HomeMy WebLinkAbout2019-03-26 Meeting Minutes Engineering Services Committee Meeting Commission Chamber - 3/26/2019 ATTENDANCE: Present: Hons. M. Williams, Chairman; Hasan, Vice Chairman; Garrett and Frantom, members. Absent: Hon. Hardie Davis, Jr., Mayor. ENGINEERING SERVICES 1. Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Cranston Engineering in the amount of $428,182.13 for the 5th Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-283. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commisioner Sean Frantom Commissioner Ben Hasan Passes 2. Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Clark Patterson Lee in the amount of $228,325.00 for the 6th Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-279. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commisioner Sean Frantom Commissioner Ben Hasan Passes 3. Motion to approve amending Section 4-2-6 of the Augusta Code - Fees for Environmental Services Department Landfill Fees and Waive the Second Reading. (Referred from March 19 Commission Meeting) Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commisioner Sean Frantom Commissioner Ben Hasan Passes 4. Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Hussey Gay Bell (HGB) in the amount of $2,078,797.19 for the Broad Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-311. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 5. Motion to approve the minutes of the Engineering Services Committee held on March 12, 2019. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commisioner Sean Frantom Commissioner Ben Hasan Passes 6. Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Goodwyne, Mills & Cawood (GMC) in the amount of $279,000.88 for the 13th Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-258. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commissioner Ben Hasan Commisioner Sean Frantom Passes 7. Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Infrastructure Systems Management, LLC (ISM) in the amount of $685,061.06 for the Greene Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-312. Item Action: Approved Motions Motion Type Motion Text Made By Seconded By Motion Result Approve Motion to approve. Motion Passes 4-0. Commisioner Sean Frantom Commissioner Ben Hasan Passes 8. Update on SPLOST 4 through 6 funded projects from Engineering Department and plan for utilizing remaining funds. (Requested by Commissioner Brandon Garrett) Item Action: Rescheduled Motions Motion Type Motion Text Made By Seconded By Motion Result Defer Motion to refer this item to the next committee meeting. Motion Passes 4-0. Commissioner Brandon Garrett Commissioner Ben Hasan Passes 9. Update on tree plan across Richmond County including how often trees downtown are cut, who handles that process, and can a business request removal of a tree in front of their business? (Requested by Mayor Pro Tem Commissioner Sean Frantom) Item Action: Approved Motions Motion Text Made By Seconded By Motion Type Motion Result Approve Motion to approve revisiting the Tree ordinance, evaluate it and determine where changes can be made. Motion Passes 4-0. Commissioner Brandon Garrett Commisioner Sean Frantom Passes www.augustaga.gov Engineering Services Committee Meeting 3/26/2019 1:10 PM Attendance 3/26/19 Department: Presenter: Caption: Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: OFFICIAL VENDORS Attachment "B"E-Verify Addendum 1 SAVE Form Original 6 Copies Fee Proposal WOOD 1075 BIG SHANTY RD., SUITE 100 KENNESAW, GA 30144 Yes 44372 Yes Yes Yes Yes Yes POND & COMPANY 621 NW FRONTAGE ROAD, STE 320 AUGUSTA, GA 30907 Yes 175046 Yes Yes Yes Yes Yes MORELAND ALTOBELLI 2450 COMMERCE AVENUE SUITE 100 DULUTH, GA 30096-8910 Yes 53328 Yes Yes Yes Yes Yes CLARK PATTERSON LEE 3011 SUTTON GATE DR. SUWANEE, GA 30024 Yes 209339 Yes Yes Yes Yes Yes LANDIS EVANS & PARTNERS 1954 AIRPORT ROAD, SE. 123 CHAMBLEE, GA 30341 Yes 622253 Yes Yes Yes Yes Yes W. R. TOOLE ENGINEERS INC 1005 BROAD STREET STE 200 AUGUSTA, GA 30901 Yes 62985 Yes Yes Yes Yes Yes GOODWYN, MILLS & CAWOOD 1450 GREENE ST, SUITE 505 AUGUSTA, GA 30901 Yes 425070 Yes Yes Yes Yes Yes CRANSTON ENGINEERING 452 ELLIS STREET AUGUSTA, GA 30903-2546 Yes 64684 Yes Yes Yes Yes Yes Total Number Specifications Mailed Out: 24 Total Number Specifications Download (Demandstar): 4 Total Electronic Notifications (Demandstar): 107 Mandatory Pre-Qualifications Conference Attendees: 13 Total Number Mailed to Local Vendors: 13 Total packages submitted: 8 Total Noncompliant: 0 RFP Item 18-283 Design Services for 5th Street Improvement Project for Augusta, GA – Engineering Department RFP Due: Wednesday, September 26, 2018 @ 3:00 p.m. Page 1 of 1 RFP Official TAB SHEET 18-283 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB#371-041110-T15041213 to approve and award Preliminary and and Final Engineering Design Consultant Services Agreement to Cranston Engineering Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. TIA Design 428,200$ 428,200$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Hardie Davis, Mayor CAPITAL PROJECT BUDGET CPB#371-041110-T15041213 5th Street Improvements (RFP #18-283) in the amount of $428,182.13 for the 5th Street Improvements project requested by AED. RFP 18-283 Funding is available in the TIA project budget: 3/14/2019 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#371-041110-T15041213 5th Street Improvements (RFP #18-283) CPB AMOUNT New SOURCE OF FUNDS CPB CPB TIA Project 371-041110/5212115-T15041213 ($428,200)($428,200) TOTAL SOURCES: ($428,200)($428,200) USE OF FUNDS ENGINEERING 371-041110-5414210/T15041213 $428,200 $428,200 TOTAL USES: $428,200 $428,200 3/14/2019 Request for Proposal Request for Proposals will be received at this office until Wednesday, September 26, 2018 @ 3:00 p.m. for furnishing for the Augusta, Georgia - Engineering Department: RFP Item # 18-279 Design Services for 6th Street Improvements Project RFP Item # 18-283 Design Services for 5th Street Improvements Project RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 RFP documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime contractors, subcontractors and suppliers exclusively from Augusta Blue Print. The fees for the plans and specifications which are non-refundable for RFP Item # 18-279 are $50.00 and for RFP Item # 18-283 are $50.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.augustablue.com) at no charge through Augusta Blue Print (706-722-6488) beginning Thursday, August 16, 2018. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. A Mandatory Pre Proposal Conference for RFP 18-279 will be held on Friday, September 7, 2018, @ 10:00 a.m. in the Procurement Department, 535 Telfair Street, Room 605. A Mandatory Pre Proposal Conference for RFP 18-283 will be held on Friday, September 7, 2018, @ 11:00 a.m. in the Procurement Department, 535 Telfair Street, Room 605. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, September 11, 2018, @ 5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 60 days after bids have been opened, pending the execution of contract with the successful bidder(s). Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waivable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov GERI A. SAMS, Procurement Director Publish: Augusta Chronicle August 16, 23, 30, September 6, 2018 Metro Courier August 16, 2018 WOOD 1075 BIG SHANTY RD., SUITE 100 KENNESAW, GA 30144 POND & COMPANY 621 NW FRONTAGE ROAD, STE 320 AUGUSTA, GA 30907 MORELAND ALTOBELLI 2450 COMMERCE AVENUE SUITE 100 DULUTH, GA 30096-8910 CLARK PATTERSON LEE 3011 SUTTON GATE DR. SUWANEE, GA 30024 LANDIS EVANS & PARTNERS 1954 AIRPORT ROAD, SE. 123 CHAMBLEE, GA 30341 W. R. TOOLE ENGINEERS INC 1005 BROAD STREET, S TE 200 AUGUSTA, GA 30901 GOODWYN, MILLS & CAWOOD 1450 GREENE ST. SUITE 505 Augusta, GA 30901 CRANSTON ENGINEERING 452 ELLIS STREET AUGUSTA, GA 30903-2546 WOOD 1075 BIG SHANTY RD., SUITE 100 KENNESAW, GA 30144 POND & COMPANY 621 NW FRONTAGE ROAD, STE 320 AUGUSTA, GA 30907 MORELAND ALTOBELLI 2450 COMMERCE AVENUE SUITE 100 DULUTH, GA 30096-8910 CLARK PATTERSON LEE 3011 SUTTON GATE DR. SUWANEE, GA 30024 LANDIS EVANS & PARTNERS 1954 AIRPORT ROAD, SE. 123 CHAMBLEE, GA 30341 W. R. TOOLE ENGINEERS INC 1005 BROAD STREET, S TE 200 AUGUSTA, GA 30901 GOODWYN, MILLS & CAWOOD 1450 GREENE ST. SUITE 505 Augusta, GA 30901 CRANSTON ENGINEERING 452 ELLIS STREET AUGUSTA, GA 30903-2546 Evaluation Criteria Ranking Points 1. Completeness of Response • Package submitted by the deadline • Package is complete (includes requested information as required per this solicitation)• Attachment B is complete, signed and notarized N/A Pass/Fail PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS 2. Qualifications & Experience (0-5)20 5.0 3.5 3.5 5.0 3.3 3.3 5.0 5.0 100.0 70.0 70.0 100.0 65.0 65.0 100.0 100.0 3. Organization & Approach (0-5)15 4.8 3.1 3.1 4.8 4.0 4.0 5.0 5.0 71.3 46.9 46.9 71.3 60.0 60.0 75.0 75.0 4. Scope of Services - Ability to Provide Scope of Services - Project Deliverables - Cost Control and Budgeting Methodology (0-5)15 4.1 3.3 3.6 4.0 4.0 3.1 4.0 4.0 61.9 48.8 54.4 60.0 60.0 46.9 60.0 60.0 5. Schedule to Work (0-5)10 4.8 3.3 3.6 5.0 4.8 1.5 4.5 4.6 47.5 32.5 36.3 50.0 47.5 15.0 45.0 46.3 Within Richmond County 5 10 0.0 5.0 0.0 0.0 0.0 5.0 5.0 5.0 0.0 50.0 0.0 0.0 0.0 50.0 50.0 50.0 Within CSRA 5 6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Within Georgia 5 4 5.0 0.0 5.0 5.0 5.0 0.0 0.0 0.0 20.0 0.0 20.0 20.0 20.0 0.0 0.0 0.0 Within SE United States (includes AL, TN, NC, SC, FL) 5 2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0  All Others 5 1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7. References (0-5)5 3.9 4.0 3.7 4.0 3.3 3.4 4.0 3.7 19.7 20.0 18.3 20.0 16.3 17.2 20.0 18.3 27.6 22.1 22.5 27.8 24.3 20.3 27.5 27.3 320.3 268.1 245.8 321.3 268.8 254.0 350.0 349.6 8. Presentation by Team (0-5)10 3 4 5 0 0 0 30 0 0 40 50 19 Q&A Response to Panel Questions (0-5)5 3.5 4 5 0 0 0 17.5 0 0 20 25 Lowest Fees 5 10 5 0 0 0 50 0 0 0 0 Second 5 6 5 0 0 0 0 0 0 0 30 Third 5 4 5 0 0 0 0 0 0 20 0 Forth 5 2 0 0 0 0 0 0 0 0 Fifth 5 1 0 0 0 0 0 0 0 0 Total Phase 2 - (Total Maximum Ranking 15- Maximum Weighted Total Possible 125) 100 0 0 0 11.5 0 0 13 15 0 0 0 97.5 0 0 80 105 27.6 22.1 22.5 39.3 24.3 20.3 40.5 42.3 0 320.3 268.1 245.8 418.8 268.8 254.0 430.0 454.6 Vendors Phase 1 Total - (Total Maximum Ranking 30 - Maximum Weighted Total Possible 375) Phase 1 RFP Item #18-283 Design Services for 5th Street Improvement Project for Augusta, Engineering Department Evalaution Meeting Date: Friday, November 9, 2018 @ 3:00 p.m. Ranking of 0-5 (Enter a number value between 0 and 5) Scale 0 (Low) to 5 (High) Weighted Scores 6 Proximity to Area (only choose 1 line according to location of the company - enter the ranking value for the one line only) Internal Use Only Evaluator: Cumulative Date: 11/9/18 Procurement DepartmentRepresentative:_________Nancy Williams__________________________ Procurement Department Completion Date: 12/20/18 Total Cumulative Score (Maximum point is 500) 10. Cost/Fee Proposal Consideration (only choose 1 line according to dollar value of the proposal in relation to all fee proposals - enter the point value for the one line only) Total (Total Possible Score 500) Phase 2 (Option - Numbers 8-9) Engineering Services Committee Meeting 3/26/2019 1:10 PM 5th Street Improvements Project Design Services for Roadway Improvements Department:Engineering Presenter: Caption:Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Cranston Engineering in the amount of $428,182.13 for the 5th Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-283. Background:The 5th Street Improvements is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in July 31, 2012 referendum. The 5th Street Improvements Project is a Band 2 project. The project improvements consist of improving roadway safety by resurfacing, reconstructing the existing curb and gutter, replacing sidewalks and improving the storm water system. The project will improve pedestrian safety at intersections with new high visibility crosswalks and organize the existing parallel parking. New street landscaping will be provided, where possible, to enhance pedestrian use and improvement roadway aesthetics. In September 2015, commission approved award of the Augusta Downtown Concept development project to Cooper Carry. Cooper Carry task is completed and the project is ready for engineering design phase. In August 2018, Request for Qualification was released for qualified firms to provide design services along the 5th Street corridor per the Project Concept Report. Analysis:RFP’s were received on September 26, 2018 and were evaluated based on qualifications, project approach, and experience. The following firms submitted RFQs for evaluations: 1. Moreland Altobelli 2. Clark Patterson Lee 3. Lands Evans & Partners 4. W.R. Toole Engineers Inc. 5. Pond & Company 6. Goodwyn, Mills & Cawood 7. Cranston Engineering 8. Wood Cranston Engineering was selected based on the evaluation procedures used for this project. Financial Impact:Funds are available in the TIA project budget. Alternatives:1). Do not approve and find alternative to complete the project and meet TIA project completion schedule. Recommendation:Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Cranston Engineering in the amount of $428,182.13 for the 5th Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-283. Funds are Available in the Following Accounts: Project TIA Funds - 371-041110-5212115/T15041213 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission OFFICIAL VENDORS Attachment "B"E-Verify Addendum 1 SAVE Form Original 6 Copies Fee Proposal HUSSEY GAY BELL 1219 ASSEMBLY ST COLUMBIA, SC 29201 Yes 398475 Yes Yes Yes Yes Yes POND & COMPANY 621 NW FRONTAGE ROAD, STE 320 AUGUSTA, GA 30907 Yes 175046 Yes Yes Yes Yes Yes MORELAND ALTOBELLI 2450 COMMERCE AVENUE SUITE 100 DULUTH, GA 30096-8910 Yes 53328 Yes Yes Yes Yes Yes CLARK PATTERSON LEE 3011 SUTTON GATE DR. SUWANEE, GA 30024 Yes 209339 Yes Yes Yes Yes Yes LANDIS EVANS & PARTNERS 1954 AIRPORT ROAD, SE. 123 CHAMBLEE, GA 30341 Yes 622253 Yes Yes Yes Yes Yes W. R. TOOLE ENGINEERS INC 1005 BROAD STREET STE 200 AUGUSTA, GA 30901 Yes 62985 Yes Yes Yes Yes Yes GOODWYN, MILLS & CAWOOD 1450 GREENE ST, SUITE 505 AUGUSTA, GA 30901 Yes 425070 Yes Yes Yes Yes Yes Total Number Specifications Mailed Out: 25 Total Number Specifications Download (Demandstar): 9 Total Electronic Notifications (Demandstar): 107 Mandatory Pre-Qualifications Conference Attendees: 13 Total Number Mailed to Local Vendors: 13 Total packages submitted: 7 Total Noncompliant: 0 RFP 18-279 Design Services for 6th Street Improvement Project for Augusta, GA – Engineering Department RFP Due: Wednesday, September 26, 2018 @ 3:00 p.m. Page 1 of 1 18-279 Oficial TAB SHEET 18-279 Georgia Department of Transportation COST PROPOSAL SUMMARY Proj. No.:RCO7-001220 Project:6th Street from Taylro St to Reynolds St PI No.:0011421 County:Richmond Prime:Clark Patterson Lee Contract Type:Cost Plus Fixed Fee Date:26-Dec-2018 Fixed Fee %:10% Offeror:Clark Patterson Lee Master Contract: 350 Town Center Avenue Contract Expiration: Suite 201 Task Order No: Suwanee, Georgia 30024 Contact:B. Mark Hanson 678-318-1063 Project Manager mhanson@cplteam.com Contract Office:Office of Program Delivery Contract Action:Task Order Contract Type:Cost Plus Fixed Fee Contract Totals Maximum Allowable Cost 228,325.00$ Contract Cost (w/o Fixed Fee) 215,514.40$ Maximum Amount for Fixed Fee 12,810.60$ Provisional Overhead Rate 146.75% Fixed Fee Percentage 10% Minimum DBE Percentage 0% 12/26/2018 3:38 PM GDOT_MainCostProp_v7.1_6-27-16- CPL-Augusta 6th St-BMH.xlsx Cover Page 1 of 1 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB#371-041110-T15041220 to approve and award Preliminary and and Final Engineering Design Consultant Services Agreement to Clark Patterson Lee Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. TIA Design 228,350$ 228,350$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Hardie Davis, Mayor CAPITAL PROJECT BUDGET CPB#371-041110-T15041220 6th Street Improvements (RFP #18-279) in the amount of $228,325.00 for the 6th Street Improvements project requested by AED. RFP 18-279 Funding is available in the TIA project budget: 3/14/2019 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#371-041110-T15041220 6th Street Improvements (RFP #18-279) CPB AMOUNT New SOURCE OF FUNDS CPB CPB TIA Project 371-041110/5212115-T15041220 ($228,350)($228,350) TOTAL SOURCES: ($228,350)($228,350) USE OF FUNDS ENGINEERING 371-041110-5414210/T15041220 $228,350 $228,350 TOTAL USES: $228,350 $228,350 3/14/2019 Request for Proposal Request for Proposals will be received at this office until Wednesday, September 26, 2018 @ 3:00 p.m. for furnishing for the Augusta, Georgia - Engineering Department: RFP Item # 18-279 Design Services for 6th Street Improvements Project RFP Item # 18-283 Design Services for 5th Street Improvements Project RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 RFP documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime contractors, subcontractors and suppliers exclusively from Augusta Blue Print. The fees for the plans and specifications which are non-refundable for RFP Item # 18-279 are $50.00 and for RFP Item # 18-283 are $50.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.augustablue.com) at no charge through Augusta Blue Print (706-722-6488) beginning Thursday, August 16, 2018. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. A Mandatory Pre Proposal Conference for RFP 18-279 will be held on Friday, September 7, 2018, @ 10:00 a.m. in the Procurement Department, 535 Telfair Street, Room 605. A Mandatory Pre Proposal Conference for RFP 18-283 will be held on Friday, September 7, 2018, @ 11:00 a.m. in the Procurement Department, 535 Telfair Street, Room 605. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, September 11, 2018, @ 5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 60 days after bids have been opened, pending the execution of contract with the successful bidder(s). Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waivable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov GERI A. SAMS, Procurement Director Publish: Augusta Chronicle August 16, 23, 30, September 6, 2018 Metro Courier August 16, 2018 HUSSEY GAY BELL 1219 ASSEMBLY ST COLUMBIA, SC 29201 POND & COMPANY 621 NW FRONTAGE ROAD, STE 320 AUGUSTA, GA 30907 MORELAND ALTOBELLI 2450 COMMERCE AVENUE SUITE 100 DULUTH, GA 30096-8910 CLARK PATTERSON LEE 3011 SUTTON GATE DR. SUWANEE, GA 30024 LANDIS EVANS & PARTNERS 1954 AIRPORT ROAD, SE. 123 CHAMBLEE, GA 30341 W. R. TOOLE ENGINEERS INC 1005 BROAD STREET, S TE 200 AUGUSTA, GA 30901 GOODWYN, MILLS & CAWOOD 1450 GREENE ST. SUITE 505 Augusta, GA 30901 HUSSEY GAY BELL 1219 ASSEMBLY ST COLUMBIA, SC 29201 POND & COMPANY 621 NW FRONTAGE ROAD, STE 320 AUGUSTA, GA 30907 MORELAND ALTOBELLI 2450 COMMERCE AVENUE SUITE 100 DULUTH, GA 30096-8910 CLARK PATTERSON LEE 3011 SUTTON GATE DR. SUWANEE, GA 30024 LANDIS EVANS & PARTNERS 1954 AIRPORT ROAD, SE. 123 CHAMBLEE, GA 30341 W. R. TOOLE ENGINEERS INC 1005 BROAD STREET, S TE 200 AUGUSTA, GA 30901 GOODWYN, MILLS & CAWOOD 1450 GREENE ST. SUITE 505 Augusta, GA 30901 Evaluation Criteria Ranking Points 1. Completeness of Response • Package submitted by the deadline • Package is complete (includes requested information as required per this solicitation) • Attachment B is complete, signed and notarized N/A Pass/Fail PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS 2. Qualifications & Experience (0-5)20 4.8 4.0 3.5 4.8 3.3 3.3 4.8 96.0 80.0 69.3 96.0 66.7 66.7 96.7 3. Organization & Approach (0-5)15 4.9 3.7 3.5 4.8 3.3 4.0 5.0 74.0 55.0 52.0 72.0 50.0 60.0 75.0 4. Scope of Services - Ability to Provide Scope of Services - Project Deliverables - Cost Control and Budgeting Methodology (0-5)15 4.9 3.8 3.4 4.9 4.1 3.3 3.7 74.0 57.5 51.5 73.0 61.5 50.0 55.0 5. Schedule to Work (0-5)10 4.7 3.8 3.9 4.7 3.8 3.2 5.0 46.7 38.3 39.3 47.0 38.0 31.7 50.0 Within Richmond County 5 10 5 5 5 0 50 0 0 0 50 50 Within CSRA 5 6 0 0 0 0 0 0 0 Within Georgia 5 4 5 5 5 5 20 0 20 20 20 0 0 Within SE United States (includes AL, TN, NC, SC, FL) 5 2 0 0 0 0 0 0 0  All Others 5 1 0 0 0 0 0 0 0 7. References (0-5)5 4.0 2.3 3.7 4.0 3.3 3.6 4.0 4 20.0 11.7 18.3 20.0 16.7 18.0 20.0 28.3 22.7 23.0 28.2 22.9 22.4 27.5 330.7 292.5 250.5 328.0 252.8 276.3 346.7 8. Presentation by Team (0-5)10 3.3 0.0 0.0 5.0 0.0 0.0 2.5 32.5 0 0 50 0 0 25 19 Q&A Response to Panel Questions (0-5)5 3.0 0.0 0.0 5.0 0.0 0.0 2.5 15 0 0 25 0 0 12.5 Lowest Fees 5 10 5 0 0 0 50 0 0 0 Second 5 6 5 0 0 0 0 0 0 30 Third 5 4 5 20 0 0 0 0 0 0 Forth 5 2 0 0 0 0 0 0 0 Fifth 5 1 0 0 0 0 0 0 0 Total Phase 2 - (Total Maximum Ranking 15- Maximum Weighted Total Possible 125) 100 11.25 0 0 15 0 0 10 67.5 0 0 125 0 0 67.5 39.6 22.7 23.0 43.2 22.9 22.4 37.5 0 398.2 292.5 250.5 453.0 252.8 276.3 414.2 Vendors Phase 1 Total - (Total Maximum Ranking 30 - Maximum Weighted Total Possible 375) Phase 1 RFP Item #18-279 Design Services for 6th Street Improvement Project for Augusta, Engineering Department Evalaution Meeting Date: Friday, November 9, 2018 @ 3:00 p.m. Ranking of 0-5 (Enter a number value between 0 and 5) Scale 0 (Low) to 5 (High) Weighted Scores 5 Internal Use Only Evaluator: Cumulative Date: 12/20/18 Procurement DepartmentRepresentative:________________Nancy Williams____________________ Procurement Department Completion Date: 12/20/18 Total Cumulative Score (Maximum point is 500) 10. Cost/Fee Proposal Consideration (only choose 1 line according to dollar value of the proposal in relation to all fee proposals - enter the point value for the one line only) Total (Total Possible Score 500) Phase 2 (Option - Numbers 8-9) Engineering Services Committee Meeting 3/26/2019 1:10 PM 6th Street Improvements Project Design Services for Roadway Improvements Department:Engineering Presenter: Caption:Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Clark Patterson Lee in the amount of $228,325.00 for the 6th Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-279. Background:The 6th Street Improvements is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in July 31, 2012 referendum. The 6th Street Improvements Project is a Band 2 project. The project improvements consist of improving roadway safety by resurfacing, reconstructing the existing curb and gutter, replacing sidewalks and improving the storm water system. The project will improve pedestrian safety at intersections with new high visibility crosswalks and organize the existing parallel parking. New street landscaping will be provided, where possible, to enhance pedestrian use and improvement of roadway aesthetics. In September 2015, commission approved award of the Augusta Downtown Concept development project to Cooper Carry. Cooper Carry task is completed and the project is ready for engineering design phase. In August 2018, Request for Qualification was released for qualified firms to provide design services along the 6th Street corridor per the Project Concept Report. Analysis:RFP’s were received on September 26, 2018 and were evaluated based on qualifications, project approach, and experience. The following firms submitted RFQs for evaluations: 1. Moreland Altobelli 2. Clark Patterson Lee 3. Hussey Gay Bell 4. W.R. Toole Engineers Inc. 5. Pond & Company 6. Goodwyn, Mills & Cawood 7. Landis Evans & Partners Clark Patterson Lee was selected based on the evaluation procedures used for this project. Financial Impact:Funds are available in the TIA project budget. Alternatives:1). Do not approve and find alternative to complete the project and meet TIA project completion schedule. Recommendation:Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Clark Patterson Lee in the amount of $228,325.00 for the 6th Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-279. Funds are Available in the Following Accounts: Project TIA Funds 371-041110-T15041220-5212115 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Sec. 4-2-2. Unlawful dumping or storing of solid waste, or the accumulation of weeds and noxious vegetation on vacant lots, and unoccupied parcels of land. (a) Prohibition. No owner of any vacant lot, undeveloped lot or unoccupied parcel of land within Augusta shall permit or allow the existence of excessive accumulation or untended growth of weeds, undergrowth or other plant life grow to a height exceeding twelve (12) inches; or stagnant water, rubbish, garbage, refuse, debris, trash, including but not limited to household furnishings, and all other objectionable, unsightly or unsanitary matter upon any lot, tract or parcel of land, or on the area between the lot or parcel of land and the street curb, be it uncovered or under open shelter, to the extent and in the manner that such lot, tract or parcel of land is or may reasonably become infested or inhabited by rodents, vermin or wild animals, or may furnish a breeding place for mosquitoes, or threatens, or endangers the public health, safety, or welfare, or may reasonably cause disease, or adversely affects and impairs the economic welfare of adjacent property. (b) Definitions. · Construction/Demolition Waste means building materials and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures. Such waste include, but are not limited to asbestos containing waste, wood, bricks, metal, concrete, wall board, paper, cardboard, and other non-putrescible wastes which have a low potential for groundwater contamination. · Lot/Parcel means any lot of record identified with a map and parcel number assigned by the Tax Assessor's Office. · Scrap Tire means a tire or portion thereof. · Tire means a continuous solid or pneumatic rubber covering designed for encircling the wheel of a motor vehicle and which is neither attached to the motor vehicle nor a part of the motor vehicle as original equipment. · Undeveloped Lot means a lot in its natural state, i.e.: a lot in a residential neighborhood that has not been built upon. · Unoccupied Parcel means a lot which has a structure/dwelling which is not occupied. · Vacant Lot means a previously developed Lot, once occupied with a structure/dwelling. (c) Duty of Property Owners Generally. It shall be the duty of the owner of each Vacant Lot or Unoccupied Parcel of land to reasonably regulate and effectively control excessive growths and accumulations, as enumerated in Section 4-2-2 (a), on the property and the street. It shall also be the duty of the owner to drain, re- grade or fill any lot, tract, or parcel, including swimming pools thereon, which shall be unwholesome or unsanitary, have stagnant water thereon, or be in such other condition as to be susceptible to producing disease. (d) Notice Augusta shall notify in writing the owner of any Vacant Lot or Unoccupied Parcel of land within Augusta to comply with Section 4-2-2(a) to include but not be limited to cutting, destroying or removing any weeds, grass, trash, rubbish or noxious matter found growing, lying or located on such owner's property or upon the sidewalk or street right-of-way abutting the property within fourteen calendar (14) days from the date the notice is mailed. Notice will include a one direct mailing to the property owner's address on records. This notice requirement will not apply for property owned by Augusta, Georgia or the Augusta Georgia Land Bank. Upon the failure or the owner to do so, Augusta will cause such weeds, grass, rubbish, or noxious matter to be cut, destroyed and/or removed. Such notice shall be deemed to be sufficient if it is mailed to the last owner of record on file in the office of the property appraiser. (e) Removal of Weeds, etc. by Augusta If after fourteen calendar (14) days from the date of the notice the conditions, as enumerated in Section 4 - 2 - 2 (a) and described in the notice, have not been remedied, the Director of Environmental Services or his designee shall cause the condition to be remedied by Augusta at the expense of the property owner; to include the removal of trash, filth, garbage or other refuse, and the chemical treatment, cutting down and abating from any private premises all weeds, including those growing thereon to a height exceeding twelve 12) inches whenever the owner of such premises or other person who is required by this chapter to cut down and remove the same fails or refuses to do so. (f) Cutting and Cleaning of Lots; Assessment of Costs; Liens Upon the completion of any combination of the removal, chemical treatment, cutting down, cleaning or abating by Augusta of any lot or parcel of land within Augusta by removing or abating therefrom; the excessive accumulation or untended growth of weeds, undergrowth or other plant life growing to a height exceeding twelve (12) inches; or stagnant water, rubbish, garbage, refuse, debris, trash, including but not limited to, household, furnishings, scrap tires, construction/demolition waste, and all other objectionable, unsightly or unsanitary matter, the Director of Environmental Services or his designee shall certify the abatement of the offensive matter described above, specifying the lot or parcel so improved and the nature of the improvements. Thereafter, the improvements and the costs thereof, shall be assessed and appropriate action as necessary shall be taken to charge and collect monies for services provided by Augusta to abate the issue. (g) Enforcement The code enforcement division of the Environmental Services Department as well as the License and Inspection Department is hereby authorized and directed to carry out the provisions of sections 4-2-2 hereof, as may be deemed reasonably by the Director of the department. (h) Violation: Penalty In addition to causing the condition of the property to be remedied as authorized in subsection (f), the enforcement officer may make a case against the offending party and upon trial and conviction thereof, the offending party shall be subject to the penalties provided in section 1- 6-1. Sec. 4-2-3. Dumping of garbage and refuse collected outside county at county landfill. (a) Prohibited. It shall be unlawful for any person to dump garbage and refuse at the Augusta Richmond County landfill, owned and operated by Augusta-Richmond County, Georgia, when said garbage or refuse was not collected in Richmond County, Georgia, except pursuant to written contract or prior approval by the Augusta-Richmond County Administrator. (b) Penalty for violation of section. Any person who shall violate this section shall be charged with each and every violation, and upon trial and conviction, shall be subject to the penalties provided in Sec. 1-6-1. Sec. 4-2-4. Trespassing, scavenging on landfill prohibited. (a) No person shall knowingly and without authority enter upon the land or premises, now or in the future, designed as an Augusta-Richmond County landfill site without the express permission of the director of the landfill or his delegate; nor shall any person knowingly and without authority remain upon the land or premises, now or in the future, designed as a landfill site, after the permission of the director of the landfill or his delegate has been withdrawn. (b) No person shall knowingly and without authority remove any materials from the land or premises now or in the future designed as a landfill site, including but not limited to material constituting residential and commercial solid waste, trash, tin cans, glass bottles, garbage, rubbish, discarded materials, sand, gravel, slag, or other refuse. (c) Any person or persons failing to comply with the lawful provisions of this section or any act prohibited hereby or failing to do any act mandated hereby shall be guilty of an offense and upon trial as a misdemeanor and conviction, shall be subject to the penalties provided in Sec. 1-6-1. Sec. 4-2-5. Refuse acceptable for disposal at solid waste landfill. (a) The following refuse shall be considered to be acceptable for disposal by the county: (1) Garbage. Putrescible animal and vegetable wastes resulting from the handling, preparation, cooking and/or consumption of foods. (2) Ashes. The residue from the burning of wood, coal, coke or other materials. (3) Rubbish. Non-putrescible solid wastes excluding ashes, consisting of paper, cardboard, tin cans, yard clippings, wood, glass, bedding, crockery, metals and any tree trunks, limbs or other wood products, provided that any such items larger than four (4) inches in diameter, shall be cut into four-foot lengths. (4) Dead animals. Small dead animals, not exceeding seventy-five (75) pounds in weight, which die in the normal course of community activity, excluding condemned animals, shall be accepted at the disposal site upon request. (b) The following refuse shall be considered to be unacceptable for disposal by the county: (1) Dangerous materials or substances, such as poisons, acids, caustics, infected materials and explosives. (2) Unusual quantities of materials resulting from the repair, excavation or construction of buildings or structures, such as earth, plaster, mortar and roofing materials. (3) The solid wastes resulting from industrial processes. (4) Solid waste that has been burned and has any evidence of smoke, spark or fire remaining. (5) Sealed drums. Each drum must have an open top for inspection. No drum for liquid storage will be accepted for disposal. (c) A separate area shall be provided at the landfill for the disposal of stumps, logs, other building materials, and tires that cannot be deposited in the regular landfill site. (d) All industrial, governmental and commercial waste haulers shall place a decal furnished by Augusta-Richmond County on their vehicle that denotes the cubic yard capacity being hauled into the landfill. (e) The fees for the disposal of refuse shall be fixed from time to time by the Augusta-Richmond County Commission and kept on file in the office of the county administrator and shall be published at the landfill site. Sec. 4-2-6. Fees for use of Augusta-Richmond County solid waste landfill. (a) Fees. The following fees shall be charged for the use of the Augusta-Richmond County solid waste landfill. Other fees for specific projects or for specific customers may be approved in writing by the Administrator. Asbestos . . . . . . . . . . . . . . $ 20.00 per cubic yard Inert waste disposal . . . . . 16.75 per ton Metal . . . . . . . . . . . . . . . . 0.00 per ton Mulch purchase (small pickup truck) . . . . . . . . . . . . . . . . 5.00 per load Mulch purchase (large pickup truck) . . . . . . . . . . . . . . . . . 10.00 per load Mulch purchase (commercial). 15.00 per ton Non-profit organizations waste disposal (with administrator's approval) . . 23.50 per ton Non-tarped loads/private ve- hicle . . . . . . . . . . . . . . . . . . . 25.00 each occurrence Non-tarped loads/commercial vehicle. . . . . . . . . . . . . . . . . 75.00 each occurrence Residential disposal (three bags or less) . . . . . . . . . . . . 0.00 Residential disposal (four bags to six bags) . . . . . . . . . . . . . 3.00 per load Minimum charge – non- Commercial (total weight of Vehicle and load under 6000lbs) 6.00 per load Solid waste (municipal solid waste, construction and demolition, special waste) disposal . . . . . . . . . . . . . . . 33.50 per ton Solid waste (2,000—4,999 tons per month) disposal . . 30.50 per ton Solid waste (5,000—9,999 tons per month) disposal . . 27.50 per ton Solid waste (10,000 or greater tons per month) disposal . . . . . . . . . . . . . . . 24.50 per ton Solid waste with beneficial use—Such materials as are usable at the landfill for daily cover and other uses and shall include, but not be limited to brick slag and other usable materials. . . . . . . . . . . . . . . 10.00 per ton Construction & demolition…….. 26.00 per ton Recyclables (commercial)……. 25.00 per ton The director of the landfill or his designee reserves the right to determine what is "usable", to limit the quantity of "usable" materials received by the landfill for any given period of time, and to receive only so much "usable" materials as are consumable by the landfill in the sole discretion of the director. Tires (17 inch or smaller). . . $ 3.00 each Tires (larger than 17 inch) . . 8.00 each Tires (truckload) . . . . . . . . . . 180.00 per ton Vehicle permit sticker . . . . . 100.00 per calendar year (b) Fee increases. Fees for each item listed above may from time to time be increased at the discretion of the administrator. The increase allocated for any calendar year shall not exceed one dollar ($1.00) for any item listed above. Should a full one dollar ($1.00) increase not be exercised the allocation of a portion equaling up to one dollar ($1.00) from that year within the unused allocation may carry forward and be used in the following year not to exceed two dollars ($2.00), and so on up to a maximum of three (3) years. At no time shall the increase at the administrator's discretion exceed three dollars ($3.00) for any item listed above. (c) Fee decrease. Fees for each item listed above may from time to time be decreased at the discretion of the administrator. The decrease allocated for any calendar year shall not exceed one dollars ($1.00) for any item listed above. Should a full one dollar ($1.00) decrease not be exercised the allocation of a portion equaling up to one dollar ($1.00) from the year within the unused allocation may carry forward and be used in the following year not to exceed two dollars ($2.00) and so on up to a maximum of three (3) years. At no time shall the decrease at the administrator's discretion exceed three dollars ($3.00) for any item listed above. (Ord. No. 6238, § 1, 1-4-00; Ord. No. 6778, § 2, 8-1-04; Ord. No. 6793, § 2, 5-17-05) Engineering Services Committee Meeting 3/26/2019 1:10 PM Approve the Changes to Section 4-2-6 - Fees, and Waive the Second Reading Department:Environmental Services Presenter: Caption:Motion to approve amending Section 4-2-6 of the Augusta Code - Fees for Environmental Services Department Landfill Fees and Waive the Second Reading. (Referred from March 19 Commission Meeting) Background:In November 2018, ESD requested approval to draft a revision to Section 4-2-6 of the Augusta Code. This section covers fees for use of the Landfill. At this time, ESD is bringing the revised Section back to the Committee and Commission for approval; and requesting that the second reading be waived. The fees to use the Landfill are set and have not been updated in approximately 12 years. The current rates have been reviewed and are competitive, however in order to remain in good financial status, to work to attract additional customers, and to reflect current and future operations, minor updates are requested at this time. Analysis:The following changes are requested at this time: 1. offer a separate rate for clean construction and demolition waste at $26/ton. 2. add a rate for commercial quantities of recyclables at $25/ton. 3. add a minimum charge for non-commercial customers at $6. Change the 4-6 bag fee from $2 to $3. 4. Allow the Administrator the authority to approve a negotiated rate per customer or per specific job. Augusta's landfill has not operated with a separate rate for construction and demolition waste, however, with other C&D landfills in the area, it is recommended that Augusta offer a market-competitive rate for C&D materials. Other landfills in the area offer C&D disposal between $24.50 and $31.50, but they also offer a more detailed rate structure (per size of truckload, or per mattress, for example). Secondly, recyclables are currently accepted for no charge, however this was intended for residential customers only. With more neighboring communities wanting to recycle, Augusta is requesting to set a rate to accept larger quantities of recyclables. Finally, allowing the Administrator the authority to approve a negotiated rate for special projects, usually larger projects, to encourage the use of the Augusta landfill, is also being requested at this time. This is a common practice at private facilities, and again, will keep our landfill competitive in the area. Financial Impact:There is no financial impact at this time; however it is anticipated that the proposed rate adjustments will attract more customers to the facility. Alternatives:1. do not approve, and allow the rates to remain as-is. 2. propose additional changes in addition to those proposed herein. Recommendation:Approve the recommended changes. Funds are Available in the Following Accounts: No funds are needed at this time. REVIEWED AND APPROVED BY: Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB#371-041110-T15040107 to approve and award Preliminary and and Final Engineering Design Consultant Services Agreement to Hussey Gay Bell (HGB) Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. TIA Design 2,078,800$ 2,078,800$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Hardie Davis, Mayor CAPITAL PROJECT BUDGET CPB#371-041110-T15040107 Broad Street Improvements (RFP #18-311) in the amount of $2,078,797.19 for the Broad Street Improvements project requested by AED. RFP 18-311. Funding is available in the TIA project budget: 3/15/2019 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#371-041110-T15040107 Broad Street Improvements (RFP #18-311) CPB AMOUNT New SOURCE OF FUNDS CPB CPB TIA Project 371-041110/5212115-T15040107 ($2,078,800)($2,078,800) TOTAL SOURCES:($2,078,800)($2,078,800) USE OF FUNDS ENGINEERING 371-041110-5414210/T15040107 $2,078,800 $2,078,800 TOTAL USES:$2,078,800 $2,078,800 3/15/2019 OFFICIAL VENDORS Attachment "B"E-Verify SAVE Form Original 6 Copies Fee Proposal MEAD & HUNT 878 S LAKE DR. LEXINGTON, SC 29072 Yes 244747 Yes Yes Yes Yes POND & COMPANY 621 NW FRONTAGE RD., SUITE 320 AUGUSTA, GA 30907 Yes 175046 Yes Yes Yes Yes HUSSEY GAY BELL 2160 SATELLITE BLVD., SUITE 250 DULUTH, GA 30097 Yes 398475 Yes Yes Yes Yes GRIFFIN & DAVIS 5425 PEACHTREE PKWY PEACHTREE CORNERS, GA 30092 WOOD 1075 BIG SHANTY RD., SUITE 100 KENNESAW, GA 30144 BENESH 1005 BROAD STREET STE 200 AUGUSTA, GA 30901 GOODWYN, MILLS & CAWOOD 1450 GREENE ST, SUITE 505 AUGUSTA, GA 30901 EMC ENGINEERING 10 CHATHAM CIR S SAVANNAH, GA 31405 CRANSTON ENGINEERING 452 ELLIS STREET AUGUSTA, GA 30903-2546 Total Number Specifications Mailed Out: 25 Total Number Specifications Download (Demandstar): Total Electronic Notifications (Demandstar): Mandatory Pre-Qualifications Conference Attendees: 13 Total packages submitted: 3 Total Noncompliant: 0 RFP Item 18-311 Design Services for Broad Street Improvements Project – Milledge Road (West Terminus) to E Boundary (East Terminus) for Augusta, GA – Engineering Department RFP Due: Thursday, November 29, 2018 @ 11:00 a.m. Page 1 of 1 $110,550.00 $23,500.00 $1,140,474.84 $24,962.58 $779,309.77 2,078,797.19 Request for Proposal Request for Proposals will be received at this office until Thursday, November 29, 2018 @ 11:00 a.m. for furnishing for the Augusta, Georgia - Engineering Department: RFP Item # 18-311 Design Services for Broad Street Improvements Project – Milledge Road (West Terminus to E Boundary (East Terminus) RFP Item # 18-312 Design Services for Green Street Improvements Project – 13th Street (West Terminus) to E Boundary Street (West Terminus) RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 RFP documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime contractors, subcontractors and suppliers exclusively from Augusta Blue Print. The fees for the plans and specifications which are non-refundable for RFP Item # 18-311 are $199.00 and for RFP Item # 18-312 are $107.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.augustablue.com) at no charge through Augusta Blue Print (706-722-6488) beginning Thursday, October 18, 2018. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. A Mandatory Pre Proposal Conference for RFP 18-311 will be held on Tuesday, November 13, 2018 @ 10:00 a.m. in the Procurement Department, 535 Telfair Street, Room 605. A Mandatory Pre Proposal Conference for RFP 18-312 will be held on Tuesday, November 13, 2018, @ 11:00 a.m. in the Procurement Department, 535 Telfair Street, Room 605. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Thursday, November 15, 2018, @ 5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 60 days after bids have been opened, pending the execution of contract with the successful bidder(s). Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waivable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov GERI A. SAMS, Procurement Director Publish: Augusta Chronicle October 18, 25 November 1, 8, 2018 Metro Courier October 18, 2018 MEAD & HUNT 878 S LAKE DR. LEXINGTON, SC 290727 POND & COMPANY 621 NW FRONTAGE RD., SUITE 320 AUGUSTA, GA 30907 HUSSEY GAY BELL 2160 SATELLITE BLVD., SUITE 250 DULUTH, GA 30097 MEAD & HUNT 878 S LAKE DR. LEXINGTON, SC 290727 POND & COMPANY 621 NW FRONTAGE RD., SUITE 320 AUGUSTA, GA 30907 HUSSEY GAY BELL 2160 SATELLITE BLVD., SUITE 250 DULUTH, GA 30097 Evaluation Criteria Ranking Points 1. Completeness of Response • Package submitted by the deadline • Package is complete (includes requested information as required per this solicitation) • Attachment B is complete, signed and notarized N/A Pass/Fail PASS PASS PASS PASS PASS PASS 2. Qualifications & Experience (0-5)20 4.0 4.0 5.0 80.0 80.0 100.0 3. Organization & Approach (0-5)15 4.3 4.0 5.0 65.0 60.0 75.0 4. Scope of Services - Ability to Provide Scope of Services - Project Deliverables - Cost Control and Budgeting Methodology (0-5)15 3.7 3.8 5.0 55.0 57.5 75.0 5. Schedule to Work (0-5)10 0.0 3.0 5.0 0.0 30.0 50.0 Within Richmond County 5 10 5 0 50 0 Within CSRA 5 6 0 0 0 Within Georgia 5 4 5 0 0 20 Within SE United States (includes AL, TN, NC, SC, FL) 5 2 5 10 0 0  All Others 5 1 0 0 0 7. References (0-5)5 4.7 5.0 5.0 23.3 25.0 25.0 21.7 24.8 30.0 233.3 302.5 345.0 8. Presentation by Team (0-5)10 0 0 0 9 Q&A Response to Panel Questions (0-5)5 0 0 0 Lowest Fees 5 10 5 0 50 0 Second 5 6 5 0 0 30 Third 5 4 5 20 0 0 Forth 5 2 0 0 0 Fifth 5 1 0 0 0 Total Phase 2 - (Total Maximum Ranking 15- Maximum Weighted Total Possible 125) 100 5 5 5 20 50 30 26.7 29.8 35.0 #253.3 352.5 375.0 Vendors Phase 1 Total - (Total Maximum Ranking 25 - Maximum Weighted Total Possible 375) Phase 1 RFP Item #18-311 Design Services for Broad Street Improvement Project for Augusta, Engineering Department Evalaution Meeting Date: Monday, January 3, 2019 @ 3:00 p.m. Ranking of 0-5 (Enter a number value between 0 and 5) Scale 0 (Low) to 5 (High) Weighted Scores 6. Proximity to Area (only choose 1 line according to location of the company - enter the ranking value for the one line only) Internal Use Only Evaluator: Cumulative Date: 1/3/2019 Procurement DepartmentRepresentative:_______Nancy Williams_____________________________________ Procurement Department Completion Date: 1/3/2019 Total Cumulative Score (Maximum point is 500) 10. Cost/Fee Proposal Consideration (only choose 1 line according to dollar value of the proposal in relation to all fee proposals - enter the point value for the one line only) Total (Total Possible Score 500) Phase 2 (Option - Numbers 8-9) Engineering Services Committee Meeting 3/26/2019 1:10 PM Broad Street Improvements Project Design Services for Roadway Improvements Department:Engineering Presenter: Caption:Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Hussey Gay Bell (HGB) in the amount of $2,078,797.19 for the Broad Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-311. Background:The Broad Street Improvements is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in July 31, 2012 referendum. The Broad Street is a Band 2 project. The project improvements consist of improving roadway safety by resurfacing, reconstructing the existing curb and gutter, replacing sidewalks and improving the storm water system. The project will improve pedestrian safety at intersections with new high visibility crosswalks. New street landscaping will be provided, where possible, to enhance pedestrian use and improvement of roadway aesthetics. In September 2015, commission approved award of the Augusta Downtown Concept development project to Cooper Carry. Cooper Carry task is completed and project is ready for the engineering design phase. In October 2018, Request for Qualification was released for qualified firms to provide design services along the Broad street corridor per the Project Concept Report. Analysis:RFP’s were received on November 29, 2018 and were evaluated based on qualifications, project approach, and experience. The following firms submitted RFQs for evaluations: 1. Mead & HUNT 2. Hussey Gay Bell 3. Pond & Company Hussy Gay Bell was selected based on the evaluation procedures used for this project. Financial Impact:Funds are available in the TIA project budget. Alternatives:1). Do not approve and find alternative to complete the project and meet TIA project completion schedule. Recommendation:Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Hussey Gay Bell (HGB) in the amount of $2,078,797.19 for the Broad Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-311 Funds are Available in the Following Accounts: Project TIA Funds 371-041110-5212115-T15040107 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Engineering Services Committee Meeting Commission Chamber - 3ll2l20L9 ATTENDANCE: Present: Hons. M. Williams, Chairman; Hasan, Vice Chairman; Garrett and Frantom, members. ENGINEERING SERVICES 1. Approve the Amendment to the Landfill Gas Sales Agreement with Covia Item Holdings Corporation. Action: Approved Motions Motion Type Approve 4-0. 2. Approve the Changes to Section 4-2-6 - Fees, and Waive the Second Reading. Item Action: Approved Motions Motion Type Approve Made By Seconded By Motion Text Made By Seconded By Motion toapprove. Commissioner Commissioner Motion Passes Ben Hasan Brandon Garrett Motion Result Passes Motion ResultMotion Text Motion to approve. Motion Passes 4-0. Commissioner Commissioner Ben Hasan Brandon Garrett Passes 3. Approve the Environmental Services Department - Augusta Landfill to Offer Reduced Rate Disposal Day. Motions Item Action: Approved Motion Motion Text Made By seconded By MotionTYPe Result Motion to Approve ix3ffiu,,., ;:rffi:;f*' ;:#ffi'8#:.. passes 4-0. 4. Approve the Landfill Disposal Agreement with Inland Waste Solutions and Item approve the execution of the Agreement by the Mayor. Action: Approved Motions X:11"' Motion Text Made By seconded By MotionrYPe - ------ -'t Result Motion to Approve ffi5ffiu,*, ;:ffi;::f*' ;:#illx'ffi:- Passes 4_0. 5. Receive update regarding Bussey Road Right-of -Way Acquisition. Item Action: Approved Motions Y:-tl"' Motion Text Made By seconded By Motion'f'ype ---- -" --------- -J Result Motion to approve A .._-^--^ receiving this item as Commisioner CommissionerApprove information. sean Frantom Brandon Garrett Passes Motion Passes 4-0. 6. Approve execution of Contract Item Utility Agreement to include Augusta Item Utilities Department's water and sanitary sewer relocations in the Georgia Action: Department of Transportation contract, through competitive bidding, for Approved GDOT Project PI 220680 SR4/l5th Street Widening - Milledgeville to Government Road. Motions Motion rf,^+:^- ,T,^-.. f,r^r- D__ d r r h Motion;_:_"^"" Motion Text Made By Seconded Bylype r ---------- -.1 Result Approve Motion to Commissioner Commisioner Sean Passesapprove. Ben Hasan Frantom Motion Passes 4-0. 7. Motion to approve the minutes of the Engineering Services Committee held Item on February 26,2019. Action: Approved Motions Motion Type Approve 4-0. 8. Designation of private parking on public parking facilities. (Requested by ltem Commissioner Marion Williams) Action: Approved Motion Text Made By Seconded By Motion to approve. Commisioner Commissioner Motion Passes Sean Frantom Brandon Garrett Motion Result Passes Motion Result Motion to approve a _.._^--^ receiving this item as Commissioner CommisionerApprove information. Brandon Garrett Sean Frantom Passes Motion Passes 4-0. 9. Update from the Environmental Services Department regarding Recycling and Item the status of the Allied Energy Waste Reclamation Facility Development. Action: Approved Motions f#:"' Motion rext Motions f#:"' Motion rext Made By Seconded By Made By Seconded By Motion Result Motion to approve ^ receiving this item as Commisioner CommissionerApprove information. sean Frantom Brandon Garrett Passes Motion Passes 4-0. 10. Approve Budget Increase of $1,000,000 for the Sanitary Sewer Connection Program - RFQ 16-205 awarded to Southern Services and Universal Plumbing. Motions Item Action: Approved Motion Motion Text Made By Type Motion to. aDDrove.APProve vtotion passes 4-0. Motions Motion;- ---- Motion Textrype Motion to approve receiving this item as Approve information.Mr. Hasan out. Motion Passes 3-0. Commisioner Commissioner Sean Frantom Brandon Garrett Passes Seconded By Motion Result 11. Discuss the railroad crossing at 6th Street. (Requested by Commissioner Item Marion Williams - referred from March 5 Commission meeting) Action: Approved Motions Motion - ----- Motion Textr ype Motion to approve tasking the Made By Administrator with setting up a meeting ^ with Norfolk southern commisioner commissioner Approve Railroad and bring a Sean Frantor Brandon Passes report back to the Dean rraruom Garrett Commission in 30 days. Mr. Hasan out. Motion Passes 3-0. 12. Update from the Engineering Department staff regarding Kratha Drive's ltem sidewalks in front of Wilkinson Gardens Elementary School. (No Action: recommendation from Engineering Services Committee February 26, ApproveC 2019 - referred from March 5 Commission meeting) Made By Commisioner Sean Frantom seconded By Htjil seconded By fffil Commissioner Brandon Garrett Passes www.auqustaga.qov Engineering Services Committee Meeting 3/26/2019 1:10 PM Minutes Department: Presenter: Caption:Motion to approve the minutes of the Engineering Services Committee held on March 12, 2019. Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: OFFICIAL VENDORS Attachment "B"E-Verify SAVE Form Addendum 1 Fee Proposal Original 6 Copies MORELAND ALTOBELLI 2450 COMMERCE AVENUE SUITE 100 DULUTH, GA 30096-8910 Yes 53328 Yes Yes Yes Yes Yes WOLVERTON & ASSOCIATES 6745 SUGARLOAF PARKWAY SUITE 100 DULUTH, GA 30097 Yes 110645 Yes Yes Yes Yes Yes HUSSEY GAY BELL 1219 ASSEMBLY STREET COLUMBIA, SC 29201 Yes 398475 Yes Yes Yes Yes Yes W. R. TOOLE ENGINEERS INC 1005 BROAD STREET, STE 200 AUGUSTA, GA 30901 Yes 62985 Yes Yes Yes Yes Yes POND & COMPANY 621 NW FRONTAGE ROAD, STE 320 AUGUSTA, GA 30907 Yes 175046 Yes Yes Yes Yes Yes GOODWYN, MILLS & CAWOOD 6120 POWERS FERRY RD NW SUITE 350 ATLANTA, GA 30339 Yes 425070 Yes Yes Yes Yes Yes INFRASTRUCTURE SYSTEMS MGT 1557 BROAD ST AUGUSTA, GA 30901 WOOD 1075 BIG SHANTY RD SUITE 100 KENNESAW, GA 30144 RFP Item #18-258 13th Street Improvement Project R.A. Dent Boulevard (South Terminus) to Reynolds Street (North Terminus) for Augusta, Engineering Department RFP Date: Tuesday, August 21, 2018 @ 3:00 p.m. Total Number Specifications Mailed Out: 25 Total Number Specifications Download (Demandstar): 208 Total Electronic Notifications (Demandstar): 1 Total Number Specifications Mailed Out to Local Vendor: 12 Mandatory Pre-Bid Conference Attendees: 17 Total packages submitted: 6 Total Noncompliant: 0 Page 1 of 1 18-258 TAB OFFICIAL Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB#371-041110-T15041223 to approve and award Preliminary and and Final Engineering Design Consultant Services Agreement to Goodwyne, Mills & Cawood (GMC) Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. TIA Design 280,000$ 280,000$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Hardie Davis, Mayor CAPITAL PROJECT BUDGET CPB#371-041110-T15041223 13th Street Improvements (RFP #18-258) in the amount of $279,000.88 for the 13th Street Improvements project requested by AED. RFP 18-258. Funding is available in the TIA project budget: 3/15/2019 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#371-041110-T15041223 13th Street Improvements (RFP #18-258) CPB AMOUNT New SOURCE OF FUNDS CPB CPB TIA Project 371-041110/5212115-T15041223 ($280,000)($280,000) TOTAL SOURCES: ($280,000)($280,000) USE OF FUNDS ENGINEERING 371-041110-5414210/T15041223 $280,000 $280,000 TOTAL USES: $280,000 $280,000 3/15/2019 Request for Proposal Request for Proposals will be received at this office until Tuesday, August 21, 2018 @ 3:00 p.m. for furnishing: RFP Item # 18-258 13th Street Improvement Project For Augusta, GA – Augusta Engineering Department RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 RFP documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime contractors, subcontractors and suppliers exclusively from ARC. The fees for the plans and specifications which are non- refundable are $75.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.e-arc.com) at no charge through ARC Southern (706 821-0405) beginning Thursday, July 12, 2018. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. Bidders are cautioned that acquisition of documents through any other source is not advisable. Acquisition of documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. A Mandatory Pre Proposal Conference will be held on Friday, August 3, 2018, @ 10:00 a.m. in the Procurement Department, 535 Telfair Street, Room 605. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Tuesday, August 7, 2018, @ 5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 60 days after bids have been opened, pending the execution of contract with the successful bidder(s). Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waivable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov GERI A. SAMS, Procurement Director Publish: Augusta Chronicle July 12, 19, 26, August 2, 2018 Metro Courier July 12, 2018 MORELAND ALTOBELLI 2450 COMMERCE AVENUE SUITE 100 DULUTH, GA 30096-8910 WOLVERTON & ASSOCIATES 6745 SUGARLOAF PARKWAY SUITE 100 DULUTH, GA 30097 HUSSEY GAY BELL 1219 ASSEMBLY STREET COLUMBIA, SC 29201 W. R. TOOLE ENGINEERS INC 1005 BROAD STREET, STE 200 AUGUSTA, GA 30901 POND & COMPANY 621 NW FRONTAGE ROAD, STE 320 AUGUSTA, GA 30907 GOODWYN, MILLS & CAWOOD 6120 POWERS FERRY RD NW SUITE 350 ATLANTA, GA 30339 MORELAND ALTOBELLI 2450 COMMERCE AVENUE SUITE 100 DULUTH, GA 30096-8910 WOLVERTON & ASSOCIATES 6745 SUGARLOAF PARKWAY SUITE 100 DULUTH, GA 30097 HUSSEY GAY BELL 1219 ASSEMBLY STREET COLUMBIA, SC 29201 W. R. TOOLE ENGINEERS INC 1005 BROAD STREET, STE 200 AUGUSTA, GA 30901 POND & COMPANY 621 NW FRONTAGE ROAD, STE 320 AUGUSTA, GA 30907 GOODWYN, MILLS & CAWOOD 6120 POWERS FERRY RD NW SUITE 350 ATLANTA, GA 30339 Evaluation Criteria Ranking Points 1. Completeness of Response • Package submitted by the deadline • Package is complete (includes requested information as required per this solicitation) • Attachment B is complete, signed and notarized N/A Pass/Fail PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS 2. Qualifications & Experience (0-5)20 3.9 4.1 4.3 3.6 4.3 4.9 77.3 82.0 86.7 72.7 86.7 98.7 3. Organization & Approach (0-5)15 3.9 3.9 3.5 3.3 3.7 5.0 58.0 59.0 52.5 49.0 55.0 75.0 4. Scope of Services - Ability to Provide Scope of Services - Project Deliverables - Cost Control and Budgeting Methodology (0-5)15 3.5 3.8 4.0 3.7 4.0 5.0 52.0 56.5 60.0 55.0 60.0 75.0 5. Schedule to Work (0-5)10 4.9 4.8 4.8 1.6 5.0 5.0 49.3 48.0 48.3 16.0 50.0 50.0 Within Richmond County 5 10 5 5 5 0.0 0.0 0.0 50.0 50.0 50.0 Within CSRA 5 6 0.0 0.0 0.0 0.0 0.0 0.0 Within Georgia 5 4 5 5 5 20.0 20.0 20.0 0.0 0.0 0.0 Within SE United States (includes AL, TN, NC, SC, FL) 5 2 0.0 0.0 0.0 0.0 0.0 0.0  All Others 5 1 0.0 0.0 0.0 0.0 0.0 0.0 7. References (0-5)5 4.7 4.7 4.7 4.7 4.9 4.9 23.3 23.3 23.7 23.5 24.3 24.7 25.8 26.3 26.4 21.9 26.9 29.9 280.0 288.8 291.2 266.2 326.0 373.3 8. Presentation by Team (0-5)10 0 0 0 0 0 0 19 Q&A Response to Panel Questions (0-5)5 0 0 0 0 0 0 Lowest Fees 5 10 5 0 0 0 0 50 0 Second 5 6 5 0 0 0 0 0 30 Third 5 4 5 0 0 0 20 0 0 Forth 5 2 5 10 0 0 0 0 0 Fifth 5 1 5 0 5 0 0 0 0 Total Phase 2 - (Total Maximum Ranking 15- Maximum Weighted Total Possible 125) 5 5 0 5 5 5 10 5 0 20 50 30 30.8 31.3 26.4 26.9 31.9 34.9 0 290 293.8 291.2 286.2 376.0 403.3Total Cumulative Score (Maximum point is 500) 10. Cost/Fee Proposal Consideration (only choose 1 line according to dollar value of the proposal in relation to all fee proposals - enter the point value for the one line only) Total (Total Possible Score 500) Phase 2 (Option - Numbers 8-9) Internal Use Only Evaluator: Cumulative Date: 9/17/18 Procurement DepartmentRepresentative:____Nancy Williams________________________________________ Procurement Department Completion Date: 9/17/18 Vendors Phase 1 Total - (Total Maximum Ranking 25 - Maximum Weighted Total Possible 375) Phase 1 RFP Item #18-258 13th Street Improvement Project R.A. Dent Boulevard (South Terminus) to Reynolds Street (North Terminus) for Augusta, Engineering Department Evalaution Meeting Date: Monday, September 17, 2018 @ 2:00 p.m. Ranking of 0-5 (Enter a number value between 0 and 5) Scale 0 (Low) to 5 (High) Weighted Scores 6. Proximity to Area (only choose 1 line according to location of the company - enter the ranking value for the one line only) Engineering Services Committee Meeting 3/26/2019 1:10 PM RFP 18-258: 13th Street Improvements Project Design Services for Roadway Improvements Department:Engineering Presenter: Caption:Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Goodwyne, Mills & Cawood (GMC) in the amount of $279,000.88 for the 13th Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-258. Background:The 13th Street Improvements is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in July 31, 2012 referendum. The 13th Street is a Band 2 project. The project improvements consist of improving roadway safety by resurfacing, reconstructing the existing curb and gutter, replacing sidewalks and improving the storm water system. The project will improve pedestrian safety at intersections with new high visibility crosswalks. New street landscaping will be provided, where possible, to enhance pedestrian use and improvement of roadway aesthetics. In September 2015, commission approved award of the Augusta Downtown Concept development project to Cooper Carry. Cooper Carry task is completed and the project is ready for engineering design phase. In July 2018, Request for Qualification was released for qualified firms to provide design services along the 13th street corridor per the Project Concept Report. Analysis:RFP’s were received on July 12, 2018 and were evaluated based on qualifications, project approach, and experience. The following firms submitted RFQs for evaluations: 1. Moreland Altobelli 2. Wolverton & Associates 3.Hussey Gay Bell 4. W.R. Toole Engineers Inc 5. Pond & Company 6. Goodwyn, Mills & Cawood 7. Infrastructure System MGT 8. Wood Goodwyne, Mills & Cawood (GMC) was selected based on the evaluation procedures used for this project. Financial Impact:Funds are available in the TIA project budget Alternatives:1). Do not approve and find alternative to complete the project and meet TIA project completion schedule. Recommendation:Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Goodwyne, Mills & Cawood (GMC) in the amount of $279,000.88 for the 13th Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18-258 Funds are Available in the Following Accounts: Project TIA Funds 371-041110-5212115-T15041223 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission OFFICIAL VENDORS Attachment "B"E-Verify Addendum 1 SAVE Form Original 6 Copies Fee Proposal WOOD 1075 BIG SHANTY RD., SUITE 100 KENNESAW, GA 30144 Yes 44372 Yes Yes Yes Yes Yes POND & COMPANY 621 NW FRONTAGE ROAD, STE 320 AUGUSTA, GA 30907 Yes 175046 Yes Yes Yes Yes Yes HUSSEY GAY BELL 2160 SATELLITE BLVD SUITE 250 DULUTH, GA 30097 Yes 398475 Yes Yes Yes Yes Yes BENESH 1005 BROAD STREET STE 200 AUGUSTA, GA 30901 Yes 307873 Yes Yes Yes Yes Yes ISM, INC 1557 BROAD STREET AUGUSTA, GA 30904 Yes 1266225 Yes Yes Yes Yes Yes GRIFFIN & DAVIS 5425 PEACHTREE PKWY PEACHTREE CORNERS, GA 30092 GOODWYN, MILLS & CAWOOD 1450 GREENE ST, SUITE 505 AUGUSTA, GA 30901 EMC ENGINEERING 10 CHATHAM CIR S SAVANNAH, GA 31405 CRANSTON ENGINEERING 452 ELLIS STREET AUGUSTA, GA 30903-2546 Total Number Specifications Mailed Out: 25 Total Number Specifications Download (Demandstar): Total Electronic Notifications (Demandstar): Mandatory Pre-Qualifications Conference Attendees: 13 Total packages submitted: 5 Total Noncompliant: 0 RFP Item 18-312 Design Services for Green Street Improvements Project – 13th Street (West Terminus) to E Boundary Street (East Terminus) for Augusta, GA – Engineering Department RFP Due: Thursday, November 29, 2018 @ 11:00 a.m. Page 1 of 1 Augusta-Richmond County, Georgia BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the following Capital Project Budget is hereby amended: Section 1: The project is authorized to CPB#371-041110-T15040117 to approve and award Preliminary and and Final Engineering Design Consultant Services Agreement to Infrastructure Systems Mgmt, LLC Section 2: The following revenues are anticipated to be available to the Consolidated Government to complete the project. TIA Design 685,070$ 685,070$ Section 3: Copies of this Capital Project Budget shall be made available to the Comptroller for direction in carrying out this project. Adopted this ____________________ day of ______________________. Approved _________________________________________________ Honorable Hardie Davis, Mayor CAPITAL PROJECT BUDGET CPB#371-041110-T15040117 Greene Street Improvements (RFP #18-312) in the amount of $685,061.06 for the Greene Street Improvements project requested by AED. RFP 18-312 Funding is available in the TIA project budget: 3/15/2019 Augusta-Richmond County, Georgia CAPITAL PROJECT BUDGET CPB#371-041110-T15040117 Greene Street Improvements (RFP #18-312) CPB AMOUNT New SOURCE OF FUNDS CPB CPB TIA Project 371-041110/5212115-T15040117 ($685,070)($685,070) TOTAL SOURCES: ($685,070)($685,070) USE OF FUNDS ENGINEERING 371-041110-5414210/T15040117 $685,070 $685,070 TOTAL USES: $685,070 $685,070 3/15/2019 Section 1: The project is authorized to CPB#371-041110-T15040117 to approve and award Preliminary and and Final Engineering Design Consultant Services Agreement to Infrastructure Systems Mgmt, LLC CPB#371-041110-T15040117 in the amount of $685,061.06 for the Greene Street Improvements project requested by AED. RFP 18-312 3/15/2019 CPB#371-041110-T15040117 3/15/2019 Request for Proposal Request for Proposals will be received at this office until Thursday, November 29, 2018 @ 11:00 a.m. for furnishing for the Augusta, Georgia - Engineering Department: RFP Item # 18-311 Design Services for Broad Street Improvements Project – Milledge Road (West Terminus) to E Boundary (East Terminus) RFP Item # 18-312 Design Services for Green Street Improvements Project – 13th Street (West Terminus) to E Boundary Street (East Terminus) RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of: Geri A. Sams, Director Augusta Procurement Department 535 Telfair Street - Room 605 Augusta, Georgia 30901 RFP documents may be examined at the office of the Augusta, GA Procurement Department, 535 Telfair Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime contractors, subcontractors and suppliers exclusively from Augusta Blue Print. The fees for the plans and specifications which are non-refundable for RFP Item # 18-311 are $199.00 and for RFP Item # 18-312 are $107.00. It is the wish of the Owner that all businesses are given the opportunity to submit on this project. To facilitate this policy the Owner is providing the opportunity to view plans online (www.augustablue.com) at no charge through Augusta Blue Print (706-722-6488) beginning Thursday, August 16, 2018. Bidders are cautioned that submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other work that is material to the successful completion of the project. A Mandatory Pre Proposal Conference for RFP 18-311 will be held on Tuesday, November 13, 2018 @ 10:00 a.m. in the Procurement Department, 535 Telfair Street, Room 605. A Mandatory Pre Proposal Conference for RFP 18-312 will be held on Tuesday, November 13, 2018, @ 11:00 a.m. in the Procurement Department, 535 Telfair Street, Room 605. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Thursday, November 15, 2018, @ 5:00 P.M. No RFP will be accepted by fax, all must be received by mail or hand delivered. No RFP may be withdrawn for a period of 60 days after bids have been opened, pending the execution of contract with the successful bidder(s). Request for proposals (RFP) and specifications. An RFP shall be issued by the Procurement Office and shall include specifications prepared in accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the procurement. All specific requirements contained in the request for proposal including, but not limited to, the number of copies needed, the timing of the submission, the required financial data, and any other requirements designated by the Procurement Department are considered material conditions of the bid which are not waivable or modifiable by the Procurement Director. All requests to waive or modify any such material condition shall be submitted through the Procurement Director to the appropriate committee of the Augusta, Georgia Commission for approval by the Augusta, Georgia Commission. Please mark RFP number on the outside of the envelope. Proponents are cautioned that acquisition of RFP documents through any source other than the office of the Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the proponent at the risk of receiving incomplete or inaccurate information upon which to base his qualifications. Correspondence must be submitted via mail, fax or email as follows: Augusta Procurement Department Attn: Geri A. Sams, Director of Procurement 535 Telfair Street, Room 605 Augusta, GA 30901 Fax: 706-821-2811 or Email: procbidandcontract@augustaga.gov GERI A. SAMS, Procurement Director Publish: Augusta Chronicle October 18, 25 November 1, 8, 2018 Metro Courier October 18, 2018 WOOD 1075 BIG SHANTY RD., SUITE 100 KENNESAW, GA 30144 POND & COMPANY 621 NW FRONTAGE RD., SUITE 320 AUGUSTA, GA 30907 HUSSEY GAY BELL 2160 SATELLITE BLVD., SUITE 250 DULUTH, GA 30097 BENESH 1005 BROAD STREET STE 200 AUGUSTA, GA 30901 ISM, INC 1557 BROAD STREET AUGUSTA, GA 30904 WOOD 1075 BIG SHANTY RD., SUITE 100 KENNESAW, GA 30144 POND & COMPANY 621 NW FRONTAGE RD., SUITE 320 AUGUSTA, GA 30907 HUSSEY GAY BELL 2160 SATELLITE BLVD., SUITE 250 DULUTH, GA 30097 BENESH 1005 BROAD STREET STE 200 AUGUSTA, GA 30901 ISM, INC 1557 BROAD STREET AUGUSTA, GA 30904 Evaluation Criteria Ranking Points 1. Completeness of Response • Package submitted by the deadline • Package is complete (includes requested information as required per this solicitation) • Attachment B is complete, signed and notarized N/A Pass/Fail PASS PASS PASS PASS PASS PASS PASS PASS 2. Qualifications & Experience (0-5)20 4.6 4.3 4.9 3.4 4.8 92.0 85.3 98.7 68.7 96.7 3. Organization & Approach (0-5)15 4.2 4.0 4.9 3.5 5.0 63.5 60.0 74.0 52.0 75.0 4. Scope of Services - Ability to Provide Scope of Services - Project Deliverables - Cost Control and Budgeting Methodology (0-5)15 3.5 3.0 5.0 3.5 5.0 52.0 45.0 75.0 52.0 75.0 5. Schedule to Work (0-5)10 4.3 4.0 5.0 3.7 5.0 43.3 40.0 50.0 36.7 50.0 Within Richmond County 5 10 5 5 5 0 50 0 50 50 Within CSRA 5 6 0 0 0 0 0 Within Georgia 5 4 5 5 20 0 20 0 0 Within SE United States (includes AL, TN, NC, SC, FL) 5 2 0 0 0 0 0 · All Others 5 1 0 0 0 0 0 7. References (0-5)5 5.0 5.0 5.0 5.0 5.0 25 25 25 25 25 26.6 25.3 29.9 24.0 29.8 295.8 305.3 342.7 284.3 371.7 8. Presentation by Team (0-5)10 3 4 5 0 30 40 0 50 9 Q&A Response to Panel Questions (0-5)5 5 5 5 0 25 25 0 25 Lowest Fees 5 10 5 0 0 0 0 50 Second 5 6 5 0 30 0 0 0 Third 5 4 5 0 0 20 0 0 Forth 5 2 0 0 0 0 0 Fifth 5 1 0 0 0 0 0 Total Phase 2 - (Total Maximum Ranking 15- Maximum Weighted Total Possible 125) 100 0 13 14 0 15 0 85 85 0 125 26.6 38.3 43.9 24.0 44.8 0 295.8 390.3 427.7 284.3 496.7 Total Cumulative Score (Maximum point is 500) 10. Cost/Fee Proposal Consideration (only choose 1 line according to dollar value of the proposal in relation to all fee proposals - enter the point value for the one line only) Total (Total Possible Score 500) Phase 2 (Option - Numbers 8-9) Internal Use Only Evaluator: Cumulative Date: 1/22/19 Procurement DepartmentRepresentative:______Nancy Williams______________________________________ Procurement Department Completion Date: 1/22/19 Vendors Phase 1 Total - (Total Maximum Ranking 25 - Maximum Weighted Total Possible 375) Phase 1 RFP Item #18-312 Design Services for Greene Street Improvement Project for Augusta, Engineering Department Evalaution Meeting Date: Monday, January 3, 2019 @ 3:00 p.m. Ranking of 0-5 (Enter a number value between 0 and 5) Scale 0 (Low) to 5 (High) Weighted Scores 6. Proximity to Area (only choose 1 line according to location of the company - enter the ranking value for the one line only) Engineering Services Committee Meeting 3/26/2019 1:10 PM RFP 18-312 Greene Street Improvements Project Design Services for Roadway Improvements Department:Engineering Presenter: Caption:Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Infrastructure Systems Management, LLC (ISM) in the amount of $685,061.06 for the Greene Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18- 312. Background:The Greene Street Improvements is a project from the “Approved Investment List” of TIA that was approved by voters of the CSRA in July 31, 2012 referendum. The Greene Street is a Band 2 project. The project improvements consist of improving roadway safety by resurfacing, reconstructing the existing curb and gutter, replacing sidewalks and improving the storm water system. The project will improve pedestrian safety at intersections with new high visibility crosswalks. New street landscaping will be provided, where possible, to enhance pedestrian use and improvement of roadway aesthetics. In September 2015, commission approved award of the Augusta Downtown Concept development project to Cooper Carry. Cooper Carry task is completed and the project is ready for engineering design phase. In October 2018, Request for Qualification was released for qualified firms to provide design services along the Greene Street corridor per the Project Concept Report. Analysis:RFP’s were received on November 29, 2018 and were evaluated based on qualifications, project approach, and experience. The following firms submitted RFQs for evaluations: 1. Benesh 2. ISM 3. Pond & Company 4. Wood 5. Hussey Gay Bell ISM was selected based on the evaluation procedures used for this project. Financial Impact:Funds are available in the TIA project budget. Alternatives:1). Do not approve and find alternative to complete the project and meet TIA project completion schedule. Recommendation:Approve and award Preliminary and Final Engineering Design Consultant Services Agreement to Infrastructure Systems Management, LLC (ISM) in the amount of $685,061.06 for the Greene Street Improvements Project as requested by the AED. Award is contingent upon receipt of signed agreement. RFP 18- 312 Funds are Available in the Following Accounts: Project TIA Funds 371-041110-5212115-T15040117 REVIEWED AND APPROVED BY: Finance. Procurement. Law. Administrator. Clerk of Commission Lena Bonner From: Sent: To: Subject: Brandon Garrett < bwgarrett@lamar.com > Tuesday, March 12,20L9 4:51 PM Lena Bonner IEXTERNAL] Engineering Committee Can we please have an Update on SPLOST 4 through 6 funded projects from Engineering department and plan for utilizing remaining funds? [NOTICE: This message originated outside of the City of Augusta's mail system -- DO NOT CLICK on links, open attachments or respond to requests for information unless you are sure the content is safe.l Engineering Services Committee Meeting 3/26/2019 1:10 PM Update on SPLOST 4 through 6 funded projects Department: Presenter:Commissioner Brandon Garrett Caption:Update on SPLOST 4 through 6 funded projects from Engineering Department and plan for utilizing remaining funds. (Requested by Commissioner Brandon Garrett) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: Lena Bonner From: Sent: To: Cc: Subject: Ms. Bonner, Please place on the agenda: Update on tree plan across process, and can a business Thank you, Sean Frantom Commissioner District 7 (706)s64-1663 sfrantom @au gustaga.gov Commissioner Sean Frantom Wednesday, March 20,20L9 4:13 PM Lena Bonner John Ussery; Hameed Malik Tree Plan Update Richmond County including how often trees downtown request removal of a tree in front of their business? are cut, who handles that a resuit oithe e'n"iail transrnissiofi. lf velification is reqi.lired, please request a hard copy version. AFD:104.'l Engineering Services Committee Meeting 3/26/2019 1:10 PM Update on tree plan Richmond County Department: Presenter:Mayor Pro Tem Sean Frantom Caption:Update on tree plan across Richmond County including how often trees downtown are cut, who handles that process, and can a business request removal of a tree in front of their business? (Requested by Mayor Pro Tem Commissioner Sean Frantom) Background: Analysis: Financial Impact: Alternatives: Recommendation: Funds are Available in the Following Accounts: REVIEWED AND APPROVED BY: