 $0 $0
C
Travel: N/A
Sub Total: - - - -
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
14
Item
Item Class Category Grant Funds
(60%
Maximum)
Matching Funds
(40% Minimum,
10% as Cash)
Total
In Kind Cash
D
Equipment:
Equipment: (What kind)
4 Water Monitoring Sondes
Purpose/use: Monitor water to track
data indicators as determined.
Equipment will be purchased by the
City of Augusta (Cash Match) $10,000
$0 $0 $10,000 $10,000
Sub Total: $0 $0 $10,000 $10,000
E
Supplies: N/A
Sub Total: - - - -
F
Contractual:
Contractor Name: Savannah
Riverkeeper
Description of Duties: Execute project
$74,544 $0 $0 $74,544
Savannah Riverkeeper Indirect
Charges Rate 8%
Purpose/Use: For administrative work
$0 $6,157 $0 $6,157
Travel: Project Manager
4,320 miles x $.56/mile totaling
$2,419
Purpose/Use: Meetings, Field Days
and Site Visits
$0
$0
$2,419
$2,419
Supplies: Water Monitor Repair
Supplies
Purpose/Use: Repair 5 water monitor
sondes so they track water indicators
as determined by group
$176
$0
$851
$1,027
Supplies: Office
Purpose /Use: Meetings, educational
outreach, project oversight, printing
$280
$0
$700
$980
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
15
Item
Item Class Category Grant Funds
(60%
Maximum)
Matching Funds
(40% Minimum,
10% as Cash)
Total
In Kind Cash
Webmaster (TBD)
Description of Duties: Real Time Data
Collection Database
$0
$0
$10,000
$10,000
Webmaster (TBD)
Description of Duties: Web Page and
App for Real Time and Historical
Water Monitoring Data
$0
$0
$20,000
$20,000
Subtotal: $75,000 $6,157 $33,970 $115,127
Contractor Name Ogeechee
Riverkeeper
Description of Duties: Sonde
Installation, Professional
Analysis, Expert Testimony by
Damon Mullis
previously worked with Phinizy whom
now will be leading the stakeholder
group on the Ogeechee and assisting
throughout the development of this
project
$0 $8,640 $0 $8,640
Subtotal: $0 $8,640 $0 $8,640
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
16
Item
Item Class Category Grant Funds
(60%
Maximum)
Matching Funds
(40% Minimum,
10% as Cash)
Total
In Kind Cash
Contractor Names:
1. South Carolina Department of
Health and Environmental Control
(SC DHEC)
2. National Oceanic Atmospheric
Association (NOAA)
3. Savannah Upper Ogeechee GA
Water Council
4. Coastal GA Water Council
5. U.S. Army Corps of Engineers
Savannah District (US-COE)
6. The Nature Conservancy (TNC)
7. U.S. Geological Survey (USGS)
Description of Duties: Participate in
forums on Historical and future data
and BMPs.
((7) Other Invited Partners x $2,500
ea. in In-Kind match) totaling $17,500
applied toward In-Kind Match
$0 $17,500 $0 $17,500
Sub Total $0 $17,500 $0 $17,500
Contractor Name: Phinizy Center for
Water Sciences
Description of Duties: Historical Data,
Sonde installation
$0 $8,640 $8,640 $17,280
Sub Total $0 $8,640 $8,640 $17,280
G
Construction: N/A
Does not apply to Regional Water Plan
Seed Grants
N/A N/A N/A
H
Other:
Telecommunications-wireless service
for monitors
$0 $0 $4,000 $4,000
Web Based Marketing
Purpose /Use: $1800 will be spent (of
the match money provided) to promote
the website/app throughout the basin
on-line through Social media, google
ads, geozoning
$0 $0 $1,800 $1,800
In-Kind Volunteer Time $0 $4,500 $0 $4,500
Sub Total $0 $4,500 $5,800 $10,300
I
Total Direct Charges:
(Sum of A-H) $75,000 $45,437 $79,210 $199,647
J
Indirect Charges: N/A
N/A $0 N/A $0
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
17
Item
Item Class Category Grant Funds
(60%
Maximum)
Matching Funds
(40% Minimum,
10% as Cash)
Total
In Kind Cash
K
Total:
(Sum of I and J)
$75,000 $45,437 $79,210 $199,647
Budget Narrative Justification:
Item Class Categories:
(A) Personnel:
(Cash Match) $20,800
City of Augusta
One (1) Project Lead-Tom Wiedmeier 0.025 FTE ($104,000/ year) for 12 months/year-23 months
totaling $5,200
Description of Duties: Serve as lead of stakeholder committee, serve as liaison with Water Planning
Council and approve reports.
One (1) Scientific Advisor- Oscar Flite 0.05 FTE ($83,200/year) for 12 months/year-24 months
totaling $8,320
Description of Duties: Participate in all stakeholder groups, review and advise on City of Augusta’s
comments on project, collect and provide data aid in interagency discussions and provide updates to
reports.
One (1) Grant Administrator- Leedra Collins 0.05 FTE ($72,800/year) for 12 months/year- 24 months
totaling $7,280
Description of Duties: Administer contracts, maintain reporting requirements, maintaining financial
records and collate reports.
This amount of $20,800 is being applied toward Cash Match to cover the time spent by the
City of Augusta’s employees that will handle a combination of duties as the lead organization
as described under description of duties above.
(B) Fringe Benefits Narrative Justification: N/A
(C) Travel Budget Narrative Justification: N/A
(D) Equipment Budget Narrative Justification:
(Cash Match) $10,000 by the City of Augusta to purchase (4) Water Monitoring Sonds
(E) Supplies Budget Narrative Justification: N/A
(F) Contractual Narrative Justification:
(Grant Funds) $74,544 The City of Augusta will subcontract this project to the Savannah
Riverkeepers to execute project.
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
18
(In-Kind Match) $6,157, Savannah Riverkeeper Indirect Charges Rate 8%
Purpose/Use: For administrative work
(Cash Match) $2,419
Purpose/Use Travel for Meetings, Field Days and Site Visits
4,320 miles x $.56/mile totaling $2,419
(Grant Funds) $176, (Cash Match) $851 totaling $1,027 for Water Monitor Repair Supplies
Purpose/Use: Repair 5 water monitor sondes so they track water indicators as determined by
group. There are currently 4 old water monitoring sondes on the Savannah River. Savannah
Riverkeepers will work with Phinizy Science Center to get them running and working with
the new data collection system. The funds will help maintain the sondes and upgrade as
needed.
(Grant Funds) $280, (Cash Match) $700 totaling $980 for Office Supplies
Purpose /Use: The office supplies will be used for printing costs for reports, mailing of reports
and information packets, paper supplies, workshop handouts, envelopes, and printer ink.
(Cash Match) $10,000
Purpose/Use: Webmaster (TBD)
Real Time Data Collection Database
(Cash Match) $20,000
Purpose/ Use: Webmaster (TBD)
Web Page and App for Real Time and Historical Water Monitoring Data
(In-Kind Match) $8,640 Ogeechee Riverkeeper
Purpose/Use: The Ogeechee Riverkeeper has committed to assist the sub-contractor
Savannah Riverkeeper with this project, with 8 hours of time paid at $45 an hour for 24 month
and 8 hours of in-kind at $45 an hour for 24 month. A staff member will assist the sub-
contractor Savannah Riverkeepers with professional analysis, expert testimony, sondes
installation, and sondes repair.
(In-Kind Match) $17,500, (7) Other Invited Partners which include the following:
1. South Carolina Department of Health and Environmental Control (SC DHEC)
2. National Oceanic Atmospheric Association (NOAA)
3. Savannah Upper Ogeechee GA Water Council
4. Coastal GA Water Council
5. U.S. Army Corps of Engineers Savannah District (US-COE)
6. The Nature Conservancy (TNC)
7. U.S. Geological Survey (USGS)
Purpose/Use: Participate in forums on Historical and future data and BMPs.
This amount of $17,5,000 is being applied toward In-Kind Match to cover the time spent in
participating in forums on Historical and future data and BMPs.
(In-Kind Match) $8,640 (Cash Match) $8,640 totaling $17,280, Phinizy Center for Water
Sciences
City of Augusta
Initiating and Upgrading Publicly Accessible Water Monitoring for the Savannah-Upper Ogeechee and
Coastal Regional Water Plans
19
Purpose/Use: Phinizy Center for Water Sciences has committed to assist the sub-contractor
Savannah Riverkeeper with this project, with 8 hours of time paid at $45 an hour for 24 month
period for $8,640 to be applied toward In-Kind Match and $8,640 to be applied toward Cash
Match totaling $17,280. A staff member will assist the sub-contractor Savannah Riverkeepers
with professional analysis, historical data from old sondes system, expert testimony, sondes
installation, and sondes repair.
(G) Construction: N/A
(H) Other Narrative Justification:
(Cash Match) $4,000
Purpose/Use: Telecommunications for wireless service for monitors
(Cash Match) $1,800
Purpose/Use: Web Based Marketing to promote the website/app throughout the basin on-line
through Social media, google ads, geozoning. The City of Augusta will have the subcontractor
Savannah Riverkeepers make contact with a TBD person/ or company to develop a Real Time
Data Collection Database, with specific data points as determined by this consortium with the
end result being the development of a web based interface for Public access to the historical
and real-time water data.
(In-Kind Match) $4,500
Purpose/Use: In-Kind Volunteer Time
(J) Indirect Charges Narrative Justification: N/A
Engineering Services Committee Meeting
6/11/2019 1:20 PM
Seed Grant for Water Operational Data in the Savannah/Upper Ogeechee Rivers
Department:Utilities
Presenter:Tom Wiedmeier
Caption:Approve seed grant from Georgia EPD for water operational
data network for the Savannah River.
Background:The 2004 Comprehensive State-wide Water Management
Planning Act mandated the development of a statewide water
plan. Water Planning Councils were established for each river
basin; Augusta is part of the Savannah – Upper Ogeechee Water
Planning Council. These water planning councils remain active,
as each plan is updated every five years. The state established
Regional Water Plan Seed Grants up to $75,000 that are
available to support local governments and other water users as
they undertake their Regional Water Plan implementation
responsibilities.
Analysis:On November 8, 2018, Savannah Riverkeeper proposed to the
Savannah/Upper Ogeechee Water Planning Council a project to
agglomerate real-time and publicly accessible water data on the
Savannah and Upper Ogeechee Rivers. This project was
subsequently endorsed by Council Chair Ron Cross, and an
application was submitted. This application was approved by
Georgia EPD; as the grant recipient is required to be a local,
regional or state agency, EPD requested that Augusta be the
grant recipient. Partners in this project that will contribute
services and funding include SRK, Augusta, Columbia County
and Phinizy Center for Water Sciences
Financial Impact:The grant amount is $75,000. Augusta would contribute $15,000
toward this project, in addition to staff time. Staff that will be
primarily involved are Oscar Flite, Leadra Collins and myself.
Alternatives:The Commission could elect not to accept this grant.
Recommendation:Recommend that Augusta accept the seed grant as outlined
above.
Funds are
Available in the
Following
Accounts:
Account 506043110-5212999 and in-kind: salary.
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
6/11/2019 1:20 PM
South Entrance or service road into the Augusta Regional Airport.
Department:
Presenter:Commissioner Sammie Sias
Caption:Move to approve for the Engineering Department to bring back
to the Commission a design plan to install a turning lane from
Doug Barnard Pkwy into the South Entrance or service road into
the Augusta Regional Airport. (Requested by Commissioner
Sammie Sias)
Background:A temporary solution has been proposed by our Engineering
department that can be done in-house. This temporary solution
will work for now until we get to a better place. However, a
bigger and better permanent solution is required. Our airport
must grow along with our city. The traffic has
increased dramatically in all areas of the airport. The traffic at
this entrance must compete with fully loaded log trucks,
tractor trailers, and other over
trucks servicing this industrial area. Life and limb is at risk.
This is especially true during Maters week when we
have limousines, passenger vans, and numerous other high
profile vehicles entering and existing this gate.
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Engineering Services Committee Meeting
6/11/2019 1:20 PM
Street Light Maintenance Agreement for High Mast Lighting at Interstate 20 and Washington Road
Department:Engineering
Presenter:
Caption:Approve entering into a monthly maintenance and power
agreement with Georgia Power Company to light, maintain, and
repair the high mast lighting located around the intersection of
Interstate 20 (I-20) and State Route 28 (Washington Road).
Funding is available in the Street Lighting budget account
#276041610-5312310.
Background:Currently, Augusta has entered into a maintenance agreement
with Georgia DOT to maintain the interchange lighting at
several locations along the interstates throughout Richmond
County. Due to the nature and design of these street lights,
Augusta staff cannot maintain the lighting through normal
means. A high mast lighting specialist needs to be hired for any
maintenance or repair purposes.
Analysis:The cost proposal was received by Georgia Power Company on
May 20, 2019 in the amount of: CONTRACTOR BID 1.
Georgia Power Upfront Cost - $0.00 Monthly Cost - $1,459.00
Financial Impact:Funds are available in the street lighting budget and expenditure
of this amount will leave sufficient funds for any emergencies
that may arise before the end of the year.
Alternatives:1). Approve entering into an agreement with Georgia Power
Company to take over monthly electrical and maintenance
responsibility of high mast lighting. 2). Do not approve
agreement.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
FUNDS ARE AVAILABLE IN THE FOLLOWING
ACCOUNTS: 276-04-1610-5312310
Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
6/11/2019 1:20 PM
Street Light Maintenance Agreement for High Mast Lighting at Interstate 520 and Deans Bridge Road
Department:Engineering
Presenter:
Caption:Approve entering into a monthly maintenance and power
agreement with Georgia Power Company to light, maintain, and
repair the high mast lighting located around the intersection of
Interstate 520 (Bobby Jones) and State Route 1 (Deans Bridge
Road). Funding is available in the Street Lighting budget
account #276041610-5312310.
Background:Currently, Augusta has entered into a maintenance agreement
with Georgia DOT to maintain the interchange lighting at
several locations along the interstates throughout Richmond
County. Due to the nature and design of these street lights,
Augusta staff cannot maintain the lighting through normal
means. A high mast lighting specialist needs to be hired for any
maintenance or repair purposes.
Analysis:The cost proposal was received by Georgia Power Company on
May 20, 2019 in the amount of: CONTRACTOR BID 1.
Georgia Power Upfront Cost $0.00 Monthly Cost 1,068.00
Financial Impact:Funds are available in the street lighting budget and expenditure
of this amount will leave sufficient funds for any emergencies
that may arise before the end of the year.
Alternatives:1). Approve entering into an agreement with Georgia Power
Company to take over monthly electrical and maintenance
responsibility of high mast lighting. 2). Do not approve
agreement.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
FUNDS ARE AVAILABLE IN THE FOLLOWING
ACCOUNTS: 276-04-1610-5312310
Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
6/11/2019 1:20 PM
Street Light Maintenance Agreement for High Mast Lighting at Interstate 520 and Gordon Hwy
Department:Engineering
Presenter:
Caption:Approve entering into a monthly maintenance and power
agreement with Georgia Power Company to light, maintain, and
repair the high mast lighting located around the intersection of
Interstate 520 (Bobby Jones) and State Route 78 (Gordon Hwy).
Funding is available in the Street Lighting budget account
#276041610-5312310
Background:Currently, Augusta has entered into a maintenance agreement
with Georgia DOT to maintain the interchange lighting at
several locations along the interstates throughout Richmond
County. Due to the nature and design of these street lights,
Augusta staff cannot maintain the lighting through normal
means. A high mast lighting specialist needs to be hired for any
maintenance or repair purposes.
Analysis:The cost proposal was received by Georgia Power Company on
May 20, 2019 in the amount of: CONTRACTOR BID 1.
Georgia Power Upfront Cost - $0.00 Monthly Cost - $1,276.00
Financial Impact:Funds are available in the street lighting budget and expenditure
of this amount will leave sufficient funds for any emergencies
that may arise before the end of the year.
Alternatives:1). Approve entering into an agreement with Georgia Power
Company to take over monthly electrical and maintenance
responsibility of high mast lighting. 2). Do not approve
agreement.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
FUNDS ARE AVAILABLE IN THE FOLLOWING
ACCOUNTS: 276-04-1610-5312310
Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Engineering Services Committee Meeting
6/11/2019 1:20 PM
Street Light Maintenance Agreement for High Mast Lighting at Interstate 520 and Wrightsboro Road
Department:Engineering
Presenter:
Caption:Approve entering into a monthly maintenance and power
agreement with Georgia Power Company to light, maintain, and
repair the high mast lighting located around the intersection of
Interstate 520 (Bobby Jones) and Wrightsboro Road. Funding is
available in the Street Lighting budget account #276041610-
5312310.
Background:Currently, Augusta has entered into a maintenance agreement
with Georgia DOT to maintain the interchange lighting at
several locations along the interstates throughout Richmond
County. Due to the nature and design of these street lights,
Augusta staff cannot maintain the lighting through normal
means. A high mast lighting specialist needs to be hired for any
maintenance or repair purposes.
Analysis:The cost proposal was received by Georgia Power Company on
May 20, 2019 in the amount of: CONTRACTOR BID 1.
Georgia Power Upfront Cost $0.00 Monthly Cost $570.00
Financial Impact:Funds are available in the street lighting budget and expenditure
of this amount will leave sufficient funds for any emergencies
that may arise before the end of the year.
Alternatives:1). Approve entering into an agreement with Georgia Power
Company to take over monthly electrical and maintenance
responsibility of high mast lighting. 2). Do not approve
agreement.
Recommendation:Approve Alternative Number One.
Funds are
Available in the
FUNDS ARE AVAILABLE IN THE FOLLOWING
ACCOUNTS: 276-04-1610-5312310
Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission